Block 0239, lot 003
410 California St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 2
- Rooms
- 7 bathrooms
- Building
- 33,028 sq ft
- Lot
- 10,846 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
134 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2023 | In progress issued Jan 2024 | 400 California St | remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible rampDetails
remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible ramp | $250,000 | |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 400 California St | Everon Llc | add (1) relo (3) sprinklers to storage rm level 1 add (4) upright sprinklers to telecom, panel, duct, and accessory rms. level b1 replace existing 4 main at bank high ceiling. exissting bracing to remain remove/reinstall existing 2" cross main w/ (9) upright sprinklers level 3Details
add (1) relo (3) sprinklers to storage rm level 1 add (4) upright sprinklers to telecom, panel, duct, and accessory rms. level b1 replace existing 4 main at bank high ceiling. exissting bracing to remain remove/reinstall existing 2" cross main w/ (9) upright sprinklers level 3 | $16,000 |
| Jan 9, 2020 | Completed final sign-off Apr 2020 | 400 California St | Red Hawk Fire & Security Ca Llc | 7th fl - ti add 38 speaker strobes, 9 duct detectors for fsd, 6 smoke detectors fsd & 1 control relay for fsds control; 11th fl - add 34 speaker strobes, 3 speakers only, 4 duct detectors for fsds, 8 smoke detectors for fsds & 1 control relay for fsds control. ref pa 2019-0820-9236 & 2019-0820-9238Details
7th fl - ti add 38 speaker strobes, 9 duct detectors for fsd, 6 smoke detectors fsd & 1 control relay for fsds control; 11th fl - add 34 speaker strobes, 3 speakers only, 4 duct detectors for fsds, 8 smoke detectors for fsds & 1 control relay for fsds control. ref pa 2019-0820-9236 & 2019-0820-9238 | $48,000 |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 400 California St | Red Hawk Fire & Security Ca Llc | 10th floor: fire alarm t.i. on 10th floor: add 35 speaker strobes, 6 strobes, 5 duct detectors for fsds, 11 smoke detectors for fsds, 6 area smoke detectors,1 control relay for a/v shutdown, and 1 control relay for fsds. ref app#2019073117404. n/a for maherDetails
10th floor: fire alarm t.i. on 10th floor: add 35 speaker strobes, 6 strobes, 5 duct detectors for fsds, 11 smoke detectors for fsds, 6 area smoke detectors,1 control relay for a/v shutdown, and 1 control relay for fsds. ref app#2019073117404. n/a for maher | $20,000 |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 400 California St | Red Hawk Fire & Security Ca Llc | 8th floor fire alarm t.i. add 35 speaker strobes, 6 stobes, 3 duct detectors for sfds, 13 smoke detectors for fsds, 6 area smoke detectors, 1 relay for a/v shutdown and 1 relay for fsd shutdown. ref app#201907317409Details
8th floor fire alarm t.i. add 35 speaker strobes, 6 stobes, 3 duct detectors for sfds, 13 smoke detectors for fsds, 6 area smoke detectors, 1 relay for a/v shutdown and 1 relay for fsd shutdown. ref app#201907317409 | $20,000 |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 400 California St | Red Hawk Fire & Security Ca Llc | 9th floor: fire alarm t.i. on 9th floor: add 35 speakers, 6 strobes, 6 duct detectors for fsds, 10 smoke detectors for fsds, 6 area smoke detectors, 1 control relay for a/v shutdown. n/a for maherDetails
9th floor: fire alarm t.i. on 9th floor: add 35 speakers, 6 strobes, 6 duct detectors for fsds, 10 smoke detectors for fsds, 6 area smoke detectors, 1 control relay for a/v shutdown. n/a for maher | $20,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 400 California St | Bana Construction Inc | scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permitDetails
scope of work is to record e historic interior stone wall panels, remove and reinstall in place with e or new as necessary during the seismic retrofit voluntary work. revision to 201804247160. structutral and mep work work on a separate permit | $13,200 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 400 California St | Bana Construction Inc | rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriutionDetails
rev to pa# 201810112890; as noted, lighting, finishes, elecrical, mechanical distriution | |
| Apr 18, 2019 | Completed final sign-off Jul 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti 18th fl add 18 speaker strobes, 4 strobes, 1 sync module, 4 smoke det, 3 duct detecord, for fsds, 1 control relay for security interface. 19th fl add 17 speaker strobes, 3 strobes, 1 smoke det, 3 duct detec at fsds, 1 control relay for secity interface; ref pa#201810042318Details
