Block 0271, lot 027
530 Bush St
- City’s use
- Commercial Office
- Built
- 1982
- Stories
- 10
- Building
- 98,210 sq ft
- Lot
- 13,653 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
144 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 12, 2022 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | Mastec Network Solutions Inc | revision to pa#202106253247. (e-1) breaker panel schedule to match installDetails
revision to pa#202106253247. (e-1) breaker panel schedule to match install | |
| Dec 14, 2021 | Never finaled issued Nov 2022, no final | 530 Bush St | Apex Site Solutions Inc | verizon remove&replace 8(e) antennasw/8(n); install 4(n)radio 4449 units @antennas; install 4(n) radio 8843 units 2 antennas; install 4(n) radio 8863 units @ antennas; install 4(n) filters @ antennas; remove & replace 1() raycap 3315 surge suppresoor w/2(n) raycap 6627 surge suppressors @ antenna;Details
verizon remove&replace 8(e) antennasw/8(n); install 4(n)radio 4449 units @antennas; install 4(n) radio 8843 units 2 antennas; install 4(n) radio 8863 units @ antennas; install 4(n) filters @ antennas; remove & replace 1() raycap 3315 surge suppresoor w/2(n) raycap 6627 surge suppressors @ antenna; | $40,000 |
| Jun 25, 2021 | Completed final sign-off Mar 2023 | 530 Bush St | Mastec Network Solutions Inc | a modification to e wireless telecommunications facility to include 3 n antenna mounts, 1 per sector, 6 new antennas, 3 e antennas to remain, 9 total. 3 n radios, 3 e to remain 6 total. remove replace 2 cabinets, install 3 n hybrid cables. power upgrade t0 100 ampDetails
a modification to e wireless telecommunications facility to include 3 n antenna mounts, 1 per sector, 6 new antennas, 3 e antennas to remain, 9 total. 3 n radios, 3 e to remain 6 total. remove replace 2 cabinets, install 3 n hybrid cables. power upgrade t0 100 amp | $25,000 |
| Jun 14, 2019 | Expired or cancelled withdrawn Jul 2021 | 530 Bush St | t-mobile modification install 3 nw antenna, 6 extg antennas to remain 9 total. install 3 nw antenna mounts, install 3 nw rru's. remove cabinet, replace with new cabinets, relocate battery cabinet. install 3 nw hybid caldes.Details
t-mobile modification install 3 nw antenna, 6 extg antennas to remain 9 total. install 3 nw antenna mounts, install 3 nw rru's. remove cabinet, replace with new cabinets, relocate battery cabinet. install 3 nw hybid caldes. | $25,000 | |
| Apr 30, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | Commercial Interior Builders Inc | modify ductwork and equip as shown on 6m2.0. install new ductwork and mech equip as shown on 6.m2.1 no new fire smoke dampers in this project. ref 201903014165Details
modify ductwork and equip as shown on 6m2.0. install new ductwork and mech equip as shown on 6.m2.1 no new fire smoke dampers in this project. ref 201903014165 | $57,250 |
| Apr 18, 2019 | Completed final sign-off May 2019 | 530 Bush St | Golden Gate Fire Protection Inc | 6/f: fire sprinkler only - revision pa 2019-0325-6082; field inspector need window protection to be included on fire; and additional earth quake bracing as wellDetails
6/f: fire sprinkler only - revision pa 2019-0325-6082; field inspector need window protection to be included on fire; and additional earth quake bracing as well | |
| Apr 3, 2019 | Completed final sign-off May 2019 | 530 Bush St | Siemens Industry, Inc. | fire alram "spec suite" add 8 speaker/strobes and 5 speakers ref 201903014165Details
fire alram "spec suite" add 8 speaker/strobes and 5 speakers ref 201903014165 | $8,240 |
| Mar 25, 2019 | Never finaled issued Mar 2019, no final | 530 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 8 pendents & relocate 35 uprights for swa 6th fl. ref pa #201903014165.Details
fire sprinkler only - relocate 8 pendents & relocate 35 uprights for swa 6th fl. ref pa #201903014165. | $21,500 |
| Mar 1, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | Commercial Interior Builders Inc | 6th fl; barrier removal at 6th fl. restroomsDetails
6th fl; barrier removal at 6th fl. restrooms | $20,000 |
| Mar 1, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | Commercial Interior Builders Inc | 6th fl. t.i. light demo of select walls (non structural) doors & finishes, providing new elec, lighting & power, providing new non rated walls, doors, lighting and finishesDetails
6th fl. t.i. light demo of select walls (non structural) doors & finishes, providing new elec, lighting & power, providing new non rated walls, doors, lighting and finishes | $400,000 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 530 Bush St | Golden Gate Fire Protection Inc | ref pa# 201811166086; fire sprinkler, relocate 43 pendent sprinklers on the 9th fl.Details
ref pa# 201811166086; fire sprinkler, relocate 43 pendent sprinklers on the 9th fl. | $22,575 |
| Jan 16, 2019 | Completed final sign-off Mar 2019 | 530 Bush St | Commercial Interior Builders Inc | 9th fl - demo ductwork equipment as shown on 9m2.0. install new low pressure ductwork and equipment as shown on 9m2.1. no new fre smoke dampers. ref pa 2018-1116-6086 for architectural workDetails
9th fl - demo ductwork equipment as shown on 9m2.0. install new low pressure ductwork and equipment as shown on 9m2.1. no new fre smoke dampers. ref pa 2018-1116-6086 for architectural work | $41,250 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 530 Bush St | Siemens Industry, Inc. | 9th flr - fore alarm - add 2 speakers and 10 speaker/strobes ref 201811166086 for "all trails"Details
9th flr - fore alarm - add 2 speakers and 10 speaker/strobes ref 201811166086 for "all trails" | $7,590 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 530 Bush St | 9th flr. barrier removal at restroomsDetails
