From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 225 Bush St | Novo Construction Inc | 2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scopeDetails
2nd fl construction and cosmetic finish updates to a 1429 sq ft portion of the e office area (southeastern corner of the floor plate. the work includes demo of 4 phone rooms in place of 2 new offices, and dividing 1 conference room into 2 offices. no new materials or finishes added to the scope | $400,000 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 225 Bush St | Ayoob & Peery Plumbing Co Inc | 15th fl - add 9 fire sprinklers in phone booths per ti; 16th fl - add 7 fire sprinklers in phone booths per ref pa 202501097987Details
15th fl - add 9 fire sprinklers in phone booths per ti; 16th fl - add 7 fire sprinklers in phone booths per ref pa 202501097987 | $9,938 |
| May 18, 2021 | Never finaled issued Jun 2021, no final | 225 Bush St | Bilcor Inc | fire life safety: install (8) smoke detectors, (9) control relaysDetails
fire life safety: install (8) smoke detectors, (9) control relays | $11,220 |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 225 Bush St | Bilcor Inc | fire life safety: install (23) wall mounted speaker strobes, (1) wall mounted strobe, (4) ceiling mounted speaker strobes. ti reference #: 2020-1202-0073.Details
fire life safety: install (23) wall mounted speaker strobes, (1) wall mounted strobe, (4) ceiling mounted speaker strobes. ti reference #: 2020-1202-0073. | $18,480 |
| Oct 19, 2020 | Completed final sign-off Dec 2020 | 225 Bush St | Skyline Construction | 6/f: rev to pa 202002053583 to remove previously approved scope including millwork, food equipment & finishes.Details
6/f: rev to pa 202002053583 to remove previously approved scope including millwork, food equipment & finishes. | |
| Jul 17, 2020 | Completed final sign-off Dec 2020 | 225 Bush St | Bilcor Inc | fire life safety: install (1)monitor module. reference t.i. #202002053583.Details
fire life safety: install (1)monitor module. reference t.i. #202002053583. | $660 |
| Jun 29, 2020 | Never finaled issued Jul 2020, no final | 225 Bush St | Edison Fire Extinguisher Company Inc | new fire suppression system. hood and ductDetails
new fire suppression system. hood and duct | $2,800 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 225 Bush St | Principal Builders Inc. | consturction of wall/new service counter to service copy/open office area. additoin of water lines and power distribution on sep trade permits. no mep. all work is in e tenant spaceDetails
consturction of wall/new service counter to service copy/open office area. additoin of water lines and power distribution on sep trade permits. no mep. all work is in e tenant space | $10,000 |
| Feb 26, 2020 | Completed final sign-off May 2020 | 225 Bush St | Skyline Construction | 6th fl - revision to pa 2020-0122-2497 to change new door to glazing at room 628.Details
6th fl - revision to pa 2020-0122-2497 to change new door to glazing at room 628. | |
| Feb 5, 2020 | Completed final sign-off Dec 2020 | 225 Bush St | Skyline Construction | new kitchen equipment placement and finishes. m.e. p under separate permitDetails
new kitchen equipment placement and finishes. m.e. p under separate permit | $150,000 |
| Jan 22, 2020 | Completed final sign-off May 2020 | 225 Bush St | Skyline Construction | modification of ti on the 6th fl to include selective demolition of non-load bearing partitions & millwork construction of glazing, millwork & finishes.Details
modification of ti on the 6th fl to include selective demolition of non-load bearing partitions & millwork construction of glazing, millwork & finishes. | $25,000 |
| Aug 6, 2019 | Completed final sign-off Aug 2019 | 225 Bush St | Bilcor Inc | fire alarm for 15th floor tiDetails
fire alarm for 15th floor ti | $1,320 |
| Jul 16, 2019 | Completed final sign-off Jul 2019 | 225 Bush St | Bilcor Inc | 13th flr - fire alarm install 13 ceiling speaker strobes. ref 201905241646 & 201905019377Details
13th flr - fire alarm install 13 ceiling speaker strobes. ref 201905241646 & 201905019377 | $8,600 |
| Jul 5, 2019 | Completed final sign-off Jul 2019 | 225 Bush St | Bilcor Inc | fire alarm ti on 13th & 14th fl: install 87 ceiling speaker strobes, install 4 wall strobes, install 36 duct detectors, install 2 control relays, install 1 call stations.Details
fire alarm ti on 13th & 14th fl: install 87 ceiling speaker strobes, install 4 wall strobes, install 36 duct detectors, install 2 control relays, install 1 call stations. | $85,800 |
| Jun 11, 2019 | Completed final sign-off Nov 2019 | 225 Bush St | Bilcor Inc | fire alarm ti - convert building's existing floor of alarm evacuation method to a relocation method; upgrade building's survivability to have 2 hour pathway protection where requiredDetails
fire alarm ti - convert building's existing floor of alarm evacuation method to a relocation method; upgrade building's survivability to have 2 hour pathway protection where required | $10,000 |
| May 30, 2019 | Completed final sign-off Aug 2019 | 225 Bush St | Bilcor Inc | 18th fl - fire alarm ti install 2 ceiling mount speaker strobes; relocate 1 wall mount strobe, remove 2 wall mount strobe. ref pa 2019-0326-6263Details
18th fl - fire alarm ti install 2 ceiling mount speaker strobes; relocate 1 wall mount strobe, remove 2 wall mount strobe. ref pa 2019-0326-6263 | $1,200 |
| May 23, 2019 | Expired or cancelled cancelled Jun 2019 | 225 Bush St | Bilcor Inc | as built ref 201902213487 - show revised location of "s" door holder & smk detDetails
as built ref 201902213487 - show revised location of "s" door holder & smk det | |
| Apr 23, 2019 | Completed final sign-off May 2019 | 225 Bush St | R L H Fire Protection Inc | fire sprinkler ti suite 1840 relocate one head ref 201803266263Details
fire sprinkler ti suite 1840 relocate one head ref 201803266263 | $2,195 |
| Apr 1, 2019 | Completed final sign-off Apr 2019 | 225 Bush St | R L H Fire Protection Inc | fire sprinkler tenant improvement relocate 4 and add 2 pendent sprinklers - 6 heads total ref pa 2019-0208-2443Details
fire sprinkler tenant improvement relocate 4 and add 2 pendent sprinklers - 6 heads total ref pa 2019-0208-2443 | $2,900 |
| Mar 13, 2019 | Completed final sign-off Mar 2019 | 225 Bush St | Bilcor Inc | 3rd flr, fire alarm tenant improvement. install 2 ceiling speaker-strobes. ref t.i 201812188582Details
3rd flr, fire alarm tenant improvement. install 2 ceiling speaker-strobes. ref t.i 201812188582 | $1,320 |
| Feb 21, 2019 | Completed final sign-off Jun 2019 | 225 Bush St | Bilcor Inc | 15th fl = fire alarm improvement install 45 ceiling speaker strobes, install 7 ceiling strobes, 2 duct detectors, 2 smoke detectors, 4 control relays, 1 call stations, 1 booster panel. ref pa 2018-1211-7965Details
15th fl = fire alarm improvement install 45 ceiling speaker strobes, install 7 ceiling strobes, 2 duct detectors, 2 smoke detectors, 4 control relays, 1 call stations, 1 booster panel. ref pa 2018-1211-7965 | $40,300 |
| Feb 14, 2019 | Completed final sign-off Apr 2019 | 225 Bush St | R L H Fire Protection Inc | 15th flr. fire sprinkler permit relcate 56, add 29 and delete 14 sprinklers on the 15th fl ref 201812117965Details
15th flr. fire sprinkler permit relcate 56, add 29 and delete 14 sprinklers on the 15th fl ref 201812117965 | $28,000 |
| Dec 20, 2018 | Completed final sign-off Feb 2019 | 225 Bush St | Bilcor Inc | 2nd fl - as built ref pa 2018-1207-7691, revise layout to reflect accurate field layout. remove installation of (1) duct detector for hvac unit fc-24Details
2nd fl - as built ref pa 2018-1207-7691, revise layout to reflect accurate field layout. remove installation of (1) duct detector for hvac unit fc-24 | |
| Dec 14, 2018 | Completed final sign-off Jan 2019 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler - replacing a back flow in 225 bush basementDetails
fire sprinkler - replacing a back flow in 225 bush basement | $1,000 |
| Dec 11, 2018 | Completed final sign-off Aug 2019 | 225 Bush St | Principal Builders Inc. | ti on 15th fl: demo & construction of new non-load bearing partitions, doors, millwork, glazing, finishes, & mep systems. life safety & fire alarms.Details
ti on 15th fl: demo & construction of new non-load bearing partitions, doors, millwork, glazing, finishes, & mep systems. life safety & fire alarms. | $2,612,874 |
| Dec 7, 2018 | Completed final sign-off Feb 2019 | 225 Bush St | Bilcor Inc | 2nd flr - fire alarm t.i. install 11 ceiling mount speakers/strobes, 1 ceiling mount strobe, 6 weatherproof ceiling mount strobes, 6 duct detectors w/ sampling tubes, 2 control relays. ref t.i 201802161481Details
2nd flr - fire alarm t.i. install 11 ceiling mount speakers/strobes, 1 ceiling mount strobe, 6 weatherproof ceiling mount strobes, 6 duct detectors w/ sampling tubes, 2 control relays. ref t.i 201802161481 | $15,600 |