fire alarm ti 18th fl add 18 speaker strobes, 4 strobes, 1 sync module, 4 smoke det, 3 duct detecord, for fsds, 1 control relay for security interface. 19th fl add 17 speaker strobes, 3 strobes, 1 smoke det, 3 duct detec at fsds, 1 control relay for secity interface; ref pa#201810042318 | $30,000 |
| Apr 18, 2019 | Completed final sign-off Jul 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti 12th fl add 30 speaker strobes, 6 strobes, 1 sync module, 2 smoke detectors, 11 duct detectors at fsds. 13th fl add 34 speaker strobes, 6 strobes, 4 smoke dete, 11 duct detectors at fsds. ref 201810042315 maher not reqDetails
fire alarm ti 12th fl add 30 speaker strobes, 6 strobes, 1 sync module, 2 smoke detectors, 11 duct detectors at fsds. 13th fl add 34 speaker strobes, 6 strobes, 4 smoke dete, 11 duct detectors at fsds. ref 201810042315 maher not req | $48,000 |
| Mar 11, 2019 | Completed final sign-off Mar 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm as built for 201812077762 and 201902143017 correct: matrix device address and remove door holder from floor planDetails
fire alarm as built for 201812077762 and 201902143017 correct: matrix device address and remove door holder from floor plan | |
| Feb 20, 2019 | Never finaled issued Feb 2019, no final | 400 California St | street space onlyDetails
street space only | ||
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 400 California St | street spaceDetails
street space | ||
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 400 California St | street spaceDetails
street space | ||
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 400 California St | street space/mta metersDetails
street space/mta meters | ||
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 400 California St | street space onlyDetails
street space only | ||
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 400 California St | street spaceDetails
street space | ||
| Nov 30, 2018 | Never finaled issued Nov 2018, no final | 400 California St | street spaceDetails
street space | ||
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 400 California St | street spaceDetails
street space | ||
| Oct 11, 2018 | Never finaled issued Oct 2018, no final | 400 California St | Bana Construction Inc | mechanical, electrical and plumbing removal and replacement of mechanical and electrical distribution and lighting as required to accommodate voluntary seismic stregthening under sep permit 201804242160Details
mechanical, electrical and plumbing removal and replacement of mechanical and electrical distribution and lighting as required to accommodate voluntary seismic stregthening under sep permit 201804242160 | $300,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 400 California St | street spaceDetails
street space | ||
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 400 California St | street spaceDetails
street space | ||
| Aug 7, 2018 | Never finaled issued Aug 2018, no final | 400 California St | street spaceDetails
street space | ||
| Apr 27, 2018 | Completed final sign-off May 2018 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 12, 13th fl. add 8 high candela ceiling mount speaker strobes ref 201711103696Details
fire alarm ti on 12, 13th fl. add 8 high candela ceiling mount speaker strobes ref 201711103696 | $4,000 |
| Apr 27, 2018 | Completed final sign-off May 2018 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on the 14, 15, 16, 17th fl. add 16 high candela ceiling mount speaker strobesDetails
fire alarm ti on the 14, 15, 16, 17th fl. add 16 high candela ceiling mount speaker strobes | $8,000 |
| Apr 24, 2018 | Completed final sign-off Mar 2021 | 400 California St | Bana Construction Inc | architectural/landscape of removal and replacement of non-structural partitions, ceilings, architectural finishes, landscape(as required) to accomodate voluntary seismic strengthening. mep seperate permit.**maher n/a** n.b. see 2018-0423-7048 for structural aspects. roof occ load 307.Details
architectural/landscape of removal and replacement of non-structural partitions, ceilings, architectural finishes, landscape(as required) to accomodate voluntary seismic strengthening. mep seperate permit.**maher n/a** n.b. see 2018-0423-7048 for structural aspects. roof occ load 307. | $670,800 |
| Apr 23, 2018 | Completed final sign-off Mar 2021 | 400 California St | Bana Construction Inc | voluntary seismic strengthening: selective removal and replacement of structural walls, framing, etc. **n/a for maher**Details
voluntary seismic strengthening: selective removal and replacement of structural walls, framing, etc. **n/a for maher** | $2,500,000 |
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 400 California St | street spaceDetails
street space | ||