9th flr. barrier removal at restrooms | $1,400 | |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 530 Bush St | Commercial Interior Builders Inc | 9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishesDetails
9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishes | $350,000 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 530 Bush St | Commercial Interior Builders Inc | 5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvementsDetails
5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvements | $40,000 |
| Mar 16, 2018 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | verizon - replace (e) antennas with new verizon wireless antennas, replace (e) radios with new radios. new panels to cover antennas to be installed. on rooftop. maher n/a.Details
verizon - replace (e) antennas with new verizon wireless antennas, replace (e) radios with new radios. new panels to cover antennas to be installed. on rooftop. maher n/a. | $30,000 | |
| Oct 5, 2017 | Expired or cancelled withdrawn Mar 2018 | 530 Bush St | replaced (e) antenna with new antenna. replace (e) radios with new. new panels to cover antenna to be installed. 1 new line to be installed on (e) cables route. ref pa# 2013/08/09/3937.Details
replaced (e) antenna with new antenna. replace (e) radios with new. new panels to cover antenna to be installed. 1 new line to be installed on (e) cables route. ref pa# 2013/08/09/3937. | $30,000 | |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 530 Bush St | Siemens Industry, Inc. | fire alarm work for the "elevator modernization" project on floors 6 and the penthouse level; additions are 2 relay modules at elevator machine roomsDetails
fire alarm work for the "elevator modernization" project on floors 6 and the penthouse level; additions are 2 relay modules at elevator machine rooms | $1,020 |
| Jul 11, 2017 | Completed final sign-off May 2018 | 530 Bush St | Western Allied Mechanical Inc. | remove and replace existing mech equipment with new including chiller, cooling tower, boiler, associated pumps and piping and ac unit and ductworkDetails
remove and replace existing mech equipment with new including chiller, cooling tower, boiler, associated pumps and piping and ac unit and ductwork | $1,200,000 |
| Apr 6, 2017 | Expired or cancelled cancelled Sep 2024 | 530 Bush St | remove (6) t-mobile antennas; install (6) proposed antennas - like for like swap. remove (6) diplexers; install (3) tma's, install (6) dc conductor #6 awg cables.Details
remove (6) t-mobile antennas; install (6) proposed antennas - like for like swap. remove (6) diplexers; install (3) tma's, install (6) dc conductor #6 awg cables. | $25,000 | |
| Apr 6, 2016 | Completed final sign-off May 2016 | 530 Bush St | Siemens Industry, Inc. | fire alarm work for the "suite 800" ti remodel on floor 8; additions are 3 speakers and 3 speaker/strobes. ref pa 2015-1120-3256Details
fire alarm work for the "suite 800" ti remodel on floor 8; additions are 3 speakers and 3 speaker/strobes. ref pa 2015-1120-3256 | $3,060 |
| Mar 2, 2016 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | Allsite Corp Goods/Services Construction | revise conference room to 'office'. revision to app#201511203256Details
revise conference room to 'office'. revision to app#201511203256 | |
| Nov 24, 2015 | Completed final sign-off Jun 2017 | 530 Bush St | Nu Rev Communications Inc. | roof: modification to an extg t-mobile wireless telecommunications facility consisting of installation of 3 new antennas, 3 extg antennas to remain, replacing one extg cabinets with one new cabinet and replacing one extg battery cabinet with one new pts 8003. n/a for maherDetails
roof: modification to an extg t-mobile wireless telecommunications facility consisting of installation of 3 new antennas, 3 extg antennas to remain, replacing one extg cabinets with one new cabinet and replacing one extg battery cabinet with one new pts 8003. n/a for maher | $20,000 |
| Nov 20, 2015 | Completed final sign-off May 2016 | 530 Bush St | Allsite Corp Goods/Services Construction | update to finishes and electrical on the 8th fl of high rise. addition of new wall and tear down and update of 1 non structural wallDetails
update to finishes and electrical on the 8th fl of high rise. addition of new wall and tear down and update of 1 non structural wall | $100,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2015 | 530 Bush St | Angotti & Reilly Inc. | (e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnectedDetails
(e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnected | $10,000 |
| Dec 8, 2014 | Completed final sign-off Jan 2015 | 530 Bush St | Peacock Construction | renewal for final only to pa#201206122364Details
renewal for final only to pa#201206122364 | |
| Nov 21, 2014 | Completed final sign-off Jan 2015 | 530 Bush St | Peacock Construction | revision to pa #2012/0612/2361. barrier removal for the 8th floor men & women’s restroom.Details
revision to pa #2012/0612/2361. barrier removal for the 8th floor men & women’s restroom. | $12,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2017 | 530 Bush St | Bcci Construction Company | 10th floor - electrical work associated with approved pa #2014.1007.8298 including t-24 & new lighting.Details
10th floor - electrical work associated with approved pa #2014.1007.8298 including t-24 & new lighting. | $32,500 |
| Nov 20, 2014 | Completed final sign-off Dec 2014 | 530 Bush St | Siemens Industry, Inc. | 10th floor: fire alarm for the "iie" t.i. additions are 7 speaker/strobes and 4 speakers. ref. appl 201410078298.Details
10th floor: fire alarm for the "iie" t.i. additions are 7 speaker/strobes and 4 speakers. ref. appl 201410078298. | $5,500 |
| Oct 7, 2014 | Completed final sign-off Jan 2017 | 530 Bush St | Bcci Construction Company | new partitions, new paint & carpet. mechanical, electrical & plumbing under seperate permit. life safety under seperate permit. path of travel under pa #2014.0610.8030.Details
