John Thiele
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Studio Tmt
- Based in
- Layayette
- On San Francisco permits
- Jan 2007 to Nov 2021
112 permits since 2000 (architect on 107 permits, authorized agent-others on 3 permits, designer on 2 permits, engineer on 2 permits): 63 completed, 35 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 112.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2021 | Never finaled issued Nov 2021, no final | 235 02nd St | 6th fl:enclosure of an existing floor between floors 6 & 5.steel stud & gypsum board walls with transom glazing will be constructed on four sides at floor 6.no structural demolition or construction will occur.Details
6th fl:enclosure of an existing floor between floors 6 & 5.steel stud & gypsum board walls with transom glazing will be constructed on four sides at floor 6.no structural demolition or construction will occur. | $25,000 | |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 600 Battery St | Hillhouse Construction Company Inc | revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.Details
revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications. | $10,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2022 | 710 Sansome St | Birmingham Builders, Inc | 2/f & 3/f tenant improvement including construction of (n) walls, doors, all (e) floor and celing finishes are to remain. less than 10% of (e) lighting affected. entry doors on jackson place to be replaced with ada compliant doors.Details
2/f & 3/f tenant improvement including construction of (n) walls, doors, all (e) floor and celing finishes are to remain. less than 10% of (e) lighting affected. entry doors on jackson place to be replaced with ada compliant doors. | $75,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2021 | 600 Battery St | Hillhouse Construction Company Inc | rooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/aDetails
rooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/a | $15,000 |
| Nov 20, 2020 | Completed final sign-off Aug 2021 | 600 Battery St | Hillhouse Construction Company Inc | 1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017.Details
1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017. | $239,455 |
| Sep 2, 2020 | Completed final sign-off Nov 2021 | 600 Battery St | Hillhouse Construction Company Inc | partial renovations & non-structural demo of roof deck and new lobby doors on ground floor.Details
partial renovations & non-structural demo of roof deck and new lobby doors on ground floor. | $1,875,000 |
| Aug 31, 2020 | Completed final sign-off Aug 2021 | 600 Battery St | Hillhouse Construction Company Inc | demo extg non-structural lobby finishes and construct new lobby finishes.Details
demo extg non-structural lobby finishes and construct new lobby finishes. | $750,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2020 | 425 Market St | Richlen Construction | suite #955: scope of the project are alterations to an existing tenant space on the 9th floor. improvements include minor non-structural demo, new non-structural walls, pantry millwork, and finishes. mep, sprinklers, fire life safety deferred submittalsDetails
suite #955: scope of the project are alterations to an existing tenant space on the 9th floor. improvements include minor non-structural demo, new non-structural walls, pantry millwork, and finishes. mep, sprinklers, fire life safety deferred submittals | $147,800 |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 921 Front St | Birmingham Builders, Inc | project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred.Details
project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred. | $375,500 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 921 Front St | Birmingham Builders, Inc | 2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit.Details
2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit. | $8,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 217 02nd St | Birmingham Builders, Inc | install 1 set of 90 minute fire rated doors on electronic hold openDetails
install 1 set of 90 minute fire rated doors on electronic hold open | $7,500 |
| Aug 6, 2019 | Completed final sign-off Jan 2020 | 425 Market St | R.M.R. Construction Company | suite 970: construct a new tenant demising wall to split an (e) suite into 2 suites, suite 970 is too be occupied during construction, the new suite 9755 is to be occupied until completion of future tenant work per a-b-017Details
suite 970: construct a new tenant demising wall to split an (e) suite into 2 suites, suite 970 is too be occupied during construction, the new suite 9755 is to be occupied until completion of future tenant work per a-b-017 | $64,800 |
