Kuppe Srinvas
- Listed as
- architect, engineer
- Firm
- Ajmani & Pamidi Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jan 2021
9 permits since 2000 (engineer on 8 permits, architect on 1 permit): 8 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2021 | Completed final sign-off May 2022 | 875 Stevenson St | Richlen Construction | emergency generator set replacement.Details
emergency generator set replacement. | $800,000 |
| Jun 15, 2018 | Never finaled issued Sep 2019, no final | 425 Market St | replace emergency generator in the 2nd basement levelDetails
replace emergency generator in the 2nd basement level | $100,000 | |
| Nov 22, 2016 | Completed final sign-off May 2017 | 303 02nd St | Gci, Inc | mechanical upgrade gas meter room maher not reqDetails
mechanical upgrade gas meter room maher not req | $75,000 |
| May 20, 2010 | Completed final sign-off Mar 2013 | 425 Market St | Richlen Construction | arch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit.Details
arch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit. | $470,000 |
| Mar 18, 2008 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | revision to pa# 2000-0712-4981s3. design clarifications for chiller installationDetails
revision to pa# 2000-0712-4981s3. design clarifications for chiller installation | $17,000 | |
| Sep 18, 2007 | Completed final sign-off Apr 2008 | 500 Terry A. Francois Bl | install new non-life safety generator on roof.Details
install new non-life safety generator on roof. | $115,000 | |
| May 1, 2007 | Completed final sign-off Oct 2007 | 425 Market St | new office & classroom improvement within previously demolished space. non-structural walls, ceilings and finishes. mep. under seperate permit, life safety also udner seperate submittals.Details
new office & classroom improvement within previously demolished space. non-structural walls, ceilings and finishes. mep. under seperate permit, life safety also udner seperate submittals. | $1,193,150 | |
| May 1, 2007 | Completed final sign-off Oct 2007 | 425 Market St | Hathaway Dinwiddie Co. | oti-2, sephora usa, 3rd floor, el, me.Details
oti-2, sephora usa, 3rd floor, el, me. | $180,000 |
| Apr 9, 2007 | Completed final sign-off Aug 2007 | 555 California St | sheetmetal ductwork, one new a/c unit & electrical connection to a/c unit. no structural or ceiling work under this permit including any architectural work.Details
sheetmetal ductwork, one new a/c unit & electrical connection to a/c unit. no structural or ceiling work under this permit including any architectural work. | $86,000 |