Bangar Construction Corp.
- Based in
- Sacramento
- On San Francisco permits
- Oct 2008 to Dec 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2018 | Completed final sign-off Jan 2020 | 611 Folsom St | install 2 new computer room air handlers on the 3rd fl.Details
install 2 new computer room air handlers on the 3rd fl. | $200,000 |
| Apr 27, 2018 | Completed final sign-off May 2019 | 611 Folsom St | 9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maherDetails
9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maher | $500,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2017 | 555 Pine St | install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher naDetails
install cooling tower side stream filter. install condenser water bypass at cooling towers. modify blowdown piping and add strainer at multistack chiller. maher na | $150,000 |
| Aug 16, 2011 | Completed final sign-off Sep 2011 | 1515 19th Av | install new vertical air distribution (air boots), all controls work related to the aboveDetails
install new vertical air distribution (air boots), all controls work related to the above | $91,000 |
| Oct 14, 2008 | Completed final sign-off Feb 2009 | 951 Howard St | addition of three cooling units in new unoccupied mechanical room.Details
addition of three cooling units in new unoccupied mechanical room. | $350,000 |