| Oct 12, 2018 | Completed final sign-off Nov 2018 | 225 Bush St | Bilcor Inc | 16th flr - revision to 201612124728 - install 19 ceiling mount speaker/strobes. 35 control realys, 35 duct det w/sampling tubes, 2 smk det w/baseDetails
16th flr - revision to 201612124728 - install 19 ceiling mount speaker/strobes. 35 control realys, 35 duct det w/sampling tubes, 2 smk det w/base | $2,500 |
| Oct 9, 2018 | Completed final sign-off Oct 2019 | 225 Bush St | Walschon Fire Protection Inc | replacement of (e) fire pump at pump roomDetails
replacement of (e) fire pump at pump room | $60,000 |
| Sep 19, 2018 | Completed final sign-off Nov 2018 | 225 Bush St | Principal Builders Inc. | 16th floor: revision to app#201612124728 to redesign 5000 sq ft for architectural, mech, and electrical. life safety deferred.Details
16th floor: revision to app#201612124728 to redesign 5000 sq ft for architectural, mech, and electrical. life safety deferred. | $100,000 |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 225 Bush St | Bilcor Inc | 2/f: fa ti install 10 celiling mount strobes; 3 2all mount speaker strobes, 33 ceiling mount speaker strobes; 7 smoke detectos w/bases; 8 duct detectors w/sampling tube; 8 control relay modules; 1 booster panel/power supply ref pa 2018-02-16-1481Details
2/f: fa ti install 10 celiling mount strobes; 3 2all mount speaker strobes, 33 ceiling mount speaker strobes; 7 smoke detectos w/bases; 8 duct detectors w/sampling tube; 8 control relay modules; 1 booster panel/power supply ref pa 2018-02-16-1481 | $35,000 |
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 225 Bush St | Golden Gate Fire Protection Inc | 2nd floor: fire sprinkler only: relocate 67 pendents and 23 uprights for 2nd floor remodel . ref app#201802161481Details
2nd floor: fire sprinkler only: relocate 67 pendents and 23 uprights for 2nd floor remodel . ref app#201802161481 | $22,500 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 225 Bush St | Golden Gate Fire Protection Inc | 2nd floor remodel: fire sprinkler only. relocate 66 pendents, relocate 20 uprights. n/a for maher pa#201802161481Details
2nd floor remodel: fire sprinkler only. relocate 66 pendents, relocate 20 uprights. n/a for maher pa#201802161481 | $21,500 |
| Mar 5, 2018 | Never finaled issued Dec 2018, no final | 225 Bush St | Thomas Swan Sign Co Inc | to erect an electric single faced sign.Details
to erect an electric single faced sign. | $5,000 |
| Mar 5, 2018 | Never finaled issued Dec 2018, no final | 225 Bush St | Thomas Swan Sign Co Inc | to erect two non-electric single faced sign.Details
to erect two non-electric single faced sign. | $5,000 |
| Feb 16, 2018 | Completed final sign-off Feb 2019 | 225 Bush St | Novo Construction Inc | arch/mech ti on 2nd floor non-structural demo, (n) non-structral partitions, doors, electrical, finishes, millwork. no change in occupancy, use or area. electrical, plumbing , life safety under sep. permit. smoke detectors for fans >2000 cfmto be provided.Details
arch/mech ti on 2nd floor non-structural demo, (n) non-structral partitions, doors, electrical, finishes, millwork. no change in occupancy, use or area. electrical, plumbing , life safety under sep. permit. smoke detectors for fans >2000 cfmto be provided. | $1,523,262 |
| Jan 3, 2018 | Completed final sign-off Mar 2018 | 225 Bush St | Golden Gate Fire Protection Inc | 2nd flr - fire sprinkler only; relocate 231 uprights heads - spec suiteDetails
2nd flr - fire sprinkler only; relocate 231 uprights heads - spec suite | $57,750 |
| Oct 26, 2017 | Completed final sign-off Nov 2017 | 225 Bush St | Bilcor Inc | suite 400: fire alarm t.i. to install 1 ceiling mount speaker strobe and install 1 ceiling mount speaker. ref app#201709198993Details
suite 400: fire alarm t.i. to install 1 ceiling mount speaker strobe and install 1 ceiling mount speaker. ref app#201709198993 | $1,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2017 | 225 Bush St | Walschon Fire Protection Inc | voluntary upgrade of sprinkler system to remedy unsprinklered areas on 1st, 5th, 15th fl 18 sprinlkers total. maher n/a.Details
voluntary upgrade of sprinkler system to remedy unsprinklered areas on 1st, 5th, 15th fl 18 sprinlkers total. maher n/a. | $18,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2017 | 225 Bush St | Walschon Fire Protection Inc | add sprinklers to sr floor (btwn 18/19 floors). as built submittal for f/s pa#201705045661.Details
add sprinklers to sr floor (btwn 18/19 floors). as built submittal for f/s pa#201705045661. | |
| Oct 5, 2017 | Completed final sign-off Dec 2017 | 225 Bush St | Walschon Fire Protection Inc | voluntary retrofit of sprinkler system in 3rd floor mechanical rooms/penthouse. extend (e) sprinkler system to cover these areas.Details
voluntary retrofit of sprinkler system in 3rd floor mechanical rooms/penthouse. extend (e) sprinkler system to cover these areas. | $43,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 225 Bush St | Bilcor Inc | b & 1/f: fire alarm t.i. install 5 dual monitor modules. ref. t.i. #201706058377.Details
b & 1/f: fire alarm t.i. install 5 dual monitor modules. ref. t.i. #201706058377. | $2,500 |
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 225 Bush St | Skyline Construction | electrical work restroom upgrade and elevator lobby ref 201704032986Details
electrical work restroom upgrade and elevator lobby ref 201704032986 | $5,000 |
| Jun 15, 2017 | Never finaled issued Jun 2017, no final | 225 Bush St | Bilcor Inc | 14/f- fire alarm tenant improvement to pa#2017-0510-6170, remove (1) ceiling mount speaker strobe, relocate (1) ceiling mount speaker strobe.Details
14/f- fire alarm tenant improvement to pa#2017-0510-6170, remove (1) ceiling mount speaker strobe, relocate (1) ceiling mount speaker strobe. | $1,000 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 225 Bush St | fire alarm ti install 2 ceiling mount strobes, install 4 ceiling mount speaker-strobes. ref pa 2017-0403-2986Details
fire alarm ti install 2 ceiling mount strobes, install 4 ceiling mount speaker-strobes. ref pa 2017-0403-2986 | $3,000 | |
| Jun 5, 2017 | Never finaled issued Jul 2017, no final | 225 Bush St | Walschon Fire Protection Inc | installation of fire sprinkler system in the following areas. uppder garage, lower garage, mechanical room, chiller and pump room. total heads 537Details
installation of fire sprinkler system in the following areas. uppder garage, lower garage, mechanical room, chiller and pump room. total heads 537 | $300,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 225 Bush St | Golden Gate Fire Protection Inc | 14th floor fire sprinkler only. relocate 13 pendents; relocate 2 uprights for uthium. ref #201705106170.Details
14th floor fire sprinkler only. relocate 13 pendents; relocate 2 uprights for uthium. ref #201705106170. | $3,750 |
| May 10, 2017 | Completed final sign-off Sep 2017 | 225 Bush St | Skyline Construction | 14th fl:interior tenant improvement to include non-load bearing partitions. mep & life safety under separate permitDetails
14th fl:interior tenant improvement to include non-load bearing partitions. mep & life safety under separate permit | $144,144 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 225 Bush St | Walschon Fire Protection Inc | installation of new sprinkler in sr floor (storage floor) new sprinkler heads = 272 full floor between floors 18-19.Details
installation of new sprinkler in sr floor (storage floor) new sprinkler heads = 272 full floor between floors 18-19. | $64,000 |
| Mar 8, 2017 | Completed final sign-off Nov 2018 | 225 Bush St | 16th floor - evac mapsDetails
16th floor - evac maps | $2,700 | |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 225 Bush St | Golden Gate Fire Protection Inc | 16th flr: fire sprinlkers ref 201612124728: re;locate 21 pendent, add 2, relocate 2 upright add 1. remove for acxiom 26 headsDetails
16th flr: fire sprinlkers ref 201612124728: re;locate 21 pendent, add 2, relocate 2 upright add 1. remove for acxiom 26 heads | $6,500 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 225 Bush St | Balch Petroleum Contractors & Builders | replacement of fill port for fire pump diesel tank. no work to bldg exterior.Details
replacement of fill port for fire pump diesel tank. no work to bldg exterior. | $8,000 |
| Apr 4, 2016 | Never finaled issued Apr 2016, no final | 225 Bush St | Golden Gate Fire Protection Inc | 17th floor: fire sprinklers ref ti 2016 0311 1809: relocate 4 pendents, relocate 6 uprights and add 2 maher naDetails
17th floor: fire sprinklers ref ti 2016 0311 1809: relocate 4 pendents, relocate 6 uprights and add 2 maher na | $6,300 |
| Mar 31, 2016 | Never finaled issued Mar 2016, no final | 225 Bush St | Bilcor Inc | 17th floor: as built delete installation of 1 speaker strobe, delete relocation of 1 speaker strobe. ref app#201603212633Details
17th floor: as built delete installation of 1 speaker strobe, delete relocation of 1 speaker strobe. ref app#201603212633 | $800 |
