Block 0270, lot 040
555 Pine St
- City’s use
- Commercial Office
- Zoning
- C3R
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
98 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2025 | In progress filed Jul 2025, not yet issued | 555 Pine St | modification to existing t mobile wireless facion building rooftop.remove 6 e antennas and replace with 4 new antennsas. install n radios. n angenna mounts.remove 8 e coax, remove e tmas. remove 1 e cabinet and install 2 new cabinets.install associated equip and cabling. remove unused equip if any.Details
modification to existing t mobile wireless facion building rooftop.remove 6 e antennas and replace with 4 new antennsas. install n radios. n angenna mounts.remove 8 e coax, remove e tmas. remove 1 e cabinet and install 2 new cabinets.install associated equip and cabling. remove unused equip if any. | $10,000 | |
| Jul 3, 2025 | In progress filed Jul 2025, not yet issued | 555 Pine St | modification to (e) telecommunications facility t-mobile antennas; remove (e) 6102 cabinet; replace 2 smaller cabinet b160 & 6160 within (e) lease space; remove 3 (e) antennas per sector and replace w/2 new antennas per sector; remove tmas and replace w/(n) rrus. final config 6 antennas, 6 rrus,Details
modification to (e) telecommunications facility t-mobile antennas; remove (e) 6102 cabinet; replace 2 smaller cabinet b160 & 6160 within (e) lease space; remove 3 (e) antennas per sector and replace w/2 new antennas per sector; remove tmas and replace w/(n) rrus. final config 6 antennas, 6 rrus, | $45,000 | |
| Apr 10, 2025 | In progress issued Aug 2025 | 555 Pine St | Roebbelen Contracting Inc | install (3) clip-lv devices in the basement electrical space. replace (36) existing panel boards and (4) existing motor control center with new. all misc. electrical work.Details
install (3) clip-lv devices in the basement electrical space. replace (36) existing panel boards and (4) existing motor control center with new. all misc. electrical work. | $1,250,000 |
| Jun 18, 2024 | In progress issued Oct 2024 | 555 Pine St | Roebbelen Contracting Inc | secure the terracotta facing from coming loose and falling that have been impacted by water leaks at mechanical louvers. this phase will address a portion of the front facade/pine st. elevation.Details
secure the terracotta facing from coming loose and falling that have been impacted by water leaks at mechanical louvers. this phase will address a portion of the front facade/pine st. elevation. | $1,000,000 |
| Nov 10, 2022 | In progress issued Nov 2025 | 555 Pine St | Roebbelen Contracting Inc | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the projectDetails
install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the project | $100,000 |
| Apr 16, 2018 | Completed final sign-off Apr 2018 | 555 Pine St | Walschon Fire Protection Inc | as built for 201711083448. demo partial sprinkler branch line lateral @ future outside location. extend (e) pre-action system to cover (e) i.t equip. room. demo (e) 4" ground 90 elbow install new ground tee fitting to feed new installed system. install (n)upright sprink under (n)ducts. 95 new sprinkDetails
as built for 201711083448. demo partial sprinkler branch line lateral @ future outside location. extend (e) pre-action system to cover (e) i.t equip. room. demo (e) 4" ground 90 elbow install new ground tee fitting to feed new installed system. install (n)upright sprink under (n)ducts. 95 new sprink | |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 555 Pine St | American Incorporated | remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher.Details
remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Apr 2018 | 555 Pine St | Walschon Fire Protection Inc | demo partial (e) sprinkler branch line located @ future outside location. extend (e) preaction system to cover (e) i.t. equipment space.demo (e) 4" grooved 90 elbow install new grooved 4" tee fitting to feed new installed sys.install new upright sprinklers under new hvac ducts.total 95 new sprinklerDetails
demo partial (e) sprinkler branch line located @ future outside location. extend (e) preaction system to cover (e) i.t. equipment space.demo (e) 4" grooved 90 elbow install new grooved 4" tee fitting to feed new installed sys.install new upright sprinklers under new hvac ducts.total 95 new sprinkler | $171,740 |
