Carolyn Kiernat
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Page & Turnbull, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to May 2026
34 permits since 2000 (architect on 24 permits, authorized agent-others on 9 permits, engineer on 1 permit): 20 completed, 3 in progress, 4 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2026 | Completed final sign-off Aug 2026 | 1745 North Point St | Colindres & Associates | revision to pa 202507160985 minor modification to decorative metal work @ 2nd floorDetails
revision to pa 202507160985 minor modification to decorative metal work @ 2nd floor | |
| Oct 31, 2025 | Completed final sign-off Mar 2026 | 398 Eddy St | Urban West Construction Inc | revision to pa #202507020051 to address foundation conditions foundation in field.Details
revision to pa #202507020051 to address foundation conditions foundation in field. | |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 398 Eddy St | Urban West Construction Inc | level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift.Details
level 1: phase (1) - new accessible opening between (2) spaces, includes new stair, new lift. | $250,000 |
| Jul 30, 2025 | In progress issued Jun 2026 | 1 Dr Carlton B Goodlett Pl | scope: consist of readily achievable barrier removal of wheelchair lift proposed to allow access from the east entry to the main lobby level removal of existing wheelchair lift, patch and repair of the floor after existing lift is removed. install new lift including necessary structuralDetails
scope: consist of readily achievable barrier removal of wheelchair lift proposed to allow access from the east entry to the main lobby level removal of existing wheelchair lift, patch and repair of the floor after existing lift is removed. install new lift including necessary structural | $373,300 | |
| Jul 16, 2025 | Completed final sign-off Aug 2026 | 1745 North Point St | Colindres & Associates | to comply with nov 202533668 under direction of the planning department, enforcement case 2025-003230enf to reflect as built conditions for: removal of garage door trim , change in design and operation of windows, change in garage door design removal of door opening and corresponding trim on leftDetails
to comply with nov 202533668 under direction of the planning department, enforcement case 2025-003230enf to reflect as built conditions for: removal of garage door trim , change in design and operation of windows, change in garage door design removal of door opening and corresponding trim on left | |
| May 20, 2025 | Completed final sign-off Jul 2026 | 20 Franklin St | Pullman Sst Inc | the project is the rehabilitation of a single east facade of an existing 6 story historic brick masonry bldg built in 1911. the proposed project involves exterior envelope repairs, including: masonry repairs replacement of existing masonry opening infill & treatment of existing structural members.Details
the project is the rehabilitation of a single east facade of an existing 6 story historic brick masonry bldg built in 1911. the proposed project involves exterior envelope repairs, including: masonry repairs replacement of existing masonry opening infill & treatment of existing structural members. | $1,092,646 |
| Mar 7, 2024 | In progress issued Jun 2024 | 900 North Point St | Rainbow Waterproofing & Restor | roof repairs to clock tower (tiles, sheet metal, lighting)Details
roof repairs to clock tower (tiles, sheet metal, lighting) | $255,000 |
| Jan 23, 2024 | Expired or cancelled withdrawn Aug 2025 | 1 Dr Carlton B Goodlett Pl | the proposed project is limitted in scope and consists of readily achievable barrier removal. a wheel chair lift is proposed to allow access from the east entry to the main lobby level.Details
the proposed project is limitted in scope and consists of readily achievable barrier removal. a wheel chair lift is proposed to allow access from the east entry to the main lobby level. | $597,000 | |
| May 22, 2023 | Completed final sign-off Jan 2025 | 1 Powell St | Rainbow Waterproofing & Restor | exterior facade repairs of (e) historic granite stone & terra cotta masonry. prep & painting of hist. steel wndw frames. isolated locations of glass replacement on the windows. north facing facade require misc stucco & cement plaster repair. installation of elastomeric paint on majority of these...Details
exterior facade repairs of (e) historic granite stone & terra cotta masonry. prep & painting of hist. steel wndw frames. isolated locations of glass replacement on the windows. north facing facade require misc stucco & cement plaster repair. installation of elastomeric paint on majority of these... | $3,091,690 |