new partitions, new paint & carpet. mechanical, electrical & plumbing under seperate permit. life safety under seperate permit. path of travel under pa #2014.0610.8030. | $200,000 |
| Jun 10, 2014 | Completed final sign-off Jan 2015 | 530 Bush St | Peacock Construction | permit revision to 201108293450, technically infeasable.Details
permit revision to 201108293450, technically infeasable. | |
| Jan 16, 2014 | Completed final sign-off Jul 2014 | 530 Bush St | Siemens Industry, Inc. | addition of 16 speaker/strobes for the bama remodels on floors 2 and 3. all new devices connect onto the fire alarm system.Details
addition of 16 speaker/strobes for the bama remodels on floors 2 and 3. all new devices connect onto the fire alarm system. | $8,000 |
| Jan 2, 2014 | Never finaled issued Jan 2014, no final | 530 Bush St | Legacy Mechanical & Energy Services, Inc | 1)replace of one water source heat pump on 2nd floor. 2)modification/relocation of extg air distribution to suit new floor layout jon 2nd and 3rd floors. reference bldg permit #201311212558Details
1)replace of one water source heat pump on 2nd floor. 2)modification/relocation of extg air distribution to suit new floor layout jon 2nd and 3rd floors. reference bldg permit #201311212558 | $45,100 |
| Jan 2, 2014 | Completed final sign-off Jan 2014 | 530 Bush St | R L H Fire Protection Inc | on 2/f & 3/f fire sprinkler permit- relocate 61, add 2 and delete 19 pendent sprinklers t.i.# 201312182558Details
on 2/f & 3/f fire sprinkler permit- relocate 61, add 2 and delete 19 pendent sprinklers t.i.# 201312182558 | $24,672 |
| Dec 5, 2013 | Completed final sign-off Jan 2014 | 530 Bush St | Siemens Industry, Inc. | addition of one speaker/ strobe for a meeting room which had been an office on floor 8. the new device connects onto the fire alarm systemDetails
addition of one speaker/ strobe for a meeting room which had been an office on floor 8. the new device connects onto the fire alarm system | $500 |
| Nov 21, 2013 | Completed final sign-off Jan 2014 | 530 Bush St | Angotti & Reilly Inc. | 2nd & 3rd floor tenant improvement to existing office space. demolitoin of non-structural partitions, ceiling grid, construction of new non-structural partitions, ceiling, lights, millwork.Details
2nd & 3rd floor tenant improvement to existing office space. demolitoin of non-structural partitions, ceiling grid, construction of new non-structural partitions, ceiling, lights, millwork. | $257,108 |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 530 Bush St | Desert Mechanical Inc | mechical ventilation(revised duct work) as built drawings. revision to approved permit app#201307303135Details
mechical ventilation(revised duct work) as built drawings. revision to approved permit app#201307303135 | |
| Aug 9, 2013 | Completed final sign-off Mar 2016 | 530 Bush St | Quality Telecom Consultants | 4 (e) verizon wireless panel antennas to be removed. 4 new verizon wireless panel antennas to be installed. 4 new verizon wireless rrus 12 to be installed. 3 new raycap surge protectors to be installed. 2 new verizon wireless hybrid cables to be installed. 12 (e) 7/8" coax cable to be revised.Details
4 (e) verizon wireless panel antennas to be removed. 4 new verizon wireless panel antennas to be installed. 4 new verizon wireless rrus 12 to be installed. 3 new raycap surge protectors to be installed. 2 new verizon wireless hybrid cables to be installed. 12 (e) 7/8" coax cable to be revised. | $40,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 530 Bush St | Tutor Perini Corporation | 3rd/4th floors-revision to pa# 2013-0708-1340-construction of new non bearing walls, ceiling to remain exposed (e). new dropped ceiling where indicated on plans. 1 hour rated wall at 4th floor it roomDetails
3rd/4th floors-revision to pa# 2013-0708-1340-construction of new non bearing walls, ceiling to remain exposed (e). new dropped ceiling where indicated on plans. 1 hour rated wall at 4th floor it room | |
| Jul 30, 2013 | Never finaled issued Aug 2013, no final | 530 Bush St | Desert Mechanical Inc | modify existing hvac ductwork to accomodate new floor plan on floors 1,3,4. ref 201307081340Details
modify existing hvac ductwork to accomodate new floor plan on floors 1,3,4. ref 201307081340 | $100,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 530 Bush St | Cosco Fire Protection Inc. | add 13 new, relocate 13 heads and plug 5 sprinkler heads total on 1st, 3rd, 4th floor. ti app# 2013071466Details
add 13 new, relocate 13 heads and plug 5 sprinkler heads total on 1st, 3rd, 4th floor. ti app# 2013071466 | $14,750 |
| Jul 10, 2013 | Completed final sign-off Feb 2014 | 530 Bush St | Tutor Perini Corporation | 1st/3rd & 4th floors-barrier removal improvement at restrooms; (both men & women's room)Details
1st/3rd & 4th floors-barrier removal improvement at restrooms; (both men & women's room) | $50,000 |
| Jul 9, 2013 | Completed final sign-off Jul 2014 | 530 Bush St | Siemens Industry, Inc. | 4th floor-addition of 11 speaker/strobes and 2 speakers for the office ti remodel on floor 4. all new devices connect onto the fire alarm system. pa ref# 201306280781Details
4th floor-addition of 11 speaker/strobes and 2 speakers for the office ti remodel on floor 4. all new devices connect onto the fire alarm system. pa ref# 201306280781 | $6,500 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 530 Bush St | Siemens Industry, Inc. | 3rd flr: addition of 13 speakers/strobes and 2 speakers for the office t.i. remodel on floor 3, all new devices connect onto the fire alarm syste, pa ref. 201306280781Details
3rd flr: addition of 13 speakers/strobes and 2 speakers for the office t.i. remodel on floor 3, all new devices connect onto the fire alarm syste, pa ref. 201306280781 | $7,500 |
