| Oct 1, 2026 | In progress | 500 Washington St | 1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred | $675,000 | |
| Aug 25, 2026 | In progress | 500 Washington St | Rowdy Red Construction Llc | revision to bpa#202511129349, addition of fire damper | $5,600 |
| Jul 29, 2026 | In progress | 500 Washington St | Rowdy Red Construction Llc | 5th and 6th floor: restroom upgrade by property owner. barrier removal, no change of use or occupancy. renovation of men's and women's restroom on level 5 and 6 . no changing in plumbing fixture count. | $100,000 |
| Jul 17, 2026 | In progress | 500 Washington St | Rowdy Red Construction Llc | modifications to approved planns for tenant improvements at the 7th floor creat three seperate suites, each with its own break room, offices, conference rooms * open office work area. ref pa#202509306438 | |
| Jul 1, 2026 | In progress | 500 Washington St | Acco Engineered Systems Inc. Dba Acco En | demo & replace (e) boilers & (e) chiller with like units. replace (e) hhw pumps with (n) primary/secondary system. | $600,000 |
| May 13, 2026 | In progress | 500 Washington St | renovation of (e) exterior paseo. exterior coa motion no.504 | $1,900,000 | |
| May 11, 2026 | In progress | 500 Washington St | Rowdy Red Construction Llc | interior non-structural demo on 1st floor, ste: 102 only. per ab-017 | $25,000 |
| Dec 19, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | l5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exterior | $117,000 |
| Nov 14, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | 3/f: deferred mep for pa# 202509306379. | $558,454 |
| Nov 12, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | 7/fl-ref ti 202509306438 deferred mep | $430,162 |
| Nov 12, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | level 1: interior renovation of existing building lobby | $287,329 |
| Nov 10, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | basement -expansion and remodel of (e) basement gym | $809,897 |
| Sep 30, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | 7/f: full floor tenant improvement. remodeling/construction of new offices, conference rooms, employee lounge, and restrooms. construction of a new, accessible toilet room. | $1,085,000 |
| Sep 30, 2025 | In progress | 500 Washington St | Rowdy Red Construction Llc | 3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spaces | $1,474,000 |
| Aug 21, 2025 | Completed | 500 Washington St | Pioneer Fire Inc. | 1st, 3rd & 7th fl: convert 92 pendents to upright. reference pa # 2025-0123-8931 | $23,000 |
| Jan 27, 2025 | Expired or cancelled | 500 Washington St | level 4: removal of extisting interior partitions, flooring, finishes, ceiling, millwork, mechanical, electrical fire alarm devices, sprinkler, and equipment not intended to be revised. ab-017 ada @ t.i. | $30,000 | |
| Jan 23, 2025 | Completed | 500 Washington St | Rowdy Red Construction Llc | floors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017 | $31,000 |
| Feb 25, 2021 | Completed | 500 Washington St | Sabah International Incorporated | voluntary fire alarm system replacement. replace existing simplex fire alarm control out with a new est3 facu. all 86 existing initiating and 187 notification appliances will be replaced with new on a one for one basis | $523,500 |
| Feb 20, 2019 | Completed | 500 Washington St | D A Pope Inc | suite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a. | $100,000 |
| Jan 15, 2019 | Completed | 500 Washington St | Johnson Controls Fire | on 4th floor - fire alarm tenant improvement: install (6) new strobe notification appliances and (1) new speaker notification appliance relocate (1) existing speaker. ref#201811065128 | $3,700 |
