Permit GraphSan Francisco building permits since 2000

Block 0196, lot 023

500 Washington St

120 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 1, 2026In progress500 Washington St1 + mezz/fl-construct (n) beverage bar and food prep area, construct new seating and gallery areas, install (n) stair serving (e) mezzaine, install (n) lula elevator serving (e) mezzaine, install associated food service equipment, casework, finishes and fixtures. mep deferred$675,000
Aug 25, 2026In progress500 Washington StRowdy Red Construction Llcrevision to bpa#202511129349, addition of fire damper$5,600
Jul 29, 2026In progress500 Washington StRowdy Red Construction Llc5th and 6th floor: restroom upgrade by property owner. barrier removal, no change of use or occupancy. renovation of men's and women's restroom on level 5 and 6 . no changing in plumbing fixture count.$100,000
Jul 17, 2026In progress500 Washington StRowdy Red Construction Llcmodifications to approved planns for tenant improvements at the 7th floor creat three seperate suites, each with its own break room, offices, conference rooms * open office work area. ref pa#202509306438
Jul 1, 2026In progress500 Washington StAcco Engineered Systems Inc. Dba Acco Endemo & replace (e) boilers & (e) chiller with like units. replace (e) hhw pumps with (n) primary/secondary system.$600,000
May 13, 2026In progress500 Washington Strenovation of (e) exterior paseo. exterior coa motion no.504$1,900,000
May 11, 2026In progress500 Washington StRowdy Red Construction Llcinterior non-structural demo on 1st floor, ste: 102 only. per ab-017$25,000
Dec 19, 2025In progress500 Washington StRowdy Red Construction Llcl5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exterior$117,000
Nov 14, 2025In progress500 Washington StRowdy Red Construction Llc3/f: deferred mep for pa# 202509306379.$558,454
Nov 12, 2025In progress500 Washington StRowdy Red Construction Llc7/fl-ref ti 202509306438 deferred mep$430,162
Nov 12, 2025In progress500 Washington StRowdy Red Construction Llclevel 1: interior renovation of existing building lobby$287,329
Nov 10, 2025In progress500 Washington StRowdy Red Construction Llcbasement -expansion and remodel of (e) basement gym$809,897
Sep 30, 2025In progress500 Washington StRowdy Red Construction Llc7/f: full floor tenant improvement. remodeling/construction of new offices, conference rooms, employee lounge, and restrooms. construction of a new, accessible toilet room.$1,085,000
Sep 30, 2025In progress500 Washington StRowdy Red Construction Llc3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spaces$1,474,000
Aug 21, 2025Completed500 Washington StPioneer Fire Inc.1st, 3rd & 7th fl: convert 92 pendents to upright. reference pa # 2025-0123-8931$23,000
Jan 27, 2025Expired or cancelled500 Washington Stlevel 4: removal of extisting interior partitions, flooring, finishes, ceiling, millwork, mechanical, electrical fire alarm devices, sprinkler, and equipment not intended to be revised. ab-017 ada @ t.i.$30,000
Jan 23, 2025Completed500 Washington StRowdy Red Construction Llcfloors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017$31,000
Feb 25, 2021Completed500 Washington StSabah International Incorporatedvoluntary fire alarm system replacement. replace existing simplex fire alarm control out with a new est3 facu. all 86 existing initiating and 187 notification appliances will be replaced with new on a one for one basis$523,500
Feb 20, 2019Completed500 Washington StD A Pope Incsuite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a.$100,000
Jan 15, 2019Completed500 Washington StJohnson Controls Fireon 4th floor - fire alarm tenant improvement: install (6) new strobe notification appliances and (1) new speaker notification appliance relocate (1) existing speaker. ref#201811065128$3,700
Dec 7, 2018Completed500 Washington StAct Now Fire Inspectionsuite 450: relocate 5, add 1 fire sprinkler to accomodate new t.i. changes. maher n/a.$6,500
Nov 29, 2018Completed500 Washington StLegacy Mechanical & Energy Services, Inc2 vav replacements minor ductwork changes. 4th floor suite 450. mechanical submittal related to pa #201811065128.$10,000
Nov 6, 2018Completed500 Washington StD A Pope Incsuite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions.$200,000
