Building Services/System Maintenance Inc
- Based in
- Concord
- On San Francisco permits
- May 2011 to Apr 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2017 | Completed final sign-off Jul 2018 | 555 Pine St | architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada workDetails
architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada work | $139,000 |
| Mar 25, 2016 | Completed final sign-off Dec 2016 | 690 Stanyan St | provide emergency repairs to (e) meat prep cooler by replacing (e) walls and metal stud ceiling farring with cooler box wall and ceiling panel constrcution. remove and replace hand sink, electrical receptacles, light fituxres, fan coil and fire sprinkler (f/s under sep permit).Details
provide emergency repairs to (e) meat prep cooler by replacing (e) walls and metal stud ceiling farring with cooler box wall and ceiling panel constrcution. remove and replace hand sink, electrical receptacles, light fituxres, fan coil and fire sprinkler (f/s under sep permit). | $5,000 |
| May 8, 2015 | Completed final sign-off Nov 2016 | 399 04th St | replace bathroom finishes. add power to faucets. remove and replace bathroom finishes.Details
replace bathroom finishes. add power to faucets. remove and replace bathroom finishes. | $50,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2015 | 1200 Irving St | renew for final 201302250841Details
renew for final 201302250841 | |
| Jun 6, 2014 | Completed final sign-off Mar 2015 | 1200 Irving St | ti remodel of existing bakery-removal of customer counters and refrigerated display cases, track lights, deck oven. new display cases, demonstration counter, sales displays, rack oven utilizing existing type 1 hood what will be rebalanced and all led track lights. utilize existing refrigeration/cirDetails
ti remodel of existing bakery-removal of customer counters and refrigerated display cases, track lights, deck oven. new display cases, demonstration counter, sales displays, rack oven utilizing existing type 1 hood what will be rebalanced and all led track lights. utilize existing refrigeration/cir | $40,000 |
| Mar 26, 2012 | Never finaled issued Apr 2012, no final | 3232 Geary Bl | tenant improvement including addition of a partition wall & casework, replacement of existing windows, & new interior finishes.Details
tenant improvement including addition of a partition wall & casework, replacement of existing windows, & new interior finishes. | $32,000 |
| May 25, 2011 | Completed final sign-off Jul 2011 | 35 Stanford St | office ti on the 1st floor. add new non-struc. partition and door.Details
office ti on the 1st floor. add new non-struc. partition and door. | $20,000 |