| Jul 8, 2013 | Completed final sign-off Feb 2014 | 530 Bush St | Tutor Perini Corporation | 1st/3rd/4th floors-cosntruction of new non bearing partition walls, new dropped ceiling, doors, casework, finishes. mep separate permitDetails
1st/3rd/4th floors-cosntruction of new non bearing partition walls, new dropped ceiling, doors, casework, finishes. mep separate permit | $480,000 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 530 Bush St | Siemens Industry, Inc. | 1st floor-addition of 5 speakers/strobes and 2 speakers for the "office ti" remodel on floor 1. all new devices connect onto the fire alarm system. pa ref:201306280781Details
1st floor-addition of 5 speakers/strobes and 2 speakers for the "office ti" remodel on floor 1. all new devices connect onto the fire alarm system. pa ref:201306280781 | $3,500 |
| Jul 1, 2013 | Never finaled issued Jul 2013, no final | 530 Bush St | Angotti & Reilly Inc. | soft-demo per ab-017: demo of existing non bearing walls, casework, and flooringDetails
soft-demo per ab-017: demo of existing non bearing walls, casework, and flooring | $13,000 |
| Jun 28, 2013 | Completed final sign-off Jun 2014 | 530 Bush St | Angotti & Reilly Inc. | 3rd & 4th floors-demolition of (e) non bearing walls, ceilings, light fixtures, casework & flooring, per ab-017Details
3rd & 4th floors-demolition of (e) non bearing walls, ceilings, light fixtures, casework & flooring, per ab-017 | $25,000 |
| Aug 31, 2012 | Never finaled issued Dec 2012, no final | 530 Bush St | to erect non-electrical, double faced signDetails
to erect non-electrical, double faced sign | $1,800 | |
| Jul 17, 2012 | Completed final sign-off Jul 2012 | 530 Bush St | Golden Gate Fire Protection Inc | 8th floor-fire sprinkler system upgrade, relocate 8 pendent sprinkler headsDetails
8th floor-fire sprinkler system upgrade, relocate 8 pendent sprinkler heads | $4,120 |
| Jun 20, 2012 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | revision to pa# 2011-0829-3450-hardship request for accessible parkingDetails
revision to pa# 2011-0829-3450-hardship request for accessible parking | ||
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 530 Bush St | Peacock Construction Inc | barrier removal for 8th floor restrooms; men & women.Details
barrier removal for 8th floor restrooms; men & women. | $15,000 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 530 Bush St | Peacock Construction Inc | 8th floor remodeling of office tenant improvements, demo non-structural partitons, new partitions, mep under separate permit.Details
8th floor remodeling of office tenant improvements, demo non-structural partitons, new partitions, mep under separate permit. | $12,000 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 530 Bush St | Cosco Fire Protection Inc. | fire alarm ti for ste 500, 5th floor. add (7) speaker strobes, (1) strobe & (7) speakers, relocate (2) smokes detectors, demo (2) door holders.Details
fire alarm ti for ste 500, 5th floor. add (7) speaker strobes, (1) strobe & (7) speakers, relocate (2) smokes detectors, demo (2) door holders. | $12,500 |
| May 15, 2012 | Completed final sign-off Jul 2012 | 530 Bush St | Aquamatic Fire Protection | add and relocate 18 sprinklers fire, new t.i. on 5th floor in suite 500. new bracing calc's and bracing-Details
add and relocate 18 sprinklers fire, new t.i. on 5th floor in suite 500. new bracing calc's and bracing- | $8,500 |
| Apr 27, 2012 | Completed final sign-off Dec 2012 | 530 Bush St | Peacock Construction Inc | barrier removal for 5th floor restroomDetails
barrier removal for 5th floor restroom | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 530 Bush St | R L H Fire Protection Inc | basement - remove the existing corroding electric pump & pump controller, replace with a new electric fire pump & controller.Details
basement - remove the existing corroding electric pump & pump controller, replace with a new electric fire pump & controller. | $15,000 |
| Apr 24, 2012 | Completed final sign-off Dec 2012 | 530 Bush St | Peacock Construction Inc | 5th floor suite 500 t.i. includes demolishing of non-structural partitions & building new non-structural paritions. all new or revised hvac, elecrical, plumbing life safety work will be design-build & submitted for permit separately. (bldg fully sprinklered).Details
5th floor suite 500 t.i. includes demolishing of non-structural partitions & building new non-structural paritions. all new or revised hvac, elecrical, plumbing life safety work will be design-build & submitted for permit separately. (bldg fully sprinklered). | $130,000 |
| Mar 14, 2012 | Completed final sign-off May 2012 | 530 Bush St | Cosco Fire Protection Inc. | add 4 speaker to asbuilts per request of inspector. connect new devices to extg speaker circuit s 3.reference plans app#201108031660Details
add 4 speaker to asbuilts per request of inspector. connect new devices to extg speaker circuit s 3.reference plans app#201108031660 | |
| Feb 23, 2012 | Completed final sign-off Apr 2012 | 530 Bush St | Peacock Construction Inc | selective demo only on gr floor, 2nd floor, and 3rd floor of non structural walls, ceilings and lighting per ab-17. path of travel barrier removal upgrades under 201108293450. 2nd floor toilet room barrier removal upgrades under pa #201108293448.Details
selective demo only on gr floor, 2nd floor, and 3rd floor of non structural walls, ceilings and lighting per ab-17. path of travel barrier removal upgrades under 201108293450. 2nd floor toilet room barrier removal upgrades under pa #201108293448. | $28,000 |
| Sep 23, 2011 | Completed final sign-off Oct 2011 | 530 Bush St | R L H Fire Protection Inc | suite 700: fire sprinkler permit. relocate 8 and add 1 pendent sprinklerDetails