| Dec 7, 2018 | Completed | 500 Washington St | Act Now Fire Inspection | suite 450: relocate 5, add 1 fire sprinkler to accomodate new t.i. changes. maher n/a. | $6,500 |
| Nov 29, 2018 | Completed | 500 Washington St | Legacy Mechanical & Energy Services, Inc | 2 vav replacements minor ductwork changes. 4th floor suite 450. mechanical submittal related to pa #201811065128. | $10,000 |
| Nov 6, 2018 | Completed | 500 Washington St | D A Pope Inc | suite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions. | $200,000 |
| Oct 25, 2018 | Completed | 500 Washington St | Sabah International Incorporated | fire alarm system add 1 power supply and add 6 speaker strobes. ref 201809109549 | $8,825 |
| Oct 22, 2018 | Completed | 500 Washington St | Peacock Construction | t-24 electrical for work under pa# 201809109549 & 201809109550. n/a for maher. | $60,000 |
| Oct 22, 2018 | Never finaled | 500 Washington St | Golden Gate Fire Protection Inc | fire sprinkler only change/correcting pipe size on plan from s 1/2" to 2" by plumbing inspectors request. revision to 2018-1010-2724 | |
| Oct 10, 2018 | Completed | 500 Washington St | Golden Gate Fire Protection Inc | 2nd fl - fire sprinkler only relocate 29 conceal sprinkler heads for pel on the 2nd floor suite, 200. | $15,080 |
| Sep 10, 2018 | Completed | 500 Washington St | Peacock Construction | 2nd floor:common area upgrades of finishes and lighting barrier removal at restrooms. n/a for maher | $153,527 |
| Sep 10, 2018 | Completed | 500 Washington St | Peacock Construction | 2nd floor: t.i. for removal of non-structural, partitions. new finishes, millwork, offices, and electrical. mep, fire, life safety and sprinkler under seperate permit. n/a for maher | $355,305 |
| Aug 1, 2018 | Never finaled | 500 Washington St | street space | ||
| Jan 19, 2018 | Completed | 500 Washington St | Team Commercial Construction Inc. | # 425: modification and extend extg duct work. relocate supply and return grilles. relocate t-stats, re-balance 5 vav boxes. ref#201709137923. n/a for maher | $4,972 |
| Jan 19, 2018 | Never finaled | 500 Washington St | Team Commercial Construction Inc. | # 425: partial scope office tenant retrofit:lighing power & signal, wiring and controls. ref#201709137923. n/a for maher | $18,331 |
| Nov 10, 2017 | Completed | 500 Washington St | Pioneer Fire Inc. | relocate 3 pendents and add 3 pendents ref pa 2017-0913-7923 | $4,730 |
| Sep 13, 2017 | Completed | 500 Washington St | Team Commercial Construction Inc. | 4th fl, suite 425: ti includes demo of non-structural partitions and build (n) non-structural partitions. all new or revised mep's, life safety, and sprinklers will be design build and submitted separately. building is fully sprinklered. maher na | $61,000 |
| Nov 3, 2016 | Completed | 500 Washington St | Johnson Controls Fire | 4th floor: as built drawings consist of adding one strobe and relocate one strobe to a new location. n/a for maher. ref app#201610170463 | |
| Oct 17, 2016 | Completed | 500 Washington St | Johnson Controls Fire | 4th floor t.i. consists of adding (2) duct detectors & (1) smoke detector & (1) relay for the smoke dampers. ref #201608034058. n/a maher ordinance | $2,000 |
| Oct 6, 2016 | Never finaled | 500 Washington St | Team Commercial Construction Inc. | 4th floor - mechanical & electrical work from deferred pa #201608034058. | $22,000 |
| Oct 5, 2016 | Never finaled | 500 Washington St | Pioneer Fire Inc. | 4th floor: relocate 8 pendents. ref pa 2016-0803-4058. maher na | $6,800 |
| Aug 3, 2016 | Completed | 500 Washington St | Team Commercial Construction Inc. | 4th floor ti includes demo of non structural partions and building new non-structural partitions, all new & revised mep, life safety and sprinklers work, if needed under separate permit. (bldg is fully sprinklered). n/a ordinance #155-13 | $121,000 |