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 400 California St | Red Hawk Fire & Security Ca Llc | add (5) smoke detectors, add (6) speaker/strobes, add (2) speakers. ** maher: n/a **Details
add (5) smoke detectors, add (6) speaker/strobes, add (2) speakers. ** maher: n/a ** | $7,500 |
| Sep 17, 2014 | Expired or cancelled cancelled Nov 2018 | 400 California St | Red Hawk Fire & Security Ca Llc | 1st and 20th floor:fire alarm t.i. for emergency generator replacement. ref app#201406138340. including 1 smoke detector, 1 control relay, 2 monitor modules. n/a for the maher ordinance #155-13Details
1st and 20th floor:fire alarm t.i. for emergency generator replacement. ref app#201406138340. including 1 smoke detector, 1 control relay, 2 monitor modules. n/a for the maher ordinance #155-13 | $4,000 |
| Feb 26, 2014 | Completed final sign-off Aug 2018 | 400 California St | Red Hawk Fire & Security Ca Llc | as built drawings for app#201401136088. delete one speaker and one strobe from space 303 on the 3rd floor (not a room). compliance w/ordiance no. 155-13 not required.Details
as built drawings for app#201401136088. delete one speaker and one strobe from space 303 on the 3rd floor (not a room). compliance w/ordiance no. 155-13 not required. | |
| Jan 16, 2014 | Completed final sign-off Jan 2014 | 400 California St | Red Hawk Fire & Security Ca Llc | 17/f- fire alarm t.i. including (8) speaker, (8) smoke detectors. t.i.pa# 201312174344. compliance with ordinance #155-13 not required.Details
17/f- fire alarm t.i. including (8) speaker, (8) smoke detectors. t.i.pa# 201312174344. compliance with ordinance #155-13 not required. | $6,000 |
| Jan 13, 2014 | Completed final sign-off Feb 2014 | 400 California St | Red Hawk Fire & Security Ca Llc | 3rd floor:fire alarm t.i. including 18 strobes, 2 speakers,1 smoke detector, 1 snyc module. compliance with ordinance no. 155-13 not required. ref app#2013.1231.5366Details
3rd floor:fire alarm t.i. including 18 strobes, 2 speakers,1 smoke detector, 1 snyc module. compliance with ordinance no. 155-13 not required. ref app#2013.1231.5366 | $6,000 |
| Jan 8, 2014 | Completed final sign-off Feb 2014 | 400 California St | Truebeck Construction | adjust mechanical duct work to provide comfort for new offices includes modifying supply and return diffusers. add (2) van boxes. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd.Details
adjust mechanical duct work to provide comfort for new offices includes modifying supply and return diffusers. add (2) van boxes. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd. | $15,000 |
| Dec 31, 2013 | Completed final sign-off Jan 2014 | 400 California St | Deb Construction Llc | remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017Details
remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017 | $20,000 |
| Dec 17, 2013 | Completed final sign-off Feb 2014 | 400 California St | Truebeck Construction | 17th floor:new private offices on the 17th floor including walls and doors. no work on bathroom or any common space. scope is limited to private offices only.Details
17th floor:new private offices on the 17th floor including walls and doors. no work on bathroom or any common space. scope is limited to private offices only. | $120,000 |
| Nov 15, 2013 | Completed final sign-off Nov 2013 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti 8th fl adding 2 smoke detectorsDetails
fire alarm ti 8th fl adding 2 smoke detectors | $4,000 |
| Nov 15, 2013 | Completed final sign-off Jan 2014 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on b1 level: 14 smoket detectors, 89 ceiling speaker strobes, 4 ceiling strobes, 1 speakerDetails
fire alarm ti on b1 level: 14 smoket detectors, 89 ceiling speaker strobes, 4 ceiling strobes, 1 speaker | $10,000 |
| Aug 20, 2013 | Completed final sign-off Jan 2014 | 400 California St | City Building Inc. | to complete work approved under pa# 200908144866Details
to complete work approved under pa# 200908144866 | $10,000 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 400 California St | City Building Inc. | to obtain final insepction for work approved under pa# 201005172600. all work is complete. fire suppression sprinklers.Details
to obtain final insepction for work approved under pa# 201005172600. all work is complete. fire suppression sprinklers. | |
| Jul 10, 2013 | Completed final sign-off Jul 2013 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 16th fl including 3 smoke detectors, 5 speakersDetails
fire alarm ti on 16th fl including 3 smoke detectors, 5 speakers | $6,000 |
| Apr 19, 2013 | Completed final sign-off May 2013 | 400 California St | Red Hawk Fire & Security Ca Llc | b1 level fire alarm t.i. - 1 booster power supply, 13 smoke detectors, 2 strobes, 10 speaker/strobesDetails