suite 700: fire sprinkler permit. relocate 8 and add 1 pendent sprinkler | $4,500 |
| Sep 14, 2011 | Completed final sign-off May 2012 | 530 Bush St | Peacock Construction Inc | 2nd floor -office ti. new ceiling-hvac,lighting, new millwork at kitchen reusing (e) plbg, walls to remain. pa# 2011.08.29.3450 for reference. ls and spr under separate permit.Details
2nd floor -office ti. new ceiling-hvac,lighting, new millwork at kitchen reusing (e) plbg, walls to remain. pa# 2011.08.29.3450 for reference. ls and spr under separate permit. | $80,000 |
| Sep 12, 2011 | Completed final sign-off Nov 2011 | 530 Bush St | Ward Alan Emery Construction Inc. | 7th floor: demo of non-bearing partitions, new partitions and doors, accessibility upgrades in existing restrooms, in reference to pa# 201108293450.Details
7th floor: demo of non-bearing partitions, new partitions and doors, accessibility upgrades in existing restrooms, in reference to pa# 201108293450. | $115,000 |
| Aug 29, 2011 | Completed final sign-off Jan 2015 | 530 Bush St | Ward Alan Emery Construction Inc. | barrier removal for path of travel to building entry. disabled access complianceDetails
barrier removal for path of travel to building entry. disabled access compliance | $25,000 |
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 530 Bush St | Peacock Construction Inc | barrier removal at 2nd floor restroomsDetails
barrier removal at 2nd floor restrooms | $15,000 |
| Aug 18, 2011 | Completed final sign-off Oct 2011 | 530 Bush St | Freedom Fire Protection Inc. | #204 fire sprinkler work - 2 relocated ssp's, 1 new ssp, seismic bracing.Details
#204 fire sprinkler work - 2 relocated ssp's, 1 new ssp, seismic bracing. | $2,400 |
| Aug 3, 2011 | Completed final sign-off Nov 2011 | 530 Bush St | fire alarm system tenant improvement. add (1) speaker strobe and (1) strobe in basement auditorium to existing circuit.Details
fire alarm system tenant improvement. add (1) speaker strobe and (1) strobe in basement auditorium to existing circuit. | $5,800 | |
| Aug 3, 2011 | Completed final sign-off May 2012 | 530 Bush St | fire alarm system tenant improvement for goethe institut 2nd floor. add (7) strobes. have (2) existing speakers relocated. connect new strobe circuit to existing spare circuit.Details
fire alarm system tenant improvement for goethe institut 2nd floor. add (7) strobes. have (2) existing speakers relocated. connect new strobe circuit to existing spare circuit. | $11,600 | |
| Nov 30, 2010 | Completed final sign-off Feb 2011 | 530 Bush St | Bolls Fire & Safety Inc | add 7 pendent sprikers for new t.i. constructionDetails
add 7 pendent sprikers for new t.i. construction | $2,100 |
| Nov 22, 2010 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | refer to t.i. pa# 2010-0831-9943-titile 24 lighting calcs. cost for electrical (lighting) included under pa #2010-0831-9943.Details
refer to t.i. pa# 2010-0831-9943-titile 24 lighting calcs. cost for electrical (lighting) included under pa #2010-0831-9943. | ||
| Aug 31, 2010 | Completed final sign-off Feb 2011 | 530 Bush St | J M E Construction Services Inc | an optometry office into an adj. vacant tenant space. the new work to include new walls, doors, interior glazing,millwork & finishes. mep & sprinkler work to e under separate permit.Details
an optometry office into an adj. vacant tenant space. the new work to include new walls, doors, interior glazing,millwork & finishes. mep & sprinkler work to e under separate permit. | $195,000 |
| Aug 5, 2010 | Never finaled issued Mar 2012, no final | 530 Bush St | Jfc Construction Inc. | install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet.Details
install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet. | $10,000 |
| Jun 25, 2010 | Completed final sign-off Dec 2010 | 530 Bush St | N S A Wireless Inc | add 3 antennas (1 per section) and nine runs of coax to existing facilityDetails
add 3 antennas (1 per section) and nine runs of coax to existing facility | $15,000 |
| Jun 17, 2010 | Never finaled issued Jun 2010, no final | 530 Bush St | demo wall between suites. demo wall to enlarge rooms. demo wall to install glass partition. patch dry wall & repair studs. (n) carpet. fix lighting layout.Details
demo wall between suites. demo wall to enlarge rooms. demo wall to install glass partition. patch dry wall & repair studs. (n) carpet. fix lighting layout. | $62,000 | |
| Mar 25, 2009 | Completed final sign-off Apr 2009 | 530 Bush St | Decker Electric Co Inc Electrical Contra | renew pa# 2006/05/22/2136 (fire alarm) to obtain final inspection. all work has been completed.Details
renew pa# 2006/05/22/2136 (fire alarm) to obtain final inspection. all work has been completed. | |
| Mar 25, 2009 | Completed final sign-off Apr 2009 | 530 Bush St | Decker Electric Co Inc Electrical Contra | renew pa# 2006/03/28/7659 (fire alarm) to obtain final inspection. all work has been completed.Details
renew pa# 2006/03/28/7659 (fire alarm) to obtain final inspection. all work has been completed. | |
| Jun 26, 2008 | Never finaled issued Jun 2008, no final | 530 Bush St | Cosco Fire Protection Inc. | add (5) new sprinkler heads, 1 each area, 1st floor, (2) on 3rd floor, one on 6th floor & basement. relocate 3 (e) pendent sprinlers to upright position at 3rd floor corridorDetails
add (5) new sprinkler heads, 1 each area, 1st floor, (2) on 3rd floor, one on 6th floor & basement. relocate 3 (e) pendent sprinlers to upright position at 3rd floor corridor | $7,000 |
| May 19, 2008 | Completed final sign-off Jun 2008 | 530 Bush St | Delta Contracting Inc. | renew pa#200710044548,#200710054773. for final inspection.Details
renew pa#200710044548,#200710054773. for final inspection. | |
