Permit GraphShortlistSan Francisco building permits since 2000

Block 0341, lot 006

944 Market St

City’s use
Commercial Office
Built
1907
Stories
8
Rooms
9 bathrooms
Building
42,822 sq ft
Lot
5,771 sq ft
Zoning
C3G
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

66 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 26, 2025In progress
filed Nov 2025, not yet issued
944 Market St4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal.
Details
Permit
202511260498

4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal.

Open the permit page

$60,000
Jul 10, 2025Completed
final sign-off Oct 2025
944 Market StSan Francisco Fire Protectionas-built: removed 3 monitor modules and 3 duct detectors. was incorrectly placed on the basement floor where it should not have existed. duct detectors and corresponding monitor module (m248, m249 & m250) has been removed. ref pa #2023-0906-6010
Details
Permit
202507100523
Permit issued
Aug 13, 2025
Final sign-off
Oct 21, 2025

as-built: removed 3 monitor modules and 3 duct detectors. was incorrectly placed on the basement floor where it should not have existed. duct detectors and corresponding monitor module (m248, m249 & m250) has been removed. ref pa #2023-0906-6010

Open the permit page

Sep 6, 2023Completed
final sign-off Oct 2025
944 Market StSan Francisco Fire Protectionas built to pa# 202109087471. replace existing annuciator w/new led graphic at the same location at the main entrance. tie in to existing control panel. no change in matrix and device location or count.
Details
Permit
202309066010
Permit issued
Sep 6, 2023
Final sign-off
Oct 21, 2025

as built to pa# 202109087471. replace existing annuciator w/new led graphic at the same location at the main entrance. tie in to existing control panel. no change in matrix and device location or count.

Open the permit page

$2,000
Mar 9, 2023Never finaled
issued Jun 2023, no final
948 Market StEsquivel Grading & Paving, Inc.replace sub sidewalk basement roof slab affected by gtraffic signal poles and curb ramps
Details
Permit
202303093397
Permit issued
Jun 5, 2023

replace sub sidewalk basement roof slab affected by gtraffic signal poles and curb ramps

Open the permit page

$300,000
Sep 8, 2021Completed
final sign-off Oct 2025
944 Market StSan Francisco Fire Protection(like for like) fire system replacement due to elevator modernization with new panel. smoke detectors and pull station same location. install relay modules and smoke detector for elev recall. tie in (e) notification devices to new panel. install new annciator.
Details
Permit
202109087971
Permit issued
Sep 8, 2021
Final sign-off
Oct 21, 2025

(like for like) fire system replacement due to elevator modernization with new panel. smoke detectors and pull station same location. install relay modules and smoke detector for elev recall. tie in (e) notification devices to new panel. install new annciator.

Open the permit page

$24,000
Oct 29, 2020Completed
final sign-off Jan 2021
944 Market StAura Fire Safety Incprovide adequate coverage and add (2) sprinkler side wall heads for bellow new soffit. refer to building plans # 2020-0122-2505
Details
Permit
202010297792
Permit issued
Dec 3, 2020
Final sign-off
Jan 25, 2021

provide adequate coverage and add (2) sprinkler side wall heads for bellow new soffit. refer to building plans # 2020-0122-2505

Open the permit page

$4,500
Jul 16, 2020Expired or cancelled
cancelled Jan 2026
944 Market Stchange of use of (e) basement space from storage to retail
Details
Permit
202007160332

change of use of (e) basement space from storage to retail

Open the permit page

$567,000
May 7, 2020Never finaled
issued Sep 2020, no final
944 Market StH & M Fire Protection, Inc.5/f: install new branchlines off (e) fire sprinkler main & add install (37) fire sprinkler heads to acommodate new t.i.
Details
Permit
202005077348
Permit issued
Sep 17, 2020

5/f: install new branchlines off (e) fire sprinkler main & add install (37) fire sprinkler heads to acommodate new t.i.

