Block 3788, lot 038
634 02nd St
- City’s use
- Commercial Office
- Built
- 1927
- Stories
- 3
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 49,500 sq ft
- Lot
- 16,000 sq ft
- Zoning
- SSO
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
71 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2022 | Completed final sign-off May 2023 | 634 02nd St | Bsm Construction Inc | to comply with the acessible business entrance probram abe202206302090, add door assited operator at entry doorDetails
to comply with the acessible business entrance probram abe202206302090, add door assited operator at entry door | $10,000 |
| Nov 4, 2022 | Completed final sign-off Jul 2024 | 634 02nd St | C C I Commercial Construction & Improv | install new conduits to connect e conduits to pg&e higiDetails
install new conduits to connect e conduits to pg&e higi | $7,000 |
| Jan 10, 2018 | Never finaled issued Jan 2018, no final | 634 02nd St | street spaceDetails
street space | ||
| Jun 21, 2017 | Never finaled issued Jun 2017, no final | 634 02nd St | street spaceDetails
street space | ||
| Feb 7, 2017 | Completed final sign-off Feb 2017 | 634 02nd St | Pyro-Comm Systems, Inc. | 2nd & 3rd flr: ti to interconnecting bridge add 4 smoke detectors, 4 relays, relocate 1 horn/strobe. connect to (e) fire alarm system ref pa 201701137153 maher naDetails
2nd & 3rd flr: ti to interconnecting bridge add 4 smoke detectors, 4 relays, relocate 1 horn/strobe. connect to (e) fire alarm system ref pa 201701137153 maher na | $5,000 |
| Jan 23, 2017 | Completed final sign-off Jan 2017 | 634 02nd St | Sure Fire Protection | install/relocate 10 pendent/upright sprinklers. ref app#201701137153. n/a for maher 4 relocate, 2 up & down, 2 addDetails
install/relocate 10 pendent/upright sprinklers. ref app#201701137153. n/a for maher 4 relocate, 2 up & down, 2 add | $3,500 |
| Jan 13, 2017 | Never finaled issued Jan 2017, no final | 634 02nd St | Novo Construction Inc | communicating openings to adjacemnt bld (301 brannan st) re-establish (e) openings maher naDetails
communicating openings to adjacemnt bld (301 brannan st) re-establish (e) openings maher na | $100,000 |
| Dec 12, 2016 | Never finaled filed Dec 2016, never issued | 634 02nd St | City Signs | to erect non electric, wall, single faced sign. ** maher: n/a **Details
to erect non electric, wall, single faced sign. ** maher: n/a ** | $1,500 |
| Jan 13, 2016 | Completed final sign-off Jan 2016 | 634 02nd St | Pyro-Comm Systems, Inc. | new fire alarm appliance for an t.i. in an existing bldg to include (1) horn/strobe at mezz. level. reference pa 2016.0108.6622 n/a ordinance #155-13Details
new fire alarm appliance for an t.i. in an existing bldg to include (1) horn/strobe at mezz. level. reference pa 2016.0108.6622 n/a ordinance #155-13 | $1,000 |
| Jan 8, 2016 | Completed final sign-off Sep 2016 | 634 02nd St | Novo Construction Inc | revision to pa 2015-0821-4956. revision to open office space occupance and egress diagram floor 1 and mezzanineDetails
revision to pa 2015-0821-4956. revision to open office space occupance and egress diagram floor 1 and mezzanine | |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 634 02nd St | Pyro-Comm Systems, Inc. | 1st/2nd/3rd floors - new fire alarm devices for ti ref 2015 0821 4956 : add 12 relay modules, 12 duct detectors, 2 strobes, 17 horn/strobes.Details
1st/2nd/3rd floors - new fire alarm devices for ti ref 2015 0821 4956 : add 12 relay modules, 12 duct detectors, 2 strobes, 17 horn/strobes. | $8,500 |
| Oct 13, 2015 | Completed final sign-off Apr 2017 | 634 02nd St | Novo Construction Inc | mep upgrades only at roof, 1st, 2nd and 3rd floors. ref #201508214956 maher naDetails
mep upgrades only at roof, 1st, 2nd and 3rd floors. ref #201508214956 maher na | $175,000 |
| Oct 13, 2015 | Completed final sign-off Sep 2016 | 634 02nd St | Novo Construction Inc | electrical upgrade on 1st, 2nd, 3rd; ref arch 201508214956Details
