Rowdy Red Construction Llc
- Based in
- Orinda
- On San Francisco permits
- Dec 2024 to Aug 2026
- Last 24 months
- 16 permits filed
16 permits since 2000: 3 completed, 13 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 500 Washington St | revision to bpa#202511129349, addition of fire damperDetails
revision to bpa#202511129349, addition of fire damper | $5,600 |
| Jul 29, 2026 | In progress issued Aug 2026 | 500 Washington St | 5th and 6th floor: restroom upgrade by property owner. barrier removal, no change of use or occupancy. renovation of men's and women's restroom on level 5 and 6 . no changing in plumbing fixture count.Details
5th and 6th floor: restroom upgrade by property owner. barrier removal, no change of use or occupancy. renovation of men's and women's restroom on level 5 and 6 . no changing in plumbing fixture count. | $100,000 |
| Jul 17, 2026 | In progress issued Aug 2026 | 500 Washington St | modifications to approved planns for tenant improvements at the 7th floor creat three seperate suites, each with its own break room, offices, conference rooms * open office work area. ref pa#202509306438Details
modifications to approved planns for tenant improvements at the 7th floor creat three seperate suites, each with its own break room, offices, conference rooms * open office work area. ref pa#202509306438 | |
| May 11, 2026 | In progress issued May 2026 | 500 Washington St | interior non-structural demo on 1st floor, ste: 102 only. per ab-017Details
interior non-structural demo on 1st floor, ste: 102 only. per ab-017 | $25,000 |
| Feb 23, 2026 | In progress issued Apr 2026 | 55 Green St | interior only 5th floor t.i. remodel existing restrooms. new all gender restroom. renovate entire floor with new offices, open work area, break room and reception area. mep deffered.Details
interior only 5th floor t.i. remodel existing restrooms. new all gender restroom. renovate entire floor with new offices, open work area, break room and reception area. mep deffered. | $1,000,000 |
| Dec 19, 2025 | In progress issued Jan 2026 | 500 Washington St | l5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exteriorDetails
l5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exterior | $117,000 |
| Nov 14, 2025 | In progress issued Jan 2026 | 500 Washington St | 3/f: deferred mep for pa# 202509306379.Details
3/f: deferred mep for pa# 202509306379. | $558,454 |
| Nov 12, 2025 | In progress issued Jan 2026 | 500 Washington St | 7/fl-ref ti 202509306438 deferred mepDetails
7/fl-ref ti 202509306438 deferred mep | $430,162 |
| Nov 12, 2025 | In progress issued Jan 2026 | 500 Washington St | level 1: interior renovation of existing building lobbyDetails
level 1: interior renovation of existing building lobby | $287,329 |
| Nov 10, 2025 | In progress issued Jan 2026 | 500 Washington St | basement -expansion and remodel of (e) basement gymDetails
basement -expansion and remodel of (e) basement gym | $809,897 |
| Sep 30, 2025 | In progress issued Nov 2025 | 500 Washington St | 3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spacesDetails
3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spaces | $1,474,000 |
| Sep 30, 2025 | In progress issued Oct 2025 | 500 Washington St | 7/f: full floor tenant improvement. remodeling/construction of new offices, conference rooms, employee lounge, and restrooms. construction of a new, accessible toilet room.Details
7/f: full floor tenant improvement. remodeling/construction of new offices, conference rooms, employee lounge, and restrooms. construction of a new, accessible toilet room. | $1,085,000 |
| Sep 4, 2025 | In progress issued Oct 2025 | 530 Jackson St | in the basement and on 1st-5th floors, remove (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical, fa devices, sprinkler and equipment not intended to be revised. no work to exterior elevations. no work to windows and skylights.Details
in the basement and on 1st-5th floors, remove (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical, fa devices, sprinkler and equipment not intended to be revised. no work to exterior elevations. no work to windows and skylights. | $130,000 |
| Jan 23, 2025 | Completed final sign-off Jan 2026 | 500 Washington St | floors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017Details
floors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017 | $31,000 |
| Dec 16, 2024 | Completed final sign-off Feb 2025 | 55 Green St | level 1 - area of the (e) open office will be converted into an enclosed conference. total area of alteration is 258 sq ft which is 2.69% of the gross building area. mep deferred.Details
level 1 - area of the (e) open office will be converted into an enclosed conference. total area of alteration is 258 sq ft which is 2.69% of the gross building area. mep deferred. | $113,300 |
| Dec 12, 2024 | Completed final sign-off Dec 2024 | 55 Green St | remove mep scope for pa# 202406104034Details
remove mep scope for pa# 202406104034 |