| May 31, 2019 | Completed final sign-off Dec 2020 | 460 Bryant St | Skyline Construction | interior non-structural demo at (e) reception area on ground fl. construction of new coffe bar w/ada. mep and life safety under sep permit. improvements of the front door.Details
interior non-structural demo at (e) reception area on ground fl. construction of new coffe bar w/ada. mep and life safety under sep permit. improvements of the front door. | $75,000 |
| May 6, 2019 | Never finaled issued May 2019, no final | 217 02nd St | Birmingham Builders, Inc | connecting the 2 top floors (4/f & 5/f) & adding a new gyp board ceiling to the 5th floor.Details
connecting the 2 top floors (4/f & 5/f) & adding a new gyp board ceiling to the 5th floor. | $37,000 |
| Jan 29, 2019 | Expired or cancelled cancelled Jan 2026 | 1301 Sansome St | install 1 non-illuminated single-faced wall sign. (on canopy)Details
install 1 non-illuminated single-faced wall sign. (on canopy) | $2,500 | |
| Jan 29, 2019 | Expired or cancelled cancelled Jan 2026 | 1301 Sansome St | Martin Sign Co Inc. | install 1 non-illuminated single-faced wall sign. (south side)Details
install 1 non-illuminated single-faced wall sign. (south side) | $2,000 |
| Jan 29, 2019 | Never finaled issued Sep 2020, no final | 1301 Sansome St | Martin Sign Co Inc. | install 1 non-illuminated single-faced wall sign. (corner)Details
install 1 non-illuminated single-faced wall sign. (corner) | $1,000 |
| Nov 28, 2018 | Completed final sign-off Feb 2019 | 995 Market St | Narrowback Construction Co. | 5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishesDetails
5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishes | $337,513 |
| Nov 2, 2018 | Never finaled issued Nov 2018, no final | 1301 Sansome St | Birmingham Builders, Inc | (n) lobby area and partial t.i at ground flr. (n) entry glazing, (n) partitions & interior finishes, (n) breakroom. mep structural under separate permitDetails
(n) lobby area and partial t.i at ground flr. (n) entry glazing, (n) partitions & interior finishes, (n) breakroom. mep structural under separate permit | $170,000 |
| Oct 31, 2018 | Completed final sign-off May 2019 | 246 01st St | Dome Construction Corp | revision to 201507272516 & 201711174290. to show new electrical data riser closet; smoke curtain under orginal permit 201507272516. 1 hr rated usg-shaftwall.Details
revision to 201507272516 & 201711174290. to show new electrical data riser closet; smoke curtain under orginal permit 201507272516. 1 hr rated usg-shaftwall. | |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | Birmingham Builders, Inc | 1st, 2nd, & 3rd floors: t. i. for restroom upgrades floor 1 mep, demo, fire life safety under seperate permit. no exterior work.Details
1st, 2nd, & 3rd floors: t. i. for restroom upgrades floor 1 mep, demo, fire life safety under seperate permit. no exterior work. | $570,000 |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | Birmingham Builders, Inc | 4th and 5th floors: t. i. for restroom upgrades, mep, demo, fire life safety under seperate permit. no exterior work.Details
4th and 5th floors: t. i. for restroom upgrades, mep, demo, fire life safety under seperate permit. no exterior work. | $480,000 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 1301 Sansome St | Birmingham Builders, Inc | 1,2,3,4,5,6,floors soft demo; exit paths to be maintained.Details
1,2,3,4,5,6,floors soft demo; exit paths to be maintained. | $20,000 |
| Aug 10, 2018 | Expired or cancelled cancelled Jan 2026 | 995 Market St | project consists of demolition of non-structural and non-load bearing interior partitions and ceiling on floors 5, 6 and 7. no structural demo includedDetails
project consists of demolition of non-structural and non-load bearing interior partitions and ceiling on floors 5, 6 and 7. no structural demo included | $90,000 | |
| May 25, 2018 | Completed final sign-off Jun 2019 | 1098 Harrison St | Centric Construction Inc | demolition of 1 bay at 1st and 2nd fl, front cmu infill panels, replace with new glazed openings. renovation of main building entryDetails
demolition of 1 bay at 1st and 2nd fl, front cmu infill panels, replace with new glazed openings. renovation of main building entry | $195,000 |
| Apr 30, 2018 | Never finaled filed Apr 2018, never issued | 703 Market St | non structural exterior alterations to the corner retail entry at third and market streets. (e) glazing is to be demo'd and replaced with fixed glazing at third st and swinging doors with sidelights at market st.Details
non structural exterior alterations to the corner retail entry at third and market streets. (e) glazing is to be demo'd and replaced with fixed glazing at third st and swinging doors with sidelights at market st. | $69,500 | |
| Feb 13, 2018 | Never finaled issued Feb 2018, no final | 246 01st St | Dome Construction Corp | administrative permit - roof deck assembly permit for a3 use (1st time). 191 occupants. ref pa 201507272516 s1/r1. maher n/aDetails