electrical upgrade on 1st, 2nd, 3rd; ref arch 201508214956 | $50,000 |
| Oct 2, 2015 | Completed final sign-off Oct 2015 | 634 02nd St | Pyro-Comm Systems, Inc. | voluntary one for one replacement of the (e) fire alarm system in an (e) building to include: (1) facu (42) modules (25) voltage relays (8) pull stations (27) smoke detecors (1) heat detector (8) duct detectors. maher naDetails
voluntary one for one replacement of the (e) fire alarm system in an (e) building to include: (1) facu (42) modules (25) voltage relays (8) pull stations (27) smoke detecors (1) heat detector (8) duct detectors. maher na | $23,740 |
| Aug 21, 2015 | Completed final sign-off Sep 2016 | 634 02nd St | Novo Construction Inc | demolition of (e) partitions and ceiling on 3rd floor. constructionof new partial height partitions on floors 1, 2 and 3. mep, fire sprinkler & life safety under sep permit. n/a maher ord. 155-13Details
demolition of (e) partitions and ceiling on 3rd floor. constructionof new partial height partitions on floors 1, 2 and 3. mep, fire sprinkler & life safety under sep permit. n/a maher ord. 155-13 | $950,000 |
| Sep 3, 2013 | Completed final sign-off Nov 2013 | 35 Stanford St | Certified Fire & Safety Co | install ul 300 ansul fire system into kitchen hood; ref 201105045331, 201304104220 (aka 634 2nd st)Details
install ul 300 ansul fire system into kitchen hood; ref 201105045331, 201304104220 (aka 634 2nd st) | $2,000 |
| Jul 9, 2013 | Completed final sign-off Nov 2013 | 634 02nd St | Pyro-Comm Systems, Inc. | 1st floor - add new fire alarm devices to new tenant improvement build-out 1 field power supply, 1 monitor module (hood system), 1 pull station, 1 smoke detector, 2 horn strobes, 1 strobe. t.i. pa#201105045331Details
1st floor - add new fire alarm devices to new tenant improvement build-out 1 field power supply, 1 monitor module (hood system), 1 pull station, 1 smoke detector, 2 horn strobes, 1 strobe. t.i. pa#201105045331 | $5,000 |
| Jun 19, 2013 | Completed final sign-off Jul 2014 | 634 02nd St | Principal Builders Inc. | hvac for t.i. on 1st floor to install new grease exhaust fan and ductwork, new make up airfan and duct heater, new fan coil unit and air distribution and new inline exhaust fan. plaese refer to app#201105045331 for ti work.Details
hvac for t.i. on 1st floor to install new grease exhaust fan and ductwork, new make up airfan and duct heater, new fan coil unit and air distribution and new inline exhaust fan. plaese refer to app#201105045331 for ti work. | $98,220 |
| Jun 11, 2013 | Completed final sign-off Nov 2016 | 634 02nd St | Golden Gate Fire Protection Inc | relocate 3 pendent sprinkler heqds on the 1st floor. add 1 dry pendent head in walk in coolerDetails
relocate 3 pendent sprinkler heqds on the 1st floor. add 1 dry pendent head in walk in cooler | $2,060 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 634 02nd St | add two addresses for retail store at block 3788, lot 038 as; 634, 636 2nd st. per pa #201105045331Details
add two addresses for retail store at block 3788, lot 038 as; 634, 636 2nd st. per pa #201105045331 | ||
| Apr 10, 2013 | Completed final sign-off Jul 2014 | 35 Stanford St | Principal Builders Inc. | revision to pa# 201105045331 to show changes of tenant and configuration of food service equipment. no significant changes to lay out of space or change of use to approved permit.Details
revision to pa# 201105045331 to show changes of tenant and configuration of food service equipment. no significant changes to lay out of space or change of use to approved permit. | $100 |
| Jul 20, 2012 | Never finaled issued Jul 2012, no final | 35 Stanford St | Acco Engineered Systems Inc. Dba Acco En | 2nd & 3rd floor - install grease duct riser, ref pa #2011.0504.5331 & #2011.08.23.3273.Details
