Alex Filatov
- Listed as
- architect, engineer
- Firm
- Murphy Burr Curry Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Oct 2026
47 permits since 2000 (engineer on 45 permits, architect on 2 permits): 25 completed, 4 in progress, 13 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 500 Washington St | 1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferredDetails
1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred | $675,000 | |
| Aug 4, 2026 | In progress issued Aug 2026 | 180 Howard St | Metcon Ti, Inc | 9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531Details
9th fl - structural only permit submittal to show structural drawings and calcs for movable partition in the training room. ref pa 202605191531 | |
| Jul 10, 2026 | In progress issued Jul 2026 | 101 California St | Hathaway Dinwiddie Co. | 12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope.Details
12th fl revision to 202512030869. revision includes updates to structural drawings to reflect a revised slab edge detail due to field conditions. no change to architectural scope. | $5,000 |
| Nov 4, 2025 | In progress filed Nov 2025, not yet issued | 1 California St | ground fl - commercial partial interior ti of building lobby. non-structural partitions, doords/frames, ceiling, finishes and millwork. partial exterior refront alteration repairs. mep deferredDetails
ground fl - commercial partial interior ti of building lobby. non-structural partitions, doords/frames, ceiling, finishes and millwork. partial exterior refront alteration repairs. mep deferred | $432,816 | |
| Aug 12, 2025 | Completed final sign-off Aug 2025 | 100 California St | West Coast Build Aka Fairway Constructio | revision to pa#: 202411215476. revise infill assembly in type 1 building.Details
revision to pa#: 202411215476. revise infill assembly in type 1 building. | |
| Jun 5, 2025 | Expired or cancelled withdrawn Aug 2025 | 100 California St | 9th fl: ti includes 6 phone booths w/ structural calcs for anchoring. (bldg is fully sprinklered)Details
9th fl: ti includes 6 phone booths w/ structural calcs for anchoring. (bldg is fully sprinklered) | $76,000 | |
| Aug 8, 2024 | Completed final sign-off Sep 2024 | 1 California St | R.M.R. Construction Company | ground floor: removal of non bearing concrete walls at vault.Details
ground floor: removal of non bearing concrete walls at vault. | $9,500 |
| Dec 29, 2022 | Expired or cancelled expired Nov 2025 | 1025 Masonic Av | Cahill Contractors Llc. | new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg.Details
new slope of the walkway shared with church and the urban school of sf. alterations to existing basement windows,new stairs up to the church sacristy,and(n) stairs down to its basement boiler room.school renovation permit(2021-1229-5177)includes alterations to the walkway,gym/multipurpose bldg. | $50,000 |
| Dec 23, 2022 | Completed final sign-off May 2025 | 1639 Oak St | Cahill Contractors Llc. | scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planterDetails
scope of work includes alterations to the ext plaza occupying the southeast corner of the property at 1639 oak st., including alterations to an ext stair leading to the parking garage, a new ramped approach to the ext plaza and a reshaped flow-thru planter | $75,000 |
| Nov 18, 2022 | Completed final sign-off Jan 2024 | 1011 Bryant St | Tilton Pacific Const Inc. | deferred structural 202206297373Details
deferred structural 202206297373 | |
| Oct 28, 2022 | Expired or cancelled cancelled Jan 2026 | 625 Market St | install (8) davits at top of building for window washingDetails
install (8) davits at top of building for window washing | $45,000 | |
| Jun 29, 2022 | Completed final sign-off Jan 2024 | 1011 Bryant St | Tilton Pacific Const Inc. | exterio alterations including (n) rolling over head door; acm cladding interior alterations in customer areas, including tenant improvements in showroom, sales office customer lounge area and public restrooms. minor interior alterations in employee and back of house areas. primarily comprising replaDetails
exterio alterations including (n) rolling over head door; acm cladding interior alterations in customer areas, including tenant improvements in showroom, sales office customer lounge area and public restrooms. minor interior alterations in employee and back of house areas. primarily comprising repla | $1,000,000 |
| Feb 7, 2022 | Never finaled issued Feb 2022, no final | 301 Battery St | Field Construction Inc. | floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area.Details
floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area. | $375,000 |
| Aug 26, 2021 | Completed final sign-off Nov 2021 | 2121 Sacramento St | Tom Lewis Restoration And Consulting | to comply with nov 202178979 replacement/repair 10 feet of structural steel at west parapet wall. remove bricks expose steel. replace damaged steel, re-install bricks; replace loose brick, install helical anchorsDetails