Open the permit page

$2,500
May 7, 2020Never finaled
issued Nov 2021, no final
944 Market StH & M Fire Protection, Inc.lobby: relocate (3) fire sprinkler heads to accommodate new t.i. basement elevatory lobby
Details
Permit
202005077350
Permit issued
Nov 12, 2021

lobby: relocate (3) fire sprinkler heads to accommodate new t.i. basement elevatory lobby

Open the permit page

$1,500
Jan 22, 2020Never finaled
issued Jan 2020, no final
944 Market StBlock 12 Constructioninterior t.i. for condo sales office extg handicapp restroom to remain. extg mezzanine to remain. no change to store front.
Details
Permit
202001222505
Permit issued
Jan 23, 2020

interior t.i. for condo sales office extg handicapp restroom to remain. extg mezzanine to remain. no change to store front.

Open the permit page

$175,000
Dec 5, 2019Never finaled
issued Dec 2019, no final
944 Market Ststreet space with parking meters.
Details
Permit
M1172811
Permit issued
Dec 5, 2019

street space with parking meters.

Open the permit page

Nov 25, 2019Completed
final sign-off Apr 2020
944 Market StAnderson, Rowe & Buckley, Inc.3rd floor: exisitng fire sprinkler system. ti 1 added & 8 relocated sprinklers
Details
Permit
201911258145
Permit issued
Nov 25, 2019
Final sign-off
Apr 9, 2020

3rd floor: exisitng fire sprinkler system. ti 1 added & 8 relocated sprinklers

Open the permit page

$4,500
Oct 31, 2019Completed
final sign-off Feb 2020
944 Market StRoebuck Construction3/f: rev to pa# 201907125736; converting 1 radious wall from metal stud/sheetrock to intumescent covered plywood as detailed in the variance. maher n/a.
Details
Permit
201910316094
Permit issued
Nov 15, 2019
Final sign-off
Feb 12, 2020

3/f: rev to pa# 201907125736; converting 1 radious wall from metal stud/sheetrock to intumescent covered plywood as detailed in the variance. maher n/a.

Open the permit page

Aug 29, 2019Never finaled
issued Nov 2019, no final
944 Market StCharles Pankow Builders Ltdalteration of hoistway of (2) passenger elevators, elevator #1 (e) basement winding drm equip. to be removed and replaced w/basement geared traction equipment, elevator #2 (e) bsement geared traction pasenger elevator to remain and addition of (2) passenger elevator cars
Details
Permit
201908290217
Permit issued
Nov 14, 2019

alteration of hoistway of (2) passenger elevators, elevator #1 (e) basement winding drm equip. to be removed and replaced w/basement geared traction equipment, elevator #2 (e) bsement geared traction pasenger elevator to remain and addition of (2) passenger elevator cars

Open the permit page

$140,000
Aug 22, 2019Never finaled
issued Aug 2019, no final
944 Market Ststreet space
Details
Permit
M1127867
Permit issued
Aug 22, 2019

street space

Open the permit page

Aug 13, 2019Never finaled
issued Aug 2019, no final
944 Market Ststreet space
Details
Permit
M1123087
Permit issued
Aug 13, 2019

street space

Open the permit page

Jul 23, 2019Completed
final sign-off Aug 2019
944 Market StBilcor Inc3/f: fire alarm - install 4 wall strobes, 3 wall horn strobes, 1 ceiling strobe. relocate 1 wall hirn strobe, remove and reinstall 1 pull station. ref 201907125736
Details
Permit
201907236612
Permit issued
Jul 23, 2019
Final sign-off
Aug 16, 2019

3/f: fire alarm - install 4 wall strobes, 3 wall horn strobes, 1 ceiling strobe. relocate 1 wall hirn strobe, remove and reinstall 1 pull station. ref 201907125736

Open the permit page

$6,600
Jul 12, 2019Completed
final sign-off Feb 2020
944 Market StRoebuck Construction3rd flr - ti - int only. new finishes & furnishings throughout, new non structural partitions. demo men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work . mep/fir/life saftey under sep permit
Details
Permit
201907125736
Permit issued
Jul 17, 2019
Final sign-off
Feb 12, 2020

3rd flr - ti - int only. new finishes & furnishings throughout, new non structural partitions. demo men's and women's restrooms. new ada gender neutral restroom upgrades (2 total). mo structural work . mep/fir/life saftey under sep permit

Open the permit page

$149,000
Jul 2, 2019Never finaled
issued Aug 2019, no final
944 Market StCharles Pankow Builders Ltddemo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit.
Details
Permit
201907024997
Permit issued
Aug 30, 2019

demo & ti of existing 5th fl excluding elevator & stairs lobby. new inteirior finishes & restroom upgrades. mep, fire sprinklers under separate permit.