| Jul 21, 2016 | Never finaled | 500 Washington St | street space & mta parking meter | ||
| Jan 15, 2015 | Never finaled | 500 Washington St | street space, sidewalk & mta parking meter | ||
| Sep 30, 2014 | Completed | 500 Washington St | Johnson Controls Fire | 2nd floor: t.i. consist of adding 13 speaker/strobes, 2 speakers, and one smoke detector. ref app#201408113569. n/a for the maher ordinance #155-13 | $8,000 |
| Sep 11, 2014 | Never finaled | 500 Washington St | Team Commercial Construction Inc. | unit 200: mechanical and electrical work for offices on 2nd floor. ref app#201408113569. n/a for the maher ordinance #155-13 | $145,000 |
| Aug 29, 2014 | Completed | 500 Washington St | Pioneer Fire Inc. | relocate (9) concealer pendents; remove (3) sprinklers on 2nd floor (suite 200). n/a maher ordinance # 155-13 | $9,650 |
| Aug 11, 2014 | Never finaled | 500 Washington St | Team Commercial Construction Inc. | 2nd flr: t.i. include the demo of non-structural partitions & building new non structural partitions. all new or revised, hvac, elec, plmbg & l/s work will be design built & submitted separately (bldg is fully sprinklered) maher n/a | $310,000 |
| Jul 18, 2013 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | 8th floor: add and relocate fire sprinkler heads per t.i.. add 1, and relocate 3. ref app#201306189876 | $2,000 |
| Jul 17, 2013 | Completed | 500 Washington St | Simplexgrinnell Lp. | suite #800-fire alarm tenant improvement-relocate 1 (e) fire alarm strobe. reference ti 2013.0616.9876 | $1,500 |
| Jun 18, 2013 | Completed | 500 Washington St | Bcci Construction Company | tenant improvement in suite 800 including the installation of new furniture wall systes, modifications to power data/lighting layout, minor reconfiguration to existing mechanical systems. fire las and sprinklers under separate permit | $331,800 |
| May 22, 2013 | Completed | 500 Washington St | Golden Gate Fire Protection Inc | 3rd floor - relocate 7 pendent sprinkler heads. ref pa #2012.12.20.6611 | $3,600 |
| Mar 1, 2013 | Never finaled | 500 Washington St | Simplexgrinnell Lp. | 3rd floor: fire alarm t.i. adding 2 new ceiling mount strobes and 5 ceiling mount spk/strobes to extg nac panel ref app#201712206611 | $3,000 |
| Dec 20, 2012 | Completed | 500 Washington St | Peacock Construction Inc | 3rd floor-t.i include the demolition of non structural partition, building non structural partitions. all new or revised hvac, electrical & life safety work will be deisgn build & subbmiited for permit seperatley. building is fully sprinklered. | $110,000 |
| Apr 12, 2012 | Completed | 500 Washington St | Acco Engineered Systems Inc. Dba Acco En | replace (2) cooling tower, (4) pumps, install new heat exchanger & modify piping.replaced from (e) weight of 7010 lbs to new weight of 5600 lbs (reduced in weight). | $400,000 |
| Nov 23, 2011 | Completed | 500 Washington St | Novo Construction Inc | (1st floor) tenant improvement include the demolition of non-structural partitions & building new non-structural partition; hvac electrical, plumbing & life safety will be design build & submitted separately. sprinkler work not required. | $60,000 |
| Sep 8, 2011 | Completed | 500 Washington St | Simplex Grinnell | 2nd floor-fire alarm ti, 6 new ceiling speakers, 5 new strobes | $12,600 |
| Aug 3, 2011 | Completed | 500 Washington St | Novo Construction Inc | office ti on 2nd fl. ste 200 - demo of non struc, partitions, and building new non struc partitions. all new or revised hvac, elec, plbg and life safety will be dsign build and will be sumitted under separate permit. building fully sprinklered | $57,000 |
