Carrie Byles
- Listed as
- architect, engineer
- Firm
- Som
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Sep 2026
41 permits since 2000 (architect on 39 permits, engineer on 2 permits): 15 completed, 23 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 530 Jackson St | on level 5: the existing west exterior terrace is to be renovated. the e. exterior doors to the terrace are to be raplaced with new sliding doors & a new egress swing door. a new contilevered trellis, new millwork, new light fixtures & tiled flooring are to be added. revision to 2025 1217 2080Details
on level 5: the existing west exterior terrace is to be renovated. the e. exterior doors to the terrace are to be raplaced with new sliding doors & a new egress swing door. a new contilevered trellis, new millwork, new light fixtures & tiled flooring are to be added. revision to 2025 1217 2080 | $750,000 | |
| Aug 25, 2026 | In progress issued Sep 2026 | 500 Washington St | Rowdy Red Construction Llc | revision to bpa#202511129349, addition of fire damperDetails
revision to bpa#202511129349, addition of fire damper | $5,600 |
| Aug 20, 2026 | In progress issued Sep 2026 | 530 Jackson St | Truebeck Construction | revision pa#: 202512172080. issued for permit for ground floor store front and window replacementDetails
revision pa#: 202512172080. issued for permit for ground floor store front and window replacement | $850,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated.Details
5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated. | |
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 450 Pacific Av | Skyline Construction | occupant load review for intermitent use of lobby as assembly in support of sffd operational permit.Details
occupant load review for intermitent use of lobby as assembly in support of sffd operational permit. | |
| Jul 2, 2026 | In progress issued Jul 2026 | 300 Clay St | Gci, Inc | mep deferred. 5/f: tenant space, construct two new partitions w/ new door, relocated sink within new millwork. re-install relocated door frames and hardware. install associated power, data and modify (e) acoustic ceiling tiles as required for new scope of work.Details
mep deferred. 5/f: tenant space, construct two new partitions w/ new door, relocated sink within new millwork. re-install relocated door frames and hardware. install associated power, data and modify (e) acoustic ceiling tiles as required for new scope of work. | $142,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.Details
4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures. | $250,000 |
| May 14, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.Details
4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred. | $4,250,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271Details
29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345Details
21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716Details
8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716 | |
| Mar 9, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred.Details
24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred. | $4,250,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferredDetails
5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred | $4,250,000 |
| Feb 25, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferredDetails
3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred | $4,250,000 |
| Jan 23, 2026 | In progress issued Aug 2026 | 530 Jackson St | Truebeck Construction | b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door.Details
b lvl & 1 lvl: new base building room, restaurant spaces and circulation spaces constructed. lvl 2,3 & n/s 4: new b occ. office spaces provided. s/s lvl 4 and lvl 5: new residential units to be provided. (e) ter lvl 5 renovated and doors to ter replaced with sliding door system with egress door. | $4,323,223 |
| Jan 21, 2026 | In progress issued Feb 2026 | 560 Mission St | Bcci Construction Company | 8th floor- revision to include new partitions & door hardware. ref. pa#202507140716Details
8th floor- revision to include new partitions & door hardware. ref. pa#202507140716 | $50,000 |
| Dec 19, 2025 | In progress issued Jan 2026 | 500 Washington St | Rowdy Red Construction Llc | l5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exteriorDetails
l5&6, ab17 remove existing interior partitions, flooring, finishes, ceilings, millwork, electrical, fire alarm devices & equipment on the plans to be removed. in restroom and elevator lobby on 5th & 6th floors and in tenant areas on level6. no demo of structure. no new construction work. no exterior | $117,000 |