| Oct 31, 2017 | Completed final sign-off Oct 2018 | 555 Pine St | Red Hawk Fire & Security Ca Llc | 1st fl fa: new: (4) new vesda units, (7) new smoke detectors, (3) new heat detectors, (6) monitoring modules, (1) control relay, (12) speaker stroves, (4) strobes. relocate: (1) speaker strove, (1) smoke detector, (1) relay cabinet. ref mech pa #201706098944. maher naDetails
1st fl fa: new: (4) new vesda units, (7) new smoke detectors, (3) new heat detectors, (6) monitoring modules, (1) control relay, (12) speaker stroves, (4) strobes. relocate: (1) speaker strove, (1) smoke detector, (1) relay cabinet. ref mech pa #201706098944. maher na | $15,000 |
| Jul 24, 2017 | Completed final sign-off Nov 2017 | 555 Pine St | Red Hawk Fire & Security Ca Llc | add 1 new vespa unit,control relays for fan/fsd shutdown, 2 m\new smoke detectoers, 2 new duct detectors, add 1 replace 1 speaker strobe maher not reqDetails
add 1 new vespa unit,control relays for fan/fsd shutdown, 2 m\new smoke detectoers, 2 new duct detectors, add 1 replace 1 speaker strobe maher not req | $5,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2018 | 555 Pine St | American Incorporated | 1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance.Details
1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance. | $4,700,000 |
| Apr 18, 2017 | Completed final sign-off Jul 2018 | 555 Pine St | Building Services/System Maintenance Inc | architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada workDetails
architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada work | $139,000 |
| Mar 13, 2017 | Never finaled issued Mar 2017, no final | 555 Pine St | Potter Fire Protection | 6th flr relocate branch line and 2 fire sprinkler ref 2016-1118-3123 maher naDetails
6th flr relocate branch line and 2 fire sprinkler ref 2016-1118-3123 maher na | $1,280 |
| Nov 18, 2016 | Completed final sign-off Dec 2017 | 555 Pine St | American Incorporated | replace an air handler on the 6th floor. maher naDetails
replace an air handler on the 6th floor. maher na | $450,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 555 Pine St | street space permit - renewal of permit # m710208Details
street space permit - renewal of permit # m710208 | ||
| Sep 29, 2016 | Never finaled issued Sep 2016, no final | 555 Pine St | street spaceDetails
street space | ||
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 555 Pine St | American Incorporated | add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher naDetails
add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher na | $50,000 |
| Aug 2, 2016 | Never finaled issued Aug 2016, no final | 555 Pine St | street spaceDetails
street space | ||
| Aug 2, 2016 | Completed final sign-off Dec 2016 | 555 Pine St | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $921,842 |
| Feb 9, 2016 | Completed final sign-off Jan 2017 | 555 Pine St | Bangar Construction Corp. | install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher naDetails
install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher na | $150,000 |
| Dec 10, 2015 | Never finaled issued Apr 2016, no final | 555 Pine St | American Incorporated | 8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinanceDetails
8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinance | $20,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 555 Pine St | street spaceDetails
street space | ||
| May 21, 2013 | Never finaled issued May 2013, no final | 555 Pine St | street space and mta parking and sidewalk repairDetails
street space and mta parking and sidewalk repair | ||
| Sep 8, 2011 | Completed final sign-off Sep 2011 | 555 Pine St | Roebbelen Contracting Inc | create, install evacuation maps at elevator lobby, entrance to stairwell, entrance to elevator lobby & entrances to bldg. typical 7th., 12th., 13th., 15th. & 16th. floors.Details
create, install evacuation maps at elevator lobby, entrance to stairwell, entrance to elevator lobby & entrances to bldg. typical 7th., 12th., 13th., 15th. & 16th. floors. | $2,500 |