| Mar 21, 2016 | Completed final sign-off Apr 2016 | 225 Bush St | Bilcor Inc | 17th floor, fire alarm ti, relocate 2 ceiling mount speaker-strobes, install 3 ceiling mount speaker/strobes, ref pa 2015-0423-4464Details
17th floor, fire alarm ti, relocate 2 ceiling mount speaker-strobes, install 3 ceiling mount speaker/strobes, ref pa 2015-0423-4464 | $2,000 |
| Mar 11, 2016 | Completed final sign-off May 2016 | 225 Bush St | Principal Builders Inc. | 17th flr: revision to pa 201504234464 to reconfigure layout and mech/elec equipment locations.Details
17th flr: revision to pa 201504234464 to reconfigure layout and mech/elec equipment locations. | $50,000 |
| Feb 11, 2016 | Never finaled issued Feb 2016, no final | 225 Bush St | Skyline Construction | mechanical and electrical work for ti, ref pa 2016-0107-6528 & 2015-0924-7934Details
mechanical and electrical work for ti, ref pa 2016-0107-6528 & 2015-0924-7934 | $1,000 |
| Jan 22, 2016 | Completed final sign-off Mar 2016 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 14 pendents & relocate 9 uprights for twitch 6th floor. reference ti 2015.0924.7934Details
fire sprinkler only - relocate 14 pendents & relocate 9 uprights for twitch 6th floor. reference ti 2015.0924.7934 | $11,500 |
| Jan 7, 2016 | Completed final sign-off Apr 2016 | 225 Bush St | Skyline Construction | revision to 201509247934 to keep existing partitions, new sound rated wall. demo existing glazing and provide alternate f glazing & provide alternate f glazing.Details
revision to 201509247934 to keep existing partitions, new sound rated wall. demo existing glazing and provide alternate f glazing & provide alternate f glazing. | |
| Dec 28, 2015 | Completed final sign-off Jan 2016 | 225 Bush St | Bilcor Inc | 6th floor: fire alarm t.i. install 10 ceiling mount speaker-strobes. as builts include turnstyle shall release upon alarm at exit doors from lobby. t.i. #201509046154Details
6th floor: fire alarm t.i. install 10 ceiling mount speaker-strobes. as builts include turnstyle shall release upon alarm at exit doors from lobby. t.i. #201509046154 | $5,000 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 225 Bush St | Bilcor Inc | 12th floor: fire alarm t.i. install one wall mount strobes. install 24 ceiling mount speaker strobes, install 2 smoke detectors, and 1 relay module. t.i. #201509046154.Details
12th floor: fire alarm t.i. install one wall mount strobes. install 24 ceiling mount speaker strobes, install 2 smoke detectors, and 1 relay module. t.i. #201509046154. | $11,000 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 225 Bush St | evacuation plan on 12/f. 6 signsDetails
evacuation plan on 12/f. 6 signs | $2,700 | |
| Dec 3, 2015 | Never finaled issued Dec 2015, no final | 225 Bush St | Skyline Construction | mechanical and electrical work for ti on the 12th floor. ref pa 2015-0904-6154Details
mechanical and electrical work for ti on the 12th floor. ref pa 2015-0904-6154 | $240,000 |
| Nov 20, 2015 | Expired or cancelled cancelled Jan 2026 | 225 Bush St | new non rated partitions, new double door. no change in occupancy, use, or area. mep, l/s, sprinkler deferredDetails
new non rated partitions, new double door. no change in occupancy, use, or area. mep, l/s, sprinkler deferred | $4,081 | |
| Nov 12, 2015 | Completed final sign-off Jan 2016 | 225 Bush St | Bilcor Inc | fire alarm t.i., install 10 ceiling mount speaker/strobes. t.i. pa#201509247934.Details
fire alarm t.i., install 10 ceiling mount speaker/strobes. t.i. pa#201509247934. | $4,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 3 pendents; add 1 pendent, relocate 3 uprights; add 3 uprights, total 10 heads for radius 12th floor. reference ti 2015.0904.6154Details
fire sprinkler only - relocate 3 pendents; add 1 pendent, relocate 3 uprights; add 3 uprights, total 10 heads for radius 12th floor. reference ti 2015.0904.6154 | $5,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 13 pendents, delete 3 pendents for switch 6th floor. ref pa 2015-0924-7934Details
fire sprinkler only - relocate 13 pendents, delete 3 pendents for switch 6th floor. ref pa 2015-0924-7934 | $6,500 |
| Oct 19, 2015 | Never finaled issued Oct 2015, no final | 225 Bush St | Skyline Construction | 6th floor: mech & elec work only ti - ref pa 2015 0924 7934. fire protection under sep permitDetails
6th floor: mech & elec work only ti - ref pa 2015 0924 7934. fire protection under sep permit | $40,000 |
| Sep 24, 2015 | Completed final sign-off Apr 2016 | 225 Bush St | Skyline Construction | 6th floor: ti- of (e) office, selective demo and new partitions, doors, ceiling - no structural work. mep/fire/life safety under sep permit.Details
6th floor: ti- of (e) office, selective demo and new partitions, doors, ceiling - no structural work. mep/fire/life safety under sep permit. | $600,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2016 | 225 Bush St | Skyline Construction | 12th floor: t.i. to include new partitions, glazing, doors, and finishes. mep, sprinklers and fire alarm under separate permit.Details
12th floor: t.i. to include new partitions, glazing, doors, and finishes. mep, sprinklers and fire alarm under separate permit. | $750,000 |
| Aug 26, 2015 | Completed final sign-off Sep 2015 | 225 Bush St | Bilcor Inc | 8th floor:fire alarm t.i. install 18 ceiling mount speaker-strobes, install 27 wall mount speaker-strobes, install 1 booster panel, install 13 duct detectors, install 12 smoke detectors, install 17 relay modules, 2 dual monitor modules, install 5 pull stations, and signal module. t.i. #201501286935Details
8th floor:fire alarm t.i. install 18 ceiling mount speaker-strobes, install 27 wall mount speaker-strobes, install 1 booster panel, install 13 duct detectors, install 12 smoke detectors, install 17 relay modules, 2 dual monitor modules, install 5 pull stations, and signal module. t.i. #201501286935 | $38,400 |
| Aug 20, 2015 | Never finaled issued Aug 2015, no final | 225 Bush St | install 17th floor evacuation plan.Details
install 17th floor evacuation plan. | $2,400 | |
| Aug 20, 2015 | Completed final sign-off Jul 2016 | 225 Bush St | Bilcor Inc | install 4 fire alarm control unit on 1st and 15th floor. (2 on first floor and 2 on 15th floor)Details
install 4 fire alarm control unit on 1st and 15th floor. (2 on first floor and 2 on 15th floor) | $20,000 |
| Aug 17, 2015 | Never finaled issued Aug 2015, no final | 225 Bush St | Skyline Construction | 8th flr: mechanical and electrical work for tenant improvement on the 8th flr, ref. arch. 2015-0128-6935. & ref sprinkler/pre-app system 2015-0327-2041.Details
8th flr: mechanical and electrical work for tenant improvement on the 8th flr, ref. arch. 2015-0128-6935. & ref sprinkler/pre-app system 2015-0327-2041. | $420,000 |
| Jul 31, 2015 | Never finaled issued Jul 2015, no final | 225 Bush St | install 6 evacuation plan signs on 8th floor.Details
install 6 evacuation plan signs on 8th floor. | $3,050 | |
| Jul 20, 2015 | Completed final sign-off Aug 2015 | 225 Bush St | Bilcor Inc | 17th fl - ref arch tenant improvement #2015-0423-4464. install fire alarm devices for tenant improvement. (58) ceiling speaker-strodes, (2) wall speaker-strobes, (8) smoke detectors, (16) duct detectors, (17) control relay, (5) pull stations, (1) signal module, (1) booster panel.Details
17th fl - ref arch tenant improvement #2015-0423-4464. install fire alarm devices for tenant improvement. (58) ceiling speaker-strodes, (2) wall speaker-strobes, (8) smoke detectors, (16) duct detectors, (17) control relay, (5) pull stations, (1) signal module, (1) booster panel. | $43,300 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 225 Bush St | Eco Bay Services Inc. | 2nd floor - non-structural demo only, no (n) work per ab-017.Details
2nd floor - non-structural demo only, no (n) work per ab-017. | $99,000 |
| Jun 22, 2015 | Completed final sign-off Jul 2015 | 225 Bush St | Golden Gate Fire Protection Inc | 17th floor: fire sprinkler only. relocate 184 heads, add24 head, remove 23 heads. total 208 sprinkler heads for "acxiom" ref app#201504234464Details
17th floor: fire sprinkler only. relocate 184 heads, add24 head, remove 23 heads. total 208 sprinkler heads for "acxiom" ref app#201504234464 | $104,000 |
| Jun 1, 2015 | Never finaled issued Jul 2015, no final | 225 Bush St | Skyline Construction | clarification to pa# 2015-0109-5337 and 2015-0128-6935 to remove requirement for full floor smoke detection associated with delayed egress. additional manufacture info & response ot code ref. 2013 cbc 1008.43 & 1008.1.9.8Details
clarification to pa# 2015-0109-5337 and 2015-0128-6935 to remove requirement for full floor smoke detection associated with delayed egress. additional manufacture info & response ot code ref. 2013 cbc 1008.43 & 1008.1.9.8 | |
| May 19, 2015 | Completed final sign-off Jun 2015 | 225 Bush St | Bilcor Inc | 3rd flr: install 1 booster panel. 12 ceiling mount speaker-storbes, 10 control realy modules, 10 duct detectors, remove and replace 1 pull station. t.i. 201504022598Details