administrative permit - roof deck assembly permit for a3 use (1st time). 191 occupants. ref pa 201507272516 s1/r1. maher n/a | |
| Dec 15, 2017 | Never finaled issued Dec 2017, no final | 703 Market St | Dome Construction Corp | title 24 permit, ref 201707273040Details
title 24 permit, ref 201707273040 | $900,000 |
| Aug 15, 2017 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp | ground floor: modification of work permitted under application #201511233384. the project consists of modifications to the interior elevator wall finishes at the ground floor lobby. glass block will remain exposed and new ceramic tile panel pilasters constructed elev. doors.Details
ground floor: modification of work permitted under application #201511233384. the project consists of modifications to the interior elevator wall finishes at the ground floor lobby. glass block will remain exposed and new ceramic tile panel pilasters constructed elev. doors. | $38,000 |
| Jul 27, 2017 | Never finaled issued Oct 2017, no final | 703 Market St | Dome Construction Corp | 20thfl: project consist of new t.i. including walls, glazing door,s and finishes, and new accessibile restrooms. no structural work. is involced. seperate demo permit #201707141866. mep/fire life saftey deferred.Details
20thfl: project consist of new t.i. including walls, glazing door,s and finishes, and new accessibile restrooms. no structural work. is involced. seperate demo permit #201707141866. mep/fire life saftey deferred. | $255,000 |
| Jul 14, 2017 | Completed final sign-off Mar 2018 | 703 Market St | Dome Construction Corp | 20th fl: project consist of demolition of non-structural and non-load bearing interior partitions and ceilings, glazing, doors and finishes. no structural demo involvedDetails
20th fl: project consist of demolition of non-structural and non-load bearing interior partitions and ceilings, glazing, doors and finishes. no structural demo involved | $17,750 |
| Mar 20, 2017 | Completed final sign-off Dec 2018 | 425 Market St | Source Planning And Construction Inc | 10th floor passenger elevator lobby, scope of work is to upgrade floor, wall and ceiling finishes as well as upgraded lighting. no structural, mechanical, plumbing or fire life safety work. some minor work is to be performed in restrooms for accessibility compliance. maher naDetails
10th floor passenger elevator lobby, scope of work is to upgrade floor, wall and ceiling finishes as well as upgraded lighting. no structural, mechanical, plumbing or fire life safety work. some minor work is to be performed in restrooms for accessibility compliance. maher na | $45,000 |
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 16 & 19 floor - ti for market ready including new restrooms, walls, glazing, doors. no structural work is uncluded. demo has been previously permitted. demo permit for 16th fl: #2016-0503-6434. demo permit for 19th fl: #2016-0823-5721.Details
16 & 19 floor - ti for market ready including new restrooms, walls, glazing, doors. no structural work is uncluded. demo has been previously permitted. demo permit for 16th fl: #2016-0503-6434. demo permit for 19th fl: #2016-0823-5721. | $508,000 |
| Aug 24, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 15th floor - project consists of ti for market ready including walls, glass, doors and finishes. new accessible restroom are included - no structural work. demo is completed under #2016-0503-6433. mep & fls under separate permit.Details
15th floor - project consists of ti for market ready including walls, glass, doors and finishes. new accessible restroom are included - no structural work. demo is completed under #2016-0503-6433. mep & fls under separate permit. | $254,400 |
| Aug 23, 2016 | Completed final sign-off Mar 2017 | 703 Market St | Dome Construction Corp | 19th floor: project consists of demo to (e) office space.Details
19th floor: project consists of demo to (e) office space. | $20,000 |
| Aug 17, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 14th flr: ti including walls, glazing, doors & finishes as wekk as new accessible restrooms. no structural work in involved, demo complete under permit 201601136961Details
14th flr: ti including walls, glazing, doors & finishes as wekk as new accessible restrooms. no structural work in involved, demo complete under permit 201601136961 | $254,400 |
| Jul 28, 2016 | Completed final sign-off Jun 2017 | 703 Market St | Dome Construction Corp | 5th & 6th floor: new tenant improvements including, wall, glazing, doors and finishes for the entire space as well as new accessible restrooms. no structural and demo has been previously permitted and is complete; separate mep, life safety permit.Details