Open the permit page

$120,509
Jan 10, 2019Expired or cancelled
cancelled Jan 2026
944 Market Sttemant improvement of (e) lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door.
Details
Permit
201901100022

temant improvement of (e) lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door.

Open the permit page

$58,296
May 15, 2017Completed
final sign-off May 2025
944 Market StFaith N Jason Construction Llcinstall 13"x20.5" evacuation plan on ground floor. n/a for maher.
Details
Permit
201705156613
Permit issued
May 15, 2017
Final sign-off
May 15, 2025

install 13"x20.5" evacuation plan on ground floor. n/a for maher.

Open the permit page

$100
Dec 5, 2014Never finaled
issued Dec 2014, no final
944 Market StP 3 Construction & Remodeling Inc3/f: mep for modification and redistribution of existing air distribution system, ref 201407282305. compliance with maher ordinance 155-13 not required.
Details
Permit
201412053161
Permit issued
Dec 10, 2014

3/f: mep for modification and redistribution of existing air distribution system, ref 201407282305. compliance with maher ordinance 155-13 not required.

Open the permit page

$7,500
Oct 21, 2014Completed
final sign-off Aug 2016
944 Market StSabah International Incorporated3rd floor provide a modification of the existing fire alarm system: add (1) heat detector, (4) duct smoke detectors, (4) control relays, (1) power supply, (5) horn/strobes, (2) strobes. ref t.i. #2014.0728.2305. n/a maher ordinance
Details
Permit
201410219442
Permit issued
Dec 23, 2014
Final sign-off
Aug 4, 2016

3rd floor provide a modification of the existing fire alarm system: add (1) heat detector, (4) duct smoke detectors, (4) control relays, (1) power supply, (5) horn/strobes, (2) strobes. ref t.i. #2014.0728.2305. n/a maher ordinance

Open the permit page

$10,664
Sep 10, 2014Completed
final sign-off Sep 2014
944 Market StMadden Plumbing, Llcremove 5 extg sprinklers and relocate 2 sprinklers on 3rd floor only. ti app#201407282305. n/a for the maher ordinance #155-13
Details
Permit
201409105987
Permit issued
Sep 15, 2014
Final sign-off
Sep 30, 2014

remove 5 extg sprinklers and relocate 2 sprinklers on 3rd floor only. ti app#201407282305. n/a for the maher ordinance #155-13

Open the permit page

$1,000
Sep 5, 2014Completed
final sign-off Feb 2015
944 Market StP 3 Construction & Remodeling Incremove and replace elevator lobby doors with new 1.5 hour rated doors at floors 3, 6, 7.
Details
Permit
201409055550
Permit issued
Sep 19, 2014
Final sign-off
Feb 26, 2015

remove and replace elevator lobby doors with new 1.5 hour rated doors at floors 3, 6, 7.

Open the permit page

$30,000
Jul 29, 2014Expired or cancelled
cancelled Jan 2026
944 Market StP 3 Construction & Remodeling Inc3rd floor - demo of non-structural interior walls per ab-017. t.i . under separate permit. n/a maher orinance
Details
Permit
201407292463

3rd floor - demo of non-structural interior walls per ab-017. t.i . under separate permit. n/a maher orinance

Open the permit page

$7,500
Jul 28, 2014Completed
final sign-off May 2015
944 Market StP 3 Construction & Remodeling Inc3/f - ti- full floor remodel incl. new partitions, m/w bathrroms, kitchenette, (3) offices & open desk space. mep, ls, and sprinklers on separate permits. entry door from stair/elevator lobby on separate permit. n/a maher ordinance # 155-13.
Details
Permit
201407282305
Permit issued
Jul 31, 2014
Final sign-off
May 11, 2015

3/f - ti- full floor remodel incl. new partitions, m/w bathrroms, kitchenette, (3) offices & open desk space. mep, ls, and sprinklers on separate permits. entry door from stair/elevator lobby on separate permit. n/a maher ordinance # 155-13.