| Oct 8, 2010 | Completed | 500 Washington St | R L H Fire Protection Inc | ti upgrade on existing fire sprinkler system on 1st floor. 31 new pendents and 27 new uprights | $18,000 |
| Sep 16, 2010 | Completed | 500 Washington St | Simplex Grinnell | first fl: add 2 smoke detectors, 12 duct smoke detectors ann 19 speaker/strobes | $13,000 |
| Aug 27, 2010 | Expired or cancelled | 500 Washington St | installation of unmanned telecommunications facility with equipment cabinets on roof top & antennas mounted to (e) building penthouse structure. 6 new attenas; 2 new equip cabinets (2 future) | $80,000 | |
| Aug 2, 2010 | Expired or cancelled | 500 Washington St | replacement of the glazing of 4 exterior windows and replacement of 1 pair of exterior doors | $21,000 | |
| Jul 8, 2010 | Completed | 500 Washington St | Novo Construction Inc | tenant improvement on the ground floor to include new conference center, 'servery', restrooms and reception. mechanical and electrical included. life safety and fire sprinkler under sep permit. | $590,142 |
| Apr 6, 2009 | Never finaled | 500 Washington St | Ayoob & Peery Plumbing Co Inc | remove fire sprinkler heads, pipe and hangers plug elevator mech room and elevator shaft. | $2,500 |
| Mar 17, 2009 | Never finaled | 500 Washington St | Simplex Grinnell | revision to 2009/0116/0380 changes locations of (2) smoke detectors from elevators shaft to elevator control rm. | |
| Feb 17, 2009 | Expired or cancelled | 500 Washington St | Novo Construction Inc | 2nd floor-tenant improvement to include adding ceiling grid and light fixtures. t-24, electrical, life safety seperate permit. | $15,800 |
| Jan 16, 2009 | Never finaled | 500 Washington St | Simplex Grinnell | fire alarm t.i. @ elevator machine on 1st floor addition of 5 smoke detectors and 1 czam. | $1,500 |
| Jan 7, 2009 | Never finaled | 500 Washington St | Ayoob & Peery Plumbing Co Inc | at 2nd fl: relocate & remove fire sprinkler heads per t.i. 14 relocate, 11 remove. | $2,520 |
| Dec 15, 2008 | Completed | 500 Washington St | Novo Construction Inc | interior non structural demolition on the 2nd fl per ab017 | $18,000 |
| Dec 11, 2008 | Completed | 500 Washington St | Novo Construction Inc | grd floor - demolition of non-structural partitions ab-017. | $4,000 |
| Dec 9, 2008 | Expired or cancelled | 500 Washington St | Novo Construction Inc | ground floor-demolition of non-structural partitions, ceiling tiles, grid, light fixtures and existing distribution duct work & by-pass control boxes ab-017. | $4,000 |
| Sep 23, 2008 | Never finaled | 500 Washington St | street space only. | ||
| Sep 16, 2008 | Completed | 500 Washington St | Simplex Grinnell | install 1 nac extender, 3 pull stations, 10 smoke detectors, 4 duct smoke detectors, 1 duct sensor, 2 control zams, 8 door holders, 26 strobes & 28 sprinklers on 8th floor. | $50,000 |
| Aug 25, 2008 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | at 8th fl: add, relocate fire sprinkler per t.i., 96 relocated heads, 14 added heads, 5 plugged heads. | $19,000 |
| Jul 31, 2008 | Completed | 500 Washington St | Novo Construction Inc | renew pa#200801082074, 200712130358, 200802285880 for final inspeciton only. | |
| Jul 11, 2008 | Completed | 500 Washington St | Bcci Construction Company | 8th floor, ste 800 - full floor tenant improvement including new partitions, new lighting, new power & data outlets, new hvac distribution, new finishes & materials . fire sprinklers & l.s. under separate permit. include upgrading of the restrooms on this floor. interior work only. | $1,900,000 |
| Jul 8, 2008 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | add 5 heads per tenant improvement | $1,225 |
| Jul 3, 2008 | Never finaled | 500 Washington St | street space permit only. | ||