5th & 6th floor: new tenant improvements including, wall, glazing, doors and finishes for the entire space as well as new accessible restrooms. no structural and demo has been previously permitted and is complete; separate mep, life safety permit. | $508,000 |
| Jul 21, 2016 | Never finaled issued Nov 2016, no final | 703 Market St | Dome Construction Corp | 2nd, 3rd, 4th floors: drywall @ communicating opening. service (e) doors revision to pa 201605258238Details
2nd, 3rd, 4th floors: drywall @ communicating opening. service (e) doors revision to pa 201605258238 | $5,555 |
| Jun 14, 2016 | Completed final sign-off May 2017 | 30 03rd St | Dome Construction Corp, Cci Com'l Constr & Improv**See 985808*** | ab-010 complaiance fdor extg communicating openings related to app#201503050030(26 3rd street) revision to pa 201503050030 for communicating opening to 703 marketDetails
ab-010 complaiance fdor extg communicating openings related to app#201503050030(26 3rd street) revision to pa 201503050030 for communicating opening to 703 market | $5,555 |
| May 25, 2016 | Never finaled issued Jul 2016, no final | 703 Market St | Dome Construction Corp | floors 2,3,4, interior base building upgrades in building new accessible restrooms and enclosure of elevator lobbies. does not anticipate authorization or approval of any future use or occupancy without permits and modification. sprinklers under separate permit.Details
floors 2,3,4, interior base building upgrades in building new accessible restrooms and enclosure of elevator lobbies. does not anticipate authorization or approval of any future use or occupancy without permits and modification. sprinklers under separate permit. | $160,500 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 16th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
16th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | 2nd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
2nd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 15th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
15th floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| May 3, 2016 | Completed final sign-off Mar 2017 | 703 Market St | C C I Commercial Construction & Improv | 3rd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes.Details
3rd floor - demo of non-structural and non-load bearing interior partitions and ceilings; including walls, glazing, doors and finishes. | $35,000 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 360 03rd St | Skyline Construction | tenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13Details
tenant improvement - new partitions, doors, millwork. mep & fire life safety under separate permit. compliance with maher ordinance no 155-13 | $255,000 |
| Nov 23, 2015 | Completed final sign-off Feb 2019 | 703 Market St | Dome Construction Corp, C C I Commercial Construction & Improv | project consists of the removal of non-structural decorative exteior stone surround, existing glazing & doors & the install off (n) stone surround, glazing & doors. the interior lobby is to be refinished including a new guard desk.Details
project consists of the removal of non-structural decorative exteior stone surround, existing glazing & doors & the install off (n) stone surround, glazing & doors. the interior lobby is to be refinished including a new guard desk. | $500,000 |
| Nov 13, 2015 | Completed final sign-off Nov 2016 | 651 Brannan St | Aquamatic Fire Protection | 2nd, 3rd and 4th floors. 3 relocated pendent sprinklers. ref app# 201510089187. n/a for maherDetails
2nd, 3rd and 4th floors. 3 relocated pendent sprinklers. ref app# 201510089187. n/a for maher | $1,600 |
| Aug 11, 2015 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobbyDetails
basement - (n) ada accessible ramp & stairs to replace (e) non accessible ramp & stairs; (n) rated walls, doors & smoke detector at (e) passenger elevator lobby | $16,850 |
| Jul 27, 2015 | Completed final sign-off May 2019 | 246 01st St | Dome Construction Corp | demo of (e) mezzanine, new 2nd floor in its place. demo (e) freight elevator, install new passenger elevator. new ada restrooms on 2nd floor. new roof deck & stair access to roof. structural upgrades as well. (n) windows on south facade. ** maher: compliance with ordinance no# 155-13 not required **Details
demo of (e) mezzanine, new 2nd floor in its place. demo (e) freight elevator, install new passenger elevator. new ada restrooms on 2nd floor. new roof deck & stair access to roof. structural upgrades as well. (n) windows on south facade. ** maher: compliance with ordinance no# 155-13 not required ** | $4,500,000 |
| Jul 27, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | new t.i. including, walls, glazing, doors, and finishes for the 7th floor as well as new accessible restrooms. demo work is complete and no structural work.Details