2nd & 3rd floor - install grease duct riser, ref pa #2011.0504.5331 & #2011.08.23.3273. | $20,000 |
| Jul 10, 2012 | Never finaled issued Jul 2012, no final | 35 Stanford St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system add 18 sprinklers, relocate 5 sprinklers. all work on the 3rd floor.Details
tenant improvements to existing fire sprinkler system add 18 sprinklers, relocate 5 sprinklers. all work on the 3rd floor. | $12,500 |
| Jul 6, 2012 | Completed final sign-off Sep 2012 | 35 Stanford St | 3rd floor-t.i consisting of 2 new vav boxes, relocationm of 1 vav box & registers per new office layout, also includes m.e.pDetails
3rd floor-t.i consisting of 2 new vav boxes, relocationm of 1 vav box & registers per new office layout, also includes m.e.p | $75,000 | |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 35 Stanford St | Pyro-Comm Systems, Inc. | 3rd fl. relocate and or remove extg audible and visual notification appliances to accomodate t.i. space.Details
3rd fl. relocate and or remove extg audible and visual notification appliances to accomodate t.i. space. | $3,000 |
| May 30, 2012 | Completed final sign-off Sep 2012 | 35 Stanford St | Gci, Inc | 3rd floor-interior tenant improvement-selective demolition of partitions, new partitions & ceiling modifications. m.e.p under seperate permitDetails
3rd floor-interior tenant improvement-selective demolition of partitions, new partitions & ceiling modifications. m.e.p under seperate permit | $280,000 |
| Aug 25, 2011 | Never finaled issued Jul 2012, no final | 35 Stanford St | Principal Builders Inc. | new 2 hour rated shaft and duct from ground floor through roof. new mechanical unit on roof.mep to be design build on seperate permit.structural calculations included. exterior work has approved certificate of appropriateness(sheet a-0.1). reference pa #2011.05.04.5331.Details
new 2 hour rated shaft and duct from ground floor through roof. new mechanical unit on roof.mep to be design build on seperate permit.structural calculations included. exterior work has approved certificate of appropriateness(sheet a-0.1). reference pa #2011.05.04.5331. | $75,000 |
| May 25, 2011 | Completed final sign-off Jul 2011 | 35 Stanford St | Building Services/System Maintenance Inc | office ti on the 1st floor. add new non-struc. partition and door.Details
office ti on the 1st floor. add new non-struc. partition and door. | $20,000 |
| May 4, 2011 | Completed final sign-off Nov 2013 | 35 Stanford St | Novo Construction Inc | ground floor - change of use from vacant commercial (retail) to restaurant. new rated demising walls, load bearing equipment platform, restaurant built-out. mep on separate permit.Details
ground floor - change of use from vacant commercial (retail) to restaurant. new rated demising walls, load bearing equipment platform, restaurant built-out. mep on separate permit. | $376,000 |
| Jul 16, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | to obtain final inspection for work approved under pa 200801041848; all work has been completedDetails
to obtain final inspection for work approved under pa 200801041848; all work has been completed | |
| Jul 16, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | to obtain final inspection for work approved under pa 200804048795; all work has been completedDetails
to obtain final inspection for work approved under pa 200804048795; all work has been completed | |
| Jul 16, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | to obtain final inspection for work approved under pa 200804048798; all work has been completedDetails
to obtain final inspection for work approved under pa 200804048798; all work has been completed | |
| Jun 1, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | demolition of existing colling roll down door, header and glazing above.construction of new storefront, new interior concrete slab, floor/ramp stair,, new storefront lighting and related structural modifications. mep under separate permit.Details