| May 19, 2008 | Completed final sign-off Jun 2008 | 530 Bush St | Delta Contracting Inc. | renew pa#200710044245,#200708079000,#200708079045 for final inspection.Details
renew pa#200710044245,#200708079000,#200708079045 for final inspection. | |
| May 19, 2008 | Completed final sign-off Jun 2008 | 530 Bush St | Delta Contracting Inc. | renew pa#200710094901,#200710296729,#200710094898.for final inspection.Details
renew pa#200710094901,#200710296729,#200710094898.for final inspection. | |
| Feb 21, 2008 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | demo of non structural partitions, new ceiling height partitions, restroom upgrade on 8th floor. all new revised hvac, electrical, plumbing and life saftey will be design built and submitted under separate permit.Details
demo of non structural partitions, new ceiling height partitions, restroom upgrade on 8th floor. all new revised hvac, electrical, plumbing and life saftey will be design built and submitted under separate permit. | $160,000 | |
| Nov 13, 2007 | Expired or cancelled expired Feb 2009 | 530 Bush St | Decker Electric Co Inc Electrical Contra | renew pa# 2006/03/28/7659 & pa# 2006/05/22/2136 for final inspection only.Details
renew pa# 2006/03/28/7659 & pa# 2006/05/22/2136 for final inspection only. | |
| Oct 29, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | revision to pa# 2007/09/05/1816, correcting from type i to type ii construction, since existing floors are wood construction.Details
revision to pa# 2007/09/05/1816, correcting from type i to type ii construction, since existing floors are wood construction. | |
| Oct 26, 2007 | Never finaled issued Oct 2007, no final | 530 Bush St | street spaceDetails
street space | ||
| Oct 9, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | install a total of 13 sprinkler heads on the 5th and 6th floor.Details
install a total of 13 sprinkler heads on the 5th and 6th floor. | $2,000 |
| Oct 9, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Thorpe Design Inc | install a total of 32 heads on the 1st and 2nd floor.Details
install a total of 32 heads on the 1st and 2nd floor. | $4,000 |
| Oct 5, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | revision to p.a. 200709051816. infill hole in rated 5th floor, created by removal of existing shaft above. cost of infill include in app #200709051816Details
revision to p.a. 200709051816. infill hole in rated 5th floor, created by removal of existing shaft above. cost of infill include in app #200709051816 | $100 |
| Oct 4, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | 1st & 2nd fl. - this is a tenant improvement to (e) base job appl. #200709051804. the new strobe circuit is coming off the spare circuit on (e) wheelock pone the new speaker tie to floor circuit. (4) strobe, (10) speaker/strobe, (11) speaker.Details
1st & 2nd fl. - this is a tenant improvement to (e) base job appl. #200709051804. the new strobe circuit is coming off the spare circuit on (e) wheelock pone the new speaker tie to floor circuit. (4) strobe, (10) speaker/strobe, (11) speaker. | $20,000 |
| Oct 4, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | 5th & 6th floor - t.i. to (e) base job appl. #220709051816. new strobe circuit coming off the spare circuit on the (e) cooper wheelock panel. (n) speakers tie into floors (e) speaker circuit. (4) strobe, (10) speaker/strobe, (11) speaker.Details
5th & 6th floor - t.i. to (e) base job appl. #220709051816. new strobe circuit coming off the spare circuit on the (e) cooper wheelock panel. (n) speakers tie into floors (e) speaker circuit. (4) strobe, (10) speaker/strobe, (11) speaker. | $20,000 |
| Sep 5, 2007 | Completed final sign-off Jun 2008 | 530 Bush St | Delta Contracting Inc. | iconstruct new interior walls & doors on 5/f & 6/f, ceiling, grid and carpet for suite 501 & 650. mechanical and electrical under seperate permits. no exterior work. no structural ada work $54,800.Details
iconstruct new interior walls & doors on 5/f & 6/f, ceiling, grid and carpet for suite 501 & 650. mechanical and electrical under seperate permits. no exterior work. no structural ada work $54,800. | $210,000 |
| Sep 5, 2007 | Completed final sign-off Jun 2008 | 530 Bush St | Delta Contracting Inc. | construct new walls & doors on 1st & 2nd floors for suites 104 and 202. and restroom work ony. mechanical & electrical under seperate permits. no exterior work. nothing structural. ada work $41,150.Details
construct new walls & doors on 1st & 2nd floors for suites 104 and 202. and restroom work ony. mechanical & electrical under seperate permits. no exterior work. nothing structural. ada work $41,150. | $150,000 |
| Aug 7, 2007 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | work on 1st and 2nd floorDetails
work on 1st and 2nd floor | ||
| Aug 7, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | demolition of existing interior walls and interior doors and cabinetry, plumbing, lighting & electrical. floors 1,2 with connecting stairs. no exterior work, no structural.Details
demolition of existing interior walls and interior doors and cabinetry, plumbing, lighting & electrical. floors 1,2 with connecting stairs. no exterior work, no structural. | $10,000 |
| Aug 7, 2007 | Expired or cancelled expired Jun 2008 | 530 Bush St | Delta Contracting Inc. | demolition of existing intrior walls & interior doors and existing electrical, plumbing, ceiling grid, lighting & carpet. no exterior work. nothing structural.Details
demolition of existing intrior walls & interior doors and existing electrical, plumbing, ceiling grid, lighting & carpet. no exterior work. nothing structural. | $15,000 |
| May 22, 2006 | Expired or cancelled expired Mar 2009 | 530 Bush St | Decker Electric Co Inc Electrical Contra | emergency replacement of the fire alarm panel per siemens drawings sheet 1 through 24 dated 05/09/0. this is for plan revison only. the fire alarm replacement cost was pair for under pa# 2006/03/28/7659.Details