| May 6, 2011 | Completed final sign-off May 2011 | 555 Pine St | comply w/complaint #200992644 - umbrella permit under s.f high rise building fire sprinkler retrofit ordinance #337-93Details
comply w/complaint #200992644 - umbrella permit under s.f high rise building fire sprinkler retrofit ordinance #337-93 | ||
| Apr 21, 2011 | Completed final sign-off May 2013 | 555 Pine St | Roebbelen Contracting Inc | upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facility,upsize retrn piping,upgrade monitor sys.install (n) secondary containment.Details
upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facility,upsize retrn piping,upgrade monitor sys.install (n) secondary containment. | $75,000 |
| Mar 8, 2011 | Never finaled issued Mar 2011, no final | 555 Pine St | Sabah International Incorporated | 1st thru 16th floors-install heat smoke detectors in the pipe chases, upgrade system shall include the following: add 16 new photo smoke detectors, add 16 new heat detectors, 32 detector basesDetails
1st thru 16th floors-install heat smoke detectors in the pipe chases, upgrade system shall include the following: add 16 new photo smoke detectors, add 16 new heat detectors, 32 detector bases | $54,867 |
| Mar 3, 2011 | Never finaled issued Mar 2011, no final | 555 Pine St | street space & parking meterDetails
street space & parking meter | ||
| Feb 10, 2011 | Completed final sign-off May 2011 | 555 Pine St | Sabah International Incorporated | install a dual input module for rms monitoring on the 17th fl. reference permit application 201010072530 for chiller permit.Details
install a dual input module for rms monitoring on the 17th fl. reference permit application 201010072530 for chiller permit. | $7,957 |
| Jan 12, 2011 | Never finaled issued Jan 2011, no final | 555 Pine St | street space and mtaDetails
street space and mta | ||
| Jan 7, 2011 | Never finaled filed Jan 2011, never issued | 555 Pine St | |||
| Jan 7, 2011 | Completed final sign-off Jan 2011 | 555 Pine St | Roebbelen Contracting Inc | 16th floor-removal of wall mounted fall protection eye bolt from ti scope of work, 201006184827. identify fall protection tie off points at columns h4 and j4Details
16th floor-removal of wall mounted fall protection eye bolt from ti scope of work, 201006184827. identify fall protection tie off points at columns h4 and j4 | |
| Dec 17, 2010 | Completed final sign-off Mar 2011 | 555 Pine St | Potter Fire Protection | floors 1 through 5 & 7 - add sprinkler in pipe chase; floors 8 through 16 - add sprinkler in pipe chase & above restrooms in attic space.Details
floors 1 through 5 & 7 - add sprinkler in pipe chase; floors 8 through 16 - add sprinkler in pipe chase & above restrooms in attic space. | $24,000 |
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 555 Pine St | street space & meterDetails
street space & meter | ||
| Dec 14, 2010 | Never finaled issued Dec 2010, no final | 555 Pine St | Potter Fire Protection | 17th & 18th floors-relocate 2 fire sprinkler branch lines around new hvac ductworkDetails
17th & 18th floors-relocate 2 fire sprinkler branch lines around new hvac ductwork | $1,120 |
| Dec 13, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Sabah International Incorporated | 8th floor:fire alarm upgrade. add 5 new photoelectric smoke detectors. 5 detector bases.Details
8th floor:fire alarm upgrade. add 5 new photoelectric smoke detectors. 5 detector bases. | $6,324 |
| Nov 29, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Potter Fire Protection | remove 5-fire sprinkler lines & sprinkler in telecom equipment room.Details
remove 5-fire sprinkler lines & sprinkler in telecom equipment room. | $1,120 |
| Nov 15, 2010 | Never finaled issued Nov 2010, no final | 555 Pine St | street space and mtaDetails
street space and mta | ||
| Oct 7, 2010 | Never finaled issued Oct 2010, no final | 555 Pine St | street spaceDetails
street space | ||
| Oct 7, 2010 | Completed final sign-off May 2011 | 555 Pine St | Roebbelen Contracting Inc | demolish retired i place dhiller and replace with new modular chiller. relocate pumps to facilitate work. modify chilled water pipiing to relocate pumps and connect new chillerDetails
