Block 1228, lot 006
690 Stanyan St
- City’s use
- Commercial Misc
- Built
- 1961
- Lot
- 13,747 sq ft
- Zoning
- HAIGHT
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2026 | In progress issued Jul 2026 | 690 Stanyan St | Omni Mechanical Solutions | t.i to (e) retail consisting of replacing three (3) condensing units that have reached end of life. new equipment will be of similar height and weight to (e) equipment to be replaced. all work work will occur overnight to avoid store operation being disrupted.Details
t.i to (e) retail consisting of replacing three (3) condensing units that have reached end of life. new equipment will be of similar height and weight to (e) equipment to be replaced. all work work will occur overnight to avoid store operation being disrupted. | $120,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 690 Stanyan St | Outfront Media Group Llc. | voluntary removal of general advertising sign. remove all equipment associated w/ sign. repair, patch, & make weatherproof all areas of the wall/roof where the board was connected/attached to the building. there will be an understanding once the sign is removed, it cannot be put up again.Details
voluntary removal of general advertising sign. remove all equipment associated w/ sign. repair, patch, & make weatherproof all areas of the wall/roof where the board was connected/attached to the building. there will be an understanding once the sign is removed, it cannot be put up again. | $1,000 |
| Mar 2, 2023 | Never finaled filed Mar 2023, never issued | 690 Stanyan St | installation of amazon package return kioskDetails
installation of amazon package return kiosk | $765 | |
| Jan 18, 2023 | Completed final sign-off Mar 2023 | 690 Stanyan St | P S R West Coast Builders Inc | revision to pa# 202206146339. flooring on issued permit is different current/existing floor is wood panel anchoring of self check outs updated to reflect existing floor.Details
revision to pa# 202206146339. flooring on issued permit is different current/existing floor is wood panel anchoring of self check outs updated to reflect existing floor. | |
| Jun 14, 2022 | Completed final sign-off Mar 2023 | 690 Stanyan St | P S R West Coast Builders Inc | tenant improvemnt to remove 1 standard checkstand. remove 7 express checkstands, and provide 8 new self-service checkstands includes minor updates to cored stanchion and belt system.Details
tenant improvemnt to remove 1 standard checkstand. remove 7 express checkstands, and provide 8 new self-service checkstands includes minor updates to cored stanchion and belt system. | $75,000 |
| Sep 30, 2020 | Completed final sign-off Dec 2020 | 690 Stanyan St | Eric F Anderson Incorporated | minor upgrade to provide self-contained chilled berry cases for self service shopping. no changes to buildings structural, plumbing or mechanical systems shall be made under this permit.Details
minor upgrade to provide self-contained chilled berry cases for self service shopping. no changes to buildings structural, plumbing or mechanical systems shall be made under this permit. | $10,000 |
| Oct 19, 2018 | Never finaled issued Oct 2018, no final | 690 Stanyan St | Sunclean Energy Corporation | led lighting retrofit one for one. lighting control systemDetails
led lighting retrofit one for one. lighting control system | $100,000 |
| Jun 29, 2017 | Completed final sign-off Sep 2017 | 690 Stanyan St | Tilton Pacific Const Inc. | removal of existing check stands. new non structural partition wall and finishes. new equipment as shown on plans. associated electrical work as shown on plansDetails
removal of existing check stands. new non structural partition wall and finishes. new equipment as shown on plans. associated electrical work as shown on plans | $17,500 |
| Sep 16, 2016 | Completed final sign-off Nov 2016 | 690 Stanyan St | Battalion One Fire Protection | as built 201010153136 replace e strobe with weatherproof horn/strobe at same locationDetails
as built 201010153136 replace e strobe with weatherproof horn/strobe at same location | |
| Aug 2, 2016 | Completed final sign-off Nov 2016 | 690 Stanyan St | Freedom Fire Protection Inc. | installation of 3 fire sprinkler headsDetails
installation of 3 fire sprinkler heads | $4,100 |
| Mar 25, 2016 | Completed final sign-off Dec 2016 | 690 Stanyan St | Building Services/System Maintenance Inc | provide emergency repairs to (e) meat prep cooler by replacing (e) walls and metal stud ceiling farring with cooler box wall and ceiling panel constrcution. remove and replace hand sink, electrical receptacles, light fituxres, fan coil and fire sprinkler (f/s under sep permit).Details
provide emergency repairs to (e) meat prep cooler by replacing (e) walls and metal stud ceiling farring with cooler box wall and ceiling panel constrcution. remove and replace hand sink, electrical receptacles, light fituxres, fan coil and fire sprinkler (f/s under sep permit). | $5,000 |
| Feb 27, 2012 | Completed final sign-off Oct 2012 | 690 Stanyan St | Ad Art Inc. | fabricate and install 2 non-illuminated canopies over entrance and loading dock.Details
fabricate and install 2 non-illuminated canopies over entrance and loading dock. | $10,000 |
| Dec 21, 2011 | Completed final sign-off Apr 2012 | 690 Stanyan St | Construction Mgmt & Builders Inc | ada accessibility remediation - parking stall re-striping, ramp replacement, curb ramp level landing, drinking fountain remediation, men's restroom remodel. barrier removal.Details