| Dec 18, 2025 | In progress issued May 2026 | 560 Mission St | Bcci Construction Company | 4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet.Details
4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet. | $459,800 |
| Nov 12, 2025 | In progress issued Jan 2026 | 500 Washington St | Rowdy Red Construction Llc | level 1: interior renovation of existing building lobbyDetails
level 1: interior renovation of existing building lobby | $287,329 |
| Nov 10, 2025 | In progress issued Jan 2026 | 500 Washington St | Rowdy Red Construction Llc | basement -expansion and remodel of (e) basement gymDetails
basement -expansion and remodel of (e) basement gym | $809,897 |
| Sep 30, 2025 | In progress issued Nov 2025 | 500 Washington St | Rowdy Red Construction Llc | 3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spacesDetails
3rd fl - tenant improvement construction of new offices, conference rooms, restrooms & tenant amenity spaces | $1,474,000 |
| Sep 4, 2025 | In progress issued Oct 2025 | 530 Jackson St | Rowdy Red Construction Llc | in the basement and on 1st-5th floors, remove (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical, fa devices, sprinkler and equipment not intended to be revised. no work to exterior elevations. no work to windows and skylights.Details
in the basement and on 1st-5th floors, remove (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical, fa devices, sprinkler and equipment not intended to be revised. no work to exterior elevations. no work to windows and skylights. | $130,000 |
| Jul 21, 2025 | In progress issued Jul 2025 | 560 Mission St | Bcci Construction Company | 29th floor: architectural and structural for office build out. new partitions, offices, and conference rooms. mep deferred.Details
29th floor: architectural and structural for office build out. new partitions, offices, and conference rooms. mep deferred. | $5,000,000 |
| Apr 25, 2025 | Completed final sign-off Nov 2025 | 560 Mission St | Bcci Construction Company | 3rd fl- arch and mep for construction of temp print and mail roomDetails
3rd fl- arch and mep for construction of temp print and mail room | $60,000 |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 560 Mission St | Bcci Construction Company | levels 8, 21, 29 - interior floor demo only. per ab-017Details
levels 8, 21, 29 - interior floor demo only. per ab-017 | $70,000 |
| Jan 27, 2025 | Expired or cancelled cancelled Jul 2025 | 500 Washington St | level 4: removal of extisting interior partitions, flooring, finishes, ceiling, millwork, mechanical, electrical fire alarm devices, sprinkler, and equipment not intended to be revised. ab-017 ada @ t.i.Details
level 4: removal of extisting interior partitions, flooring, finishes, ceiling, millwork, mechanical, electrical fire alarm devices, sprinkler, and equipment not intended to be revised. ab-017 ada @ t.i. | $30,000 | |
| Jan 27, 2025 | In progress issued Feb 2025 | 450 Pacific Av | Skyline Construction | assembly permit ref pa # 2023-0717-2307Details
assembly permit ref pa # 2023-0717-2307 | |
| Jan 23, 2025 | Completed final sign-off Jan 2026 | 500 Washington St | Rowdy Red Construction Llc | floors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017Details
floors 1, 3, 7: removal of (e) interior partitions, flooring, finishes, ceilings, millwork, mechanical, electrical. fire alarm devices, sprinkler, and equipment are not intended to be reused. ab-017 | $31,000 |
| Dec 16, 2024 | Completed final sign-off Feb 2025 | 55 Green St | Rowdy Red Construction Llc | level 1 - area of the (e) open office will be converted into an enclosed conference. total area of alteration is 258 sq ft which is 2.69% of the gross building area. mep deferred.Details
level 1 - area of the (e) open office will be converted into an enclosed conference. total area of alteration is 258 sq ft which is 2.69% of the gross building area. mep deferred. | $113,300 |
| Jul 3, 2024 | Completed final sign-off Feb 2025 | 300 Clay St | Gci, Inc | revision to permit 202402226340. remove scope on level 5 at gridline r b/t gridlines 4 and 6 previously shown in the approved permit drawings. on level 4 at gridline 3 b/t gridlines p and r, combined 2 offices into one office.Details
revision to permit 202402226340. remove scope on level 5 at gridline r b/t gridlines 4 and 6 previously shown in the approved permit drawings. on level 4 at gridline 3 b/t gridlines p and r, combined 2 offices into one office. | |