b1 level fire alarm t.i. - 1 booster power supply, 13 smoke detectors, 2 strobes, 10 speaker/strobes | $10,000 |
| Mar 29, 2013 | Completed final sign-off May 2013 | 400 California St | Ayoob & Peery Plumbing Co Inc | relocate and remove fire sprinkler heads per t.i. at basement. relocate 27 and remove 13. ref app#201302200491Details
relocate and remove fire sprinkler heads per t.i. at basement. relocate 27 and remove 13. ref app#201302200491 | $13,800 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 400 California St | Turner Construction Co | 15th floor: revision to app#20120924-0508. all interior work, architectural & meps.Details
15th floor: revision to app#20120924-0508. all interior work, architectural & meps. | |
| Dec 11, 2012 | Completed final sign-off Apr 2013 | 400 California St | One Workplace L-Ferrari Inc. (See Notes) | install glass office front panels (demountable partitions). interior work only.Details
install glass office front panels (demountable partitions). interior work only. | $170,000 |
| Nov 14, 2012 | Completed final sign-off Apr 2013 | 400 California St | Red Hawk Fire & Security Ca Llc | 15th floor-fire alarm t.i-48 smokes, 5 strobes, 22 speaker strobes, 8 speakersDetails
15th floor-fire alarm t.i-48 smokes, 5 strobes, 22 speaker strobes, 8 speakers | $20,000 |
| Sep 24, 2012 | Completed final sign-off May 2013 | 400 California St | Turner Construction Co | tenant improvement on the 15th fl including demo, drywall, millwork, finishes, electric and mech. all doors and office fronts by dirh systems under separate permitDetails
tenant improvement on the 15th fl including demo, drywall, millwork, finishes, electric and mech. all doors and office fronts by dirh systems under separate permit | $1,220,800 |
| Mar 23, 2012 | Completed final sign-off Jul 2012 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on b1 level. 12 speaker strobes, 9 strobes, 30 relocate smokesDetails
fire alarm ti on b1 level. 12 speaker strobes, 9 strobes, 30 relocate smokes | $15,000 |
| Feb 9, 2012 | Completed final sign-off Aug 2018 | 400 California St | Red Hawk Fire & Security Ca Llc | restroom ti on 14th and 16th fl. new dampers to be controlled by existing fire alarm control relayDetails
restroom ti on 14th and 16th fl. new dampers to be controlled by existing fire alarm control relay | $1,000 |
| Feb 8, 2012 | Completed final sign-off May 2012 | 400 California St | Ayoob & Peery Plumbing Co Inc | add relocate, remove and replace fire sprinkler heads per imp. 1 add,63 relocate,16 remove,73 replace.Details
add relocate, remove and replace fire sprinkler heads per imp. 1 add,63 relocate,16 remove,73 replace. | $70,418 |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 400 California St | R L H Fire Protection Inc | fire sprinker only - 14th floor restroom/lobby relocate 7 heads. 16th floor - restroom/lobby/ relocate 2 heads. total 9 heads.Details
fire sprinker only - 14th floor restroom/lobby relocate 7 heads. 16th floor - restroom/lobby/ relocate 2 heads. total 9 heads. | $4,500 |
| May 24, 2011 | Completed final sign-off Jul 2011 | 400 California St | Red Hawk Fire & Security Ca Llc | add 2 relays at 400 california first floor loading dock to control new dock doors. 2 relays- existing 1st floor heat detectors in area will activate the closing of dock doors-Details
add 2 relays at 400 california first floor loading dock to control new dock doors. 2 relays- existing 1st floor heat detectors in area will activate the closing of dock doors- | $7,000 |
| May 17, 2010 | Completed final sign-off Jul 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | relocate fire-sprinkler heads per tenant imp. 10-relocate, 9-change.Details
relocate fire-sprinkler heads per tenant imp. 10-relocate, 9-change. | $1,800 |
| May 14, 2010 | Completed final sign-off Mar 2011 | 400 California St | Diversified Fire Products | fire alarm retrofit for entire building.Details
fire alarm retrofit for entire building. | $250,000 |
| Apr 30, 2010 | Completed final sign-off Jul 2010 | 400 California St | Swinerton Builders | office ti. partial floor ( 18th fl) audio visual upgrade to single occupant floor. modify (e) millwork to install new replacement rear projection screen and window shades. ceiling to be patched for new speaker locations.Details
office ti. partial floor ( 18th fl) audio visual upgrade to single occupant floor. modify (e) millwork to install new replacement rear projection screen and window shades. ceiling to be patched for new speaker locations. | $50,000 |
| Mar 26, 2010 | Completed final sign-off May 2010 | 400 California St | Swinerton Builders | 19th-barrier removel, demo (e) non compliant urinal & water closet partition. install new urinals & water closet partition. no lighting, electrical workDetails
