Freedom Fire Protection Inc.
- Based in
- Ripon
- On San Francisco permits
- Nov 2006 to Feb 2026
- Last 24 months
- 20 permits filed
73 permits since 2000: 53 completed, 10 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2026 | Expired or cancelled withdrawn Jul 2026 | 180 Howard St | 9 fl:revise fire sprinkler system to accommodate new tenant floor layout. relocating 78 heads and installing 114 new heads. total of 192 sprinkler headsDetails
9 fl:revise fire sprinkler system to accommodate new tenant floor layout. relocating 78 heads and installing 114 new heads. total of 192 sprinkler heads | $60,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 332 Divisadero St | 2nd & 3rd fl ref pa #2025-1125-0385: fire sprinkler as builtDetails
2nd & 3rd fl ref pa #2025-1125-0385: fire sprinkler as built | |
| Jan 14, 2026 | Completed final sign-off Apr 2026 | 180 Howard St | 8/f: revise fire sprinkler system to accommodate new tenant floor layout. relocating 80 heads and installing 105 new heads. total of 185 sprinkler headsDetails
8/f: revise fire sprinkler system to accommodate new tenant floor layout. relocating 80 heads and installing 105 new heads. total of 185 sprinkler heads | $20,000 |
| Dec 31, 2025 | In progress issued Dec 2025 | 2534 Chestnut St | as built plan to show how ug pipe popped up infront of building then entered the building wall, no change to over head system or cals. ref to 202504083960Details
as built plan to show how ug pipe popped up infront of building then entered the building wall, no change to over head system or cals. ref to 202504083960 | |
| Dec 23, 2025 | Completed final sign-off Aug 2026 | 1417 York St | install fire sprinkler system 24 heads. ref pa #2021-1119-2769Details
install fire sprinkler system 24 heads. ref pa #2021-1119-2769 | $11,000 |
| Nov 25, 2025 | In progress issued Nov 2025 | 332 Divisadero St | installing fire sprinkler system on the 2nd and 3rd floor. each floor will have its own dedicated service for a total of 52 heads. ref 202504224973Details
installing fire sprinkler system on the 2nd and 3rd floor. each floor will have its own dedicated service for a total of 52 heads. ref 202504224973 | $19,260 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 180 Howard St | 7th/f ste# 750: fire sprinkler t.i. work relocate 41 heads & install 53 new heads. total 94. ref to t.i. 202509044560Details
7th/f ste# 750: fire sprinkler t.i. work relocate 41 heads & install 53 new heads. total 94. ref to t.i. 202509044560 | $28,000 |
| Jul 21, 2025 | Completed final sign-off Sep 2025 | 180 Howard St | fire sprinkler t.i. in office space - relocating 23 heads and installing 53 new heads. total 76 heads. only on the 7th floor suite 700. only on the 7th floor suite 700. ref#: 202505025705.Details
fire sprinkler t.i. in office space - relocating 23 heads and installing 53 new heads. total 76 heads. only on the 7th floor suite 700. only on the 7th floor suite 700. ref#: 202505025705. | $23,130 |
| Jul 9, 2025 | Completed final sign-off Aug 2025 | 2750 19th St | revise fire sprinkler system office space. installing 5 new heads. ref pa # 2025-0521-6997Details
revise fire sprinkler system office space. installing 5 new heads. ref pa # 2025-0521-6997 | $5,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 180 Howard St | fire sprinkler as built plan for pa # 2025-0408-3933 added 11 more heads from the original planDetails
fire sprinkler as built plan for pa # 2025-0408-3933 added 11 more heads from the original plan | $5,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 444 Spear St | fire sprinkler system t.i. relocating 2 heads and installing 14 new heads total 16 at 2nd floor only. bldg pa #202504295442 suite 215 & 220Details
fire sprinkler system t.i. relocating 2 heads and installing 14 new heads total 16 at 2nd floor only. bldg pa #202504295442 suite 215 & 220 | $5,000 |