new t.i. including, walls, glazing, doors, and finishes for the 7th floor as well as new accessible restrooms. demo work is complete and no structural work. | $254,400 |
| Jul 9, 2015 | Expired or cancelled cancelled Oct 2016 | 703 Market St | C C I Commercial Construction & Improv | to accomodate future new water, tel/data and fire lift safety risers being installed up through the bldg, project consists on 2nd floor only of the construction of new closets to house risers and the relocation of an extg tenant corridor wall to allow proper corridor width.Details
to accomodate future new water, tel/data and fire lift safety risers being installed up through the bldg, project consists on 2nd floor only of the construction of new closets to house risers and the relocation of an extg tenant corridor wall to allow proper corridor width. | $2,625 |
| Jul 3, 2015 | Completed final sign-off Aug 2016 | 703 Market St | C C I Commercial Construction & Improv | soft demo ab-017 on 8th floor.Details
soft demo ab-017 on 8th floor. | $10,000 |
| Jul 1, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | project consists of new t.i. to the 21/f including walls, glazing, doors and finishes for entire space. no structural work.Details
project consists of new t.i. to the 21/f including walls, glazing, doors and finishes for entire space. no structural work. | $242,000 |
| Jun 25, 2015 | Completed final sign-off Dec 2016 | 26 03rd St | C C I Commercial Construction & Improv | modification to pa#201503050030, demo partitions and raised floor at g/f tenant space and delete showers and reconfiguration of electrical/fire pump room in basement. work on retail area only.Details
modification to pa#201503050030, demo partitions and raised floor at g/f tenant space and delete showers and reconfiguration of electrical/fire pump room in basement. work on retail area only. | $12,500 |
| Mar 27, 2015 | Expired or cancelled withdrawn May 2017 | 703 Market St | C C I Commercial Construction & Improv | 13th flr: project consists of new ti including walls, glazing, doors and finishes for the space. new restrooms are to be included, no structural work involved.Details
13th flr: project consists of new ti including walls, glazing, doors and finishes for the space. new restrooms are to be included, no structural work involved. | $243,000 |
| Mar 26, 2015 | Completed final sign-off Aug 2015 | 1699 Van Ness Av | C C I Commercial Construction & Improv | da checklist correction revision to pa 2014 1103 0549Details
da checklist correction revision to pa 2014 1103 0549 | |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 1699 Van Ness Av | C C I Commercial Construction & Improv | rev. to pa#201411030549- entry door modification/replacement. revision to mezz. room layout.Details
rev. to pa#201411030549- entry door modification/replacement. revision to mezz. room layout. | $5,000 |
| Dec 4, 2014 | Expired or cancelled cancelled Jul 2015 | 703 Market St | C C I Commercial Construction & Improv | new t.i. to the entire 21st floor including partitions, glazing, doors, finishes and accessible restrooms.Details
new t.i. to the entire 21st floor including partitions, glazing, doors, finishes and accessible restrooms. | $282,326 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 703 Market St | Skyline Construction | 13th floor: demolition of non-structural and non-load bearing interior walls or partitions and ceilings including walls, glazing, doors and finishes. for ab-017. t.i. permit under separate. maher n/a.Details
13th floor: demolition of non-structural and non-load bearing interior walls or partitions and ceilings including walls, glazing, doors and finishes. for ab-017. t.i. permit under separate. maher n/a. | $16,000 |
| Sep 29, 2014 | Completed final sign-off Nov 2015 | 615 Front St | Plant Construction Co, Lp | revision to app#201312043324 s-1. additional demolition scope of interior structure and floor plan modification. n/a for the maher ordinance #155-13; separate structural permitDetails
revision to app#201312043324 s-1. additional demolition scope of interior structure and floor plan modification. n/a for the maher ordinance #155-13; separate structural permit | |
| Jul 28, 2014 | Completed final sign-off Mar 2015 | 200 Kansas St | C C I Commercial Construction & Improv | commercial t.i. and ada restroom upgrade. new partitions, finishes cabinetry. n/a for the maher ordinance #155-13Details
commercial t.i. and ada restroom upgrade. new partitions, finishes cabinetry. n/a for the maher ordinance #155-13 | $400,000 |
| Jun 23, 2014 | Completed final sign-off Aug 2016 | 703 Market St | Skyline Construction, C C I Commercial Construction & Improv | enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs.Details
enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs. | $41,490 |