emergency replacement of the fire alarm panel per siemens drawings sheet 1 through 24 dated 05/09/0. this is for plan revison only. the fire alarm replacement cost was pair for under pa# 2006/03/28/7659. | |
| Mar 28, 2006 | Expired or cancelled expired Feb 2009 | 530 Bush St | Decker Electric Co Inc Electrical Contra | emergency replacement of fire alarm panel and associated addressable devices (pull stations, smoke detector, duct detector, mointor relays, fan control panel.) the existing panel was destroyed due t a small fire (drawing to follow) not to be final, see note on back page.Details
emergency replacement of fire alarm panel and associated addressable devices (pull stations, smoke detector, duct detector, mointor relays, fan control panel.) the existing panel was destroyed due t a small fire (drawing to follow) not to be final, see note on back page. | $150,000 |
| Feb 8, 2005 | Completed final sign-off Feb 2005 | 530 Bush St | Peacock Construction Inc | renew app #200405254750 for final inspDetails
renew app #200405254750 for final insp | |
| Feb 1, 2005 | Completed final sign-off Jun 2005 | 530 Bush St | L.D. Strobel Co Ltd | replacing center antennas on all existing sectors. 3 totalDetails
replacing center antennas on all existing sectors. 3 total | $2,500 |
| May 27, 2004 | Never finaled issued May 2004, no final | 530 Bush St | street spaceDetails
street space | ||
| May 25, 2004 | Expired or cancelled expired Dec 2004 | 530 Bush St | Peacock Construction Inc | oti-1 10th floor, lsDetails
oti-1 10th floor, ls | $24,000 |
| Jan 15, 2004 | Completed final sign-off Apr 2004 | 530 Bush St | Peacock Construction Inc | oti-1, 4th fl-el,me,ls.Details
oti-1, 4th fl-el,me,ls. | $12,300 |
| Dec 16, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | Simplex Grinnell | addition of four(4) devices to an extng circuit on 3rd flr, suite 300. (1 speaker & 3 strobes).Details
addition of four(4) devices to an extng circuit on 3rd flr, suite 300. (1 speaker & 3 strobes). | $5,000 |
| Dec 9, 2003 | Completed final sign-off Mar 2004 | 530 Bush St | Peacock Construction Inc | renew appl#200304011124 for final inspectionDetails
renew appl#200304011124 for final inspection | |
| Nov 10, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | telephone/data outlets/ revision to 200306227566Details
telephone/data outlets/ revision to 200306227566 | $3,000 | |
| Jul 22, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | renew app #9914961/9914962Details
renew app #9914961/9914962 | ||
| Jun 22, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | oti-1 3/f el me ls spDetails
oti-1 3/f el me ls sp | $40,000 | |
| Jun 22, 2003 | Never finaled issued Aug 2003, no final | 530 Bush St | oti-2, 3rd fl, el, ls.Details
oti-2, 3rd fl, el, ls. | $20,000 | |
| May 9, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | scope: demolish existing cooling tower, install new steel platform to fit new tower, replace w/newDetails
scope: demolish existing cooling tower, install new steel platform to fit new tower, replace w/new | $46,000 | |
| May 6, 2003 | Never finaled issued May 2003, no final | 530 Bush St | Simplex Grinnell | renew#200201118852 for life safety work onlyDetails
renew#200201118852 for life safety work only | $8,000 |
| Apr 1, 2003 | Expired or cancelled expired Mar 2004 | 530 Bush St | response to n.o.v. 200339099 removal of eelctrical conduits at stairwell enclosureDetails
response to n.o.v. 200339099 removal of eelctrical conduits at stairwell enclosure | $1,000 | |
| Mar 11, 2003 | Never finaled issued Mar 2003, no final | 530 Bush St | renew expired permits 9419853, 9419856, & 9506824 for final inspection only.Details
renew expired permits 9419853, 9419856, & 9506824 for final inspection only. | ||
| Mar 11, 2003 | Expired or cancelled expired Dec 2004 | 530 Bush St | renew expired permits 9609871, 9619986 & 9623089 for final inspection only.Details
renew expired permits 9609871, 9619986 & 9623089 for final inspection only. | ||
| Mar 11, 2003 | Never finaled issued Mar 2003, no final | 530 Bush St | renew expired permits 9900680,9902638 for final. 8606089 to clarify that work was ner done for finalDetails
renew expired permits 9900680,9902638 for final. 8606089 to clarify that work was ner done for final | ||
| Oct 31, 2002 | Never finaled issued Oct 2002, no final | 530 Bush St | J M E Construction Services Inc | alfter existing hvac duct to new office configuration on 1st floor suite 101Details
alfter existing hvac duct to new office configuration on 1st floor suite 101 | $1,800 |
| Oct 11, 2002 | Never finaled issued Oct 2002, no final | 530 Bush St | Simplex Grinnell | tenant improvement for 3rd flr adding 2 (n)smoke detectors,2(n)strobes,7(n)speakers & relocate 2 strDetails
tenant improvement for 3rd flr adding 2 (n)smoke detectors,2(n)strobes,7(n)speakers & relocate 2 str | $14,000 |
| Sep 18, 2002 | Expired or cancelled expired Dec 2004 | 530 Bush St | to renew app#9207656,9221065 & 9221066 for final inspection.Details
to renew app#9207656,9221065 & 9221066 for final inspection. | ||
| Sep 13, 2002 | Completed final sign-off Sep 2002 | 530 Bush St | renew#9415185,9415184,9415186 for final inspection onlyDetails
renew#9415185,9415184,9415186 for final inspection only | ||
| Sep 13, 2002 | Completed final sign-off Sep 2002 | 530 Bush St | renew#9415183 &9513658 for final inspection onlyDetails
renew#9415183 &9513658 for final inspection only | ||
| Sep 6, 2002 | Expired or cancelled expired Dec 2004 | 530 Bush St | field change to approved appn. 200206058303;change location of 1 sector of antennasDetails
field change to approved appn. 200206058303;change location of 1 sector of antennas | ||