| Feb 22, 2024 | Completed final sign-off Feb 2025 | 300 Clay St | Gci, Inc | 4/f & 5/f: on 4/f, inside current tenant space, remove 2 (e) phone booths, construct 3 new partitions, repair ceiling, install 3 doors, shelving, base cabinets and a dishwasher. on 5/f, inside current tenant space,construct 2 new partitions, reinstall 1 relocated door & modify 2 (e) glass paritionsDetails
4/f & 5/f: on 4/f, inside current tenant space, remove 2 (e) phone booths, construct 3 new partitions, repair ceiling, install 3 doors, shelving, base cabinets and a dishwasher. on 5/f, inside current tenant space,construct 2 new partitions, reinstall 1 relocated door & modify 2 (e) glass paritions | $155,000 |
| Oct 20, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | removal of building entrance storefront, exterior metal fence and gate, exterior terrance paving and ceiling. construction of new building entrance storefronts, planters, pavings, and ceiling. no demolition or modification of existing structural elements.Details
removal of building entrance storefront, exterior metal fence and gate, exterior terrance paving and ceiling. construction of new building entrance storefronts, planters, pavings, and ceiling. no demolition or modification of existing structural elements. | $400,000 |
| Aug 22, 2023 | Completed final sign-off Jul 2024 | 450 Pacific Av | Skyline Construction | deferred mep submittal for approved bpa#202307172307Details
deferred mep submittal for approved bpa#202307172307 | $2,094,002 |
| Jul 17, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | 1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications.Details
1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications. | $10,840,867 |
| Jun 5, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | level 1 to 4 -remove of (e)interior partition, flooring finishes, ceiling, millwork, mech, elect, fire alarm devices, sprinklers and equipment not intended to be reused no demo of structure, no enterior demo except for disabled access to vacant space per ab017 (sprinkler ti for demo = 202306079420)Details
level 1 to 4 -remove of (e)interior partition, flooring finishes, ceiling, millwork, mech, elect, fire alarm devices, sprinklers and equipment not intended to be reused no demo of structure, no enterior demo except for disabled access to vacant space per ab017 (sprinkler ti for demo = 202306079420) | $300,000 |
| Oct 25, 2018 | Completed final sign-off Dec 2020 | 345 Montgomery St | Bcci Construction Company | revisiont o t201712045429 for new 3 hr fire rate shutter, toilet room plum, ele, service routing & historical t-24 lighting, generator exhaust & flue routing, sewage ejection pump & plaza storm drain routing maher naDetails
revisiont o t201712045429 for new 3 hr fire rate shutter, toilet room plum, ele, service routing & historical t-24 lighting, generator exhaust & flue routing, sewage ejection pump & plaza storm drain routing maher na | |
| Oct 18, 2018 | Completed final sign-off Sep 2020 | 555 California St | Bcci Construction Company | penetration in rc wall for mechanical exhaust duct. n/a for maher.Details
penetration in rc wall for mechanical exhaust duct. n/a for maher. | $9,000 |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 855 Front St | Skyline Construction | selective demolition of interior existing non-structural partitions, ceilings, mezzanine and stairway. no structural, mechanical & electrical or plumbing demolition work; maher n/a. ti under separate permit. ab-017 applies.Details
selective demolition of interior existing non-structural partitions, ceilings, mezzanine and stairway. no structural, mechanical & electrical or plumbing demolition work; maher n/a. ti under separate permit. ab-017 applies. | $10,000 |
| Dec 13, 2013 | Never finaled issued Jan 2014, no final | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | renovation of basement bi level storage room - installation of walls + glass walls for animal display.Details
renovation of basement bi level storage room - installation of walls + glass walls for animal display. | $50,000 |
| Dec 26, 2012 | Completed final sign-off Jul 2016 | 55 Music Concourse Dr | Cci Com'l Constr & Improv**See 985808*** | t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permitsDetails
t.i renovation of basement b1 level support areas. converting office spaces to storage. removal and construction of drywall partitions. mech, plumbing & electrical work. open in existing concrete wall. sprinklers, fire alarm under sep permits | $2,000,000 |
| May 25, 2007 | Completed final sign-off Jul 2008 | 419 29th St | S L R Construction | comply with 3r-4740. in conjunction with 200705252267.Details
comply with 3r-4740. in conjunction with 200705252267. | $10,000 |