19th-barrier removel, demo (e) non compliant urinal & water closet partition. install new urinals & water closet partition. no lighting, electrical work | $10,000 |
| Sep 14, 2009 | Completed final sign-off Dec 2010 | 400 California St | Ayoob & Peery Plumbing Co Inc | 11th &17th floor - relocate fire sprinkler heads fo rtenant improvement, reloc 10, @11th floor, relo 4@ 17th floor.Details
11th &17th floor - relocate fire sprinkler heads fo rtenant improvement, reloc 10, @11th floor, relo 4@ 17th floor. | $3,000 |
| Aug 14, 2009 | Never finaled issued Aug 2009, no final | 400 California St | City Building Inc. | replace existing boilers @ basements.Details
replace existing boilers @ basements. | $180,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 400 California St | Arrow Sign Company | to erect non electric, wall, single faced sign.Details
to erect non electric, wall, single faced sign. | $500 |
| Jun 30, 2009 | Completed final sign-off Sep 2009 | 400 California St | Arrow Sign Company | to erect non electric, wall, single faced sign.Details
to erect non electric, wall, single faced sign. | $300 |
| Jun 30, 2009 | Never finaled issued Jul 2009, no final | 400 California St | Arrow Sign Company | to erect non electric, wall, single faced sign.Details
to erect non electric, wall, single faced sign. | $3,000 |
| May 4, 2009 | Expired or cancelled cancelled Jan 2026 | 400 California St | Arrow Sign Company | to erect non electric wall signDetails
to erect non electric wall sign | $2,500 |
| Feb 10, 2009 | Completed final sign-off Mar 2009 | 400 California St | Niscayah Inc. | revision 200806053761, drawing to show card reader.Details
revision 200806053761, drawing to show card reader. | |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 400 California St | Siemens Industry, Inc. | addition of 1 relay module for the release of a man-trap door on floor 1 upon a ire alarm condition. also, a fire alarm pull station near this same area has been reloclatedDetails
addition of 1 relay module for the release of a man-trap door on floor 1 upon a ire alarm condition. also, a fire alarm pull station near this same area has been reloclated | $700 |
| Jan 29, 2009 | Never finaled issued Jan 2009, no final | 400 California St | sidewalk repair.Details
sidewalk repair. | ||
| Dec 11, 2008 | Completed final sign-off Mar 2009 | 400 California St | revision to ap#200806053761. to revise exit path of travel.Details
revision to ap#200806053761. to revise exit path of travel. | ||
| Oct 29, 2008 | Completed final sign-off Mar 2009 | 400 California St | Capitol Electric Const | revision to 200810033304: add 1 wall mounted strobe, 2 wall mounted speaker/strobes, 1 ceiling mounted speakerDetails
revision to 200810033304: add 1 wall mounted strobe, 2 wall mounted speaker/strobes, 1 ceiling mounted speaker | $7,000 |
| Oct 29, 2008 | Never finaled issued Oct 2008, no final | 400 California St | Anderson, Rowe & Buckley, Inc. | tenant improvement to the extg fire sprinkler system. 16 relocates. 4 adds. 10th and 1st floorDetails
tenant improvement to the extg fire sprinkler system. 16 relocates. 4 adds. 10th and 1st floor | $4,000 |
| Oct 3, 2008 | Expired or cancelled cancelled Jan 2026 | 400 California St | Capitol Electric Const | 10th floor - 6 new strobes for life safety.Details
10th floor - 6 new strobes for life safety. | $7,000 |
| Sep 23, 2008 | Completed final sign-off Feb 2009 | 400 California St | Anderson, Rowe & Buckley, Inc. | tenant improvement to the existing fire sprinker system, 2 relocates, 1 removalDetails
tenant improvement to the existing fire sprinker system, 2 relocates, 1 removal | $1,000 |
| Sep 5, 2008 | Never finaled issued Sep 2008, no final | 400 California St | street space only.Details
street space only. | ||
| Aug 29, 2008 | Completed final sign-off Feb 2009 | 400 California St | Swinerton Builders | 9th floor-partial tenant improvement including selective demolition, partition, electrical, ceiling, finishes and life safety. mech. elec, & lighting under seperate permit.Details
9th floor-partial tenant improvement including selective demolition, partition, electrical, ceiling, finishes and life safety. mech. elec, & lighting under seperate permit. | $7,500 |
| Aug 29, 2008 | Completed final sign-off Feb 2009 | 400 California St | Swinerton Builders | 9th floor-construction of 3 new vav boxes and all mechanical work involvedDetails
9th floor-construction of 3 new vav boxes and all mechanical work involved | $6,000 |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 400 California St | Swinerton Builders | 1st floor revision to appl #200804230444 - construction of 1-hr rated hard lid ceiling and smoke fire damper.Details