3rd flr: install 1 booster panel. 12 ceiling mount speaker-storbes, 10 control realy modules, 10 duct detectors, remove and replace 1 pull station. t.i. 201504022598 | $13,600 |
| May 6, 2015 | Completed final sign-off Sep 2015 | 225 Bush St | Bilcor Inc | 9th floor: fire alarm t.i. install 31 ceiling mount speaker-strobes, install 20 wall mount speaker-strobes, install 1 booster panel, install 15 duct detecters, install 15 smoke detectors with bases, install 3 control relay modules, install 4 pull stations. ref. t.i. appl. 2015.0109.5337.Details
9th floor: fire alarm t.i. install 31 ceiling mount speaker-strobes, install 20 wall mount speaker-strobes, install 1 booster panel, install 15 duct detecters, install 15 smoke detectors with bases, install 3 control relay modules, install 4 pull stations. ref. t.i. appl. 2015.0109.5337. | $35,600 |
| Apr 23, 2015 | Completed final sign-off May 2016 | 225 Bush St | Principal Builders Inc. | 17th floor: t.i. to demo and construct non-structural partition, doors/frames, hardwar, millwork, ceiling,finishes, mechanical, electrical and plumbing. f/a,sprinkler under separate permitDetails
17th floor: t.i. to demo and construct non-structural partition, doors/frames, hardwar, millwork, ceiling,finishes, mechanical, electrical and plumbing. f/a,sprinkler under separate permit | $2,213,499 |
| Apr 21, 2015 | Completed final sign-off May 2015 | 225 Bush St | Pribuss Engineering Inc | fire sprinkler t.i. : add 2, relocate 45. total 47 . ref app#201504022598Details
fire sprinkler t.i. : add 2, relocate 45. total 47 . ref app#201504022598 | $24,187 |
| Mar 27, 2015 | Completed final sign-off Aug 2015 | 225 Bush St | Golden Gate Fire Protection Inc | 8th flr: fire sprinkler only- revision to 201503110478, 3 sheets with pre action detail.Details
8th flr: fire sprinkler only- revision to 201503110478, 3 sheets with pre action detail. | $1,000 |
| Mar 25, 2015 | Completed final sign-off Sep 2015 | 225 Bush St | Intelligent Technologies & Services Inc | 8th floor: install a pre-action detection system in server room. sprinkler permit #2015.0327.2041.Details
8th floor: install a pre-action detection system in server room. sprinkler permit #2015.0327.2041. | $12,915 |
| Mar 20, 2015 | Never finaled issued Apr 2015, no final | 225 Bush St | Skyline Construction | mechanical and electrical for t.i. to include new fcu's exaust. new lighting. ref app#201501095377Details
mechanical and electrical for t.i. to include new fcu's exaust. new lighting. ref app#201501095377 | $15,000 |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only. ref bpa# 2015-0109-5337. add 71 pendant and 12 upright sprinkler for twitch 9th floor.Details
fire sprinkler only. ref bpa# 2015-0109-5337. add 71 pendant and 12 upright sprinkler for twitch 9th floor. | $42,000 |
| Mar 11, 2015 | Completed final sign-off Aug 2015 | 225 Bush St | Golden Gate Fire Protection Inc | add 47 heads (sprinklers) for twitch (8th floor).Details
add 47 heads (sprinklers) for twitch (8th floor). | $23,500 |
| Feb 23, 2015 | Never finaled issued Feb 2015, no final | 225 Bush St | Bilcor Inc | as built - fire alarm t.i. relocate smoke detector to ceiling beam.Details
as built - fire alarm t.i. relocate smoke detector to ceiling beam. | |
| Feb 2, 2015 | Never finaled issued Feb 2015, no final | 225 Bush St | Bilcor Inc | 1st floor & mezzanine fire alarm t.i. - install 2 booster panel, 23 speaker/strobes, 1 ceiling mount strobe, 11 duct detectors, 11 remote annunicator alarm led, 2 control relay, 3 mini monitor modules, 1 pull stations, 1 smoke detectors. ref t.i. #201409156316.Details
1st floor & mezzanine fire alarm t.i. - install 2 booster panel, 23 speaker/strobes, 1 ceiling mount strobe, 11 duct detectors, 11 remote annunicator alarm led, 2 control relay, 3 mini monitor modules, 1 pull stations, 1 smoke detectors. ref t.i. #201409156316. | $22,000 |
| Jan 29, 2015 | Never finaled issued Mar 2015, no final | 225 Bush St | 1st/2nd flrs: t.i. revision to pa 201409156316 for starbucks cafe and minor interior redesign of retail space for target store on 1st and 2nd flr.Details
1st/2nd flrs: t.i. revision to pa 201409156316 for starbucks cafe and minor interior redesign of retail space for target store on 1st and 2nd flr. | $5,000 | |
| Jan 28, 2015 | Never finaled issued Mar 2015, no final | 225 Bush St | Skyline Construction | 8th floor t.i. for office work includes (n) partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits.Details
8th floor t.i. for office work includes (n) partitions, glazing, doors ceilings, lighting, fixtures, finishes. no structural work. mep, fire protection under separate permits. | $1,000,000 |
| Jan 9, 2015 | Never finaled issued Jan 2015, no final | 225 Bush St | Skyline Construction | 9th flr tenant interior improvement consisting of new partitions, glazing doors ceilings lighting and electrical fixures. no structural. no exterior work. mep deferred submittal.Details
9th flr tenant interior improvement consisting of new partitions, glazing doors ceilings lighting and electrical fixures. no structural. no exterior work. mep deferred submittal. | $1,000,000 |
| Jan 5, 2015 | Completed final sign-off Jul 2016 | 225 Bush St | Ayoob & Peery Plumbing Co Inc | sprinklers ti for target on 1 and mezz.- 1st fl add 68 sprinkler and relocate 44 sprinkler , mezzanine add 77 sprinklers ref 201409156316Details
sprinklers ti for target on 1 and mezz.- 1st fl add 68 sprinkler and relocate 44 sprinkler , mezzanine add 77 sprinklers ref 201409156316 | $97,146 |
| Dec 22, 2014 | Completed final sign-off Jan 2015 | 225 Bush St | Pribuss Engineering Inc | 7th floor: fire sprinkler t.i. under bpa#2014-0602-7289. relocate/change 8 heads, add 1 head.Details
7th floor: fire sprinkler t.i. under bpa#2014-0602-7289. relocate/change 8 heads, add 1 head. | $4,632 |
| Nov 26, 2014 | Expired or cancelled cancelled Jan 2026 | 225 Bush St | barrier removal only, upgrade toilet rooms on 17th floor for accessibility only.Details
barrier removal only, upgrade toilet rooms on 17th floor for accessibility only. | $75,000 | |
| Nov 25, 2014 | Completed final sign-off Feb 2015 | 225 Bush St | Bcci Construction Company | revision to app#201406138324 and 201406249315. revised floor plan. it storage area, finishes, glazing and light fixtures and associated mep revisions.Details
revision to app#201406138324 and 201406249315. revised floor plan. it storage area, finishes, glazing and light fixtures and associated mep revisions. | $32,000 |
| Nov 6, 2014 | Completed final sign-off Jan 2015 | 225 Bush St | Skyline Construction | revise pa#201406279800 to reconfigure 1 hr. occupancy seperation and location of fire smoke dampers due to existing duct configuration.Details
revise pa#201406279800 to reconfigure 1 hr. occupancy seperation and location of fire smoke dampers due to existing duct configuration. | |
| Nov 5, 2014 | Completed final sign-off Aug 2015 | 225 Bush St | The Whiting-Turner Contracting Company | 1st and 2nd level: scope includes storage stock shelving.Details
1st and 2nd level: scope includes storage stock shelving. | $100,000 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 225 Bush St | 5th floor.evacuation planDetails
5th floor.evacuation plan | $2,695 | |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 225 Bush St | Bilcor Inc | 5th floor: fire alarm t.i. remove and replace 1 booster panel, install 4 wall mount speaker-strobes, install 34 ceiling mount speaker-strobes, install 16 duct detectors, install 15 control relay modules, install 1 smoke detector. ref app#201403170923.Details
5th floor: fire alarm t.i. remove and replace 1 booster panel, install 4 wall mount speaker-strobes, install 34 ceiling mount speaker-strobes, install 16 duct detectors, install 15 control relay modules, install 1 smoke detector. ref app#201403170923. | $28,400 |
| Sep 15, 2014 | Completed final sign-off Aug 2015 | 225 Bush St | The Whiting-Turner Contracting Company | archtiectural work is limited to minor demo and repair/replacement of non-original finishes, new mep & accessible restrooms on 1/f & 2/f. sprinklers & fire alarm under separate permits.Details
archtiectural work is limited to minor demo and repair/replacement of non-original finishes, new mep & accessible restrooms on 1/f & 2/f. sprinklers & fire alarm under separate permits. | $1,600,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 225 Bush St | Skyline Construction | 15th floor:revision to app#201406259362 to enclose private office 1521 with new door, addition of glazing in extg wall.Details
15th floor:revision to app#201406259362 to enclose private office 1521 with new door, addition of glazing in extg wall. | |
| Aug 12, 2014 | Completed final sign-off Sep 2014 | 225 Bush St | provide 7th floor evacuation plan.Details
provide 7th floor evacuation plan. | $2,800 | |