| Aug 19, 2002 | Never finaled issued Aug 2002, no final | 530 Bush St | street spaceDetails
street space | ||
| Aug 14, 2002 | Never finaled issued Aug 2002, no final | 530 Bush St | Superior Automatic Sprinkler | tenant improvement-relocate (4) & add (2) sprinklers to accommodagte the new ceiling, walls & lightDetails
tenant improvement-relocate (4) & add (2) sprinklers to accommodagte the new ceiling, walls & light | $2,108 |
| Aug 6, 2002 | Never finaled issued Aug 2002, no final | 530 Bush St | street spaceDetails
street space | ||
| Jul 17, 2002 | Expired or cancelled expired Mar 2004 | 540 Bush St | oti-1, 3rd flr, el, ls, spDetails
oti-1, 3rd flr, el, ls, sp | $82,500 | |
| Jun 13, 2002 | Never finaled issued Jul 2002, no final | 530 Bush St | demo partitions & finishes.construct new partitions,cabinetry,lighting,sink,extend mech/hvac system.Details
demo partitions & finishes.construct new partitions,cabinetry,lighting,sink,extend mech/hvac system. | $75,000 | |
| Jun 5, 2002 | Completed final sign-off Nov 2002 | 530 Bush St | Westower Communications | installation of 6 panel antennas on (e) rooftop penthouse, assoc equipment installed.cellular antenDetails
installation of 6 panel antennas on (e) rooftop penthouse, assoc equipment installed.cellular anten | $41,500 |
| May 14, 2002 | Completed final sign-off Aug 2004 | 530 Bush St | disable access upgrade nov 200002855 at entry ramp.new handrail at exist entry stairs.Details
disable access upgrade nov 200002855 at entry ramp.new handrail at exist entry stairs. | $15,000 | |
| Mar 6, 2002 | Expired or cancelled expired Jul 2002 | 530 Bush St | sidewalk permitDetails
sidewalk permit | ||
| Nov 14, 2001 | Expired or cancelled expired Mar 2002 | 530 Bush St | side walk repairDetails
side walk repair | ||
| Jul 17, 2001 | Completed final sign-off Sep 2001 | 530 Bush St | Simplex Grinnell*** See 802591**** | modification to (e)fire alarm system on 2nd floorDetails
modification to (e)fire alarm system on 2nd floor | $5,000 |
| Jun 12, 2001 | Completed final sign-off Sep 2001 | 530 Bush St | Simplex Grinnell*** See 802591**** | add 2 sprinkler heads, plug 2 heads, relocate 1 head, all ssp heads,2nd floor onlyDetails
add 2 sprinkler heads, plug 2 heads, relocate 1 head, all ssp heads,2nd floor only | $2,500 |
| Mar 19, 2001 | Completed final sign-off Sep 2001 | 530 Bush St | oti-2 2nd fl el meDetails
oti-2 2nd fl el me | $40,000 | |
| Mar 16, 2001 | Completed final sign-off Sep 2001 | 530 Bush St | oti-1 2nd floor el me ls spDetails
oti-1 2nd floor el me ls sp | $75,000 | |
| Feb 7, 2001 | Expired or cancelled expired Jun 2001 | 530 Bush St | Ayoob & Peery Plumbing Co Inc | relocate two fire sprinkler heads per tenant imrpovement-9th floorDetails
relocate two fire sprinkler heads per tenant imrpovement-9th floor | $450 |
| Jan 26, 2001 | Expired or cancelled expired Jan 2002 | 530 Bush St | street space permitDetails
street space permit | ||
| Jan 10, 2001 | Expired or cancelled expired Feb 2002 | 530 Bush St | John Cressa & Sons | oti-3, 5th floor, me, lsDetails
oti-3, 5th floor, me, ls | $35,000 |
| Oct 20, 2000 | Expired or cancelled expired Jan 2002 | 530 Bush St | John Cressa & Sons | oti-2, 5th floor, el, me, spDetails
oti-2, 5th floor, el, me, sp | $64,000 |
| Sep 13, 2000 | Expired or cancelled expired Sep 2001 | 530 Bush St | street spaceDetails
street space | ||
| Aug 29, 2000 | Expired or cancelled expired Apr 2001 | 530 Bush St | oti-1, 9th fl el, me, ls, spDetails
oti-1, 9th fl el, me, ls, sp | $25,000 | |
| Aug 23, 2000 | Expired or cancelled expired Sep 2001 | 530 Bush St | oti-1 5th floor electrical/mechanical/lifesafty/sprinklerDetails
oti-1 5th floor electrical/mechanical/lifesafty/sprinkler | $120,000 | |
| Jul 17, 2000 | Expired or cancelled expired Nov 2000 | 530 Bush St | Anderson, Rowe & Buckley, Inc. | oti-3 sp ground floorDetails
oti-3 sp ground floor | $2,190 |
| May 19, 2000 | Completed final sign-off Sep 2000 | 530 Bush St | Peacock Construction Inc | oti-1 g/f el me ls spDetails
oti-1 g/f el me ls sp | $65,357 |
| Mar 14, 2000 | Expired or cancelled expired Jul 2000 | 530 Bush St | Simplex Grinnell*** See 802591**** | renewal of pa 9723964Details
renewal of pa 9723964 | |
| Feb 16, 2000 | Expired or cancelled expired Jun 2000 | 530 Bush St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Delta Contracting Inc. (12), Peacock Construction Inc (12), Siemens Industry, Inc. (10), Commercial Interior Builders Inc (6), Decker Electric Co Inc Electrical Contra (5), Angotti & Reilly Inc. (4), Cosco Fire Protection Inc. (4), Golden Gate Fire Protection Inc (4), Peacock Construction (3), R L H Fire Protection Inc (3), Simplex Grinnell (3), Simplex Grinnell*** See 802591**** (3), Tutor Perini Corporation (3), Allsite Corp Goods/Services Construction (2), Bcci Construction Company (2), Desert Mechanical Inc (2), J M E Construction Services Inc (2), John Cressa & Sons (2), Mastec Network Solutions Inc (2), Ward Alan Emery Construction Inc. (2), Anderson, Rowe & Buckley, Inc., Apex Site Solutions Inc, Aquamatic Fire Protection, Ayoob & Peery Plumbing Co Inc, Bolls Fire & Safety Inc, Freedom Fire Protection Inc., Jfc Construction Inc., L.D. Strobel Co Ltd, Legacy Mechanical & Energy Services, Inc, N S A Wireless Inc, Nu Rev Communications Inc., Quality Telecom Consultants, Superior Automatic Sprinkler, Thorpe Design Inc, Western Allied Mechanical Inc., Westower Communications
- Architects
- Shawn Alexander (13), Norman Hooks (4), Nestor Popowych (3), Domvs Design Group (2), Danilo Pineda, Glenn Rescalvo, Larry Houghtby, Manuel Tsihlas, Melissa Pesci, Michael Zucker, Naveen Mathur, Pamela Robinson
- Engineers
- Bret Mccomb, George Arellano, James R. Spore, Maged Henein, Michael Zucker, Pankaj Sanchdeva, Peter Kelly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.