32 permits since 2000: 27 completed, 5 never finaled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2025 | Completed final sign-off Oct 2025 | 7355 Geary Bl | removal of service station gas dispensor canopy. disconnect & remove all tank and fuel island trim. remove gas storage tanks and backfill.Details
removal of service station gas dispensor canopy. disconnect & remove all tank and fuel island trim. remove gas storage tanks and backfill. | $20,000 |
| Dec 15, 2022 | Never finaled issued Dec 2022, no final | 945 Sacramento St | install a remote fuel fill system for an e roof top mounted generator. fill box located flush in exterior building wall at street level. fill pipe runs through building, up to roof through an existing 2 fire rated shaft. fill box includes intergral transfer pump and controller.Details
install a remote fuel fill system for an e roof top mounted generator. fill box located flush in exterior building wall at street level. fill pipe runs through building, up to roof through an existing 2 fire rated shaft. fill box includes intergral transfer pump and controller. | $110,000 |
| Jan 5, 2021 | Never finaled issued Apr 2021, no final | 185 Berry St | relocation (removal/replacement) of (2) 2" remote fill lines, (2) 6" single wall emergency, (2) 2" single wall normal vent lines and 1 remote fill box on the (e) above ground diesel tank located in the basement.Details
relocation (removal/replacement) of (2) 2" remote fill lines, (2) 6" single wall emergency, (2) 2" single wall normal vent lines and 1 remote fill box on the (e) above ground diesel tank located in the basement. | $100,000 |
| May 18, 2017 | Completed final sign-off May 2019 | 151 Beach St | temporary shoring and excavation. ref 2017-0213-9309, construction 24" concrete hydrocap. maher applicable > 50 yrdsDetails
temporary shoring and excavation. ref 2017-0213-9309, construction 24" concrete hydrocap. maher applicable > 50 yrds | $300,000 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 225 Bush St | replacement of fill port for fire pump diesel tank. no work to bldg exterior.Details
replacement of fill port for fire pump diesel tank. no work to bldg exterior. | $8,000 |
| Oct 30, 2015 | Completed final sign-off Mar 2016 | 2700 03rd St | replace 5 under dispenser cabinets in (e) fuel station, demo 2 unused under dispenser boxes. compliance with maher ordinance no 155-13 not required.Details
replace 5 under dispenser cabinets in (e) fuel station, demo 2 unused under dispenser boxes. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Oct 16, 2015 | Completed final sign-off Nov 2016 | 2270 Jerrold Av | demo one story canopy.Details
demo one story canopy. | $10,000 |
| Sep 17, 2015 | Completed final sign-off Nov 2016 | 2270 Jerrold Av | erect 1-story, gas station canopy. ** maher: compliance with ordinance no# 155-13 not required **Details
erect 1-story, gas station canopy. ** maher: compliance with ordinance no# 155-13 not required ** | $2,000 |
| Sep 17, 2015 | Completed final sign-off Nov 2016 | 2270 Jerrold Av | removal of one 15,000 gal capacity underground storage tank (diesel) installation of one 25,000 gal split tank gas - 15,000 gal & disel - 10,000 gal. installation of canopy 20' x 20' over fueling area. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
removal of one 15,000 gal capacity underground storage tank (diesel) installation of one 25,000 gal split tank gas - 15,000 gal & disel - 10,000 gal. installation of canopy 20' x 20' over fueling area. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $20,000 |
| Aug 14, 2014 | Completed final sign-off Dec 2014 | 2845 Cesar Chavez St | replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinanceDetails
replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinance | $70,000 |
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 973 Market St | revision to pa #2014.02.21.8982 - install 2 hour fire proofing to all internal double trac fuel piping at ground level. compliance with ordinance #155-13 not requiredDetails
revision to pa #2014.02.21.8982 - install 2 hour fire proofing to all internal double trac fuel piping at ground level. compliance with ordinance #155-13 not required | $5,000 |
| Feb 21, 2014 | Completed final sign-off Jun 2014 | 973 Market St | installation fuel port and exterior fuel supply line from ground level to (e) diesel generator at roof level. work includes low voltage controls. generator installed under app# 2013 1021 9777 compliance with ordiance no. 155-13 not required. interim controls: market st & soma is required.Details
installation fuel port and exterior fuel supply line from ground level to (e) diesel generator at roof level. work includes low voltage controls. generator installed under app# 2013 1021 9777 compliance with ordiance no. 155-13 not required. interim controls: market st & soma is required. | $43,000 |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 455 Golden Gate Av | remove existing underground fuel oil supply and return lines and replace with western fiberglass co-flex line and convert to existing fuel lines inside building at basement level.Details