1st floor revision to appl #200804230444 - construction of 1-hr rated hard lid ceiling and smoke fire damper. | $3,000 |
| Jun 12, 2008 | Completed final sign-off Oct 2008 | 400 California St | Pribuss Engineering Inc | ti for fire sprinkler on the 1st floor. add 3 head and relocate 14 head, total 17 heads.Details
ti for fire sprinkler on the 1st floor. add 3 head and relocate 14 head, total 17 heads. | $4,000 |
| Jun 5, 2008 | Completed final sign-off Mar 2009 | 400 California St | ti install ation of a constrolled access unit(cau), and alarmed emergency exit door, minokdemo andd const are required, mech, elect, life safety and sprinkler are not included underis permit,Details
ti install ation of a constrolled access unit(cau), and alarmed emergency exit door, minokdemo andd const are required, mech, elect, life safety and sprinkler are not included underis permit, | $30,000 | |
| Apr 23, 2008 | Expired or cancelled expired May 2011 | 400 California St | Swinerton Builders | demo some ex. partition walls and ceiling. reconstruct new partitions, doors for private/open offices, new ceiling, electrical, lighting and finshesDetails
demo some ex. partition walls and ceiling. reconstruct new partitions, doors for private/open offices, new ceiling, electrical, lighting and finshes | $300,000 |
| Nov 6, 2007 | Expired or cancelled cancelled Sep 2011 | 400 California St | replace existing structural supports for window washing davits at parapet of 18 & 19 floors roof top. not visible from street.Details
replace existing structural supports for window washing davits at parapet of 18 & 19 floors roof top. not visible from street. | $500,000 | |
| Oct 30, 2007 | Never finaled issued Oct 2007, no final | 400 California St | street space permitDetails
street space permit | ||
| Jul 3, 2007 | Never finaled issued Jul 2007, no final | 400 California St | street space permitDetails
street space permit | ||
| Jun 11, 2007 | Completed final sign-off Apr 2008 | 400 California St | Swinerton Builders | oti-2, union bank of calif, 6th floor, el, me.Details
oti-2, union bank of calif, 6th floor, el, me. | $300,000 |
| May 22, 2007 | Completed final sign-off Apr 2008 | 400 California St | Swinerton Builders | oti-1, union bank of calif, 6th fl, el, me, ls, sp.Details
oti-1, union bank of calif, 6th fl, el, me, ls, sp. | $350,000 |
| May 22, 2007 | Completed final sign-off Jan 2008 | 400 California St | Swinerton Builders | soft demolitio only, disable accessibility compliance exempt per ab-017Details
soft demolitio only, disable accessibility compliance exempt per ab-017 | $50,000 |
| Mar 13, 2007 | Expired or cancelled expired Apr 2009 | 400 California St | installation of a new fire alarm system 2nd floorDetails
installation of a new fire alarm system 2nd floor | $41,680 | |
| Feb 28, 2007 | Expired or cancelled expired Jun 2011 | 400 California St | Kent M Lim & Company Inc | oti-2 2nd fl meDetails
oti-2 2nd fl me | $343,700 |
| Jan 30, 2007 | Expired or cancelled expired Jun 2011 | 400 California St | Capitol Electric Const | correction to app 200606305433. change matrix to show shunt trip for elevator not required as builts for 20th, 21st and lobby floorsDetails
correction to app 200606305433. change matrix to show shunt trip for elevator not required as builts for 20th, 21st and lobby floors | |
| Jan 8, 2007 | Expired or cancelled expired May 2011 | 400 California St | Signs America Inc Dba Sign A Rama | to erect non electrical signDetails
to erect non electrical sign | $3,000 |
| Jun 30, 2006 | Expired or cancelled expired May 2011 | 400 California St | Capitol Electric Const | oti-2 , 1st floor, el, ls.Details
oti-2 , 1st floor, el, ls. | $79,850 |
| Jun 8, 2006 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | oti-3, 1st floor, sp.Details
oti-3, 1st floor, sp. | $22,000 |
| May 1, 2006 | Expired or cancelled expired Jun 2011 | 400 California St | bathroom upgrade, lighting only, t-24. revision to appl#200604269990Details
bathroom upgrade, lighting only, t-24. revision to appl#200604269990 | $15,000 | |
| Apr 26, 2006 | Expired or cancelled expired Mar 2009 | 400 California St | Kent M Lim & Company Inc | oti-3 me 2nd floorDetails
oti-3 me 2nd floor | $15,000 |
| Apr 18, 2006 | Expired or cancelled expired Mar 2009 | 400 California St | Swinerton Builders | uprgrade existing fire alarm system, 2nd flrDetails
uprgrade existing fire alarm system, 2nd flr | $15,000 |
| Mar 6, 2006 | Completed final sign-off Mar 2006 | 400 California St | Swinerton Builders | demolition permit; ceiling ht partion. all work on 13th floor. 3 interior offices only. within tenant space.Details
demolition permit; ceiling ht partion. all work on 13th floor. 3 interior offices only. within tenant space. | $10,000 |