| Apr 25, 2025 | In progress issued Apr 2025 | 2534 Chestnut St | new ug fire service main being installed ref bldg 2021-0220-5052 & fire 2025-0131-9471Details
new ug fire service main being installed ref bldg 2021-0220-5052 & fire 2025-0131-9471 | $10,000 |
| Apr 8, 2025 | Completed final sign-off Oct 2025 | 180 Howard St | fire sprinkler ti in office remodel relocation 20 heads and installing 38 new heads total of 58 heads buiiding permit # 2024-1024-3671Details
fire sprinkler ti in office remodel relocation 20 heads and installing 38 new heads total of 58 heads buiiding permit # 2024-1024-3671 | $18,600 |
| Apr 8, 2025 | In progress issued Apr 2025 | 2534 Chestnut St | as built plan to show 4 additoinal heads installed. ref 202501319471Details
as built plan to show 4 additoinal heads installed. ref 202501319471 | |
| Mar 28, 2025 | Completed final sign-off Jun 2025 | 1493 Valencia St | ref ti 202409271881-relocating 1 heard and installing 8 (n) heads for a total of 9 headsDetails
ref ti 202409271881-relocating 1 heard and installing 8 (n) heads for a total of 9 heads | $8,500 |
| Mar 28, 2025 | In progress issued Mar 2025 | 33 New Montgomery St | 11/fl- ref 202503061735 ti - relocating 28 heads anbd installing 2 (n) heads total 30 headsDetails
11/fl- ref 202503061735 ti - relocating 28 heads anbd installing 2 (n) heads total 30 heads | $15,000 |
| Mar 14, 2025 | In progress issued Mar 2025 | 2750 19th St | 1/f: revise fire sprinkler system new tenant floor plan. relocating 7 heads and installing 16 new heads total 23. ref arch 2024-0829-9734Details
1/f: revise fire sprinkler system new tenant floor plan. relocating 7 heads and installing 16 new heads total 23. ref arch 2024-0829-9734 | $12,675 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1 Lombard St | ref pa # 2024-0708-5966 revise fire sprinkler system new tenant fl plan/ceiling plan. relocating 3 heads and installing 19 new heads. 22 totalDetails
ref pa # 2024-0708-5966 revise fire sprinkler system new tenant fl plan/ceiling plan. relocating 3 heads and installing 19 new heads. 22 total | $38,850 |
| Jan 31, 2025 | In progress issued Feb 2025 | 2534 Chestnut St | ref 202412106476- install fire sprinkler system on first floor only install 23 heads per nfpa 13r piping in attic and garage to be coverd and cpvc pipe starts in attic noteDetails
ref 202412106476- install fire sprinkler system on first floor only install 23 heads per nfpa 13r piping in attic and garage to be coverd and cpvc pipe starts in attic note | $10,000 |
| Dec 17, 2024 | Completed final sign-off Apr 2025 | 260 California St | 6/fl- 202408057915- fire sprinkler ti work on (n) office ceiling layout. removing heads of dropped ceiling area taht will be removed. relocating 9 heads and install 28 (n) headsDetails
6/fl- 202408057915- fire sprinkler ti work on (n) office ceiling layout. removing heads of dropped ceiling area taht will be removed. relocating 9 heads and install 28 (n) heads | $15,600 |
| Sep 27, 2024 | In progress issued Sep 2024 | 3040 16th St | revise fire sprinkler system to accomodate new tenant ceiling plan. installing 14 new heads. reference pa #202408158753Details
revise fire sprinkler system to accomodate new tenant ceiling plan. installing 14 new heads. reference pa #202408158753 | $8,740 |
| Aug 28, 2024 | Completed final sign-off Nov 2024 | 2343 Fillmore St | revise fire sprinkler system to accomodate new teanat floor/ ceiling plan/ install 22 new heads and relocate 2 heads. total = 24. ref pa 202402065323Details
revise fire sprinkler system to accomodate new teanat floor/ ceiling plan/ install 22 new heads and relocate 2 heads. total = 24. ref pa 202402065323 | $8,000 |
| Jun 7, 2024 | Completed final sign-off Sep 2024 | 180 Howard St | revise fire sprinkler system to accomate new spec suite floor plan. installing 102 new heads and relocating 25 heads: total 127Details
