Block 0164, lot 010
450 Pacific Ave
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 4
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 28,586 sq ft
- Lot
- 7,150 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 450 Pacific Av | Skyline Construction | occupant load review for intermitent use of lobby as assembly in support of sffd operational permit.Details
occupant load review for intermitent use of lobby as assembly in support of sffd operational permit. | |
| Jan 27, 2025 | In progress issued Feb 2025 | 450 Pacific Av | Skyline Construction | assembly permit ref pa # 2023-0717-2307Details
assembly permit ref pa # 2023-0717-2307 | |
| Apr 19, 2024 | Completed final sign-off Apr 2024 | 450 Pacific Av | Skyline Construction | evacuations signs for bpa 202307172307Details
evacuations signs for bpa 202307172307 | $2,000 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 450 Pacific Av | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm tenant improvement: adding 3 power supplies, 18 smoke detectors, 2 heat detectors, 4 duct detectors, 1 control module, 3 dual point monitor modules, 7 relay modules, 42 horn-strobes and 48 strobes to existing notifier nfs-320 fire alarm system.Details
fire alarm tenant improvement: adding 3 power supplies, 18 smoke detectors, 2 heat detectors, 4 duct detectors, 1 control module, 3 dual point monitor modules, 7 relay modules, 42 horn-strobes and 48 strobes to existing notifier nfs-320 fire alarm system. | $42,600 |
| Feb 8, 2024 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | structural revisio to 202308154476 includes revisions to stair footing due to unforseen buried existing conduit. no changes to special inspection requirments.Details
structural revisio to 202308154476 includes revisions to stair footing due to unforseen buried existing conduit. no changes to special inspection requirments. | |
| Dec 15, 2023 | Completed final sign-off May 2024 | 450 Pacific Av | Pribuss Engineering Inc | modify nfpa 13 sprinkler head floors 1-4. total 324 install new floor controller riser assemblies and main drain instair 1 at all levels. ref 202307172307Details
modify nfpa 13 sprinkler head floors 1-4. total 324 install new floor controller riser assemblies and main drain instair 1 at all levels. ref 202307172307 | $165,508 |
| Oct 20, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | removal of building entrance storefront, exterior metal fence and gate, exterior terrance paving and ceiling. construction of new building entrance storefronts, planters, pavings, and ceiling. no demolition or modification of existing structural elements.Details
removal of building entrance storefront, exterior metal fence and gate, exterior terrance paving and ceiling. construction of new building entrance storefronts, planters, pavings, and ceiling. no demolition or modification of existing structural elements. | $400,000 |
| Aug 22, 2023 | Completed final sign-off Jul 2024 | 450 Pacific Av | Skyline Construction | deferred mep submittal for approved bpa#202307172307Details
deferred mep submittal for approved bpa#202307172307 | $2,094,002 |
| Aug 15, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7. infill.Details
deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7. infill. | $1,131,565 |
| Jul 17, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | 1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications.Details
1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications. | $10,840,867 |
| Jun 7, 2023 | Completed final sign-off Oct 2023 | 450 Pacific Av | Pribuss Engineering Inc | modify sprinkler heads. total heads = 8.Details
modify sprinkler heads. total heads = 8. | $4,000 |
| Jun 5, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | Skyline Construction | level 1 to 4 -remove of (e)interior partition, flooring finishes, ceiling, millwork, mech, elect, fire alarm devices, sprinklers and equipment not intended to be reused no demo of structure, no enterior demo except for disabled access to vacant space per ab017 (sprinkler ti for demo = 202306079420)Details
level 1 to 4 -remove of (e)interior partition, flooring finishes, ceiling, millwork, mech, elect, fire alarm devices, sprinklers and equipment not intended to be reused no demo of structure, no enterior demo except for disabled access to vacant space per ab017 (sprinkler ti for demo = 202306079420) | $300,000 |
| Nov 20, 2008 | Completed final sign-off Feb 2009 | 450 Pacific Av | Webcor Construction Lp | 2nd floor-revision to pa# 2007-1129-9168-approval of "local equivalency" for 2nd floor women's bathroom #220, no work done.Details
2nd floor-revision to pa# 2007-1129-9168-approval of "local equivalency" for 2nd floor women's bathroom #220, no work done. | |
| Nov 20, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | 1st floor-revision to pa# 2007-1228-1528-approval of "local equivalency" for custom grab bars in (e) 1st floor women's bathroom (#115). see delta "c" changes onlyDetails
1st floor-revision to pa# 2007-1228-1528-approval of "local equivalency" for custom grab bars in (e) 1st floor women's bathroom (#115). see delta "c" changes only | $500 |
| Oct 22, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | mechanical equipment access to roof top ac unit for maintenanceDetails
mechanical equipment access to roof top ac unit for maintenance | $10,000 |
| Aug 13, 2008 | Never finaled issued Aug 2008, no final | 450 Pacific Av | street space permit only.Details
street space permit only. | ||
| Jul 2, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | revision to 200806255310: divide private dining room 106 to create screened serving counter and wet bar.Details
revision to 200806255310: divide private dining room 106 to create screened serving counter and wet bar. | $20,000 | |
