Block 0136, lot 003
921 Front St
- City’s use
- Commercial Office
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 20,280 sq ft
- Lot
- 12,742 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 921 Front St | Birmingham Builders, Inc | addition of accessible restroom in existing gr fl tenant suiteDetails
addition of accessible restroom in existing gr fl tenant suite | $42,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 100 Vallejo St | Birmingham Builders, Inc | revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement.Details
revision to permit 202112073925. revision consists of supporting the stairs on the existing slab on grade, removing new concrete footings, and special inspection requirement for concrete and reinforcement. | |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 100 Vallejo St | Birmingham Builders, Inc | reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferredDetails
reconfigure basement office layout, new conferance room, modify kitchen areas, storage, and add lactation room. reconfigure 1st floor office layout. provide new accessible stair. provide new accessible entry door on vallejo street. mep deferred | $85,000 |
| Jan 6, 2020 | Never finaled issued Jan 2020, no final | 921 Front St | street spaceDetails
street space | ||
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 921 Front St | Associated Builders | re-roof - tear off (e) b.u.r & install (n) modified bituman roof over 2815 frp with entire western colloid #720 arc. flat roof, not visible from street.Details
re-roof - tear off (e) b.u.r & install (n) modified bituman roof over 2815 frp with entire western colloid #720 arc. flat roof, not visible from street. | $48,650 |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 921 Front St | Birmingham Builders, Inc | project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred.Details
project scope consists of new t.i. improvements, with mep and minor fire life safety. on 2nd floor. mep deferred. | $375,500 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 921 Front St | Birmingham Builders, Inc | 2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit.Details
2nd fl.: soft demo of (e) t.i. per ab017; remains vacant until accessibility compliance deferred till t.i. to be completed under separate permit. | $8,000 |
| May 4, 2017 | Never finaled issued May 2017, no final | 100 Vallejo St | street space permit & sidewalk permitDetails
street space permit & sidewalk permit | ||
| Apr 26, 2013 | Never finaled issued Apr 2013, no final | 921 Front St | street space permitDetails
street space permit | ||
| Oct 18, 2012 | Never finaled issued Oct 2012, no final | 921 Front St | street spaceDetails
street space | ||
| Sep 9, 2009 | Expired or cancelled expired Dec 2010 | 921 Front St | Birmingham Builders, Inc | tenant improvements @ ground flr. interior partitions, doors finishes, breakroom, cabentry. no exterior changes & no structural work. (mep under separate permit).Details
tenant improvements @ ground flr. interior partitions, doors finishes, breakroom, cabentry. no exterior changes & no structural work. (mep under separate permit). | $40,000 |
| Jul 23, 2009 | Expired or cancelled expired Dec 2010 | 921 Front St | tenant improvement work on 2nd floor. new walls to create office & new walls at staircase.Details
tenant improvement work on 2nd floor. new walls to create office & new walls at staircase. | $42,000 | |
| Mar 20, 2009 | Expired or cancelled expired Dec 2010 | 921 Front St | Birmingham Builders, Inc | demolition of existing restrooms and the construction of new ada compliant restrooms.Details
demolition of existing restrooms and the construction of new ada compliant restrooms. | $30,000 |
| Sep 25, 2008 | Never finaled issued Sep 2008, no final | 921 Front St | soft demolition. interior office partitions at lower level 1/2 of 1st floor and 2nd floor. all stairs, elevators base bldg support rooms, and bathrooms shall remainDetails
soft demolition. interior office partitions at lower level 1/2 of 1st floor and 2nd floor. all stairs, elevators base bldg support rooms, and bathrooms shall remain | $30,000 | |
| Nov 30, 2004 | Completed final sign-off Dec 2004 | 921 Front St | Ac And Company | renew app 200210118877 for final onlyDetails
renew app 200210118877 for final only | |
| Oct 11, 2002 | Expired or cancelled expired Jul 2007 | 921 Front St | Ac And Company | install 3 new steel wndws in extg bricked up window areas on front st vallejo stDetails
install 3 new steel wndws in extg bricked up window areas on front st vallejo st | $25,000 |
| Sep 16, 2002 | Completed final sign-off Apr 2003 | 921 Front St | tenant improvement include new lunch area, interior doors &windows floor covering&light fixtures.Details
tenant improvement include new lunch area, interior doors &windows floor covering&light fixtures. | $40,000 | |
| Aug 21, 2002 | Completed final sign-off Aug 2002 | 921 Front St | Ac And Company | final rev to umb pa#9702570 r1 alteration as built plans for handicap parking & welding metal doorsDetails
final rev to umb pa#9702570 r1 alteration as built plans for handicap parking & welding metal doors | $100 |
| Aug 6, 2002 | Never finaled issued Aug 2002, no final | 921 Front St | Vision Construction | interrio demo on wall @ 3 locations as shown on plan no structure wkDetails
interrio demo on wall @ 3 locations as shown on plan no structure wk | $4,000 |
| Jul 30, 2002 | Expired or cancelled cancelled Jan 2004 | 921 Front St | Ac And Company | final revision 9702570 alteration as-built plans for handicap parking&welding metal doors.Details
final revision 9702570 alteration as-built plans for handicap parking&welding metal doors. | $100 |
| May 8, 2002 | Never finaled issued May 2002, no final | 921 Front St | Ac And Company | to renew app#09723861 for final inspection.Details
to renew app#09723861 for final inspection. | $20,000 |
| Feb 5, 2002 | Completed final sign-off Mar 2002 | 921 Front St | Ac And Company | reroofingDetails
reroofing | $32,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.