Open the permit page

$200,000
May 28, 2014Completed
final sign-off Jun 2014
944 Market StH C I Systems Incas built for pa#201405085238. n/a ordinance #155-13. added 3 duct smoke detectors and 3 control mods to shutdown 3 heat pumps.
Details
Permit
201405286825
Permit issued
May 28, 2014
Final sign-off
Jun 4, 2014

as built for pa#201405085238. n/a ordinance #155-13. added 3 duct smoke detectors and 3 control mods to shutdown 3 heat pumps.

Open the permit page

May 8, 2014Completed
final sign-off Jun 2014
944 Market StH C I Systems Incadd new fire alarm devices to existing fire alarm system in a new ti space on the 6th and 7th fl. 11 horn strobes, 4 strobes, 1 duct detector, 1 smoke detector, 1 booster panel, 4 control modules. maher 155-13 not required.
Details
Permit
201405085238
Permit issued
May 8, 2014
Final sign-off
Jun 4, 2014

add new fire alarm devices to existing fire alarm system in a new ti space on the 6th and 7th fl. 11 horn strobes, 4 strobes, 1 duct detector, 1 smoke detector, 1 booster panel, 4 control modules. maher 155-13 not required.

Open the permit page

$6,900
May 6, 2014Never finaled
issued May 2014, no final
944 Market StP 3 Construction & Remodeling Inc6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not required
Details
Permit
201405064979
Permit issued
May 7, 2014

6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not required

Open the permit page

Apr 25, 2014Completed
final sign-off May 2014
944 Market StP 3 Construction & Remodeling Incmodification & redistribution of existing air distribution system on the 7f. reference ti 2013.0920.7404 n/a ordinance #155-13
Details
Permit
201404254187
Permit issued
May 1, 2014
Final sign-off
May 13, 2014

modification & redistribution of existing air distribution system on the 7f. reference ti 2013.0920.7404 n/a ordinance #155-13

Open the permit page

$7,500
Apr 4, 2014Completed
final sign-off Apr 2014
944 Market StMadden Plumbing, Llcsprinkler ti. relocate (14) sprinkler on 6 floor only, ordinance #155-13 not required.
Details
Permit
201404042448
Permit issued
Apr 4, 2014
Final sign-off
Apr 25, 2014

sprinkler ti. relocate (14) sprinkler on 6 floor only, ordinance #155-13 not required.

Open the permit page

$5,000
Feb 28, 2014Completed
final sign-off Mar 2025
944 Market StMadden Plumbing, Llc7th floor:relocate 26 extg sprinkler heads on 7th floor only. t.i. app#201309207404. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13
Details
Permit
201402289597
Permit issued
Feb 28, 2014
Final sign-off
Mar 5, 2025

7th floor:relocate 26 extg sprinkler heads on 7th floor only. t.i. app#201309207404. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13

Open the permit page

$7,000
Feb 19, 2014Completed
final sign-off Jun 2014
944 Market StH C I Systems Incmaher ord - extended not required. as builts 201310189692
Details
Permit
201402198801
Permit issued
Apr 16, 2014
Final sign-off
Jun 18, 2014

maher ord - extended not required. as builts 201310189692

Open the permit page

Feb 18, 2014Completed
final sign-off Feb 2016
944 Market StP 3 Construction & Remodeling Incremodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mech, plumbing, elec separate permit
Details
Permit
201402188719
Permit issued
Feb 28, 2014
Final sign-off
Feb 12, 2016

remodel tenant space. demolish existing interior partitions, baths. build new interior partitions, bathrooms, coffee area. mech, plumbing, elec separate permit

Open the permit page

$200,000
Dec 18, 2013Completed
final sign-off Jan 2014
944 Market StH C I Systems Incadd 6 horn strobe and 2 strobe to an existing fa system in a new 4th floor t.i. space. t.i. pa#201306109059
Details
Permit
201312184505
Permit issued
Dec 18, 2013
Final sign-off
Jan 2, 2014

add 6 horn strobe and 2 strobe to an existing fa system in a new 4th floor t.i. space. t.i. pa#201306109059

Open the permit page

$6,200
Dec 18, 2013Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Inc4th fl. mechanical work associated with pa#2013-0610-9059.
Details
Permit
201312184485
Permit issued
Dec 18, 2013
Final sign-off
Dec 20, 2013

4th fl. mechanical work associated with pa#2013-0610-9059.