| Jun 25, 2008 | Completed final sign-off Feb 2009 | 450 Pacific Av | Webcor Construction Lp | revision to 2007-12-28-1528: add moveable file system and make minor layout changes to library and private dining area, add janitor closet. relocate door in copy room. no change to disabled access.Details
revision to 2007-12-28-1528: add moveable file system and make minor layout changes to library and private dining area, add janitor closet. relocate door in copy room. no change to disabled access. | $5,000 |
| Jun 25, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | revision to 200803257951: repair deteriorated portion of existing slab.Details
revision to 200803257951: repair deteriorated portion of existing slab. | $10,000 |
| May 1, 2008 | Completed final sign-off Feb 2009 | 450 Pacific Av | Anderson, Rowe & Buckley, Inc. | ti existing fire sprinkler system, 432 changeouts from standard response to quick response. relocate for new partitionsDetails
ti existing fire sprinkler system, 432 changeouts from standard response to quick response. relocate for new partitions | $86,400 |
| Apr 28, 2008 | Never finaled issued May 2008, no final | 450 Pacific Av | Pacific Auxiliary Fire Alarm | installation of new fire alarm system in the whole bldg.Details
installation of new fire alarm system in the whole bldg. | $46,000 |
| Apr 14, 2008 | Never finaled issued Apr 2008, no final | 450 Pacific Av | street space permit only.Details
street space permit only. | ||
| Apr 8, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | modification to lighting previously approved under pa# 2008-03-17-7332Details
modification to lighting previously approved under pa# 2008-03-17-7332 | |
| Mar 25, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | modify existing entryway.work on grd floor. replace 2 skylites. replace 1 flight of stairs (grd floor to mezz). reference current permit for t.i. 200712281528 & seismic upgrade permit 200709122426.Details
modify existing entryway.work on grd floor. replace 2 skylites. replace 1 flight of stairs (grd floor to mezz). reference current permit for t.i. 200712281528 & seismic upgrade permit 200709122426. | $290,000 |
| Mar 17, 2008 | Expired or cancelled cancelled May 2008 | 450 Pacific Av | Webcor Construction Lp | electrical and energy compliance plan for ti applications 1st floor 200712281528,2nd floor 200711299168,3rd floor 200711299171,and 4th floor 200711087623.Details
electrical and energy compliance plan for ti applications 1st floor 200712281528,2nd floor 200711299168,3rd floor 200711299171,and 4th floor 200711087623. | $550,000 |
| Mar 7, 2008 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | complete new hvac system at all floor levels ( 4 floors). no exterior work.Details
complete new hvac system at all floor levels ( 4 floors). no exterior work. | $500,000 |
| Dec 28, 2007 | Completed final sign-off Feb 2009 | 450 Pacific Av | Webcor Construction Lp | tenant improvements of 1st floor(5,584 sq.ft). drywall partitions and framing, drywall ceilings on (e) framing, doors, frames, harware, interior glazing, finishes, and handicap access upgrades.new drywall for the mechanical mezzannine. mechanical,electrical and plumbing under seperate permit.Details
tenant improvements of 1st floor(5,584 sq.ft). drywall partitions and framing, drywall ceilings on (e) framing, doors, frames, harware, interior glazing, finishes, and handicap access upgrades.new drywall for the mechanical mezzannine. mechanical,electrical and plumbing under seperate permit. | $290,000 |
| Nov 29, 2007 | Completed final sign-off Jan 2009 | 450 Pacific Av | Webcor Construction Lp | office tenant improvement on 2nd floor: interior non bearing, dry wall & framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permit.Details
office tenant improvement on 2nd floor: interior non bearing, dry wall & framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permit. | $325,000 |
| Nov 29, 2007 | Completed final sign-off Feb 2009 | 450 Pacific Av | Webcor Construction Lp | interior tenant improvement on 3rd fl. drywall and framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permitDetails
interior tenant improvement on 3rd fl. drywall and framing, doors, frames and hardware, interior glazing, finishes, accoustical insulation. mep under separate permit | $290,000 |
| Nov 8, 2007 | Completed final sign-off Jan 2009 | 450 Pacific Av | office tenant improvement on 4th fl. non bearing interior drywall and framing, doors, frames and hardware. interior glazing, drywall ceiling @ (e)restrooms, finishes, handicap upgrade. mep under separate permit. no exterior work.Details
office tenant improvement on 4th fl. non bearing interior drywall and framing, doors, frames and hardware. interior glazing, drywall ceiling @ (e)restrooms, finishes, handicap upgrade. mep under separate permit. no exterior work. | $360,000 | |
| Oct 18, 2007 | Never finaled issued Oct 2007, no final | 450 Pacific Av | street space permit only.Details
street space permit only. | ||
| Sep 13, 2007 | Completed final sign-off Mar 2008 | 450 Pacific Av | interior non-strl. demolition only on all floors.Details
interior non-strl. demolition only on all floors. | $100,000 | |
| Sep 12, 2007 | Completed final sign-off Jan 2009 | 450 Pacific Av | seismic upgrade and interior demolition of entire office building. upgrade restrooms, elevator and path of travel for accessibility. replacement and upgrade of structure on all floors including roof. mep, sprinkler & fire alarm under seperate permit.Details
seismic upgrade and interior demolition of entire office building. upgrade restrooms, elevator and path of travel for accessibility. replacement and upgrade of structure on all floors including roof. mep, sprinkler & fire alarm under seperate permit. | $3,200,000 | |
| Jul 17, 2007 | Never finaled issued Jul 2007, no final | 450 Pacific Av | street space permit only.Details
street space permit only. | ||
| Nov 14, 2000 | Completed final sign-off Nov 2001 | 450 Pacific Av | comply w/nov 200009650Details
comply w/nov 200009650 | $4,000 |