to comply with nov 202178979 replacement/repair 10 feet of structural steel at west parapet wall. remove bricks expose steel. replace damaged steel, re-install bricks; replace loose brick, install helical anchors | $88,000 |
| Jul 29, 2021 | Completed final sign-off Nov 2021 | 1139 Howard St | Tom Lewis Restoration And Consulting | parapet concrete repair approx 60'x18"x6" corner wall concrete repair approx 20'x12"x4" deep. remove damaged omcrete. install rebar epoxy. form & pour new concrete.Details
parapet concrete repair approx 60'x18"x6" corner wall concrete repair approx 20'x12"x4" deep. remove damaged omcrete. install rebar epoxy. form & pour new concrete. | $94,680 |
| Nov 13, 2020 | Completed final sign-off Oct 2021 | 797 Corbett Av | Kadima-Schoepp, Inc | rev to pa201909121438, to comply with nov201972841: replace wealkway deck to plans, repair any damagaed rot, wire, paper, stucco.Details
rev to pa201909121438, to comply with nov201972841: replace wealkway deck to plans, repair any damagaed rot, wire, paper, stucco. | $10,000 |
| Sep 19, 2020 | Never finaled issued Feb 2021, no final | 3 Embarcadero Center | Skyline Construction | structural work for slab reinforcement on the 19 & 22nd fl.Details
structural work for slab reinforcement on the 19 & 22nd fl. | $30,000 |
| Sep 19, 2020 | Never finaled issued Jun 2021, no final | 3 Embarcadero Center | Skyline Construction | slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit.Details
slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit. | $45,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 5 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 7 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 7 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 9 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 9 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 10 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 10 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 6 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 8 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 8 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 11 - to erect a type 3-a, 4-story, two-family dwelling with no basement.Details
building 11 - to erect a type 3-a, 4-story, two-family dwelling with no basement. | $1,292,500 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 599 Crestmont Dr | building 12 - to erect a type 3-a, 3-story, single family dwelling with no basement.Details
building 12 - to erect a type 3-a, 3-story, single family dwelling with no basement. | $921,000 | |
| Nov 7, 2019 | Completed final sign-off Jul 2022 | 730 Harrison St | Famand Inc Dba Indoor Environmental Serv | replacement of extg cooling tower.Details
replacement of extg cooling tower. | $175,000 |
| Jun 13, 2019 | Never finaled issued Sep 2019, no final | 180 Howard St | Team Commercial Construction Inc. | voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1.Details
voluntary seismic improvement of the floor diaphram to core wall connections at level 1. voluntary seismic improvement of the wall stability of the north and south core walls at level 1. | $82,350 |
| Dec 17, 2018 | Completed final sign-off Apr 2019 | 600 Townsend St | C C I Commercial Construction & Improv | revision to permit #201810102750. suite 125: ti improvement to vacant suite including finishes, lighting, structural partitions. fire life safety, mep under separate permits.Details
revision to permit #201810102750. suite 125: ti improvement to vacant suite including finishes, lighting, structural partitions. fire life safety, mep under separate permits. | $300,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2021 | 1522 Bush St | Gci, Inc | repair defective welding done as part of umb seismic retrofitDetails
repair defective welding done as part of umb seismic retrofit | $440,000 |
| Jun 25, 2018 | Completed final sign-off Nov 2018 | 771 Teresita Bl | Merlyn Construction | revision to app#201805229765 voluntary strenthening per planDetails
revision to app#201805229765 voluntary strenthening per plan | $30,000 |
| Dec 20, 2017 | Completed final sign-off Feb 2018 | 1625 Oak St | Baseline Homes | revision to 201606270916 - alteration to existing fence to 10' high. maher naDetails
revision to 201606270916 - alteration to existing fence to 10' high. maher na | $800 |
| Nov 27, 2017 | Completed final sign-off Aug 2018 | 1011 Bryant St | Tilton Pacific Const Inc. | demo select interior area incl partitions, finishes & fixtures on ground flr & 2nd flr. addition of floor area on 2nd flr to create customer lounge in showroom. renovation to upgrade (e) flr restrooms. mep associsted w/work above. new entry portal & associated paving at erterior. n/a maher ordina.Details