Oct 25, 2018Completed500 Washington StSabah International Incorporatedfire alarm system add 1 power supply and add 6 speaker strobes. ref 201809109549$8,825
Oct 22, 2018Completed500 Washington StPeacock Constructiont-24 electrical for work under pa# 201809109549 & 201809109550. n/a for maher.$60,000
Oct 22, 2018Never finaled500 Washington StGolden Gate Fire Protection Incfire sprinkler only change/correcting pipe size on plan from s 1/2" to 2" by plumbing inspectors request. revision to 2018-1010-2724
Oct 10, 2018Completed500 Washington StGolden Gate Fire Protection Inc2nd fl - fire sprinkler only relocate 29 conceal sprinkler heads for pel on the 2nd floor suite, 200.$15,080
Sep 10, 2018Completed500 Washington StPeacock Construction2nd floor:common area upgrades of finishes and lighting barrier removal at restrooms. n/a for maher$153,527
Sep 10, 2018Completed500 Washington StPeacock Construction2nd floor: t.i. for removal of non-structural, partitions. new finishes, millwork, offices, and electrical. mep, fire, life safety and sprinkler under seperate permit. n/a for maher$355,305
Aug 1, 2018Never finaled500 Washington Ststreet space
Jan 19, 2018Completed500 Washington StTeam Commercial Construction Inc.# 425: modification and extend extg duct work. relocate supply and return grilles. relocate t-stats, re-balance 5 vav boxes. ref#201709137923. n/a for maher$4,972
Jan 19, 2018Never finaled500 Washington StTeam Commercial Construction Inc.# 425: partial scope office tenant retrofit:lighing power & signal, wiring and controls. ref#201709137923. n/a for maher$18,331
Nov 10, 2017Completed500 Washington StPioneer Fire Inc.relocate 3 pendents and add 3 pendents ref pa 2017-0913-7923$4,730
Sep 13, 2017Completed500 Washington StTeam Commercial Construction Inc.4th fl, suite 425: ti includes demo of non-structural partitions and build (n) non-structural partitions. all new or revised mep's, life safety, and sprinklers will be design build and submitted separately. building is fully sprinklered. maher na$61,000
Nov 3, 2016Completed500 Washington StJohnson Controls Fire4th floor: as built drawings consist of adding one strobe and relocate one strobe to a new location. n/a for maher. ref app#201610170463
Oct 17, 2016Completed500 Washington StJohnson Controls Fire4th floor t.i. consists of adding (2) duct detectors & (1) smoke detector & (1) relay for the smoke dampers. ref #201608034058. n/a maher ordinance$2,000
Oct 6, 2016Never finaled500 Washington StTeam Commercial Construction Inc.4th floor - mechanical & electrical work from deferred pa #201608034058.$22,000
Oct 5, 2016Never finaled500 Washington StPioneer Fire Inc.4th floor: relocate 8 pendents. ref pa 2016-0803-4058. maher na$6,800
Aug 3, 2016Completed500 Washington StTeam Commercial Construction Inc.4th floor ti includes demo of non structural partions and building new non-structural partitions, all new & revised mep, life safety and sprinklers work, if needed under separate permit. (bldg is fully sprinklered). n/a ordinance #155-13$121,000
Jul 21, 2016Never finaled500 Washington Ststreet space & mta parking meter
Jan 15, 2015Never finaled500 Washington Ststreet space, sidewalk & mta parking meter
Sep 30, 2014Completed500 Washington StJohnson Controls Fire2nd floor: t.i. consist of adding 13 speaker/strobes, 2 speakers, and one smoke detector. ref app#201408113569. n/a for the maher ordinance #155-13$8,000
Sep 11, 2014Never finaled500 Washington StTeam Commercial Construction Inc.unit 200: mechanical and electrical work for offices on 2nd floor. ref app#201408113569. n/a for the maher ordinance #155-13$145,000
Aug 29, 2014Completed500 Washington StPioneer Fire Inc.relocate (9) concealer pendents; remove (3) sprinklers on 2nd floor (suite 200). n/a maher ordinance # 155-13$9,650
Aug 11, 2014Never finaled500 Washington StTeam Commercial Construction Inc.2nd flr: t.i. include the demo of non-structural partitions & building new non structural partitions. all new or revised, hvac, elec, plmbg & l/s work will be design built & submitted separately (bldg is fully sprinklered) maher n/a$310,000
Jul 18, 2013Completed500 Washington StAyoob & Peery Plumbing Co Inc8th floor: add and relocate fire sprinkler heads per t.i.. add 1, and relocate 3. ref app#201306189876$2,000
Jul 17, 2013Completed500 Washington StSimplexgrinnell Lp.suite #800-fire alarm tenant improvement-relocate 1 (e) fire alarm strobe. reference ti 2013.0616.9876$1,500