demolish retired i place dhiller and replace with new modular chiller. relocate pumps to facilitate work. modify chilled water pipiing to relocate pumps and connect new chiller | $600,000 |
| Oct 7, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Roebbelen Contracting Inc | 8th floor - modify ductwork for space including new ducting, demolition and controls. demolish fire sprinklers in space. install new early warning smoke detectors.Details
8th floor - modify ductwork for space including new ducting, demolition and controls. demolish fire sprinklers in space. install new early warning smoke detectors. | $150,000 |
| Sep 29, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Sabah International Incorporated | furnish/final & test the following devices; add (26)new photo elec. detectors. relocate (24) (e) smoke detectors. relocate (4) (e) junction boxes.Details
furnish/final & test the following devices; add (26)new photo elec. detectors. relocate (24) (e) smoke detectors. relocate (4) (e) junction boxes. | $20,145 |
| Sep 14, 2010 | Never finaled issued Sep 2010, no final | 555 Pine St | street space & meterDetails
street space & meter | ||
| Sep 2, 2010 | Never finaled issued Sep 2010, no final | 555 Pine St | street space and mat parkingDetails
street space and mat parking | ||
| Aug 6, 2010 | Completed final sign-off Nov 2010 | 555 Pine St | Potter Fire Protection | install (15) new fire sprinklers in 3 new telecom rooms.Details
install (15) new fire sprinklers in 3 new telecom rooms. | $5,000 |
| Aug 3, 2010 | Never finaled issued Aug 2010, no final | 555 Pine St | street space permitDetails
street space permit | ||
| Jul 19, 2010 | Never finaled issued Jul 2010, no final | 555 Pine St | street space and mtaDetails
street space and mta | ||
| Jul 6, 2010 | Never finaled issued Jul 2010, no final | 555 Pine St | street space and sidewalk and mtaDetails
street space and sidewalk and mta | ||
| Jul 1, 2010 | Never finaled issued Jul 2010, no final | 555 Pine St | street space permit & mtaDetails
street space permit & mta | ||
| Jun 18, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Roebbelen Contracting Inc | at&t. office ti on the 16th floor. addition of office room and storage room. remodel men's restroom for adf compliance. work to include mech, elec, fire alarm, plumbing.Details
at&t. office ti on the 16th floor. addition of office room and storage room. remodel men's restroom for adf compliance. work to include mech, elec, fire alarm, plumbing. | $85,000 |
| Jun 8, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Roebbelen Contracting Inc | provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lightingDetails
provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lighting | $1,000,000 |
| Jun 1, 2010 | Completed final sign-off Aug 2010 | 555 Pine St | Balch Petroleum Contractors & Builders | replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space.Details
replace fill sump and spill bucket including manhole covers to 18,000 gallon diesel underground storage tank (ust) in open space. | $17,980 |
| May 7, 2010 | Never finaled issued May 2010, no final | 555 Pine St | street space permit & mtaDetails
street space permit & mta | ||
| Apr 13, 2010 | Never finaled issued Apr 2010, no final | 555 Pine St | street space permit & mtaDetails
street space permit & mta | ||
| Feb 25, 2010 | Never finaled issued Feb 2010, no final | 555 Pine St | street spaceDetails
street space | ||
| Feb 1, 2010 | Never finaled issued Feb 2010, no final | 555 Pine St | street space permitDetails
street space permit | ||
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 555 Pine St | Roebbelen Contracting Inc | chiller installation in basement. fa is required under separate permit.Details
chiller installation in basement. fa is required under separate permit. | $775,392 |
| Jul 8, 2009 | Never finaled issued Jul 2009, no final | 555 Pine St | street space permit; mtaDetails
street space permit; mta | ||
| May 5, 2009 | Never finaled issued May 2009, no final | 555 Pine St | street space permit only.Details
street space permit only. | ||
| Nov 17, 2008 | Completed final sign-off Dec 2008 | 555 Pine St | Transbay Fire Protection | to finalize work approved under pa#200509284174.Details