demolition of existing colling roll down door, header and glazing above.construction of new storefront, new interior concrete slab, floor/ramp stair,, new storefront lighting and related structural modifications. mep under separate permit. | $100,000 |
| Jan 12, 2009 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | revision to permit #2008/1201/7527. revision to egress path barrier at roof.Details
revision to permit #2008/1201/7527. revision to egress path barrier at roof. | |
| Dec 1, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | revision to permit #200802134674(permit # 1155228).reconfiguration of rooftop egress path per field inspector(tam chiu) comments.Details
revision to permit #200802134674(permit # 1155228).reconfiguration of rooftop egress path per field inspector(tam chiu) comments. | |
| Jul 28, 2008 | Completed final sign-off Aug 2008 | 35 Stanford St | Golden Gate Sign Company Inc. | erect a non-electric wall single faced non-illuminated new signDetails
erect a non-electric wall single faced non-illuminated new sign | $3,000 |
| May 1, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | R L H Fire Protection Inc | 2nd floor-t.i. upgrade of sprinkler system; relocate 11 headsm delete 18 heads and add 19 sprinkler heads. relcate-11, add-19, delete-18Details
2nd floor-t.i. upgrade of sprinkler system; relocate 11 headsm delete 18 heads and add 19 sprinkler heads. relcate-11, add-19, delete-18 | $6,000 |
| May 1, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | R L H Fire Protection Inc | 3rd floor-t.i. upgrade to sprinkler system; relocate 1 head, delete 18 heads and add 17 heads. relocate-1, add-17, delete-18Details
3rd floor-t.i. upgrade to sprinkler system; relocate 1 head, delete 18 heads and add 17 heads. relocate-1, add-17, delete-18 | $3,400 |
| May 1, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | R L H Fire Protection Inc | 1st floor-t.i. upgrade to sprinkler system, relocate 5 sprinkler heads, delete 15 and add 15 sprinkler heads. relocate-5, add-15, delete-15Details
1st floor-t.i. upgrade to sprinkler system, relocate 5 sprinkler heads, delete 15 and add 15 sprinkler heads. relocate-5, add-15, delete-15 | $4,000 |
| Apr 4, 2008 | Expired or cancelled expired Apr 2010 | 35 Stanford St | Diversified Fire Products | ti for fire alarm for the whole bldg. 3 sync module, 73 horn/strobes, 15 strobes and 1 wp horn/strobeDetails
ti for fire alarm for the whole bldg. 3 sync module, 73 horn/strobes, 15 strobes and 1 wp horn/strobe | $44,692 |
| Apr 4, 2008 | Expired or cancelled expired Apr 2010 | 35 Stanford St | Diversified Fire Products | ti for elevator upgrade to include 4 cr's, 1 pull station 1 heat detector, 3 smoke detectors, 3 horn/strobes and 1 wp horn/strobeDetails
ti for elevator upgrade to include 4 cr's, 1 pull station 1 heat detector, 3 smoke detectors, 3 horn/strobes and 1 wp horn/strobe | $21,817 |
| Apr 2, 2008 | Expired or cancelled expired Feb 2012 | 35 Stanford St | modify ductwork, install new supply, return air devices to accomodate new floor plan-floors 1-3. install 1 new fan coil and assoc. piping&t.stat on 1st floor. ref gc permit (1st fl) 200802205729, (2nd) 200802215215, (3rd) 200802205126.Details
modify ductwork, install new supply, return air devices to accomodate new floor plan-floors 1-3. install 1 new fan coil and assoc. piping&t.stat on 1st floor. ref gc permit (1st fl) 200802205729, (2nd) 200802215215, (3rd) 200802205126. | $110,531 | |
| Feb 21, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | 2nd floor: tenant improvement around 15,000 sf. t.i. consis of interior remodel of existing office suite, selective demolition of partitions, construction of partition for new offices, modification of ceiling. m.e.p., life safety, sprinkler under separate permit.Details