| Jul 3, 2008 | Never finaled | 500 Washington St | Bcci Construction Company | 8th floor-demolition plans for 8th floor under ab-017. demo interior partitions, floor, wall finishes, power, data, lighting and ceilings. fire and life safety to remain on for duration of demolition. | $19,500 |
| May 23, 2008 | Completed | 500 Washington St | revision to application 200712190892, 6th floor (n) door hardware to decks, 5th floor (n) 18" deep smoke draft curtain. | $4,500 | |
| May 15, 2008 | Never finaled | 500 Washington St | Simplex Grinnell | 6th floor-revision to pa# 2008-0305-6354 includes the removal of 2 wp horn strobes and 2 adapter modules to 6th floor deck areas. 6th floor only | $575 |
| Apr 25, 2008 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | 6th floor:fire sprinkler system. relocate and remove fire sprinkler heads. reloacte 117 heads, removed 14 heads. | $20,000 |
| Mar 5, 2008 | Completed | 500 Washington St | Simplex Grinnell | t.i. fire alarm to 5th & 6th floors. includes addition of (2) nac panels (57) strobes, (52) speakers, (20) smoke detectors, 16 duct detectors, (11) door holders, (6) control modules and (2) signal modules. | $22,000 |
| Feb 28, 2008 | Completed | 500 Washington St | Simplex Grinnell | as builts to app 200801082074. includes demo 1 strobe, increased candela on 1 strobe, replacment of 5 existing core strobes with new | $2,000 |
| Feb 19, 2008 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | 5th floor - t.i. for sprinkler system on the 5th floor. relocate 107 sprikler heads and add 9 heads. total 116 heads. | $13,500 |
| Jan 28, 2008 | Expired or cancelled | 500 Washington St | 4th floor: revision to appl #200711278968 to change drinking fountain status on d.a. checklist to hardship provided. | ||
| Jan 8, 2008 | Completed | 500 Washington St | Simplex Grinnell | provide & install (1) nac power supply (12) ceiling speakers, (14) strobes and (3) smoke detectors to connect to existing facp as noted on plans. | $11,500 |
| Jan 8, 2008 | Completed | 500 Washington St | Acco Engineered Systems Inc. Dba Acco En | installation of 4 new vav boxes, install (21) new supply grilles and install (17) new thermostats. relocate (1) existing thermostat, air balance at area of work only per new floor plan. modify ductwork, architect plans under 200711278968. | $25,000 |
| Jan 3, 2008 | Completed | 500 Washington St | Novo Construction Inc | 4th floor - lighting fixture including title 24, ref # 200711278968. | $42,000 |
| Dec 31, 2007 | Completed | 500 Washington St | Novo Construction Inc | full floor electrical, mechanical and plubing work on the 5th and 6th floor. ref. pa# 2007/12/19/0892 | $575,000 |
| Dec 19, 2007 | Completed | 500 Washington St | 5th and 6th floor ti. interior demolition and construction of new non-structural demising walls throughout. new restrooms. hvac, electrical and life safety work will be done under separate permit | $700,000 | |
| Dec 13, 2007 | Completed | 500 Washington St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler per tenant improvements. total of 66 heads - 16 heads plugges. | $8,500 |
| Nov 27, 2007 | Completed | 500 Washington St | Novo Construction Inc | tenant improvements including (n) demising of suite, ceiling ht partitions, (n) ceiling. work on 4th floor. | $150,000 |
| Nov 19, 2007 | Completed | 500 Washington St | Novo Construction Inc | demolition of interior non structural partitions, ceiling grid and ceiling tile on 4th floor | $35,000 |
| Aug 17, 2007 | Expired or cancelled | 500 Washington St | suite 400 4th floor oti sprinkler, mechanical and life safety under seperate permit | $81,000 | |
| Oct 23, 2006 | Completed | 500 Washington St | Skyline Construction | oti-4 3rd floor me | $36,000 |