to finalize work approved under pa#200509284174. | |
| Jul 31, 2008 | Completed final sign-off Dec 2008 | 555 Pine St | Roebbelen Contracting Inc | 7th-15th floors-fire smoke dampers & 1-hr rated partition & ceiling. partial 7th & 15th floors. fire smoke dampers deletion where not required. delete the toilet room upgrade on 13th floor; 7th floor restroom upgrade, revision to pa# 2005-0929-4332Details
7th-15th floors-fire smoke dampers & 1-hr rated partition & ceiling. partial 7th & 15th floors. fire smoke dampers deletion where not required. delete the toilet room upgrade on 13th floor; 7th floor restroom upgrade, revision to pa# 2005-0929-4332 | $200,000 |
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 555 Pine St | street spaceDetails
street space | ||
| Aug 16, 2007 | Completed final sign-off Dec 2008 | 555 Pine St | Sabah International Incorporated | renewal pa 200507076998Details
renewal pa 200507076998 | $25,100 |
| Aug 10, 2007 | Never finaled issued Aug 2007, no final | 555 Pine St | street space permitDetails
street space permit | ||
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 555 Pine St | streetspaceDetails
streetspace | ||
| Feb 27, 2007 | Never finaled issued Feb 2007, no final | 555 Pine St | street space permit only.Details
street space permit only. | ||
| Jan 8, 2007 | Never finaled issued Jan 2007, no final | 555 Pine St | street space permit only.Details
street space permit only. | ||
| Dec 7, 2006 | Never finaled issued Dec 2006, no final | 555 Pine St | street space permit only.Details
street space permit only. | ||
| Oct 4, 2006 | Never finaled issued Oct 2006, no final | 555 Pine St | street space permit only.Details
street space permit only. | ||
| Jul 14, 2006 | Never finaled issued Jul 2006, no final | 555 Pine St | street space permitDetails
street space permit | ||
| Feb 27, 2006 | Completed final sign-off Mar 2006 | 555 Pine St | Roebbelen Contracting Inc | to erect non-electric wall single faced sign.Details
to erect non-electric wall single faced sign. | $6,000 |
| Oct 27, 2005 | Completed final sign-off Dec 2005 | 555 Pine St | Roebbelen Contracting Inc | renew permit app 200206058302- for final inspectionDetails
renew permit app 200206058302- for final inspection | |
| Sep 29, 2005 | Completed final sign-off Dec 2008 | 555 Pine St | Roebbelen Contracting Inc | install fire sprinklers(under separate sumittal).install fire smoke dampers in all (e) 1-hr rated partitions. unused non-rated rooms to be removed to smplify sprinkler retrofit on 3,7,8,15,17 etc.Details
install fire sprinklers(under separate sumittal).install fire smoke dampers in all (e) 1-hr rated partitions. unused non-rated rooms to be removed to smplify sprinkler retrofit on 3,7,8,15,17 etc. | $300,000 |
| Sep 28, 2005 | Never finaled issued Feb 2006, no final | 555 Pine St | Transbay Fire Protection | extend (e) preaction systems throughout the building.Details
extend (e) preaction systems throughout the building. | $325,000 |
| Jul 7, 2005 | Never finaled issued Aug 2005, no final | 555 Pine St | Sabah International Incorporated | adding heat detectors, (36) heat detectors; (1) single input module (4) dual input moduleDetails
adding heat detectors, (36) heat detectors; (1) single input module (4) dual input module | $30,000 |
| May 20, 2005 | Completed final sign-off Jun 2005 | 555 Pine St | Mark Olson Electric | renew app3200308142136 for final inspection.Details
renew app3200308142136 for final inspection. | |
| May 10, 2005 | Completed final sign-off Jun 2005 | 555 Pine St | Tait Environmental Services Inc | remove/replace fuel piping underground. install monitoringDetails
remove/replace fuel piping underground. install monitoring | $40,000 |
| Apr 1, 2005 | Completed final sign-off May 2005 | 555 Pine St | Sabah International Incorporated | furnish & test f.a. system: (1) single input module, (1) double input module, (1)laser compact det.Details
furnish & test f.a. system: (1) single input module, (1) double input module, (1)laser compact det. | $24,594 |
| Mar 11, 2005 | Completed final sign-off Apr 2005 | 555 Pine St | Siemens Industry, Inc. | install new refrigerant monitor system to serve basement chiller room.connect fire alarm system undeDetails