| May 23, 2014 | Never finaled issued Jun 2014, no final | 26 03rd St | Skyline Construction, Plant Construction Company Lp | interior soft demolition for future t.i. per ab-017. n/a for the maher ordinance #155-13Details
interior soft demolition for future t.i. per ab-017. n/a for the maher ordinance #155-13 | $200,000 |
| Feb 19, 2014 | Completed final sign-off Jul 2014 | 447 Battery St | Coast Construction | 2nd floor: revision to appl #2013.0808.3815 - remove shower from scope reconfigure restrooms & office partitions. compliance with ordinance #155-13 not requiredDetails
2nd floor: revision to appl #2013.0808.3815 - remove shower from scope reconfigure restrooms & office partitions. compliance with ordinance #155-13 not required | |
| Dec 4, 2013 | Completed final sign-off Nov 2015 | 615 Front St | Plant Construction Company Lp | full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dphDetails
full building upgrade including structure, glazing rear facade replacement, roof sky lights, inter stairs, finishes restooms & pantries. compliance with maher ordinance no.155-13 required. route to dph | $1,000,000 |
| Oct 15, 2013 | Never finaled issued Jan 2014, no final | 200 Kansas St | Cci Com'l Constr & Improv**See 985808*** | demolition of inteior structural wall, construct demising walls, new tenant exterior opening and glazing. compliance with ordinance #155-13 not required.Details
demolition of inteior structural wall, construct demising walls, new tenant exterior opening and glazing. compliance with ordinance #155-13 not required. | $110,000 |
| Oct 15, 2013 | Never finaled issued Oct 2013, no final | 945 Battery St | Birmingham Builders, Inc | non structural soft demo of inteior partitions and constructionDetails
non structural soft demo of inteior partitions and construction | $10,000 |
| Aug 8, 2013 | Completed final sign-off Jul 2014 | 447 Battery St | Coast Construction | 2nd floor interior tenant improvement including interior doors, walls, glazing, coffee rooms, ada restroom upgrades; compliance with ord 155-13 not requiredDetails
2nd floor interior tenant improvement including interior doors, walls, glazing, coffee rooms, ada restroom upgrades; compliance with ord 155-13 not required | $95,000 |
| Jul 18, 2013 | Never finaled issued Aug 2013, no final | 710 Sansome St | Birmingham Builders, Inc | basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural workDetails
basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural work | $450,000 |
| Jul 18, 2013 | Expired or cancelled withdrawn Dec 2013 | 500 Montgomery St | basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural workDetails
basement/1st/2nd/3rd floors-t.i to include new walls, fixtures, doors & finshes. ada restroom upgrades, (e) fire escape upgrades. no mechanical, electrical or structural work | ||
| May 29, 2013 | Completed final sign-off Dec 2013 | 1017 Market St | Howard S. Wright Constructors Lp | tenant improvements to the 5th floor, includes construction of reception area, break area, one conference room.Details
tenant improvements to the 5th floor, includes construction of reception area, break area, one conference room. | $189,000 |
| Apr 12, 2013 | Completed final sign-off Dec 2013 | 233 Post St | Swinerton Builders | 1st floor-new finshesDetails
1st floor-new finshes | $68,500 |
| Mar 26, 2013 | Completed final sign-off Jan 2015 | 88 Kearny St | Swinerton Builders | reduced scope of work. revision to 201208207724. deleted scope - work is limited to 88 kearny entrance onlyDetails
reduced scope of work. revision to 201208207724. deleted scope - work is limited to 88 kearny entrance only | |
| Feb 12, 2013 | Completed final sign-off Oct 2013 | 1550 Bryant St | renovation of bldg lobby, all elevator lobbies, ada restroom upgrades on all floors, bike room, stair rails, new shower rooms, lift roof deck upgrade, new exterior finishes & paint, elevator cab interiorDetails
renovation of bldg lobby, all elevator lobbies, ada restroom upgrades on all floors, bike room, stair rails, new shower rooms, lift roof deck upgrade, new exterior finishes & paint, elevator cab interior | $1,500,000 | |
| Jan 9, 2013 | Never finaled issued Jan 2013, no final | 710 Sansome St | Birmingham Builders, Inc | modifaction of exterior parapet and repair of existing wood cornice.Details
modifaction of exterior parapet and repair of existing wood cornice. | $2,500 |
| Dec 5, 2012 | Completed final sign-off Aug 2014 | 1017 Market St | Howard S. Wright Constructors Lp | bldg core improvement. renovate stairs enclosure, toilet & elevators; enclose rooms for new main eletrical service. future permits for sprinklers, fire alarm, mech, plumb & elec submitted under separate permit. low rise buildingDetails