revise fire sprinkler system to accomate new spec suite floor plan. installing 102 new heads and relocating 25 heads: total 127 | $25,500 |
| Apr 26, 2024 | Completed final sign-off Jul 2024 | 952 Clement St | ref pa# 2022-0930-3509 & 2022-0908-2074 fire sprinkler as builts. 89 fire sprinkler heads.Details
ref pa# 2022-0930-3509 & 2022-0908-2074 fire sprinkler as builts. 89 fire sprinkler heads. | $75,000 |
| May 18, 2023 | Completed final sign-off Jul 2024 | 952 Clement St | install new underground fire service to building. fire sprinklers under different permit (pa 202209303509). ref permit 201805310563 and 202209082074.Details
install new underground fire service to building. fire sprinklers under different permit (pa 202209303509). ref permit 201805310563 and 202209082074. | $45,000 |
| Jan 12, 2023 | Completed final sign-off Dec 2023 | 114 Noe St | ref pa# 202206106076, change out 1" meter to 2" combo meter.Details
ref pa# 202206106076, change out 1" meter to 2" combo meter. | $6,500 |
| Oct 11, 2022 | Completed final sign-off Dec 2022 | 190 Otis St | partially comply with nov 201830581 remove 6 jpse va;ves frp, east e;evatopm fore escape-cap permanently; provide (1) new hose valve standpipe @ south fire escape roof location.Details
partially comply with nov 201830581 remove 6 jpse va;ves frp, east e;evatopm fore escape-cap permanently; provide (1) new hose valve standpipe @ south fire escape roof location. | $15,000 |
| Sep 30, 2022 | Completed final sign-off Jul 2024 | 952 Clement St | new fire sprinkler system, 89 heads and install new underground fire serviceDetails
new fire sprinkler system, 89 heads and install new underground fire service | $45,000 |
| Jun 10, 2022 | Completed final sign-off Dec 2023 | 114 Noe St | installing fire sprinklers to accomodate new floor plans ti. installing 22 new heads ref# pa201905019443 & pa#202203180315.Details
installing fire sprinklers to accomodate new floor plans ti. installing 22 new heads ref# pa201905019443 & pa#202203180315. | $8,000 |
| Jun 3, 2022 | Completed final sign-off Aug 2022 | 323 Octavia St | revise fire sprinkler system due to accomodate new tenant floor plan. swap out intermediate temp sprinklers to ordinary installing 7 new heads. swap out 33 existing heads.Details
revise fire sprinkler system due to accomodate new tenant floor plan. swap out intermediate temp sprinklers to ordinary installing 7 new heads. swap out 33 existing heads. | $7,500 |
| Mar 2, 2022 | Completed final sign-off Mar 2024 | 1466 Jackson St | installs 18 new sprinkler heads at 1st floor renovation. extgs system first floor only. ref pa#201603266268 (s1)Details
installs 18 new sprinkler heads at 1st floor renovation. extgs system first floor only. ref pa#201603266268 (s1) | $8,000 |
| Oct 5, 2021 | Completed final sign-off Oct 2023 | 1016 De Haro St | fire sprinkler system installed, as-built plans to show pipe run and head layout per inspector. ref pa 201506229512-s3.Details
fire sprinkler system installed, as-built plans to show pipe run and head layout per inspector. ref pa 201506229512-s3. | $2,000 |
| Feb 13, 2020 | Completed final sign-off May 2021 | 224 Townsend St | roof level - as-built revision - fire sprinkler work to accomodate new tenant floor & ceiling plan. ref pa 202001151935.Details
roof level - as-built revision - fire sprinkler work to accomodate new tenant floor & ceiling plan. ref pa 202001151935. | |
| Jan 15, 2020 | Completed final sign-off May 2021 | 224 Townsend St | fire sprinkler system to accomodate new tenant floor and ceiling. relocate 2 heads, install 35 new heads.Details
fire sprinkler system to accomodate new tenant floor and ceiling. relocate 2 heads, install 35 new heads. | $8,246 |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 1 Stanyan Bl | fire sprinkler system ti for a small cafe in (e) vacant space. adding 6 more sprinkler heads. ref 201903286510Details