| Aug 5, 2014 | Never finaled issued Aug 2014, no final | 225 Bush St | Bilcor Inc | 16th floor install 1 booster panel, install 37 ceiling mount speaker-strobes, install 3 duct detectors, install 3 remote annunciator alarm led, install 1 monitor module, install 4 control relay modules and replace smoke detectors as needed. ref. t.i. apppl. #2014.0522.6461.Details
16th floor install 1 booster panel, install 37 ceiling mount speaker-strobes, install 3 duct detectors, install 3 remote annunciator alarm led, install 1 monitor module, install 4 control relay modules and replace smoke detectors as needed. ref. t.i. apppl. #2014.0522.6461. | $19,600 |
| Jul 22, 2014 | Expired or cancelled cancelled Jan 2026 | 225 Bush St | 3rd floor - non structural demolistion of walls, doors, finishes. no accessibility per ab-017. no change is occupancy, use, area.Details
3rd floor - non structural demolistion of walls, doors, finishes. no accessibility per ab-017. no change is occupancy, use, area. | $45,000 | |
| Jul 15, 2014 | Completed final sign-off Aug 2014 | 225 Bush St | Pribuss Engineering Inc | 7th floor fire sprinkler for t.i. - relocated 23 pendent heads, added 2 pendent heads, relocate 36 upright heads. total 61 heads. ref #201406138324Details
7th floor fire sprinkler for t.i. - relocated 23 pendent heads, added 2 pendent heads, relocate 36 upright heads. total 61 heads. ref #201406138324 | $31,392 |
| Jul 10, 2014 | Completed final sign-off Aug 2014 | 225 Bush St | Bilcor Inc | 7th floor - remove 1 wall mount speaker-strobe. remove 3 wall mount strobe. install 14 ceiling mount speakers-strobes.Details
7th floor - remove 1 wall mount speaker-strobe. remove 3 wall mount strobe. install 14 ceiling mount speakers-strobes. | $7,200 |
| Jun 27, 2014 | Completed final sign-off Nov 2014 | 225 Bush St | Skyline Construction | interior non structural ti on 5th floor. new partitions, power, lighting hvac. demo pa done under 201403170923. sprinkler and fire alarm under separate permitDetails
interior non structural ti on 5th floor. new partitions, power, lighting hvac. demo pa done under 201403170923. sprinkler and fire alarm under separate permit | $1,300,000 |
| Jun 25, 2014 | Completed final sign-off Oct 2014 | 225 Bush St | Skyline Construction | 15th floor:tenant improvement of southwest corner of 15th fl to add new meeting rooms and low acoustic wall and new lighting. fire and mech under sep permitDetails
15th floor:tenant improvement of southwest corner of 15th fl to add new meeting rooms and low acoustic wall and new lighting. fire and mech under sep permit | $20,000 |
| Jun 24, 2014 | Completed final sign-off Feb 2015 | 225 Bush St | Bcci Construction Company | 7th floor -work associated w/approved pa #2014/0613/8324 - existing hvac distribution to be modified to serve new space plan. (1) new vav box is being added. no new fsds are being added.Details
7th floor -work associated w/approved pa #2014/0613/8324 - existing hvac distribution to be modified to serve new space plan. (1) new vav box is being added. no new fsds are being added. | $84,578 |
| Jun 13, 2014 | Completed final sign-off Feb 2015 | 225 Bush St | Bcci Construction Company | 7th flr -minor alterations to an existing 26,000 (gross) s.f. tenant improvement for nitro pdf. alterations include new offices, meeting rooms, finish & upgrades. mechanical, electrical, life safety are deferred submittals. no plumbing work, no structural work.Details
7th flr -minor alterations to an existing 26,000 (gross) s.f. tenant improvement for nitro pdf. alterations include new offices, meeting rooms, finish & upgrades. mechanical, electrical, life safety are deferred submittals. no plumbing work, no structural work. | $329,000 |
| Jun 11, 2014 | Completed final sign-off Aug 2015 | 225 Bush St | Bcci Construction Company | ste 700. electrical work associated with 201406027289. existing distribution modified to serve new space plan. 2 new vav boxes being added, 1 new fan coil unit, 1 new transfer fan added. no new fsds added. lightingDetails
ste 700. electrical work associated with 201406027289. existing distribution modified to serve new space plan. 2 new vav boxes being added, 1 new fan coil unit, 1 new transfer fan added. no new fsds added. lighting | $380,000 |
| Jun 3, 2014 | Never finaled issued Jun 2014, no final | 225 Bush St | Skyline Construction | 14th floor - electrical /lighting for tenant improvement. ref #2014.0522.6487Details
14th floor - electrical /lighting for tenant improvement. ref #2014.0522.6487 | $4,000 |
| Jun 2, 2014 | Completed final sign-off Jan 2015 | 225 Bush St | Bcci Construction Company | 7th floor approx 8325 teant improvement project. construction of meeting rooms, offices, employee break room. mech, electrical work to be submitted under separate permit. life safety sep. permitsDetails
7th floor approx 8325 teant improvement project. construction of meeting rooms, offices, employee break room. mech, electrical work to be submitted under separate permit. life safety sep. permits | $510,000 |
| May 22, 2014 | Completed final sign-off Jun 2014 | 225 Bush St | Skyline Construction | remodel southeast corner of the 14th fl to add new storage room and low acoustic wall. remove glazing and door from conference room.Details
remodel southeast corner of the 14th fl to add new storage room and low acoustic wall. remove glazing and door from conference room. | $65,000 |
| Apr 4, 2014 | Completed final sign-off Dec 2014 | 225 Bush St | Eco Bay Services Inc. | non-structural demolition only, no dated construction to be demolished, no build back, work per ab-017Details
non-structural demolition only, no dated construction to be demolished, no build back, work per ab-017 | $25,000 |
| Mar 31, 2014 | Completed final sign-off Dec 2014 | 225 Bush St | Skyline Construction | 5/f: barrier removal. upgrade toilet rooms to full compliance only. new and relocated accessories and partitons. add ambulatory stall at mens. no change occupancy, use, area, or water demand.Details
5/f: barrier removal. upgrade toilet rooms to full compliance only. new and relocated accessories and partitons. add ambulatory stall at mens. no change occupancy, use, area, or water demand. | $35,000 |
| Nov 13, 2013 | Completed final sign-off Dec 2013 | 225 Bush St | Skyline Construction | 13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355.Details
13th floor - mechanical & electrical work to consist of new vav boxes, transfer fans, condenser & heat pump, new lighting. ref pa #2013.10.03.8355. | $25,000 |
| Nov 1, 2013 | Completed final sign-off Nov 2013 | 225 Bush St | Golden Gate Fire Protection Inc | 13th floor: relocate 22 pendent sprinkler heads on the 13th floor. relocate 16 upright sprinkler, upgrade end of line bracing. ti pa# 201310038355Details
13th floor: relocate 22 pendent sprinkler heads on the 13th floor. relocate 16 upright sprinkler, upgrade end of line bracing. ti pa# 201310038355 | $19,570 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 225 Bush St | Skyline Construction | interior t.i improvement on the 13th fl to include new breakroom & office etc. new ada compliant restroom core is addded in addition to (e) ada compliant restrooms to remain.Details
interior t.i improvement on the 13th fl to include new breakroom & office etc. new ada compliant restroom core is addded in addition to (e) ada compliant restrooms to remain. | $1,336,000 |
| Aug 28, 2013 | Never finaled issued Aug 2013, no final | 225 Bush St | Bilcor Inc | 6th floor-install 54 ceiling mount speakers/strobes, 11 smoke detector with base, 3 control relay modules, 1 booster power supply, 1 pull station & 1 monitor moduleDetails
6th floor-install 54 ceiling mount speakers/strobes, 11 smoke detector with base, 3 control relay modules, 1 booster power supply, 1 pull station & 1 monitor module | $28,000 |
| Aug 20, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | evacution maps for 225 bush street 6th floorDetails
evacution maps for 225 bush street 6th floor | $1,800 | |
| Jul 31, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Skyline Construction | 6th floor-revision to pa# 2013-0528-7976-remove idf room #656 & 654Details
6th floor-revision to pa# 2013-0528-7976-remove idf room #656 & 654 | |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Skyline Construction | 6th floor-mechanical & electrical permit for t.i pa# 2013-0528-7976Details
6th floor-mechanical & electrical permit for t.i pa# 2013-0528-7976 | $335,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Anderson, Rowe & Buckley, Inc. | 6th floor fire sprinkler system existing tenant improvements - 114 new sprinklers, ref pa #2013.03.13.2160Details
6th floor fire sprinkler system existing tenant improvements - 114 new sprinklers, ref pa #2013.03.13.2160 | $57,000 |
| May 15, 2013 | Never finaled issued May 2013, no final | 225 Bush St | evacuation map plan 10th, 14, and 15th floor.Details