bldg core improvement. renovate stairs enclosure, toilet & elevators; enclose rooms for new main eletrical service. future permits for sprinklers, fire alarm, mech, plumb & elec submitted under separate permit. low rise building | $650,000 |
| Dec 3, 2012 | Never finaled issued Dec 2012, no final | 710 Sansome St | Birmingham Builders, Inc | demo of all non-structural & non load bearing walls, glazing, doors, finishes. soft demo only per ab-017 remains vacant.Details
demo of all non-structural & non load bearing walls, glazing, doors, finishes. soft demo only per ab-017 remains vacant. | $25,000 |
| Dec 3, 2012 | Expired or cancelled expired May 2016 | 651 Brannan St | Triton Construction Company Inc | 4th fl only restroom upgrades to fully complying toilet, sinks & drinking fountain.Details
4th fl only restroom upgrades to fully complying toilet, sinks & drinking fountain. | $84,420 |
| Nov 1, 2012 | Completed final sign-off Jul 2013 | 500 Montgomery St | Marchetti Construction Inc. | interior soft demolition, construction of new pantry cabinets, conference room glazing and door and interior finishes. no exterior work.Details
interior soft demolition, construction of new pantry cabinets, conference room glazing and door and interior finishes. no exterior work. | $60,000 |
| Oct 2, 2012 | Expired or cancelled expired Jul 2017 | 572 07th St | Novo Construction Inc | enlarge mezzanine to become 2nd floor. new stairs to 2nd floor, new ada lift centry modify entry to accomodate access.Details
enlarge mezzanine to become 2nd floor. new stairs to 2nd floor, new ada lift centry modify entry to accomodate access. | $100,000 |
| Sep 13, 2012 | Completed final sign-off Apr 2013 | 225 Bush St | Novo Construction Inc | 18th flr -interior remodel with new partitions, demising walls, tenant entry doors, infill of floor slab and interior finishes. mep under separate permitDetails
18th flr -interior remodel with new partitions, demising walls, tenant entry doors, infill of floor slab and interior finishes. mep under separate permit | $259,000 |
| Aug 20, 2012 | Completed final sign-off Jan 2014 | 88 Kearny St | Swinerton Builders | new entry canopy, new entry glazing to replace existing, new decorative metal cladding over existing store front cladding.Details
new entry canopy, new entry glazing to replace existing, new decorative metal cladding over existing store front cladding. | $482,000 |
| May 9, 2012 | Expired or cancelled cancelled May 2013 | 808 Brannan St | Novo Construction Inc | removal of extg canvas awning and aof new steel and glass canopy over extg entry. upgrade of facade finishes.Details
removal of extg canvas awning and aof new steel and glass canopy over extg entry. upgrade of facade finishes. | $30,000 |
| May 9, 2012 | Completed final sign-off May 2012 | 208 Utah St | establish office use per planning commission approval of case #20110468 b (no construction)Details
establish office use per planning commission approval of case #20110468 b (no construction) | ||
| Jan 3, 2012 | Completed final sign-off Sep 2013 | 808 Brannan St | clarification of record. administration permit only to establish exisitng and permitted uses under the planning code.Details
clarification of record. administration permit only to establish exisitng and permitted uses under the planning code. | ||
| Dec 16, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | Cci Com'l Constr & Improv**See 985808*** | revision to appl #201104053530 & #201106148108: store fronts on utah & potrero street formerly to be replaced are to remain. revision shown at grid lines 5a & 6a detail 4 a02.00, at grid lines 6 & 7 detail 12 a02.00Details
revision to appl #201104053530 & #201106148108: store fronts on utah & potrero street formerly to be replaced are to remain. revision shown at grid lines 5a & 6a detail 4 a02.00, at grid lines 6 & 7 detail 12 a02.00 | |
| Nov 22, 2011 | Never finaled issued Feb 2012, no final | 425 Market St | accessibility and finish upgrade to the men and womens restrooms on the 11th floorDetails
accessibility and finish upgrade to the men and womens restrooms on the 11th floor | $92,300 | |
| Nov 22, 2011 | Never finaled issued Dec 2011, no final | 651 Brannan St | Triton Construction Company Inc | demolition and construction of new glazing in 2nd fl tenant space, new interior partitions, doors, glazing within existing tenant spaces. restrooms and drinking fountains will be upgraded for accessibility reasons. portion of existing 2nd fl tenant spaceDetails
demolition and construction of new glazing in 2nd fl tenant space, new interior partitions, doors, glazing within existing tenant spaces. restrooms and drinking fountains will be upgraded for accessibility reasons. portion of existing 2nd fl tenant space | $221,433 |
| Oct 12, 2011 | Never finaled issued Nov 2011, no final | 589 Howard St | Birmingham Builders, Inc | reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor.Details