| Feb 23, 2006 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | t.i. relocate fire sprinklersDetails
t.i. relocate fire sprinklers | $1,400 |
| Nov 9, 2005 | Expired or cancelled expired Jun 2011 | 400 California St | Swinerton Builders | demolition of vacate floor. (per ab 017 requirement)Details
demolition of vacate floor. (per ab 017 requirement) | $85,000 |
| Oct 13, 2005 | Completed final sign-off Dec 2005 | 400 California St | oti-3 7th floor me.install (n)hvac duct & air outlets for tenant space plan.Details
oti-3 7th floor me.install (n)hvac duct & air outlets for tenant space plan. | $280,000 | |
| Aug 22, 2005 | Completed final sign-off Dec 2005 | 400 California St | Swinerton Builders | oti-1, 7th floor, el, me, ls, sp.Details
oti-1, 7th floor, el, me, ls, sp. | $650,000 |
| Aug 18, 2005 | Completed final sign-off Dec 2005 | 400 California St | Ayoob & Peery Plumbing Co Inc | 83 fire sprinkler relocated heads. 27 fire sprinkler heads removed for t.i.Details
83 fire sprinkler relocated heads. 27 fire sprinkler heads removed for t.i. | $15,100 |
| Jul 25, 2005 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per ti on 13th fl only.note-verify arch wk/demo was done w/ permit.jdDetails
relocate fire sprinkler heads per ti on 13th fl only.note-verify arch wk/demo was done w/ permit.jd | $4,000 |
| Feb 11, 2005 | Completed final sign-off May 2005 | 400 California St | Capitol Electric Const | oti-3, 5th floor, ls.Details
oti-3, 5th floor, ls. | $15,000 |
| Jan 5, 2005 | Completed final sign-off Feb 2005 | 400 California St | Dome Construction Corp | revision to amend scope of work on 200403269733/add monitoring modules to fire alarm/l/s system atDetails
revision to amend scope of work on 200403269733/add monitoring modules to fire alarm/l/s system at | |
| Jan 5, 2005 | Completed final sign-off Feb 2005 | 400 California St | Dome Construction Corp | renew appl#200403269733 for final inspectionDetails
renew appl#200403269733 for final inspection | |
| Jun 21, 2004 | Completed final sign-off Dec 2004 | 400 California St | Richlen Construction | oti-2 9th floor, el, meDetails
oti-2 9th floor, el, me | $15,000 |
| Jun 8, 2004 | Completed final sign-off Dec 2004 | 400 California St | oti - 1 el,me, ls,spDetails
oti - 1 el,me, ls,sp | $150,000 | |
| Jun 3, 2004 | Expired or cancelled expired Nov 2005 | 400 California St | Capitol Electric Const | monitoring water flow and tamper switch locations(qty 2) on 7th floor tie in to extg fa systemDetails
monitoring water flow and tamper switch locations(qty 2) on 7th floor tie in to extg fa system | $2,000 |
| Mar 26, 2004 | Never finaled issued Mar 2004, no final | 400 California St | Capitol Electric Const | add initiating and notification devices to fire alarm/life safety system in core area of 5th flrDetails
add initiating and notification devices to fire alarm/life safety system in core area of 5th flr | $7,000 |
| Mar 26, 2004 | Never finaled issued Mar 2004, no final | 400 California St | Capitol Electric Const | add monitoring modules to fire alarm/life safety system at waterflow/tamper switchDetails
add monitoring modules to fire alarm/life safety system at waterflow/tamper switch | $3,000 |
| Jan 21, 2004 | Expired or cancelled expired Dec 2004 | 400 California St | L.V.I. Enviromental Svrs. | re-fireproofing to post abatement structural steel, beams, columns, metal deck 5th floorDetails
re-fireproofing to post abatement structural steel, beams, columns, metal deck 5th floor | $22,330 |
| Sep 26, 2003 | Never finaled issued Sep 2003, no final | 400 California St | Capitol Electric Const | add addressable device capability-add 1 panel to 12th fl only.Details
add addressable device capability-add 1 panel to 12th fl only. | $10,000 |
| Sep 16, 2003 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system at 4th fl. connect to (e) riser. no increase in office spaceDetails
install fire sprinkler system at 4th fl. connect to (e) riser. no increase in office space | $41,500 |
| Aug 22, 2003 | Completed final sign-off Oct 2003 | 400 California St | Richlen Construction | fire sprinkler 200305205100Details
fire sprinkler 200305205100 | $19,000 |
| Aug 12, 2003 | Completed final sign-off Oct 2003 | 400 California St | Capitol Electric Const | fire alarm update tenant improvement 9th floorDetails
fire alarm update tenant improvement 9th floor | $10,000 |
| Dec 24, 2002 | Expired or cancelled expired Mar 2004 | 400 California St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $112,402 |
| Mar 25, 2002 | Completed final sign-off Sep 2002 | 400 California St | provide life safety per plan interior work only 18/f & 19th floorsDetails
provide life safety per plan interior work only 18/f & 19th floors | $30,000 | |