Open the permit page

$25,000
Dec 18, 2013Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Inc4th fl. revision to app#2013-0610-9059. revise (1) hour interior partitions to regular assembly not (1) hour assembly at offices# 1, 2 and 3.
Details
Permit
201312184482
Permit issued
Dec 18, 2013
Final sign-off
Dec 20, 2013

4th fl. revision to app#2013-0610-9059. revise (1) hour interior partitions to regular assembly not (1) hour assembly at offices# 1, 2 and 3.

Open the permit page

Oct 28, 2013Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Increvision to pa# 201209048834. revise 1 hr interior partitons to regular assembly. not 1 hour assembly
Details
Permit
201310280364
Permit issued
Oct 28, 2013
Final sign-off
Dec 20, 2013

revision to pa# 201209048834. revise 1 hr interior partitons to regular assembly. not 1 hour assembly

Open the permit page

Oct 18, 2013Completed
final sign-off Dec 2013
944 Market StH C I Systems Increplace existing fire alarm panel with new panel due to notice of violation for panel in 'trouble' condition. all devices are 100% compatible. as-built drawings to be provided under a separate permit prior to sign-off
Details
Permit
201310189692
Permit issued
Oct 18, 2013
Final sign-off
Dec 9, 2013

replace existing fire alarm panel with new panel due to notice of violation for panel in 'trouble' condition. all devices are 100% compatible. as-built drawings to be provided under a separate permit prior to sign-off

Open the permit page

$8,700
Oct 16, 2013Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Inc8th floor-mechanical work associated with pa# 2012-0904-8834
Details
Permit
201310169386
Permit issued
Oct 29, 2013
Final sign-off
Dec 20, 2013

8th floor-mechanical work associated with pa# 2012-0904-8834

Open the permit page

$25,000
Sep 20, 2013Completed
final sign-off Feb 2016
944 Market StP 3 Construction & Remodeling Incdemolition of interior non load bearing walls, new offices and support facilities. elec, life safety, plumbing, and sperinkler work sep permit
Details
Permit
201309207404
Permit issued
Sep 27, 2013
Final sign-off
Feb 12, 2016

demolition of interior non load bearing walls, new offices and support facilities. elec, life safety, plumbing, and sperinkler work sep permit

Open the permit page

$279,000
Aug 26, 2013Never finaled
issued Aug 2013, no final
944 Market StMadden Plumbing, Llcrelocate 15 e sprinkler heads and add 6 new heads on 4th fl only
Details
Permit
201308265231
Permit issued
Aug 26, 2013

relocate 15 e sprinkler heads and add 6 new heads on 4th fl only

Open the permit page

$10,000
Jun 10, 2013Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Incinterior remodel of the 4th floor office space. plumbing, electrical, and fire sprinkler under seperate application.
Details
Permit
201306109059
Permit issued
Jul 22, 2013
Final sign-off
Dec 20, 2013

interior remodel of the 4th floor office space. plumbing, electrical, and fire sprinkler under seperate application.

Open the permit page

$100,000
Mar 20, 2013Never finaled
issued Mar 2013, no final
944 Market StB B J Electric, Increlocate 5 horn strobes on 8th floor only.
Details
Permit
201303202657
Permit issued
Mar 21, 2013

relocate 5 horn strobes on 8th floor only.

Open the permit page

$2,750
Oct 19, 2012Completed
final sign-off Mar 2013
944 Market StMadden Plumbing, Llc8th floor-relocate 11 (e) sprinkler heads & remove 24 drop sprinklers from (e) pendent heads. ti pa# 2012-1011-1889
Details
Permit
201210192484
Permit issued
Oct 22, 2012
Final sign-off
Mar 26, 2013

8th floor-relocate 11 (e) sprinkler heads & remove 24 drop sprinklers from (e) pendent heads. ti pa# 2012-1011-1889

Open the permit page

$5,000
Oct 11, 2012Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Incdemo (e) wall paneling. replace w/ sheetrock where needed. demo (e) floor tile, install new floor tile, paint throughout lobby. all electrical, mechanical, plumbing & fire under separate application.
Details
Permit
201210111889
Permit issued
Oct 12, 2012
Final sign-off
Dec 20, 2013

demo (e) wall paneling. replace w/ sheetrock where needed. demo (e) floor tile, install new floor tile, paint throughout lobby. all electrical, mechanical, plumbing & fire under separate application.