reconfiguration of stairs from 1st floor to basement, new ada bathroom & stair vestibule on ground floor. | $86,850 |
| Aug 10, 2011 | Completed final sign-off Jul 2012 | 425 Market St | Richlen Construction | revision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor.Details
revision to pa# 2010.03.29.9157. enlarge (e) fcc room, relocate annuciator panel. any electrical. fire sprinkler or life safety upgraded or relocated accordingly at ground floor. | $45,000 |
| Jun 28, 2011 | Never finaled issued Jun 2011, no final | 651 Brannan St | Triton Construction Company Inc | 3rd fl: demo and construction of small portion of existing 3rd floor tenant space. work includes new gyp bd and glass walls and doors, elec, mech, and plumbing. included will be upgrdes to drinking fountain and restrooms to ensure accessiblility complianceDetails
3rd fl: demo and construction of small portion of existing 3rd floor tenant space. work includes new gyp bd and glass walls and doors, elec, mech, and plumbing. included will be upgrdes to drinking fountain and restrooms to ensure accessiblility compliance | $121,500 |
| Jun 10, 2011 | Completed final sign-off Mar 2014 | 155 05th St | Plant Construction Company Lp | complete renovation of exteriior building cladding systems, interior improvements, and new fire life safety systems. structural upgrades will be required in addition to improvements to existing building, mechanical, electrical, and plumbing systems. total project size is approximately 396,536 gsf.Details
complete renovation of exteriior building cladding systems, interior improvements, and new fire life safety systems. structural upgrades will be required in addition to improvements to existing building, mechanical, electrical, and plumbing systems. total project size is approximately 396,536 gsf. | $9,569,000 |
| May 26, 2011 | Completed final sign-off Nov 2011 | 560 Pacific Av | Birmingham Builders, Inc | ground floor & basement interior tenant improvement including walls, doors, kitchenette counter & restrooms. mep under separate permit.Details
ground floor & basement interior tenant improvement including walls, doors, kitchenette counter & restrooms. mep under separate permit. | $48,000 |
| Mar 17, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | Cci Com'l Constr & Improv**See 985808*** | demolitoin of portion of (e) floor structure, construction of (n) steel interconnecting stair.Details
demolitoin of portion of (e) floor structure, construction of (n) steel interconnecting stair. | $62,000 |
| Mar 17, 2011 | Completed final sign-off Feb 2012 | 560 Pacific Av | Birmingham Builders, Inc | 1st & 2nd floor - interior non-structural demolition walls, doors, windows per ab-017.Details
1st & 2nd floor - interior non-structural demolition walls, doors, windows per ab-017. | $15,000 |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 651 Brannan St | Triton Construction Company Inc | exterior work consists of ground floor glazing along brannan street & re-construction with new glazing & ceiling & canopyDetails
exterior work consists of ground floor glazing along brannan street & re-construction with new glazing & ceiling & canopy | $72,000 |
| Dec 13, 2010 | Never finaled issued Dec 2010, no final | 651 Brannan St | Triton Construction Company Inc | 1st floor-demolition of interior partitions & finishes, new interior partition walls, new interior window, door & new break room cabinetryDetails
1st floor-demolition of interior partitions & finishes, new interior partition walls, new interior window, door & new break room cabinetry | $15,000 |
| May 20, 2010 | Completed final sign-off Mar 2013 | 425 Market St | Richlen Construction | arch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit.Details
arch. permit #201003299157 mep permit; demo lighting, hvac. install thermostats, 3-slot diffusers, return air dampers, controls, pressure heads, (n) lighting, 4-(n) drains for plumbing. life safety & fire sprinkler under separate permit. | $470,000 |
| Jan 22, 2010 | Expired or cancelled expired Nov 2013 | 215 02nd St | Birmingham Builders, Inc | tenant improvement-construction of 5 new offices in basement. minor electrical & mechanical in that area under seperate permitDetails
tenant improvement-construction of 5 new offices in basement. minor electrical & mechanical in that area under seperate permit | $17,500 |
| Sep 21, 2009 | Never finaled issued Nov 2009, no final | 215 02nd St | Birmingham Builders, Inc | non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement.Details
non-structural demolition of (e) storefront @ basement & ground floor. new storefront @ ground level to enclose existing lightwell. modification of (e) staircase to basement. | $18,000 |