2nd floor: tenant improvement around 15,000 sf. t.i. consis of interior remodel of existing office suite, selective demolition of partitions, construction of partition for new offices, modification of ceiling. m.e.p., life safety, sprinkler under separate permit. | $570,000 |
| Feb 20, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | ground floor: tenant improvement around 15,000 sf. t.i. consist of interior remodel to (e) office suite, selective demolition of partitions, construct partitions for new offices, modification of ceilings. m.e.p., life safety, sprinkler under separate permit.Details
ground floor: tenant improvement around 15,000 sf. t.i. consist of interior remodel to (e) office suite, selective demolition of partitions, construct partitions for new offices, modification of ceilings. m.e.p., life safety, sprinkler under separate permit. | $570,000 |
| Feb 20, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | tenant improvement-3rd floor are +/- 15, 000 sf t.i. consist of interior remodel of (e) office ste, selective demolition of partitions, construction of partition for new offices, modification of ceiling. mech, elec. and fire life safety under separate permit.Details
tenant improvement-3rd floor are +/- 15, 000 sf t.i. consist of interior remodel of (e) office ste, selective demolition of partitions, construction of partition for new offices, modification of ceiling. mech, elec. and fire life safety under separate permit. | $570,000 |
| Feb 13, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevatorsDetails
elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevators | $1,250,000 |
| Feb 8, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | passenger elevator cab upgrades - aesthetic. interior work only. d.a. up-grades.Details
passenger elevator cab upgrades - aesthetic. interior work only. d.a. up-grades. | $60,000 |
| Jan 4, 2008 | Expired or cancelled expired Apr 2010 | 35 Stanford St | voluntary strengthening & barrier free removal & voluntary drinking fountains & restroom accessibility upgrades.Details
voluntary strengthening & barrier free removal & voluntary drinking fountains & restroom accessibility upgrades. | $40,000 | |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 35 Stanford St | renew pa# 9916955 for final inspection only.Details
renew pa# 9916955 for final inspection only. | ||
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 35 Stanford St | renew pa# 2001/06/12/1302 ( including pa# 9921904, pa# 9919856/r-1, pa# 9913256 for final inspection only.)Details
renew pa# 2001/06/12/1302 ( including pa# 9921904, pa# 9919856/r-1, pa# 9913256 for final inspection only.) | ||
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 35 Stanford St | renewal of appl#9812168, 9721767, 9725352.Details
renewal of appl#9812168, 9721767, 9725352. | ||
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 35 Stanford St | renewal of appl#200106121296, 200002111673, 9813392 for final.Details
renewal of appl#200106121296, 200002111673, 9813392 for final. | ||
| Jun 14, 2007 | Completed final sign-off Aug 2007 | 35 Stanford St | renewal of appl#200007245888, 200103214911, 9910625Details
renewal of appl#200007245888, 200103214911, 9910625 | ||
| Jun 14, 2007 | Expired or cancelled cancelled Aug 2007 | 35 Stanford St | renewal of appl#200106121302, 9921904, 9919856, 9913256, 9916955 for final.Details
renewal of appl#200106121302, 9921904, 9919856, 9913256, 9916955 for final. | ||
| Jun 14, 2007 | Completed final sign-off Aug 2007 | 35 Stanford St | renewal of appl#9822824, 9819301, 9817689, 9820941 for final inspections.Details
renewal of appl#9822824, 9819301, 9817689, 9820941 for final inspections. | ||
| Jun 14, 2007 | Completed final sign-off Aug 2007 | 35 Stanford St | renewal of appl#200106010540, 200106010543.Details
renewal of appl#200106010540, 200106010543. | ||