Jun 18, 2013Completed500 Washington StBcci Construction Companytenant improvement in suite 800 including the installation of new furniture wall systes, modifications to power data/lighting layout, minor reconfiguration to existing mechanical systems. fire las and sprinklers under separate permit$331,800
May 22, 2013Completed500 Washington StGolden Gate Fire Protection Inc3rd floor - relocate 7 pendent sprinkler heads. ref pa #2012.12.20.6611$3,600
Mar 1, 2013Never finaled500 Washington StSimplexgrinnell Lp.3rd floor: fire alarm t.i. adding 2 new ceiling mount strobes and 5 ceiling mount spk/strobes to extg nac panel ref app#201712206611$3,000
Dec 20, 2012Completed500 Washington StPeacock Construction Inc3rd floor-t.i include the demolition of non structural partition, building non structural partitions. all new or revised hvac, electrical & life safety work will be deisgn build & subbmiited for permit seperatley. building is fully sprinklered.$110,000
Apr 12, 2012Completed500 Washington StAcco Engineered Systems Inc. Dba Acco Enreplace (2) cooling tower, (4) pumps, install new heat exchanger & modify piping.replaced from (e) weight of 7010 lbs to new weight of 5600 lbs (reduced in weight).$400,000
Nov 23, 2011Completed500 Washington StNovo Construction Inc(1st floor) tenant improvement include the demolition of non-structural partitions & building new non-structural partition; hvac electrical, plumbing & life safety will be design build & submitted separately. sprinkler work not required.$60,000
Sep 8, 2011Completed500 Washington StSimplex Grinnell2nd floor-fire alarm ti, 6 new ceiling speakers, 5 new strobes$12,600
Aug 3, 2011Completed500 Washington StNovo Construction Incoffice ti on 2nd fl. ste 200 - demo of non struc, partitions, and building new non struc partitions. all new or revised hvac, elec, plbg and life safety will be dsign build and will be sumitted under separate permit. building fully sprinklered$57,000
Oct 8, 2010Completed500 Washington StR L H Fire Protection Incti upgrade on existing fire sprinkler system on 1st floor. 31 new pendents and 27 new uprights$18,000
Sep 16, 2010Completed500 Washington StSimplex Grinnellfirst fl: add 2 smoke detectors, 12 duct smoke detectors ann 19 speaker/strobes$13,000
Aug 27, 2010Expired or cancelled500 Washington Stinstallation of unmanned telecommunications facility with equipment cabinets on roof top & antennas mounted to (e) building penthouse structure. 6 new attenas; 2 new equip cabinets (2 future)$80,000
Aug 2, 2010Expired or cancelled500 Washington Streplacement of the glazing of 4 exterior windows and replacement of 1 pair of exterior doors$21,000
Jul 8, 2010Completed500 Washington StNovo Construction Inctenant improvement on the ground floor to include new conference center, 'servery', restrooms and reception. mechanical and electrical included. life safety and fire sprinkler under sep permit.$590,142
Apr 6, 2009Never finaled500 Washington StAyoob & Peery Plumbing Co Incremove fire sprinkler heads, pipe and hangers plug elevator mech room and elevator shaft.$2,500
Mar 17, 2009Never finaled500 Washington StSimplex Grinnellrevision to 2009/0116/0380 changes locations of (2) smoke detectors from elevators shaft to elevator control rm.
Feb 17, 2009Expired or cancelled500 Washington StNovo Construction Inc2nd floor-tenant improvement to include adding ceiling grid and light fixtures. t-24, electrical, life safety seperate permit.$15,800
Jan 16, 2009Never finaled500 Washington StSimplex Grinnellfire alarm t.i. @ elevator machine on 1st floor addition of 5 smoke detectors and 1 czam.$1,500
Jan 7, 2009Never finaled500 Washington StAyoob & Peery Plumbing Co Incat 2nd fl: relocate & remove fire sprinkler heads per t.i. 14 relocate, 11 remove.$2,520
Dec 15, 2008Completed500 Washington StNovo Construction Incinterior non structural demolition on the 2nd fl per ab017$18,000
Dec 11, 2008Completed500 Washington StNovo Construction Incgrd floor - demolition of non-structural partitions ab-017.$4,000
Dec 9, 2008Expired or cancelled500 Washington StNovo Construction Incground floor-demolition of non-structural partitions, ceiling tiles, grid, light fixtures and existing distribution duct work & by-pass control boxes ab-017.$4,000
Sep 23, 2008Never finaled500 Washington Ststreet space only.