fire sprinkler system ti for a small cafe in (e) vacant space. adding 6 more sprinkler heads. ref 201903286510 | $5,000 |
| Jun 14, 2019 | Completed final sign-off Jul 2019 | 2800 03rd St | fire sprinkler system updating fire sprinkler system within area of work. replacing heads older than 60 years. installing 56 new heads and relocating 8 heads. ref app#201802010192. n/a for maherDetails
fire sprinkler system updating fire sprinkler system within area of work. replacing heads older than 60 years. installing 56 new heads and relocating 8 heads. ref app#201802010192. n/a for maher | $26,595 |
| May 17, 2019 | Completed final sign-off Mar 2020 | 224 Townsend St | fire sprinkler as built per inspector's request - as built for 2 heads installed in soffit. ref pa 2018-1220-8853 (sprinkler) and 2018-0531-0575 (bldg permit)Details
fire sprinkler as built per inspector's request - as built for 2 heads installed in soffit. ref pa 2018-1220-8853 (sprinkler) and 2018-0531-0575 (bldg permit) | $500 |
| Apr 16, 2019 | Completed final sign-off May 2019 | 2800 03rd St | suite 201 & 202: fire sprinkler system relocating 4 heads and installing 9 new heads. 13 total heads. ref pa #201802010192Details
suite 201 & 202: fire sprinkler system relocating 4 heads and installing 9 new heads. 13 total heads. ref pa #201802010192 | $7,395 |
| Jan 25, 2019 | Completed final sign-off Feb 2019 | 2020 Jerrold Av | installing 2 new sprinklers heads in walk-in freezerDetails
installing 2 new sprinklers heads in walk-in freezer | $2,600 |
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 224 Townsend St | ref pa201812208853: as-built plans for sprinkler system and bracking. 214 heads. maher n/a.Details
ref pa201812208853: as-built plans for sprinkler system and bracking. 214 heads. maher n/a. | |
| Jan 2, 2019 | Completed final sign-off Jan 2019 | 1 Henry Adams St | as built fire sprinklers ref pa 201805310573 removed heads in meat display and wine displayDetails
as built fire sprinklers ref pa 201805310573 removed heads in meat display and wine display | $2,000 |
| Dec 20, 2018 | Never finaled issued Jan 2019, no final | 224 Townsend St | install new sprinkler system through-out building per nfpa 13 with new 4-inch underground fire service off of 8-inch main on townsend. - 214 sprinkler ref pa 2018-0531-0575Details
install new sprinkler system through-out building per nfpa 13 with new 4-inch underground fire service off of 8-inch main on townsend. - 214 sprinkler ref pa 2018-0531-0575 | $100,000 |
| Nov 15, 2018 | Completed final sign-off Jan 2019 | 1 Henry Adams St | fire sprinkler system adding kitchen suppression system to 1505 square foot remote area and add 1 sprinkler head in kitchen. revision to 201805310573 sprinkler plan. suppression system under 2018/11/15/5927 plumbing permit pp20180531866 maher naDetails
fire sprinkler system adding kitchen suppression system to 1505 square foot remote area and add 1 sprinkler head in kitchen. revision to 201805310573 sprinkler plan. suppression system under 2018/11/15/5927 plumbing permit pp20180531866 maher na | $2,000 |
| Aug 21, 2018 | Completed final sign-off Apr 2019 | 901 Rankin St | sprinkler ti for new walk in coolers/freezers 6000 sq ft to accomodate new high piled stroage, limited to 19 feet high up to class iii commodity only. no class iv or plastics storage allowed. 736 gpm @ 48 psi plus 500 gpm hose = 1236 gpm demand. maher na ref pa 201806121673Details
sprinkler ti for new walk in coolers/freezers 6000 sq ft to accomodate new high piled stroage, limited to 19 feet high up to class iii commodity only. no class iv or plastics storage allowed. 736 gpm @ 48 psi plus 500 gpm hose = 1236 gpm demand. maher na ref pa 201806121673 | $8,000 |