evacuation map plan 10th, 14, and 15th floor. | $5,400 | |
| May 14, 2013 | Completed final sign-off Jun 2013 | 225 Bush St | Bilcor Inc | 1st floor-install 1 speaker/strobe & relocate 1 pull stationDetails
1st floor-install 1 speaker/strobe & relocate 1 pull station | $1,500 |
| May 10, 2013 | Completed final sign-off Jun 2013 | 225 Bush St | Skyline Construction | 15th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0124-8696Details
15th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0124-8696 | $420,000 |
| May 10, 2013 | Completed final sign-off May 2013 | 225 Bush St | Bilcor Inc | install 89 speaker-strobes, 16 smoke detectors,1 duct detector,6 monitor modules,5 control modules. ti on 14th floor ref app#201301158001 and ti on 15 floor: app#201301248696Details
install 89 speaker-strobes, 16 smoke detectors,1 duct detector,6 monitor modules,5 control modules. ti on 14th floor ref app#201301158001 and ti on 15 floor: app#201301248696 | $40,000 |
| May 10, 2013 | Completed final sign-off Jun 2013 | 225 Bush St | Skyline Construction | 14th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0115-8001Details
14th floor-mechanical, electrical & plumbing for tenant improvement. refer to pa# 2013-0115-8001 | $420,000 |
| Apr 29, 2013 | Completed final sign-off Jul 2013 | 225 Bush St | Bilcor Inc | 10th floor fire alarm system - install 41 speaker-strobes, 1 booster panel, 6 smoke detectors, 1 control relay. ref t.i. pa #2013.02.27.1062Details
10th floor fire alarm system - install 41 speaker-strobes, 1 booster panel, 6 smoke detectors, 1 control relay. ref t.i. pa #2013.02.27.1062 | $20,000 |
| Apr 22, 2013 | Never finaled issued May 2013, no final | 225 Bush St | Skyline Construction | 10th floor:revision to permit app#201302271062 to change decorative finish at hallway #129Details
10th floor:revision to permit app#201302271062 to change decorative finish at hallway #129 | |
| Apr 18, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Golden Gate Fire Protection Inc | 10th floor-relocate 90 pendent sprinkler heads, relocate 144 upright heads. end of line restraints & earthquake bracingDetails
10th floor-relocate 90 pendent sprinkler heads, relocate 144 upright heads. end of line restraints & earthquake bracing | $120,510 |
| Apr 16, 2013 | Completed final sign-off Jun 2013 | 225 Bush St | Golden Gate Fire Protection Inc | relocate 49 pendent sprinkler heads on the 14/f, relocate 24 uprights sprinklers on 14/f. relocate 70 pendent sprinklers heads on 15/f, add 2 uprights. t.i. #201301158001 (14/f) & 201301248696 (15/f)Details
relocate 49 pendent sprinkler heads on the 14/f, relocate 24 uprights sprinklers on 14/f. relocate 70 pendent sprinklers heads on 15/f, add 2 uprights. t.i. #201301158001 (14/f) & 201301248696 (15/f) | $75,190 |
| Apr 12, 2013 | Completed final sign-off Jan 2014 | 225 Bush St | Skyline Construction | 10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062Details
10th floor-t.i of mechanical & electrical work to include new transfer fan & supply, new supply fan with electric duct heater & new exhaust grilles & transfer grills. ref. arch# 201302271062 | $75,000 |
| Apr 8, 2013 | Completed final sign-off Jan 2015 | 225 Bush St | Angotti & Reilly Inc. | suite 120 - update to (e) coffee shop with new ownership.Details
suite 120 - update to (e) coffee shop with new ownership. | $25,000 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 225 Bush St | Sabah International Incorporated | install novec 1230 fire suppression system, test & check 100% of system devices and system operation, perform pipe pressure test and pipe puff test per nfpa 2001, perform room integrity test per nfpa 2001, & coordinate shutdown & system monitoring with on-site tradesDetails
install novec 1230 fire suppression system, test & check 100% of system devices and system operation, perform pipe pressure test and pipe puff test per nfpa 2001, perform room integrity test per nfpa 2001, & coordinate shutdown & system monitoring with on-site trades | $23,150 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Anderson, Rowe & Buckley, Inc. | new fire sprinkler system, 110 new sprinklersDetails
new fire sprinkler system, 110 new sprinklers | $55,000 |
| Feb 27, 2013 | Completed final sign-off Dec 2013 | 225 Bush St | Skyline Construction | approx 26000 sf ti improvement on 10th fl. improvements include addition of offices, meeting rooms, break area, pantries & unisex restroom. finish upgrades include floor, wall & ceilings. mep & fls inc sprinkler under sep permit. no structural work.Details
approx 26000 sf ti improvement on 10th fl. improvements include addition of offices, meeting rooms, break area, pantries & unisex restroom. finish upgrades include floor, wall & ceilings. mep & fls inc sprinkler under sep permit. no structural work. | $1,500,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 225 Bush St | 19th fl evacuation mapsDetails
19th fl evacuation maps | $2,000 | |
| Feb 6, 2013 | Never finaled issued Feb 2013, no final | 225 Bush St | Novo Construction Inc | install hood & duct fire system in kitchen hood (fire suppression only). ab-17 for future t.i.Details
install hood & duct fire system in kitchen hood (fire suppression only). ab-17 for future t.i. | $70,000 |
| Jan 30, 2013 | Completed final sign-off Feb 2013 | 225 Bush St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 197 upright sprinklers on the 15th floor. add 136 pendent sprinklers on the 14th fl & add 48 pendent sprinklers. install end of line & earthquake bracing on the 14th floor. ti pa#2012-11-15-4322Details
fire sprinkler system upgrade; relocate 197 upright sprinklers on the 15th floor. add 136 pendent sprinklers on the 14th fl & add 48 pendent sprinklers. install end of line & earthquake bracing on the 14th floor. ti pa#2012-11-15-4322 | $196,215 |
| Jan 24, 2013 | Completed final sign-off Jul 2013 | 225 Bush St | Skyline Construction | 15th floor-ti office space-new lighting, finishes, non load bearing walls. no change of use. upgrade restrooms. m.e.p under seperate permit. t-24 calcu under seperate permit. mech. under seperate permit and not included in vaulation of this permit. sprinkler & fire alarm under seperat permit.Details
15th floor-ti office space-new lighting, finishes, non load bearing walls. no change of use. upgrade restrooms. m.e.p under seperate permit. t-24 calcu under seperate permit. mech. under seperate permit and not included in vaulation of this permit. sprinkler & fire alarm under seperat permit. | $1,612,960 |
| Jan 23, 2013 | Completed final sign-off Jan 2013 | 225 Bush St | Golden Gate Fire Protection Inc | 11th floor-fire sprinkler system upgrade-relocate 5 pendent sprinklers, relocate 4 uprightsDetails
11th floor-fire sprinkler system upgrade-relocate 5 pendent sprinklers, relocate 4 uprights | $4,635 |
| Jan 18, 2013 | Never finaled issued Jan 2013, no final | 225 Bush St | C B F Inc | ti pa#2012-12-21-6725 install 4 speaker strobe. remove & replace 2 speakers w/ speaker strobes. relocate 1 strobe.Details
ti pa#2012-12-21-6725 install 4 speaker strobe. remove & replace 2 speakers w/ speaker strobes. relocate 1 strobe. | $2,500 |
| Jan 18, 2013 | Completed final sign-off Feb 2013 | 225 Bush St | Skyline Construction | mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725Details
mechanical & electrical work for ti on the 11th floor. architectural revision to change door swing @ elevator lobby. ref to pa#2012-12-21-6725 | $60,000 |
| Jan 15, 2013 | Completed final sign-off Jul 2013 | 225 Bush St | Skyline Construction | 14th floor-interior tenant improvement-new non load bearing walls, finishes. new lighting, mechanical, electrical, plumbing. m.e.p under seperate permits. no structural work. restroom workDetails
14th floor-interior tenant improvement-new non load bearing walls, finishes. new lighting, mechanical, electrical, plumbing. m.e.p under seperate permits. no structural work. restroom work | $1,612,960 |
| Jan 15, 2013 | Completed final sign-off Oct 2013 | 225 Bush St | Skyline Construction | 6th floor-removal of non structural, non load bearing partitions, doors, ceilings, lighting, mechanical & electrical. ab-017Details
6th floor-removal of non structural, non load bearing partitions, doors, ceilings, lighting, mechanical & electrical. ab-017 | $50,000 |
| Dec 21, 2012 | Completed final sign-off Feb 2013 | 225 Bush St | Skyline Construction | 11th floor:approx 15,000 sf ti primarily finish upgrades. minor alteration include new offices. mep/fls under separate permit.upgrade suite entry wall/doorsDetails
11th floor:approx 15,000 sf ti primarily finish upgrades. minor alteration include new offices. mep/fls under separate permit.upgrade suite entry wall/doors | $250,000 |
| Dec 12, 2012 | Completed final sign-off Feb 2013 | 225 Bush St | Skyline Construction | 11th floor-interior non structural demolition-ab-017Details
11th floor-interior non structural demolition-ab-017 | $4,500 |