| Oct 12, 2006 | Completed | 500 Washington St | Skyline Construction | oti-2, 3rd floor el sp | $47,000 |
| Oct 11, 2006 | Completed | 500 Washington St | Skyline Construction | oti-2 3rd floor sp | $7,500 |
| Oct 5, 2006 | Completed | 500 Washington St | Simplex Grinnell | add fire alarm devices to the new t.i., 3 strobes, 2 speaker/strobes | $5,000 |
| Oct 5, 2006 | Expired or cancelled | 500 Washington St | Simplex Grinnell | add fire alarm devices to the new t.i. - (1) smoke detector, (2) strobes, (5) speaker/strobes | $6,000 |
| Oct 4, 2006 | Completed | 500 Washington St | Skyline Construction | oti-2, 3rd floor, el, me | $35,000 |
| Oct 3, 2006 | Expired or cancelled | 500 Washington St | 3rd floor-add fire alarm devices to the new t.i-1 smoke detector, 2 strobes, 5 speakers/strobes. | $6,000 | |
| Aug 22, 2006 | Completed | 500 Washington St | Skyline Construction | oti-1, 3rd floor, el, ls, sp, me. | $65,000 |
| Aug 9, 2006 | Completed | 500 Washington St | Skyline Construction | oti-1, 3rd floor, el, me, ls, sp. | $65,000 |
| Feb 23, 2006 | Expired or cancelled | 500 Washington St | Simplex Grinnell | an as built submittal to application/permit no: 2006/01/24/2846, addition includes: 2 smoke detector, 4 duct smoke detector, 1 control zam, 10 iams (2nd floor) | $9,000 |
| Feb 15, 2006 | Completed | 500 Washington St | Skyline Construction | lighting installation on 2/f | $4,500 |
| Feb 6, 2006 | Completed | 500 Washington St | Skyline Construction | sprinkler work. (20) relocates | $6,000 |
| Feb 6, 2006 | Completed | 500 Washington St | Skyline Construction | mechanical work on 2/f | $18,000 |
| Feb 6, 2006 | Completed | 500 Washington St | Skyline Construction | oti-1 3/f el, ls, sp interior demolition & reconfiguration of space. | $60,000 |
| Jan 24, 2006 | Completed | 500 Washington St | Simplex Grinnell | fire alarm notification improvement to the 2nd floor elev. lobby corridor and restrooms consiting of adding: 1 nac extender & 2 10ah battery, 6 speaker, 1 smoke detector, 7 strobes | $5,200 |
| Dec 1, 2005 | Completed | 500 Washington St | Skyline Construction | oti-1, 2nd floor, el, ls, sp. demolition & reconfrigration of office space | $110,000 |
| Oct 19, 2005 | Completed | 500 Washington St | Skyline Construction | demolition - no increase in office space - ab-017 vacant space allowance (demo only) | $4,000 |
| Oct 11, 2005 | Completed | 500 Washington St | Simplex Grinnell | fire alarm t. i. on 1st, 3rd & 7th floor. elev lobby/restroom. | $12,500 |
| Sep 19, 2005 | Completed | 500 Washington St | Skyline Construction | sprinkler work. 14 relocated heads. no increase in office space.3rd floor | $25,000 |
| Sep 19, 2005 | Completed | 500 Washington St | Skyline Construction | fire sprinkler work. 10 relocated heads, no increase in office space. | $2,300 |
| Aug 18, 2004 | Expired or cancelled | 500 Washington St | Bcci Construction Company | scope of work is ltd to interior non structural pre const demo this area is to remain unoccupied in | $4,000 |
| Sep 25, 2002 | Never finaled | 500 Washington St | street space permit | ||
| Aug 14, 2002 | Never finaled | 500 Washington St | street space permit | ||
| Aug 8, 2002 | Completed | 500 Washington St | Dpr Construction Inc | mech.systemmodifications-replace(1)chiller unit,all work on roof & basement panel | $200,000 |
| Aug 7, 2002 | Completed | 500 Washington St | Western Roofing Service | reroofing | $300,000 |
| Aug 6, 2002 | Completed | 500 Washington St | Dpr Construction Inc | fabricate & install mechanical equipment platforms | $9,500 |
| Jul 18, 2002 | Completed | 500 Washington St | Dpr Construction Inc | replace&remove roofing system-waterproofing of exterior decks. | $400,000 |
| May 19, 2000 | Expired or cancelled | 500 Washington St | street space |