Sep 16, 2008Completed500 Washington StSimplex Grinnellinstall 1 nac extender, 3 pull stations, 10 smoke detectors, 4 duct smoke detectors, 1 duct sensor, 2 control zams, 8 door holders, 26 strobes & 28 sprinklers on 8th floor.$50,000
Aug 25, 2008Completed500 Washington StAyoob & Peery Plumbing Co Incat 8th fl: add, relocate fire sprinkler per t.i., 96 relocated heads, 14 added heads, 5 plugged heads.$19,000
Jul 31, 2008Completed500 Washington StNovo Construction Increnew pa#200801082074, 200712130358, 200802285880 for final inspeciton only.
Jul 11, 2008Completed500 Washington StBcci Construction Company8th floor, ste 800 - full floor tenant improvement including new partitions, new lighting, new power & data outlets, new hvac distribution, new finishes & materials . fire sprinklers & l.s. under separate permit. include upgrading of the restrooms on this floor. interior work only.$1,900,000
Jul 8, 2008Completed500 Washington StAyoob & Peery Plumbing Co Incadd 5 heads per tenant improvement$1,225
Jul 3, 2008Never finaled500 Washington Ststreet space permit only.
Jul 3, 2008Never finaled500 Washington StBcci Construction Company8th floor-demolition plans for 8th floor under ab-017. demo interior partitions, floor, wall finishes, power, data, lighting and ceilings. fire and life safety to remain on for duration of demolition.$19,500
May 23, 2008Completed500 Washington Strevision to application 200712190892, 6th floor (n) door hardware to decks, 5th floor (n) 18" deep smoke draft curtain.$4,500
May 15, 2008Never finaled500 Washington StSimplex Grinnell6th floor-revision to pa# 2008-0305-6354 includes the removal of 2 wp horn strobes and 2 adapter modules to 6th floor deck areas. 6th floor only$575
Apr 25, 2008Completed500 Washington StAyoob & Peery Plumbing Co Inc6th floor:fire sprinkler system. relocate and remove fire sprinkler heads. reloacte 117 heads, removed 14 heads.$20,000
Mar 5, 2008Completed500 Washington StSimplex Grinnellt.i. fire alarm to 5th & 6th floors. includes addition of (2) nac panels (57) strobes, (52) speakers, (20) smoke detectors, 16 duct detectors, (11) door holders, (6) control modules and (2) signal modules.$22,000
Feb 28, 2008Completed500 Washington StSimplex Grinnellas builts to app 200801082074. includes demo 1 strobe, increased candela on 1 strobe, replacment of 5 existing core strobes with new$2,000
Feb 19, 2008Completed500 Washington StAyoob & Peery Plumbing Co Inc5th floor - t.i. for sprinkler system on the 5th floor. relocate 107 sprikler heads and add 9 heads. total 116 heads.$13,500
Jan 28, 2008Expired or cancelled500 Washington St4th floor: revision to appl #200711278968 to change drinking fountain status on d.a. checklist to hardship provided.