| Nov 21, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | C B F Inc | ti pa#2012-10-29-2957. 19th fl, install 6 strobes. install 5 speakers.Details
ti pa#2012-10-29-2957. 19th fl, install 6 strobes. install 5 speakers. | $4,000 |
| Nov 19, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | 7th fl, evacuation maps. total of 7.Details
7th fl, evacuation maps. total of 7. | $2,380 | |
| Nov 15, 2012 | Completed final sign-off Jan 2014 | 225 Bush St | Skyline Construction | 14th and 15th floor:demolition of non structural partitions, ceilings, glazing doors and finishes. ab017Details
14th and 15th floor:demolition of non structural partitions, ceilings, glazing doors and finishes. ab017 | $69,000 |
| Nov 14, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Novo Construction Inc | 19th floor-revision to pa#2012-1029-2957 to include demolition of (e) partition & glazing. refer arch pa# 2012-1029-2957Details
19th floor-revision to pa#2012-1029-2957 to include demolition of (e) partition & glazing. refer arch pa# 2012-1029-2957 | |
| Nov 9, 2012 | Completed final sign-off Nov 2012 | 225 Bush St | C B F Inc | 18th floor:revision to permit#201210242739. install 10 duct detectors, 10 monitor module. install 1 control relay. per ti app#201209139698Details
18th floor:revision to permit#201210242739. install 10 duct detectors, 10 monitor module. install 1 control relay. per ti app#201209139698 | $3,500 |
| Nov 8, 2012 | Completed final sign-off Nov 2012 | 225 Bush St | Ayoob & Peery Plumbing Co Inc | 19th floor:add and relocate fire sprinkler heads per t.i. add 10 and relocate 6. bldg app#201210292957Details
19th floor:add and relocate fire sprinkler heads per t.i. add 10 and relocate 6. bldg app#201210292957 | $9,000 |
| Nov 2, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | C B F Inc | 7th floor as built for pa #2012.0924.0494 - relocate 7 speaker/strobes, install 1 smoke detector.Details
7th floor as built for pa #2012.0924.0494 - relocate 7 speaker/strobes, install 1 smoke detector. | |
| Oct 29, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Novo Construction Inc | 3600 sf (approx) t.i in 20325 sf, 19th floor tenant space. non-structural demo; construction of new offices & kitchenette, upgrades to exist restrooms, mep & fls deferred submittal. no structural work.Details
3600 sf (approx) t.i in 20325 sf, 19th floor tenant space. non-structural demo; construction of new offices & kitchenette, upgrades to exist restrooms, mep & fls deferred submittal. no structural work. | $250,000 |
| Oct 24, 2012 | Completed final sign-off Nov 2012 | 225 Bush St | C B F Inc | install 3 speaker strobes, 2 wall speaker storbes. ti 201209130698Details
install 3 speaker strobes, 2 wall speaker storbes. ti 201209130698 | $2,500 |
| Oct 9, 2012 | Completed final sign-off Oct 2012 | 225 Bush St | Arrow Sign Company | revision to 201203206448: delete 2 signs from original scope of work. 1 deleted sign is facing bush, 1 deleted sign facing sansome. (signs to remain are at the corner of bush and sansome)Details
revision to 201203206448: delete 2 signs from original scope of work. 1 deleted sign is facing bush, 1 deleted sign facing sansome. (signs to remain are at the corner of bush and sansome) | |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 225 Bush St | Ayoob & Peery Plumbing Co Inc | 18th floor - add & relcoate fire sprinkler heads per tenant improvement, add 5, relcoate 12. t.i. reference pa #2012.09.13.9698.Details
18th floor - add & relcoate fire sprinkler heads per tenant improvement, add 5, relcoate 12. t.i. reference pa #2012.09.13.9698. | $8,500 |
| Sep 24, 2012 | Completed final sign-off Oct 2012 | 225 Bush St | C B F Inc | 22nd floor:install 5 speaker-strobe,1 strobe. replace 2 speakers. t.i. #201207255712Details
22nd floor:install 5 speaker-strobe,1 strobe. replace 2 speakers. t.i. #201207255712 | $3,500 |
| Sep 24, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | C B F Inc | 7th floor:install 10 ceil speaker-strobe, 4 wall speaker-strobes. install 1 speaker,1 control relay. replace 9 speaker-strobes. replace 4 strobes. t.i. #201208107129Details
7th floor:install 10 ceil speaker-strobe, 4 wall speaker-strobes. install 1 speaker,1 control relay. replace 9 speaker-strobes. replace 4 strobes. t.i. #201208107129 | $15,000 |
| Sep 19, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Pribuss Engineering Inc | 7th floor-fire sprinkler ti: relocate 15 sprinkler heads, relocate/change outs 75 sprinkler heads, 3 added sprinkler headsDetails
7th floor-fire sprinkler ti: relocate 15 sprinkler heads, relocate/change outs 75 sprinkler heads, 3 added sprinkler heads | $48,075 |
| Sep 13, 2012 | Completed final sign-off Apr 2013 | 225 Bush St | Novo Construction Inc | 18th flr -interior remodel with new partitions, demising walls, tenant entry doors, infill of floor slab and interior finishes. mep under separate permitDetails
18th flr -interior remodel with new partitions, demising walls, tenant entry doors, infill of floor slab and interior finishes. mep under separate permit | $259,000 |
| Sep 7, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Novo Construction Inc | tenant improvement to include installing two new card reader devices and two new emergency door realease buttons. comply with sffd-ab2.10Details
tenant improvement to include installing two new card reader devices and two new emergency door realease buttons. comply with sffd-ab2.10 | $5,000 |
| Sep 7, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Novo Construction Inc | 22nd floor mechanical & electrical work, reconfigure existing hvac design for new tenant layout, provide & install (5) new reheat vav boxes with digital controls. ref pa #2012.0725.5712.Details
22nd floor mechanical & electrical work, reconfigure existing hvac design for new tenant layout, provide & install (5) new reheat vav boxes with digital controls. ref pa #2012.0725.5712. | $10,000 |
| Aug 29, 2012 | Never finaled issued Aug 2012, no final | 225 Bush St | Golden Gate Fire Protection Inc | fire spriker system upgrade, relocate 7 upright sprinker heads on the 22nd fl. add 3 sidewall sprinklers heads and add 1 upgright. delete 6 upright heads.Details
fire spriker system upgrade, relocate 7 upright sprinker heads on the 22nd fl. add 3 sidewall sprinklers heads and add 1 upgright. delete 6 upright heads. | $5,665 |
| Aug 22, 2012 | Expired or cancelled cancelled Sep 2023 | 225 Bush St | C B F Inc | install 5 speaker-strobes, 1 strobe, 2 emergency release pull stations, replace 2 speakers.Details
install 5 speaker-strobes, 1 strobe, 2 emergency release pull stations, replace 2 speakers. | $3,500 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Bcci Construction Company | approx 15,000 sf t.i. for internet tech co. improvements include construction of 3-off., 2-meeting rms., 2-phone booths & kitchenette remodel. finish upgrades incl. clgs. elect work incl. lighting, mech. work & plumbing(sep. permit); fls incl, sprinklers (sep. permit).Details
approx 15,000 sf t.i. for internet tech co. improvements include construction of 3-off., 2-meeting rms., 2-phone booths & kitchenette remodel. finish upgrades incl. clgs. elect work incl. lighting, mech. work & plumbing(sep. permit); fls incl, sprinklers (sep. permit). | $1,157,000 |
| Jul 25, 2012 | Completed final sign-off Dec 2012 | 225 Bush St | Novo Construction Inc | temant improvement to include demolishing non structural partitions and building new non structural partitons. mep. life safety and fire sprinkler under seperate permit.Details
temant improvement to include demolishing non structural partitions and building new non structural partitons. mep. life safety and fire sprinkler under seperate permit. | $190,000 |
| Apr 10, 2012 | Never finaled issued Apr 2012, no final | 225 Bush St | C B F Inc | revision to pa# 2012-0405-7728; delete 6 strobes from original 16 for a total of 10 strobes, delete 4 speakers from original 5 for a total of 1, install 3 speaker strobesDetails
revision to pa# 2012-0405-7728; delete 6 strobes from original 16 for a total of 10 strobes, delete 4 speakers from original 5 for a total of 1, install 3 speaker strobes | |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 225 Bush St | C B F Inc | install 16-strobes, install 4-speakers.Details
install 16-strobes, install 4-speakers. | $6,000 |
| Mar 20, 2012 | Completed final sign-off Oct 2012 | 225 Bush St | Arrow Sign Company | to erect electric, projecting, door/window sign. (total 5)Details
to erect electric, projecting, door/window sign. (total 5) | $3,000 |
| Mar 20, 2012 | Completed final sign-off Oct 2012 | 225 Bush St | Arrow Sign Company | to erect non-electric, projecting, double faced sign. (total 4)Details
to erect non-electric, projecting, double faced sign. (total 4) | $3,000 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 225 Bush St | Teamwrkx Inc. | 11th floor demolition of some non-structural partitions & finishes. new partitions, glazing & doors. mech/elec to be submitted under spearate permit.Details
