Andrew J. Strickland
- Listed as
- engineer
- Firm
- Salas O'brien
- Based in
- San Jose
- On San Francisco permits
- May 2019 to May 2024
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2024 | In progress issued Nov 2025 | 430 Bush St | Roebbelen Contracting Inc | install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ...Details
install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ... | $400,000 |
| Nov 10, 2022 | In progress issued Nov 2025 | 555 Pine St | Roebbelen Contracting Inc | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the projectDetails
install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the project | $100,000 |
| May 6, 2019 | Completed final sign-off Jun 2020 | 430 Bush St | Paradigm General Contractors | 4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a.Details
4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a. | $1,500,000 |