Jan 8, 2008Completed500 Washington StSimplex Grinnellprovide & install (1) nac power supply (12) ceiling speakers, (14) strobes and (3) smoke detectors to connect to existing facp as noted on plans.$11,500
Jan 8, 2008Completed500 Washington StAcco Engineered Systems Inc. Dba Acco Eninstallation of 4 new vav boxes, install (21) new supply grilles and install (17) new thermostats. relocate (1) existing thermostat, air balance at area of work only per new floor plan. modify ductwork, architect plans under 200711278968.$25,000
Jan 3, 2008Completed500 Washington StNovo Construction Inc4th floor - lighting fixture including title 24, ref # 200711278968.$42,000
Dec 31, 2007Completed500 Washington StNovo Construction Incfull floor electrical, mechanical and plubing work on the 5th and 6th floor. ref. pa# 2007/12/19/0892$575,000
Dec 19, 2007Completed500 Washington St5th and 6th floor ti. interior demolition and construction of new non-structural demising walls throughout. new restrooms. hvac, electrical and life safety work will be done under separate permit$700,000
Dec 13, 2007Completed500 Washington StAyoob & Peery Plumbing Co Increlocate fire sprinkler per tenant improvements. total of 66 heads - 16 heads plugges.$8,500
Nov 27, 2007Completed500 Washington StNovo Construction Inctenant improvements including (n) demising of suite, ceiling ht partitions, (n) ceiling. work on 4th floor.$150,000
Nov 19, 2007Completed500 Washington StNovo Construction Incdemolition of interior non structural partitions, ceiling grid and ceiling tile on 4th floor$35,000
Aug 17, 2007Expired or cancelled500 Washington Stsuite 400 4th floor oti sprinkler, mechanical and life safety under seperate permit$81,000
Oct 23, 2006Completed500 Washington StSkyline Constructionoti-4 3rd floor me$36,000
Oct 12, 2006Completed500 Washington StSkyline Constructionoti-2, 3rd floor el sp$47,000
Oct 11, 2006Completed500 Washington StSkyline Constructionoti-2 3rd floor sp$7,500
Oct 5, 2006Completed500 Washington StSimplex Grinnelladd fire alarm devices to the new t.i., 3 strobes, 2 speaker/strobes$5,000
Oct 5, 2006Expired or cancelled500 Washington StSimplex Grinnelladd fire alarm devices to the new t.i. - (1) smoke detector, (2) strobes, (5) speaker/strobes$6,000
Oct 4, 2006Completed500 Washington StSkyline Constructionoti-2, 3rd floor, el, me$35,000
Oct 3, 2006Expired or cancelled500 Washington St3rd floor-add fire alarm devices to the new t.i-1 smoke detector, 2 strobes, 5 speakers/strobes.$6,000
Aug 22, 2006Completed500 Washington StSkyline Constructionoti-1, 3rd floor, el, ls, sp, me.$65,000
Aug 9, 2006Completed500 Washington StSkyline Constructionoti-1, 3rd floor, el, me, ls, sp.$65,000
Feb 23, 2006Expired or cancelled500 Washington StSimplex Grinnellan as built submittal to application/permit no: 2006/01/24/2846, addition includes: 2 smoke detector, 4 duct smoke detector, 1 control zam, 10 iams (2nd floor)$9,000
Feb 15, 2006Completed500 Washington StSkyline Constructionlighting installation on 2/f$4,500
Feb 6, 2006Completed500 Washington StSkyline Constructionsprinkler work. (20) relocates$6,000
Feb 6, 2006Completed500 Washington StSkyline Constructionmechanical work on 2/f$18,000
Feb 6, 2006Completed500 Washington StSkyline Constructionoti-1 3/f el, ls, sp interior demolition & reconfiguration of space.$60,000
Jan 24, 2006Completed500 Washington StSimplex Grinnellfire alarm notification improvement to the 2nd floor elev. lobby corridor and restrooms consiting of adding: 1 nac extender & 2 10ah battery, 6 speaker, 1 smoke detector, 7 strobes$5,200
Dec 1, 2005Completed500 Washington StSkyline Constructionoti-1, 2nd floor, el, ls, sp. demolition & reconfrigration of office space$110,000
Oct 19, 2005Completed500 Washington StSkyline Constructiondemolition - no increase in office space - ab-017 vacant space allowance (demo only)$4,000
Oct 11, 2005Completed500 Washington StSimplex Grinnellfire alarm t. i. on 1st, 3rd & 7th floor. elev lobby/restroom.$12,500
Sep 19, 2005Completed500 Washington StSkyline Constructionsprinkler work. 14 relocated heads. no increase in office space.3rd floor$25,000
Sep 19, 2005Completed500 Washington StSkyline Constructionfire sprinkler work. 10 relocated heads, no increase in office space.$2,300
Aug 18, 2004Expired or cancelled500 Washington StBcci Construction Companyscope of work is ltd to interior non structural pre const demo this area is to remain unoccupied in$4,000
Sep 25, 2002Never finaled500 Washington Ststreet space permit
Aug 14, 2002Never finaled500 Washington Ststreet space permit
Aug 8, 2002Completed500 Washington StDpr Construction Incmech.systemmodifications-replace(1)chiller unit,all work on roof & basement panel$200,000
Aug 7, 2002Completed500 Washington StWestern Roofing Servicereroofing$300,000
Aug 6, 2002Completed500 Washington StDpr Construction Incfabricate & install mechanical equipment platforms$9,500
Jul 18, 2002Completed500 Washington StDpr Construction Increplace&remove roofing system-waterproofing of exterior decks.$400,000
May 19, 2000Expired or cancelled500 Washington Ststreet space