demo select interior area incl partitions, finishes & fixtures on ground flr & 2nd flr. addition of floor area on 2nd flr to create customer lounge in showroom. renovation to upgrade (e) flr restrooms. mep associsted w/work above. new entry portal & associated paving at erterior. n/a maher ordina. | $300,000 |
| Sep 13, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Gci, Inc | rooftop- structural revision, frp material, to pa#201608306376 & 201708074049. n/a ordinance #155-13Details
rooftop- structural revision, frp material, to pa#201608306376 & 201708074049. n/a ordinance #155-13 | |
| Sep 6, 2017 | Completed final sign-off Feb 2018 | 1625 Oak St | Baseline Homes | rev. to pa#201606270916, steps to rear yard and bathroom pocket door.Details
rev. to pa#201606270916, steps to rear yard and bathroom pocket door. | |
| Jun 14, 2017 | Expired or cancelled expired Jul 2021 | 2121 Sacramento St | Tom Lewis Restoration And Consulting | remove collapsed retaining wall - brick. rebuild new retaining wall with piers and poured in place concrete. maher naDetails
remove collapsed retaining wall - brick. rebuild new retaining wall with piers and poured in place concrete. maher na | $50,000 |
| Feb 15, 2017 | Never finaled filed Feb 2017, never issued | 982 Market St | to erect 2 electric, projecting, double faced signs. ** maher: n/a **Details
to erect 2 electric, projecting, double faced signs. ** maher: n/a ** | $250,000 | |
| Jan 9, 2017 | Completed final sign-off Oct 2021 | 250 Hartford St | Coleman Construction | soft story retrofit. saw cut concrete. install footings in 2 areas. install all simpson hardware need. new shear wall.(plywood)install steel columns and 24ft steel beam. fix all sheetrock.Details
soft story retrofit. saw cut concrete. install footings in 2 areas. install all simpson hardware need. new shear wall.(plywood)install steel columns and 24ft steel beam. fix all sheetrock. | $20,000 |
| Oct 12, 2016 | Completed final sign-off May 2018 | 2750 Jackson St | Plant Construction Co, Lp | development of existing shell space for gym and theater use including new finishes, lighting, mechanical and structural framing at 2nd fl (maher not req).Details
development of existing shell space for gym and theater use including new finishes, lighting, mechanical and structural framing at 2nd fl (maher not req). | $1,800,000 |
| Jul 15, 2016 | Completed final sign-off Aug 2017 | 1400 16th St | Skyline Construction | new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a **Details
new non structural partitions new mechanical, plumbing and electrical. new finishes and fixtures. change of use from garment factory to laboratory. ** maher: n/a ** | $4,800,000 |
| May 13, 2016 | Completed final sign-off Nov 2018 | 2602 Pacific Av | revison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes.Details
revison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes. | $65,000 | |
| Sep 14, 2015 | Completed final sign-off Jul 2016 | 1000 Sansome St | C C I Commercial Construction & Improv | revision to 201406178678. hvac rooftop cradle design and shaft locations. arch/struct only. mep to followDetails
revision to 201406178678. hvac rooftop cradle design and shaft locations. arch/struct only. mep to follow | $50,000 |
| Jun 11, 2015 | Completed final sign-off Jul 2016 | 1000 Sansome St | C C I Commercial Construction & Improv | revision to pa#201406178678, revise to s3.0 to show rebar @ elev pit requested by inspector. revise to drop basement slab on grade by 14". reshape (e) foundationDetails
revision to pa#201406178678, revise to s3.0 to show rebar @ elev pit requested by inspector. revise to drop basement slab on grade by 14". reshape (e) foundation | $120,000 |
| Feb 3, 2014 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | Cannon Constructors North Inc | revision to addendum 1, foundation & super structure, ref approved pa# 2011/06/01/7181. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to addendum 1, foundation & super structure, ref approved pa# 2011/06/01/7181. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Oct 17, 2013 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | Cannon Constructors North Inc | tower crane erection permit. ref site permit #2011.0601.7181.Details
tower crane erection permit. ref site permit #2011.0601.7181. | $35,000 |
| Feb 13, 2008 | Completed final sign-off Apr 2010 | 35 Stanford St | Novo Construction Inc | elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevatorsDetails
elevator replacement at 2nd street serving all floors to roof. addition of roof deck 439 sq ft, new roof (see roof consult dwgs under seperate permit). new store front at 2nd & stanford elevators | $1,250,000 |
| Mar 6, 2006 | Expired or cancelled expired May 2007 | 1667 Market St | revision to approved pa# 2005/04/19/0383. caffe trieste owners seek approval to install a through-the-wall atm on gough street wall flush mounted.Details
revision to approved pa# 2005/04/19/0383. caffe trieste owners seek approval to install a through-the-wall atm on gough street wall flush mounted. | $300 |