| Mar 13, 2002 | Completed final sign-off Sep 2002 | 400 California St | revise to appln #200112125044 revise t/i on 19/f per plan and 18/fDetails
revise to appln #200112125044 revise t/i on 19/f per plan and 18/f | ||
| Feb 11, 2002 | Completed final sign-off Sep 2002 | 400 California St | provide sprinklers on the 18th & 19/f per plansDetails
provide sprinklers on the 18th & 19/f per plans | $25,000 | |
| Feb 1, 2002 | Expired or cancelled withdrawn Feb 2002 | 400 California St | provide mechanical electrical and plumbing on the 18/f & 19/f per plans addendum to app#200112125044Details
provide mechanical electrical and plumbing on the 18/f & 19/f per plans addendum to app#200112125044 | ||
| Dec 14, 2001 | Completed final sign-off Apr 2002 | 400 California St | Skyline Construction | relocate 5 sprinkler heads and add 2 new sprinkler heads on the 15th floorDetails
relocate 5 sprinkler heads and add 2 new sprinkler heads on the 15th floor | $4,000 |
| Nov 19, 2001 | Completed final sign-off Apr 2002 | 400 California St | Capitol Electric Const | kers and replace with new sync strobes on the 15th floorDetails
kers and replace with new sync strobes on the 15th floor | $25,000 |
| Oct 30, 2001 | Completed final sign-off Feb 2002 | 400 California St | Skyline Construction | 17th fl- relocate 2 (e) fire sprinkler headsDetails
17th fl- relocate 2 (e) fire sprinkler heads | $5,000 |
| Oct 15, 2001 | Completed final sign-off Apr 2002 | 400 California St | Skyline Construction | remodel elevator lobby, and create conference rm @ 1st fl. no increase in office spaceDetails
remodel elevator lobby, and create conference rm @ 1st fl. no increase in office space | $220,000 |
| Sep 27, 2001 | Completed final sign-off Nov 2001 | 400 California St | Siemens Industry, Inc. | rev. to appl#200107052970 includes relocate of strobes & speakers from original design, add 7 fire/sDetails
rev. to appl#200107052970 includes relocate of strobes & speakers from original design, add 7 fire/s | $1,800 |
| Sep 6, 2001 | Completed final sign-off Feb 2002 | 400 California St | Skyline Construction | oti-1 17th floor, ltg, mech, ls, sprDetails
oti-1 17th floor, ltg, mech, ls, spr | $20,000 |
| Jul 5, 2001 | Completed final sign-off Nov 2001 | 400 California St | Siemens Industry, Inc. | addition to the extg fire alarm system on the 3rd floorDetails
addition to the extg fire alarm system on the 3rd floor | $13,600 |
| Jun 29, 2001 | Completed final sign-off Nov 2001 | 400 California St | Skyline Construction | installation o 112 new sprinkler heads on 3rd floorDetails
installation o 112 new sprinkler heads on 3rd floor | $40,000 |
| Jun 27, 2001 | Completed final sign-off Nov 2001 | 400 California St | Skyline Construction | one-stop:.m.tjoe:demo & reconfigure partions, mech & elect. fire spinkler under s eparate permitDetails
one-stop:.m.tjoe:demo & reconfigure partions, mech & elect. fire spinkler under s eparate permit | $325,000 |
| Mar 31, 2001 | Expired or cancelled withdrawn Jul 2001 | 400 California St | renovation of facade and canopyDetails
renovation of facade and canopy | $150,000 | |
| Dec 15, 2000 | Expired or cancelled expired Apr 2001 | 400 California St | California Suppresion Dba Calif. Protect | to renew permit#2000/03/01/3215.Details
to renew permit#2000/03/01/3215. | $5,000 |
| Oct 20, 2000 | Completed final sign-off Jun 2001 | 400 California St | Siemens Industry, Inc. | add 1 wall strobe for conf rm 8 flr system testedDetails
add 1 wall strobe for conf rm 8 flr system tested | $2,300 |
| Oct 11, 2000 | Completed final sign-off Jun 2001 | 400 California St | Skyline Construction | fire sprinkler work 2 relocates 3 new heads on 8th floorDetails
fire sprinkler work 2 relocates 3 new heads on 8th floor | $8,000 |
| Sep 19, 2000 | Completed final sign-off Jun 2001 | 400 California St | Skyline Construction | oti-2 8th floor, electrical, mechanicalDetails
oti-2 8th floor, electrical, mechanical | $5,000 |
| Sep 15, 2000 | Completed final sign-off May 2001 | 400 California St | Siemens Industry, Inc. | addition of detectors,pull stations, spkrs,strbs,to e cerberus xl3 fire al sy 12th fl union bnk rmdlDetails
addition of detectors,pull stations, spkrs,strbs,to e cerberus xl3 fire al sy 12th fl union bnk rmdl | $10,300 |
| Sep 5, 2000 | Completed final sign-off Jun 2001 | 400 California St | Skyline Construction | oti 1, 8th floor el,me,ls,spDetails
oti 1, 8th floor el,me,ls,sp | $10,000 |
| Feb 1, 2000 | Expired or cancelled withdrawn Feb 2000 | 400 California St | Carli Construction, Inc. | demo existing damaged sidewalks ramp & replace per plansDetails
demo existing damaged sidewalks ramp & replace per plans | $7,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.