John Chinn
- Listed as
- engineer
- Firm
- Salas O'brien Engineers, Inc.
- Based in
- San Jose
- On San Francisco permits
- Mar 2010 to Oct 2010
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 21, 2010 | Completed final sign-off Apr 2011 | 951 Howard St | Roebbelen Contracting Inc | replace (e) 350 kw generator w/ new 500 kw gen'r. remove gen'r & enclosure. install new gen'r, stand alone, package. provide new elect'l, monitoring, alarms, controls, fuel piping. at ext'r of bldg & provide assoc'd fueling plns for perm't & temp gen'r. (connect'n to fire alarm on separate permit)Details
replace (e) 350 kw generator w/ new 500 kw gen'r. remove gen'r & enclosure. install new gen'r, stand alone, package. provide new elect'l, monitoring, alarms, controls, fuel piping. at ext'r of bldg & provide assoc'd fueling plns for perm't & temp gen'r. (connect'n to fire alarm on separate permit) | $600,000 |
| Jun 8, 2010 | Completed final sign-off Jan 2011 | 555 Pine St | Roebbelen Contracting Inc | provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lightingDetails
provide new duct distribution. provide new exhaust fan for battery room. install power distribution. remove existing light, power and install new lighting | $1,000,000 |
| Mar 31, 2010 | Completed final sign-off Apr 2011 | 951 Howard St | Roebbelen Contracting Inc | replace existing 600a service with new 800a service, including switchgear, automatic transfer switches, generator tap box, and main house service panel. this project will include a housekeeping pad for the equipment and bollards for protection.Details
replace existing 600a service with new 800a service, including switchgear, automatic transfer switches, generator tap box, and main house service panel. this project will include a housekeeping pad for the equipment and bollards for protection. | $497,097 |