install new refrigerant monitor system to serve basement chiller room.connect fire alarm system unde | $15,224 |
| Nov 22, 2004 | Completed final sign-off Apr 2005 | 555 Pine St | Sabah International Incorporated | provide monitoring of refrigerant leak detection panel to exist fire alarm control panel.......Details
provide monitoring of refrigerant leak detection panel to exist fire alarm control panel....... | $7,477 |
| Oct 4, 2004 | Completed final sign-off Sep 2005 | 555 Pine St | Sabah International Incorporated | renew of permit#200204164049Details
renew of permit#200204164049 | |
| Sep 7, 2004 | Completed final sign-off Jun 2005 | 555 Pine St | Tait Environmental Services Inc | remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building.Details
remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building. | $100,000 |
| Feb 19, 2004 | Completed final sign-off Apr 2005 | 555 Pine St | American Incorporated | replacement of chiller located in bsmnt/replace 2 chilled water pumpsDetails
replacement of chiller located in bsmnt/replace 2 chilled water pumps | $275,000 |
| Aug 14, 2003 | Never finaled issued Sep 2003, no final | 555 Pine St | installation of 3 panel type antennas & 2 outdoor cabinets base transceiver stations on (e) roof.Details
installation of 3 panel type antennas & 2 outdoor cabinets base transceiver stations on (e) roof. | $35,000 | |
| Jun 5, 2002 | Expired or cancelled expired Jan 2005 | 555 Pine St | Kleeman Roebbelen Construction | construct 1-hr rated battery contaiment room on 13th fl of pacific bell central office.Details
construct 1-hr rated battery contaiment room on 13th fl of pacific bell central office. | $70,000 |
| Apr 16, 2002 | Never finaled issued May 2002, no final | 555 Pine St | Sabah International Incorporated | furnish, test fire detection systemDetails
furnish, test fire detection system | $623,470 |
| Mar 13, 2002 | Expired or cancelled expired Sep 2002 | 555 Pine St | street spaceDetails
street space | ||
| Feb 6, 2002 | Expired or cancelled expired Jan 2005 | 555 Pine St | Simplex Grinnell*** See 802591**** | 6th & 11th floor - 1 smoke detector to exist autocall sle.Details
6th & 11th floor - 1 smoke detector to exist autocall sle. | $7,000 |
| Dec 27, 2001 | Expired or cancelled expired Jan 2005 | 555 Pine St | Johnston Sign Company | sign permit - electric, wall, single faced.Details
sign permit - electric, wall, single faced. | |
| Nov 6, 2001 | Expired or cancelled expired May 2002 | 555 Pine St | street spaceDetails
street space | ||
| Jun 13, 2001 | Expired or cancelled expired Nov 2001 | 555 Pine St | Dalzell Corporation | install nw 275 gallon day tank for generator in basement (lower basement).Details
install nw 275 gallon day tank for generator in basement (lower basement). | $3,000 |
| May 2, 2001 | Expired or cancelled expired Nov 2001 | 555 Pine St | street spaceDetails
street space | ||
| Apr 25, 2001 | Never finaled issued Apr 2001, no final | 555 Pine St | street spaceDetails
street space | ||
| Mar 12, 2001 | Expired or cancelled expired Jan 2005 | 555 Pine St | Peterson Power Systems Inc. | remove &replace emergency generator equip with new.Details
remove &replace emergency generator equip with new. | $85,000 |
| Jan 29, 2001 | Expired or cancelled expired Jan 2005 | 555 Pine St | Simplex Grinnell*** See 802591**** | monitoring of pre action sprinkler system on all floorsand monitoring of fire pump renewal of 982575Details
monitoring of pre action sprinkler system on all floorsand monitoring of fire pump renewal of 982575 | |
| Dec 29, 2000 | Never finaled issued Dec 2000, no final | 555 Pine St | street space permitDetails
street space permit | ||
| Nov 9, 2000 | Completed final sign-off May 2001 | 555 Pine St | American Incorporated | one stop (archt. finishes,mechanical duct, electrical lighting voluntary upgrade of existing roomsDetails
one stop (archt. finishes,mechanical duct, electrical lighting voluntary upgrade of existing rooms | $100,000 |
| Oct 11, 2000 | Expired or cancelled expired May 2001 | 555 Pine St | Simplex Grinnell*** See 802591**** | renew expired appl #9901178Details
renew expired appl #9901178 |
Find contractors for work like this