remove existing underground fuel oil supply and return lines and replace with western fiberglass co-flex line and convert to existing fuel lines inside building at basement level. | $35,000 |
| Mar 16, 2011 | Completed final sign-off Sep 2011 | 77 Beale St | revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added.Details
revision of wrap on insulation to spray on foam.insulation to pipe supports in basement per permit #201101128263. fuel filling sequence note added. | |
| Jan 12, 2011 | Completed final sign-off Jun 2011 | 77 Beale St | secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors.Details
secondary contained diesel fuel, 1-200 gallon day tank, fos and for between extg ust and new daytank on roof of 45 beal street. separate permits required for arch, mech, fire alarm, sprinklers, emergency generators, and hazardous containment berms with leak sensors. | $230,000 |
| Jun 1, 2010 | Completed final sign-off Aug 2010 | 555 Pine St | replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space.Details
replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space. | $17,980 |
| Aug 11, 2009 | Never finaled issued Dec 2009, no final | 2700 03rd St | change existing gasoline ust to diesel ust inc. modify spill bucket and dispenser.Details
change existing gasoline ust to diesel ust inc. modify spill bucket and dispenser. | $49,245 |
| Mar 19, 2007 | Completed final sign-off Dec 2008 | 3750 03rd St | new canopy on (e) dispense area. new trash enclosure & food mart addition. upgrading the restrooms to meet the current accessibilty standard.Details
new canopy on (e) dispense area. new trash enclosure & food mart addition. upgrading the restrooms to meet the current accessibilty standard. | $80,000 |
| Oct 25, 2005 | Completed final sign-off Nov 2005 | 470 West Portal Av | shoring for removal on tank removal per app #200505162553Details
shoring for removal on tank removal per app #200505162553 | $5,000 |
| May 16, 2005 | Completed final sign-off Nov 2005 | 470 West Portal Av | desiel storage tank removal. shoring work to be submitted under separate permit.Details
desiel storage tank removal. shoring work to be submitted under separate permit. | $40,000 |
| Feb 17, 2005 | Completed final sign-off Apr 2005 | 1330 16th St | remove underground gasoline storage tank & associated dispenserDetails
remove underground gasoline storage tank & associated dispenser | $40,000 |
| Feb 17, 2005 | Completed final sign-off Apr 2005 | 610 Brannan St | remove underground gasoline storage tank & associated dispenserDetails
remove underground gasoline storage tank & associated dispenser | $40,000 |
| Feb 25, 2003 | Completed final sign-off Sep 2003 | 4199 Mission St | erect sign for electric, wall , single faceDetails
erect sign for electric, wall , single face | |
| Feb 25, 2003 | Completed final sign-off Sep 2003 | 4199 Mission St | erect sign for electric, wall , double faceDetails
erect sign for electric, wall , double face | |
| Dec 13, 2002 | Completed final sign-off Sep 2003 | 4199 Mission St | repl one new yard light/install 1 new yard light/remove (e)yard light (rev. 200201167103Details
repl one new yard light/install 1 new yard light/remove (e)yard light (rev. 200201167103 | $1,500 |
| Nov 19, 2002 | Completed final sign-off Nov 2003 | 4199 Mission St | rev#200201167103 more detail on fuel piping as built. canopy work done under separated permited. inDetails
rev#200201167103 more detail on fuel piping as built. canopy work done under separated permited. in | |
| Oct 3, 2002 | Completed final sign-off Oct 2002 | 2690 Geary Bl | change of detail from bolting attachment to welding to coincide with special inspctn/200203010464Details
change of detail from bolting attachment to welding to coincide with special inspctn/200203010464 | |
| Sep 27, 2002 | Completed final sign-off Nov 2003 | 4199 Mission St | revision #200201167103 for shoring plansDetails
revision #200201167103 for shoring plans | |
| Jul 17, 2002 | Completed final sign-off Mar 2003 | 20 Heron St | verizon wireless cell site;12 antennas mounted to roof structureDetails
verizon wireless cell site;12 antennas mounted to roof structure | $100,000 |
| Mar 1, 2002 | Completed final sign-off Oct 2002 | 2690 Geary Bl | install 6 new antennas and supporting radio equipment on the roof.Details
install 6 new antennas and supporting radio equipment on the roof. | $45,000 |
| Mar 1, 2002 | Completed final sign-off Aug 2002 | 20 Woodside Av | installation of (3) panel antennas and (1) gps antenna to be located inside (e) church bell tower, eDetails
installation of (3) panel antennas and (1) gps antenna to be located inside (e) church bell tower, e | $45,000 |
| Jul 12, 2001 | Never finaled issued Jan 2002, no final | 200 Larkin St | install one 3000 gallon underground disel storage tard and piping, shoring for excavation is in placDetails
install one 3000 gallon underground disel storage tard and piping, shoring for excavation is in plac | $60,000 |