Open the permit page

$25,000
Sep 4, 2012Completed
final sign-off Dec 2013
944 Market StP 3 Construction & Remodeling Incinterior remodel of 8th fl office space, plumbing and electric under separate application
Details
Permit
201209048834
Permit issued
Sep 12, 2012
Final sign-off
Dec 20, 2013

interior remodel of 8th fl office space, plumbing and electric under separate application

Open the permit page

$100,000
Sep 13, 2011Completed
final sign-off Dec 2011
944 Market StP 3 Construction & Remodeling Incremove e partition at suite 400 office space. provide new kitchenette cabinetry and sink. minor work at toilet room grab bar. elevator door jamb marking
Details
Permit
201109134473
Permit issued
Sep 15, 2011
Final sign-off
Dec 1, 2011

remove e partition at suite 400 office space. provide new kitchenette cabinetry and sink. minor work at toilet room grab bar. elevator door jamb marking

Open the permit page

$5,000
Aug 23, 2011Completed
final sign-off Nov 2011
944 Market StWestern Awnings And Canvasinstall one canvas banner on left side of building entrance
Details
Permit
201108233037
Permit issued
Nov 10, 2011
Final sign-off
Nov 29, 2011

install one canvas banner on left side of building entrance

Open the permit page

$1,310
Mar 8, 2011Never finaled
issued Mar 2011, no final
944 Market StCarroll Commercial Incunit #944:install concrete vault room.revision to app#201101279149
Details
Permit
201103081583
Permit issued
Mar 10, 2011

unit #944:install concrete vault room.revision to app#201101279149

Open the permit page

Jan 27, 2011Expired or cancelled
expired Apr 2013
948 Market StCarroll Commercial Incinstall security safe. provide steel shoring structure with footings for safe.
Details
Permit
201101279149
Permit issued
Jan 28, 2011

install security safe. provide steel shoring structure with footings for safe.

Open the permit page

$10,000
Jan 25, 2011Expired or cancelled
expired Apr 2013
944 Market StCarroll Commercial Incti to convert (e) retail space to new retail space. add new unisex restroom and office at retail soace at ground floor. no change to (e) exterior of building.
Details
Permit
201101258954
Permit issued
Jan 28, 2011

ti to convert (e) retail space to new retail space. add new unisex restroom and office at retail soace at ground floor. no change to (e) exterior of building.

Open the permit page

$50,000
Dec 28, 2010Completed
final sign-off Feb 2011
944 Market StCarroll Commercial Incpartial wall demolition. non structural.
Details
Permit
201012287463
Permit issued
Dec 28, 2010
Final sign-off
Feb 22, 2011

partial wall demolition. non structural.

Open the permit page

$1,800
Feb 9, 2010Completed
final sign-off Mar 2010
944 Market StWestern Awnings And Canvasinstall one double-faced fabric banner.
Details
Permit
201002096210
Permit issued
Feb 11, 2010
Final sign-off
Mar 2, 2010

install one double-faced fabric banner.

Open the permit page

$780
Dec 15, 2009Completed
final sign-off Feb 2010
944 Market StCarter Brothers Fire & Life Safetyinstall new fire alarm devices in new ti space. device will be added to an existing fa system. includes 16 strobes, 5 horn strobes, 1 booster power supply, and 1 smoke detector
Details
Permit
200912153234
Permit issued
Dec 15, 2009
Final sign-off
Feb 2, 2010

install new fire alarm devices in new ti space. device will be added to an existing fa system. includes 16 strobes, 5 horn strobes, 1 booster power supply, and 1 smoke detector

Open the permit page

$6,200
Sep 15, 2009Completed
final sign-off Feb 2010
944 Market St2nd floor t.i. upgrade o fthe existing fire sprinkelr sytem. relocate 44 heads & delete 7 heads.
Details
Permit
200909156865
Permit issued
Sep 24, 2009
Final sign-off
Feb 2, 2010

2nd floor t.i. upgrade o fthe existing fire sprinkelr sytem. relocate 44 heads & delete 7 heads.