11th floor demolition of some non-structural partitions & finishes. new partitions, glazing & doors. mech/elec to be submitted under spearate permit. | $150,000 |
| Feb 28, 2012 | Completed final sign-off Jul 2012 | 225 Bush St | Carter Brothers Fire & Life Safety | add 2 speakers, 4 strobes, 5 speaker/strobes to an (e) fire alarm system in a new 11th floor t.i. space. (t.i.pa#201201303137)Details
add 2 speakers, 4 strobes, 5 speaker/strobes to an (e) fire alarm system in a new 11th floor t.i. space. (t.i.pa#201201303137) | $6,200 |
| Feb 22, 2012 | Completed final sign-off Jul 2012 | 225 Bush St | Novo Construction Inc | 11th floor-mechanical work for tenant improvement-refer to pa# 2012-0130-3137Details
11th floor-mechanical work for tenant improvement-refer to pa# 2012-0130-3137 | $3,000 |
| Feb 13, 2012 | Never finaled issued Feb 2012, no final | 225 Bush St | Ayoob & Peery Plumbing Co Inc | add four (4) upright sprinkler heads in office space on the 11th floor.Details
add four (4) upright sprinkler heads in office space on the 11th floor. | $2,056 |
| Jan 30, 2012 | Completed final sign-off Jul 2012 | 225 Bush St | Novo Construction Inc | t.i. on the 11th floor to include minor alterations to extg interior partitions to create office and new kitchennette. mep, life safety and fire sprinkler under seperate permit.Details
t.i. on the 11th floor to include minor alterations to extg interior partitions to create office and new kitchennette. mep, life safety and fire sprinkler under seperate permit. | $289,000 |
| Jan 6, 2012 | Never finaled issued Jan 2012, no final | 225 Bush St | street space and mta parkingDetails
street space and mta parking | ||
| Nov 3, 2011 | Never finaled issued Nov 2011, no final | 225 Bush St | street spaceDetails
street space | ||
| Sep 8, 2011 | Completed final sign-off Sep 2011 | 225 Bush St | Carter Brothers Fire & Life Safety | add 1 new speaker strobe to an extg fire alarm system in a new ti space(ti app#201105276986)Details
add 1 new speaker strobe to an extg fire alarm system in a new ti space(ti app#201105276986) | $4,750 |
| Sep 8, 2011 | Completed final sign-off Sep 2011 | 225 Bush St | Carter Brothers Fire & Life Safety | add new fire alarm devices to an existing fa system in new ti space #1330 (ti #201107150340). this includes 1 speaker strobe and 1 strobe.Details
add new fire alarm devices to an existing fa system in new ti space #1330 (ti #201107150340). this includes 1 speaker strobe and 1 strobe. | $5,660 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 225 Bush St | San Francisco Commercial Builders Inc | suite #1330-office tenant improvement-new drywall partition, doors, relocated light fixtures, millwork, plumbing, new sink, paint & carpet. electrical, fire life safety & hvac work to be design build under seperate permit. no fire sprinkler work, requiredDetails
suite #1330-office tenant improvement-new drywall partition, doors, relocated light fixtures, millwork, plumbing, new sink, paint & carpet. electrical, fire life safety & hvac work to be design build under seperate permit. no fire sprinkler work, required | $85,000 |
| Jun 6, 2011 | Never finaled issued Jul 2011, no final | 225 Bush St | 20th, 21st & 22nd floors-replace evacation signage on 3 floors of building with new graphic signage meeting current codes. installation to be done by building staff engineers. evacuation signage to be replaced on floors 20, 21, 22Details
20th, 21st & 22nd floors-replace evacation signage on 3 floors of building with new graphic signage meeting current codes. installation to be done by building staff engineers. evacuation signage to be replaced on floors 20, 21, 22 | $4,000 | |
| May 27, 2011 | Completed final sign-off Oct 2011 | 225 Bush St | Cannon Constructors North Inc | office ti on the 4th fl. ste 400 - new floor to ceiling partition. upgrade (e) electrical and modify (e) mech for new lay outDetails
office ti on the 4th fl. ste 400 - new floor to ceiling partition. upgrade (e) electrical and modify (e) mech for new lay out | $12,500 |
| May 4, 2011 | Never finaled issued May 2011, no final | 225 Bush St | street and mta permitDetails
street and mta permit | ||
| Mar 28, 2011 | Never finaled issued Mar 2011, no final | 225 Bush St | street spaceDetails
street space | ||
| Feb 25, 2011 | Never finaled issued Feb 2011, no final | 225 Bush St | Details
| ||
| Jan 7, 2011 | Never finaled issued Jan 2011, no final | 225 Bush St | street space and mta parkingDetails
street space and mta parking | ||
| Dec 20, 2010 | Completed final sign-off Aug 2011 | 225 Bush St | Carter Brothers Fire & Life Safety | 11th floor - add 3 new smoke detectors to an existing fire alarm system in new t.i. space ( t.i. pa #201012026004).Details
11th floor - add 3 new smoke detectors to an existing fire alarm system in new t.i. space ( t.i. pa #201012026004). | $3,750 |
| Dec 16, 2010 | Completed final sign-off Apr 2011 | 225 Bush St | Teamwrkx Inc. | demolition of existing non structural partitions outlets and ceiling panels. consturction of new interior partition, power and data, relocation of lights and finishesDetails
demolition of existing non structural partitions outlets and ceiling panels. consturction of new interior partition, power and data, relocation of lights and finishes | $88,000 |
| Dec 7, 2010 | Completed final sign-off Mar 2011 | 225 Bush St | Anderson, Rowe & Buckley, Inc. | 13th fl: fire sprinkler system. remove 7, add 6Details
13th fl: fire sprinkler system. remove 7, add 6 | $3,000 |
| Dec 2, 2010 | Completed final sign-off Aug 2011 | 225 Bush St | Barnegat Group | construct 4 demising partitions. install 4 doors, paint, ada work in ganged bath rooms. accessory and signage relocation. elec/ls to be design buildDetails
construct 4 demising partitions. install 4 doors, paint, ada work in ganged bath rooms. accessory and signage relocation. elec/ls to be design build | $25,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 225 Bush St | Carter Brothers Fire & Life Safety | 13th floor - add to an existing fire alarm system in a new t.i. space (pa #201011104677) one speaker strobe & strobe.Details
13th floor - add to an existing fire alarm system in a new t.i. space (pa #201011104677) one speaker strobe & strobe. | $4,200 |
| Nov 10, 2010 | Completed final sign-off Mar 2011 | 225 Bush St | Anderson, Rowe & Buckley, Inc. | 13th floor-tenant improvements to (e) fire sprinkler system-7 added sprinklers & 9 relocated sprinklersDetails
13th floor-tenant improvements to (e) fire sprinkler system-7 added sprinklers & 9 relocated sprinklers | $3,200 |
| Oct 15, 2010 | Never finaled issued Oct 2010, no final | 225 Bush St | Carter Brothers Fire & Life Safety | add 2 smoke detectors on 22nd floor elevator lobby for hold open door. this shall be added to an existing fa systemDetails
add 2 smoke detectors on 22nd floor elevator lobby for hold open door. this shall be added to an existing fa system | $2,400 |
| Oct 13, 2010 | Never finaled issued Oct 2010, no final | 225 Bush St | street spaceDetails
street space | ||
| Oct 8, 2010 | Completed final sign-off Mar 2011 | 225 Bush St | Gci, Inc | 13th floor: t.i./corridor new 1 hr demising wall/partition at suite 1300; demising wall of (2) separate suites ( #1325 + 1330) new rated egress doors. all mech, elec etc under separate permit/design build.Details
13th floor: t.i./corridor new 1 hr demising wall/partition at suite 1300; demising wall of (2) separate suites ( #1325 + 1330) new rated egress doors. all mech, elec etc under separate permit/design build. | $72,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (40), Bilcor Inc (37), Golden Gate Fire Protection Inc (20), Novo Construction Inc (11), C B F Inc (10), Bcci Construction Company (6), Carter Brothers Fire & Life Safety (6), Walschon Fire Protection Inc (6), Ayoob & Peery Plumbing Co Inc (5), Principal Builders Inc. (5), Anderson, Rowe & Buckley, Inc. (4), Pribuss Engineering Inc (4), Arrow Sign Company (3), R L H Fire Protection Inc (3), Eco Bay Services Inc. (2), Teamwrkx Inc. (2), The Whiting-Turner Contracting Company (2), Thomas Swan Sign Co Inc (2), Angotti & Reilly Inc., Balch Petroleum Contractors & Builders, Barnegat Group, Cannon Constructors North Inc, Edison Fire Extinguisher Company Inc, Gci, Inc, Intelligent Technologies & Services Inc, Sabah International Incorporated, San Francisco Commercial Builders Inc
- Architects
- George Soskin (7), Seth Hanley (7), Daniel Huntsman (4), Gene Pena (4), Clement T Soga (2), Dennis Health (2), Jane Crane (2), Aston Pereira, Barbara Stewart, Donna K Cook, Elizabeth Utley Hagerty, John Thiele, Kevin Carter, Lisa Bieringer, Melissa Pesci, Smith Group Smith Group
- Engineers
- Craig Ristow (3), Alexander Pacheco, Amanda Garcia, Amit Wadhwa, David Flum, Domagoj Vokic, George Soskin, Jesus Cabellon Jr.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.