Pankaj Sanchdeva
- License
- C59644
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C59644 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Mw Sausse & Co. Inc.
- On San Francisco permits
- Sep 2006 to Jun 2021
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Acco Engineered Systems Inc. Dba Acco En (2), Western Allied Mechanical Inc.
- Engineers
- Curtis Cady, Laura Simpson, Peter Kelly
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2021 | Completed final sign-off Jan 2022 | 501 Post St | Acco Engineered Systems Inc. Dba Acco En | remove (e) abandoned generator. replace w/new diesel generatorDetails
remove (e) abandoned generator. replace w/new diesel generator | $100,000 |
| Jul 11, 2017 | Completed final sign-off May 2018 | 530 Bush St | Western Allied Mechanical Inc. | remove and replace existing mech equipment with new including chiller, cooling tower, boiler, associated pumps and piping and ac unit and ductworkDetails
remove and replace existing mech equipment with new including chiller, cooling tower, boiler, associated pumps and piping and ac unit and ductwork | $1,200,000 |
| Sep 28, 2006 | Completed final sign-off Jul 2007 | 901 Battery St | Acco Engineered Systems Inc. Dba Acco En | remove/replace (e) mechanical rooftop equip . install new chiller, pumps & storage tank. supply fan & rooftop ductwork under separate permit.Details
remove/replace (e) mechanical rooftop equip . install new chiller, pumps & storage tank. supply fan & rooftop ductwork under separate permit. | $150,000 |