| May 31, 2018 | Completed final sign-off Jan 2019 | 1 Henry Adams St | 1st flr - restaurant dropping some ceiling. fire sprinkler system adding 82 sprinkler heads to (e) 1" plugs. relocating 4 heads. kitchen to be ord hazard i, 130 square feet maximum. using variety of head types ref 201709067003Details
1st flr - restaurant dropping some ceiling. fire sprinkler system adding 82 sprinkler heads to (e) 1" plugs. relocating 4 heads. kitchen to be ord hazard i, 130 square feet maximum. using variety of head types ref 201709067003 | $14,246 |
| Mar 16, 2018 | Completed final sign-off Sep 2018 | 934 Howard St | fire sprinkler system, relocating 2 heads and installing 20 new headsDetails
fire sprinkler system, relocating 2 heads and installing 20 new heads | $7,121 |
| Jan 12, 2018 | Completed final sign-off Jan 2018 | 2020 Jerrold Av | building l - installing 5 new sprinkler heads in walkin cooler maher naDetails
building l - installing 5 new sprinkler heads in walkin cooler maher na | $5,500 |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 190 Otis St | east 4" dry stand pipe to be removed and we will be adding manifold at the roof level, stand pipe will stay active. n/a for maher.Details
east 4" dry stand pipe to be removed and we will be adding manifold at the roof level, stand pipe will stay active. n/a for maher. | $15,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2019 | 165 Ofarrell St | tenant improvement of basement, 1st, 2nd, 3rd, 4th, 5th & 6th floor. install fire sprinklers. ** maher: n/a **Details
tenant improvement of basement, 1st, 2nd, 3rd, 4th, 5th & 6th floor. install fire sprinklers. ** maher: n/a ** | $288,325 |
| Jul 3, 2017 | Completed final sign-off Jul 2017 | 388 Fulton St | as built permit. ref#201705126478 to add one dry pendent sprinkler to walk-in freezer room, first floorDetails
as built permit. ref#201705126478 to add one dry pendent sprinkler to walk-in freezer room, first floor | |
| May 12, 2017 | Completed final sign-off Sep 2017 | 388 Fulton St | 1/f- install 22 new sprinklers head, t.i. pa#201608185378Details
1/f- install 22 new sprinklers head, t.i. pa#201608185378 | $7,046 |
| Apr 28, 2017 | Completed final sign-off May 2017 | 2035 Jerrold Av | install 2 new fire sprinklers in ripening box maher not reqDetails
install 2 new fire sprinklers in ripening box maher not req | $2,213 |
| Mar 2, 2017 | Completed final sign-off Apr 2017 | 2030 Jerrold Av | sprinkler ti - install 26 new sprinklers for cold storage warehouse. ref pa 2016-0808-4456; n/a maherDetails
sprinkler ti - install 26 new sprinklers for cold storage warehouse. ref pa 2016-0808-4456; n/a maher | $8,175 |
| Feb 10, 2017 | Expired or cancelled cancelled Jan 2026 | 165 Ofarrell St | connect to new on site 6" fire main where water company terminates maher naDetails
connect to new on site 6" fire main where water company terminates maher na | $30,000 |
| Jan 13, 2017 | Completed final sign-off Mar 2017 | 450 Hayes St | new fire sprinklers will be installed (33), existing sprinklers (2) will be relocated. ref pa 2016-0120-7535s1. maher naDetails
new fire sprinklers will be installed (33), existing sprinklers (2) will be relocated. ref pa 2016-0120-7535s1. maher na | $12,995 |
| Sep 7, 2016 | Completed final sign-off Nov 2016 | 2020 Jerrold Av | 1st floor - fire sprinklers 21 heads relocate maher naDetails
1st floor - fire sprinklers 21 heads relocate maher na | $8,500 |
| Aug 2, 2016 | Completed final sign-off Nov 2016 | 690 Stanyan St | installation of 3 fire sprinkler headsDetails
installation of 3 fire sprinkler heads | $4,100 |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 267 08th St | add 6 ependents, plug 2 (e) pendents, relocate main piping for new doors. maher naDetails
add 6 ependents, plug 2 (e) pendents, relocate main piping for new doors. maher na | $7,000 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 317 Leavenworth St | installation of fire sprinklers, 64 heads ref pa 2015-1019-0065 to basement and ground floor only. restaurant space (a-2) in hotel (r-1)Details
