Eric Long
- License
- S5275
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5275 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Som
- Based in
- San Francisco
- On San Francisco permits
- Jul 2025 to May 2026
5 permits since 2000 (engineer on 5 permits): 1 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (2), Source Planning And Construction Inc, Truebeck Construction
- Architects
- Carrie Byles (2), Carrie Byles, Mark Schwettmann
- Engineers
- Casey J Steiner
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | In progress filed May 2026, not yet issued | 500 Washington St | renovation of (e) exterior paseo. exterior coa motion no.504Details
renovation of (e) exterior paseo. exterior coa motion no.504 | $1,900,000 | |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | Source Planning And Construction Inc | 7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.Details
7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered. | $15,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferredDetails
5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred | $4,250,000 |
| Jan 23, 2026 | In progress issued Aug 2026 | 530 Jackson St | Truebeck Construction | b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door.Details
b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door. | $4,323,223 |
| Jul 22, 2025 | In progress issued Aug 2025 | 560 Mission St | Bcci Construction Company | 21st/floor: architectural and structural for office build out. new partitions offices and conference rooms. mep deferredDetails
21st/floor: architectural and structural for office build out. new partitions offices and conference rooms. mep deferred | $5,000,000 |