Open the permit page

$12,000
Aug 27, 2009Completed
final sign-off Jan 2010
944 Market StNovo Construction Inc2nd fl office ti. (demo under 2009.08.24.5410). new non struc partitions. all new revised hvac, elec, plbg, life safety under separate permit. builiding not fully sprinklered
Details
Permit
200908275661
Permit issued
Nov 17, 2009
Final sign-off
Jan 28, 2010

2nd fl office ti. (demo under 2009.08.24.5410). new non struc partitions. all new revised hvac, elec, plbg, life safety under separate permit. builiding not fully sprinklered

Open the permit page

$220,000
Aug 24, 2009Expired or cancelled
cancelled Jan 2026
944 Market Stdemo of non-struc. partitions at 2nd floor.. t.i under separate permit. bldg is not fully sprinklered
Details
Permit
200908245410

demo of non-struc. partitions at 2nd floor.. t.i under separate permit. bldg is not fully sprinklered

Open the permit page

$250,000
Aug 14, 2007Never finaled
issued Aug 2007, no final
944 Market Ststreet space permit
Details
Permit
M81904
Permit issued
Aug 14, 2007

street space permit

Open the permit page

Aug 14, 2006Expired or cancelled
expired Feb 2008
948 Market Strevision to 200604148986 and 200605252478. existing handicaped mens restroom on 2nd floor. existing handicapped womens restroom 4th floor
Details
Permit
200608149411
Permit issued
Aug 14, 2006

revision to 200604148986 and 200605252478. existing handicaped mens restroom on 2nd floor. existing handicapped womens restroom 4th floor

Open the permit page

Jul 14, 2006Expired or cancelled
expired Feb 2008
948 Market StBay Fire Protectionadd sprinkler in closet
Details
Permit
200607146645
Permit issued
Jul 14, 2006

add sprinkler in closet

Open the permit page

$500
May 25, 2006Expired or cancelled
expired Feb 2008
948 Market Stinterior remodeling for a retail shoes store on ground level. shelving partitions/doors. no work on mezzanie. submit seperate fire sprinkler permit. revision to app building permit app #200604148986
Details
Permit
200605252478
Permit issued
May 25, 2006

interior remodeling for a retail shoes store on ground level. shelving partitions/doors. no work on mezzanie. submit seperate fire sprinkler permit. revision to app building permit app #200604148986

Open the permit page

Apr 14, 2006Expired or cancelled
expired Feb 2008
948 Market Stinterior remodeling for a retail (shoe) store (ground floor) partial height partitions/doors - no work on mezzanine. submit seperate fire sprinkler permit.
Details
Permit
200604148986
Permit issued
Apr 14, 2006

interior remodeling for a retail (shoe) store (ground floor) partial height partitions/doors - no work on mezzanine. submit seperate fire sprinkler permit.

Open the permit page

$60,000
Jul 29, 2004Never finaled
issued Jul 2004, no final
944 Market StAcker & Guerrero Roof Coreroofing
Details
Permit
200407290084
Permit issued
Jul 29, 2004

reroofing

Open the permit page

$10,000
May 17, 2001Expired or cancelled
expired Sep 2001
948 Market Stto install 34" max ht x 36" counter space in accord sfbc112b.4 & b.2.1 except 3.6 at crepe n java
Details
Permit
200105179392
Permit issued
May 17, 2001

to install 34" max ht x 36" counter space in accord sfbc112b.4 & b.2.1 except 3.6 at crepe n java

Open the permit page

$1,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
P 3 Construction & Remodeling Inc (16), H C I Systems Inc (5), Madden Plumbing, Llc (5), Carroll Commercial Inc (4), San Francisco Fire Protection (3), Charles Pankow Builders Ltd (2), H & M Fire Protection, Inc. (2), Roebuck Construction (2), Western Awnings And Canvas (2), Acker & Guerrero Roof Co, Anderson, Rowe & Buckley, Inc., Aura Fire Safety Inc, B B J Electric, Inc, Bay Fire Protection, Bilcor Inc, Block 12 Construction, Carter Brothers Fire & Life Safety, Esquivel Grading & Paving, Inc., Faith N Jason Construction Llc, Novo Construction Inc, Sabah International Incorporated
Architects
Benjamin Farrell (2), William Duff Jr (2), Aston Pereira, Chang H. Lee, David Plotkin, James Howard Westover, Metro Power Engineers, Michael Steiner, Robert J Lara
Engineers
George Arellano (3), Antonio Mortera, Erevan O'neil, Ophelia Lau
Designers
Michael Williams