installation of fire sprinklers, 64 heads ref pa 2015-1019-0065 to basement and ground floor only. restaurant space (a-2) in hotel (r-1) | $15,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 601 Van Ness Av | fire sprinkler ti 57, ste f. heads on ground floor suite per building permit # 2015-06-17-9158Details
fire sprinkler ti 57, ste f. heads on ground floor suite per building permit # 2015-06-17-9158 | $8,000 |
| May 29, 2013 | Never finaled issued May 2013, no final | 250 Clara St | 2nd floor unit #4: 1 head firesprinkler relocation on 2nd floor unit #4Details
2nd floor unit #4: 1 head firesprinkler relocation on 2nd floor unit #4 | $514 |
| Apr 19, 2012 | Completed final sign-off May 2012 | 601 Van Ness Av | on 2nd floor - unit #2060: relocate 1 ss pendent for new office.Details
on 2nd floor - unit #2060: relocate 1 ss pendent for new office. | $600 |
| Aug 18, 2011 | Completed final sign-off Oct 2011 | 530 Bush St | #204 fire sprinkler work - 2 relocated ssp's, 1 new ssp, seismic bracing.Details
#204 fire sprinkler work - 2 relocated ssp's, 1 new ssp, seismic bracing. | $2,400 |
| Feb 22, 2011 | Completed final sign-off Jan 2023 | 400 02nd St | 2nd floor tenant improvement fire sprinklers, 6 relocates.Details
2nd floor tenant improvement fire sprinklers, 6 relocates. | $5,000 |
| Oct 13, 2010 | Completed final sign-off Dec 2010 | 77 Van Ness Av | t.i. fire sprinkler work. relocate 18 extg and add 5 new sprinklers within tenant space due to new walls and ceilings.Details
t.i. fire sprinkler work. relocate 18 extg and add 5 new sprinklers within tenant space due to new walls and ceilings. | $3,800 |
| Feb 4, 2010 | Completed final sign-off May 2010 | 77 Van Ness Av | 2nd floor. relocate existing fire sprinkler head and add 11 new sprinkler heads within corridor space due to new walls and ceilings.Details
2nd floor. relocate existing fire sprinkler head and add 11 new sprinkler heads within corridor space due to new walls and ceilings. | $1,600 |
| Feb 4, 2010 | Never finaled issued Feb 2010, no final | 77 Van Ness Av | 3rd floor. relocate existing and add 11 new sprinkler heads within corridor space due to new walls and ceilings.Details
3rd floor. relocate existing and add 11 new sprinkler heads within corridor space due to new walls and ceilings. | $2,200 |
| Jan 14, 2010 | Completed final sign-off May 2010 | 41 Van Ness Av | ti fire sprinkler work. relocate existig and add new sprinklers within tenant space due to new walls and ceilingsDetails
ti fire sprinkler work. relocate existig and add new sprinklers within tenant space due to new walls and ceilings | $3,200 |
| Jan 14, 2010 | Completed final sign-off Aug 2012 | 745 Marina Bl | new residential and garage fire sprinkler system per nfpa13. combo meter- underground and meter separate permit....Details
new residential and garage fire sprinkler system per nfpa13. combo meter- underground and meter separate permit.... | $12,250 |
| Jan 14, 2010 | Completed final sign-off Mar 2010 | 77 Van Ness Av | suite 303: tenant improvement fire sprinkler work. relocate existing and add new sprinklers within tenant space due to new walls and ceilings.Details
suite 303: tenant improvement fire sprinkler work. relocate existing and add new sprinklers within tenant space due to new walls and ceilings. | $4,400 |
| Jun 19, 2007 | Completed final sign-off Aug 2009 | 77 Van Ness Av | new fire sprinkler system.Details
new fire sprinkler system. | $160,000 |
| Nov 30, 2006 | Completed final sign-off Jan 2007 | 250 Executive Park Bl | 2nd floor, suite 2100 - fire speaker t.i. plans.Details
2nd floor, suite 2100 - fire speaker t.i. plans. | $8,000 |
| Nov 30, 2006 | Completed final sign-off Jan 2007 | 250 Executive Park Bl | 3rd floor, suite 3400 - fire speaker t.i. plans.Details
3rd floor, suite 3400 - fire speaker t.i. plans. | $10,000 |