Chang H Lee
- Listed as
- architect, engineer
- Firm
- Chl Associates, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jul 2025
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 2235 Polk St | Western Construction Consulting Inc | revise the fire door location between retail and garage per request from an inspector. revision to permit #202410012043 noted on drawings as delta 4.Details
revise the fire door location between retail and garage per request from an inspector. revision to permit #202410012043 noted on drawings as delta 4. | $500 |
| Feb 6, 2025 | Completed final sign-off Oct 2025 | 2235 Polk St | Western Construction Consulting Inc | restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280Details
restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280 | $32,000 |
| Aug 21, 2019 | Completed final sign-off Nov 2019 | 645 Santiago St | Bethel Construction Inc Dba Aaa Construc | revision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck.Details
revision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck. | $5,000 |
| Jul 9, 2008 | Completed final sign-off Dec 2009 | 51 Minerva St | horizontal additon for two stories, 1st fl: extend living rm & bedroom #3 = 300 sf.; 2nd fl: extend dining & family rm. =300sf; 2nd floor balcony = 225sf (total 600 sf addition & 225 sf balcony)Details
horizontal additon for two stories, 1st fl: extend living rm & bedroom #3 = 300 sf.; 2nd fl: extend dining & family rm. =300sf; 2nd floor balcony = 225sf (total 600 sf addition & 225 sf balcony) | $90,000 | |
| Dec 20, 2006 | Completed final sign-off Feb 2008 | 1710 Polk St | addition of new dining area (currently empty) change of occupnacy m-retail to b cafe create nw opening between spaces and level foor between spacesDetails
addition of new dining area (currently empty) change of occupnacy m-retail to b cafe create nw opening between spaces and level foor between spaces | $20,000 |