| Jun 14, 2007 | Completed final sign-off Jul 2007 | 35 Stanford St | renewal of appl#200105179403, 200106010485, 9820352Details
renewal of appl#200105179403, 200106010485, 9820352 | ||
| Jun 11, 2007 | Completed final sign-off Jul 2007 | 35 Stanford St | renew 09717191- umb program for final inspectin. special inspection complete 1-26-1998.Details
renew 09717191- umb program for final inspectin. special inspection complete 1-26-1998. | ||
| Jan 30, 2003 | Completed final sign-off May 2003 | 35 Stanford St | Plant Construction | add interior wall and door to create entry vestibuleDetails
add interior wall and door to create entry vestibule | $20,000 |
| Jan 18, 2002 | Completed final sign-off Mar 2002 | 35 Stanford St | Plant Construction | 2/fl., reconfigure interior walls, non structuralDetails
2/fl., reconfigure interior walls, non structural | $8,000 |
| Nov 7, 2001 | Expired or cancelled cancelled Jun 2005 | 35 Stanford St | Plant Construction | structural work/lowing floor slab to provide handicap accessibility. add restroom. provide shell conDetails
structural work/lowing floor slab to provide handicap accessibility. add restroom. provide shell con | $65,000 |
| Jun 12, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | Plant Construction | to renew permit#9813392 & 2000/02/11/1673 for final inspection only.Details
to renew permit#9813392 & 2000/02/11/1673 for final inspection only. | |
| Jun 12, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | Plant Construction | to renew permit#9921904,9919856r1,9913256,99169555Details
to renew permit#9921904,9919856r1,9913256,99169555 | |
| Jun 1, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | no work to be done on this permitDetails
no work to be done on this permit | ||
| Jun 1, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | no work to be performed on this permitDetails
no work to be performed on this permit | ||
| Jun 1, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | sprinkler permitDetails
sprinkler permit | $20,000 | |
| May 17, 2001 | Expired or cancelled expired Aug 2003 | 35 Stanford St | Plant Construction | hvac, electrical fire alarm & fire sprinklerDetails
hvac, electrical fire alarm & fire sprinkler | $260,000 |
| Mar 21, 2001 | Expired or cancelled expired Aug 2005 | 35 Stanford St | provide new elevator stop to (e) mezzanine, new 9 sq. ft mezzanine landing in front of elevatorDetails
provide new elevator stop to (e) mezzanine, new 9 sq. ft mezzanine landing in front of elevator | $25,000 | |
| Dec 21, 2000 | Completed final sign-off Jun 2001 | 35 Stanford St | Plant Construction | soft demolition, non-stuctural at 1st fl. & mezz. levelDetails
soft demolition, non-stuctural at 1st fl. & mezz. level | $30,000 |
| Jul 24, 2000 | Expired or cancelled expired Aug 2005 | 35 Stanford St | Plant Construction | oti-1, 1st floor, el, me, spDetails
oti-1, 1st floor, el, me, sp | $800,000 |
| Feb 11, 2000 | Expired or cancelled expired Aug 2003 | 35 Stanford St | Plant Construction Co, Lp | renew 9813392, 9822824, 9819301, 9817689, 9820941Details
renew 9813392, 9822824, 9819301, 9817689, 9820941 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (17), Plant Construction (8), Pyro-Comm Systems, Inc. (6), Principal Builders Inc. (3), R L H Fire Protection Inc (3), Diversified Fire Products (2), Acco Engineered Systems Inc. Dba Acco En, Anderson, Rowe & Buckley, Inc., Bsm Construction Inc, Building Services/System Maintenance Inc, C C I Commercial Construction & Improv, Certified Fire & Safety Co, City Signs, Gci, Inc, Golden Gate Fire Protection Inc, Golden Gate Sign Company Inc., Plant Construction Co, Lp, Sure Fire Protection
- Architects
- Daniel Huntsman (6), James Stefanski (2), Huntsman Group
- Engineers
- Alex Filatov, Mario R. Velasco, Mike Howe, Vahdani & Associate
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.