ada accessibility remediation - parking stall re-striping, ramp replacement, curb ramp level landing, drinking fountain remediation, men's restroom remodel. barrier removal. | $10,000 |
| Jan 11, 2011 | Never finaled issued Jan 2011, no final | 690 Stanyan St | street space and mta parking and sidewalkDetails
street space and mta parking and sidewalk | ||
| Dec 9, 2010 | Never finaled issued Dec 2010, no final | 690 Stanyan St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Nov 17, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Construction Mgmt & Builders Inc | revision to pa# 2010-0525-3165-structural revisions to approved, new hss columns & footings plus other minor revisionsDetails
revision to pa# 2010-0525-3165-structural revisions to approved, new hss columns & footings plus other minor revisions | $16,500 |
| Nov 16, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Construction Mgmt & Builders Inc | minor revisions to approved pa# 2010-0525-3165-to add janitor closet, new drinking fountains & accessible seating at outdoor areaDetails
minor revisions to approved pa# 2010-0525-3165-to add janitor closet, new drinking fountains & accessible seating at outdoor area | $12,000 |
| Oct 15, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Securitas Technology Corporation | fire alarm system installation.Details
fire alarm system installation. | $13,800 |
| Sep 21, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Ad Art Inc. | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | $10,000 |
| Sep 21, 2010 | Completed final sign-off Aug 2011 | 690 Stanyan St | Ad Art Inc. | erect a ground electric wall double faced direct new signDetails
erect a ground electric wall double faced direct new sign | $10,000 |
| Sep 16, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Pyrocorp Industries | installation of fire suppression system in hood. install fire system in pollution control unitDetails
installation of fire suppression system in hood. install fire system in pollution control unit | $2,200 |
| Sep 9, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | R L H Fire Protection Inc | installation of new fire sprinkler system. 265 headsDetails
installation of new fire sprinkler system. 265 heads | $50,000 |
| Sep 2, 2010 | Never finaled issued Sep 2010, no final | 690 Stanyan St | stret space and mta parkingDetails
stret space and mta parking | ||
| Jul 26, 2010 | Never finaled issued Jul 2010, no final | 690 Stanyan St | street space and mta parkingDetails
street space and mta parking | ||
| Jul 16, 2010 | Completed final sign-off Dec 2010 | 690 Stanyan St | Alliance Roofing Co Inc | reroofingDetails
reroofing | $160,000 |
| May 25, 2010 | Completed final sign-off Feb 2011 | 690 Stanyan St | Construction Mgmt & Builders Inc | remodel of (e) grocery store. tenant improvement of entire store consisting of exterior, interior structural & non-structural partitions & finishes. new m.e.p. fire alarm & sprinkler under separate permit.Details
remodel of (e) grocery store. tenant improvement of entire store consisting of exterior, interior structural & non-structural partitions & finishes. new m.e.p. fire alarm & sprinkler under separate permit. | $3,744,224 |
| Apr 5, 2010 | Completed final sign-off Dec 2010 | 690 Stanyan St | Marcor Environmental West Inc. | interior non-structural demolition of (e) grocery store (vacant) all demo per ab-017.Details
interior non-structural demolition of (e) grocery store (vacant) all demo per ab-017. | $42,000 |
| Feb 11, 2010 | Completed final sign-off Mar 2010 | 690 Stanyan St | John P Brennan Co Inc. | asbestos abatement-remove ground floor tile & mastic, 2500 sq ft of sheetrock, remove approx 400 sq ft of transite siding around air handler. not adding any rooms or walls (j#3h669)Details
asbestos abatement-remove ground floor tile & mastic, 2500 sq ft of sheetrock, remove approx 400 sq ft of transite siding around air handler. not adding any rooms or walls (j#3h669) | $9,000 |
| Apr 25, 2007 | Completed final sign-off Aug 2007 | 690 Stanyan St | change parking lot use from serving bldg to public parking. no work as is. change of useDetails
change parking lot use from serving bldg to public parking. no work as is. change of use | ||
| Jan 10, 2007 | Never finaled issued Jan 2007, no final | 690 Stanyan St | sidewalkDetails
sidewalk | ||
| Feb 15, 2006 | Expired or cancelled cancelled Mar 2020 | 690 Stanyan St | demolish 1 story, commercial retail building.Details
demolish 1 story, commercial retail building. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Construction Mgmt & Builders Inc (4), Ad Art Inc. (3), P S R West Coast Builders Inc (2), Alliance Roofing Co Inc, Anderson Eric F Inc, Battalion One Fire Protection, Building Services/System Maintenance Inc, Freedom Fire Protection Inc., John P Brennan Co Inc., Marcor Environmental West Inc., Omni Mechanical Solutions, Outfront Media Group Llc., Pyrocorp Industries, R L H Fire Protection Inc, Securitas Technology Corporation, Sunclean Energy Corporation, Tilton Pacific Const Inc.
- Architects
- Robert Cooley (2), Robert L Cooley (2), Mariah Meyer, Stephen Antonaros
- Engineers
- Ernesto Richard, Jonathan Goranson, William Burton
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.