George Arellano
- Listed as
- engineer
- Firm
- Axis
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Apr 2023
20 permits since 2000 (engineer on 20 permits): 13 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Nov 2023 | 512 Grant Av | Axel8 Construction | addition of hvac and toilet exhaust to the 1st fl, basement & mezzanine and install conderser on roof. ref pa# 2022-0420-2637Details
addition of hvac and toilet exhaust to the 1st fl, basement & mezzanine and install conderser on roof. ref pa# 2022-0420-2637 | $30,000 |
| Jun 7, 2021 | Completed final sign-off Aug 2022 | 730 Harrison St | Famand Inc Dba Indoor Environmental Serv | replacement of (e) cooling tower, replacement of (e) osa make up air handlerDetails
replacement of (e) cooling tower, replacement of (e) osa make up air handler | $75,000 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731Details
18/f:relocate 2 vav's. add 1 transfer fan. add diffuser, registers, transfer grills. modify & add new ductwork. relocate (e) thermostats. air balancing. add 1 new fire smoke damper. ref pa# 202010025731 | $36,440 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 150 California St | Team Commercial Construction Inc. | 7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636.Details
7/f: add 1 vav box & 1 transfer fan. add diffusers, registers, return grills, & add new ductwork. connect new vav to (e) ddc controls & relocate (e) thermostats/air balancing. ref pa# 202010015636. | $43,622 |
| Sep 30, 2020 | Completed final sign-off May 2021 | 44 Montgomery St | Source Planning And Construction Inc | 31/f: suite 3100: t.. of minimal demo of partition, millwork, etc, cosntruction of (n) partitions, doors, power/data. maher n/aDetails
31/f: suite 3100: t.. of minimal demo of partition, millwork, etc, cosntruction of (n) partitions, doors, power/data. maher n/a | $200,736 |
| Mar 13, 2020 | Completed final sign-off Dec 2020 | 33 New Montgomery St | Peacock Construction | 15th/fl: t24 mechanical for work under 202001101625.Details
15th/fl: t24 mechanical for work under 202001101625. | $2,500 |
| Jan 27, 2020 | Completed final sign-off Mar 2020 | 655 Montgomery St | R M I Mechanical Contractors | suite 1720: add 1 transfer fan, replace 1 vav box, add diffusers and registers, add and reroute duct work air balance. work in office areas only. ref 201907085266Details
suite 1720: add 1 transfer fan, replace 1 vav box, add diffusers and registers, add and reroute duct work air balance. work in office areas only. ref 201907085266 | $40,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 456 Montgomery St | Hathaway Dinwiddie Co. | suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a.Details
suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a. | $100,855 |
| Nov 27, 2019 | Expired or cancelled expired Jan 2026 | 704 Geary St | Apex America Gc Inc | tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe.Details
tenant improvement 327 sq ft. accessory use for 700 geary cafe. service counter w/ kitchen equip for juices/coffee. (n) sheetrock all demising walls & ceiling. (n) soffit/equip platform. plubming & elect work. (n) opening to 700 geary cafe. | $40,000 |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 150 California St | Team Commercial Construction Inc. | 8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance.Details
8th floor: provide lighting tenant improvements to 3,625 sq ft of office space. add 1 transfer fan, 1 supply and linear diffusers. modify and add new ductwork. relocate (e) thermostats, air balance. | $62,250 |
| May 23, 2016 | Completed final sign-off Sep 2016 | 3399 16th St | Ps2 Inc | existing gymnasium building: add electrical outlets, toilet plumbing & electrical upgrades, radiator heater. ref pa 2016-0323-2870Details
existing gymnasium building: add electrical outlets, toilet plumbing & electrical upgrades, radiator heater. ref pa 2016-0323-2870 | |
| May 23, 2016 | Never finaled issued Jun 2016, no final | 401 Church St | Ps2 Inc | existing academic building: replace light fixtures, new wall mounted projectors, add electrical outlets, toilet plumbing upgrades, relocation of radiator heaters. ref architectural permit application #2016-0323-2869Details
existing academic building: replace light fixtures, new wall mounted projectors, add electrical outlets, toilet plumbing upgrades, relocation of radiator heaters. ref architectural permit application #2016-0323-2869 | |
| May 6, 2014 | Never finaled issued May 2014, no final | 944 Market St | P 3 Construction & Remodeling Inc | 6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not requiredDetails
6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not required | |
| Apr 25, 2014 | Completed final sign-off May 2014 | 944 Market St | P 3 Construction & Remodeling Inc | modification & redistribution of existing air distribution system on the 7f. reference ti 2013.0920.7404 n/a ordinance #155-13Details
modification & redistribution of existing air distribution system on the 7f. reference ti 2013.0920.7404 n/a ordinance #155-13 | $7,500 |
| Oct 16, 2013 | Completed final sign-off Dec 2013 | 944 Market St | P 3 Construction & Remodeling Inc | 8th floor-mechanical work associated with pa# 2012-0904-8834Details
8th floor-mechanical work associated with pa# 2012-0904-8834 | $25,000 |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 530 Bush St | Desert Mechanical Inc | mechical ventilation(revised duct work) as built drawings. revision to approved permit app#201307303135Details
mechical ventilation(revised duct work) as built drawings. revision to approved permit app#201307303135 | |
| Feb 3, 2012 | Expired or cancelled cancelled Jan 2026 | 178 Townsend St | James E Roberts-Obayashi Corporation | mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540.Details
mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540. | |
| Aug 29, 2008 | Completed final sign-off Feb 2009 | 400 California St | Swinerton Builders | 9th floor-construction of 3 new vav boxes and all mechanical work involvedDetails
9th floor-construction of 3 new vav boxes and all mechanical work involved | $6,000 |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 400 California St | Swinerton Builders | 1st floor revision to appl #200804230444 - construction of 1-hr rated hard lid ceiling and smoke fire damper.Details
1st floor revision to appl #200804230444 - construction of 1-hr rated hard lid ceiling and smoke fire damper. | $3,000 |
| Aug 5, 2008 | Expired or cancelled expired Jul 2018 | 400 California St | Swinerton Builders | interior demolition of partitions, flooring and ceiling on b3, demo of exposed studs on b2, & demo of loading dock on floor 1. replacement of chiller unit under seperate permit.Details
interior demolition of partitions, flooring and ceiling on b3, demo of exposed studs on b2, & demo of loading dock on floor 1. replacement of chiller unit under seperate permit. | $40,000 |