| Feb 28, 2023 | In progress issued Jan 2024 | 400 California St | remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible rampDetails
remove (e) entry double door, storefront & throshold and replace w/ new storefront (remove e entry vestibule & patch e finish fl to match). (e) stonetile, new balanced doors w/ ada push bottom, guardrail on either side of door). new egress passage 400 califora to 430 california. new accessible ramp | $250,000 | |
| Jan 20, 2023 | Completed final sign-off Jan 2025 | 1 Powell St | Rainbow Waterproofing & Restor | exterior facade repairs of existing historic granite stone and terra cotta unit masonry. these are detailed very specifically in the project plans and specifications. the project includes the preparation and painting of (e) historic steel window frames. there are isolated locations of glass facade..Details
exterior facade repairs of existing historic granite stone and terra cotta unit masonry. these are detailed very specifically in the project plans and specifications. the project includes the preparation and painting of (e) historic steel window frames. there are isolated locations of glass facade.. | $2,115,633 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 660 Market St | Swinerton Builders | new exterior building maintenance system to meet osha regulations while maintain historic character of exterior. mpta 2021-00102ptaDetails
new exterior building maintenance system to meet osha regulations while maintain historic character of exterior. mpta 2021-00102pta | $80,000 |
| Oct 21, 2020 | Expired or cancelled expired Apr 2026 | 311 11th Av | 1)plng enf #2021001677 enf (baths 2/f, guest rms); 2)bldg/housing complaints #202173261, 202173268, 202173081,202172642; 3) ada upgrades to g/f commercial space (to complete bp202010217081); 4)restore brick on 11th ave & clement st. elevations (following removal of previous signage w/out permit);Details
1)plng enf #2021001677 enf (baths 2/f, guest rms); 2)bldg/housing complaints #202173261, 202173268, 202173081,202172642; 3) ada upgrades to g/f commercial space (to complete bp202010217081); 4)restore brick on 11th ave & clement st. elevations (following removal of previous signage w/out permit); | $40,000 | |
| Sep 30, 2020 | Expired or cancelled withdrawn Dec 2020 | 731 Market St | exterior facade maintenance & repair at rear (stevenson st):removal of (e) non-original painted cement plaster.brick masonry repair/restoration.sheet metal repir & restoration.flashing & waterproofing.new sealants at windows.new paint & breathable coatings.Details
exterior facade maintenance & repair at rear (stevenson st):removal of (e) non-original painted cement plaster.brick masonry repair/restoration.sheet metal repir & restoration.flashing & waterproofing.new sealants at windows.new paint & breathable coatings. | $500,000 | |
| Nov 15, 2019 | Completed final sign-off Apr 2022 | 2731 Folsom St | correct cause of moisture intrusion inlclude concrete work as needed.repair various wood splitting as needed. repair finger jointed window sills as needed,replace failed sealant at window perimiter,repaint sills.Details
correct cause of moisture intrusion inlclude concrete work as needed.repair various wood splitting as needed. repair finger jointed window sills as needed,replace failed sealant at window perimiter,repaint sills. | $2,000 | |
| Oct 7, 2019 | Completed final sign-off Oct 2020 | 200 Larkin St | C B 2 Builders Incorporated | installation of art work @ sw alcove of room# 201. work also includes an art light & structural provisions. lighting for temporary exitibits. ** maher: n/a **Details
installation of art work @ sw alcove of room# 201. work also includes an art light & structural provisions. lighting for temporary exitibits. ** maher: n/a ** | $25,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | removal of non-original marble cladding & non-original terrazzo steps at southernmost bay. repair & paint existing brick behind cladding. new storefront windows and entrance. new wood transom to match original.Details
removal of non-original marble cladding & non-original terrazzo steps at southernmost bay. repair & paint existing brick behind cladding. new storefront windows and entrance. new wood transom to match original. | $17,500 | |
| Aug 3, 2018 | Never finaled issued May 2020, no final | 101 Vallejo St | replacement of the (e) skylights on the non-original hip rof portion of the (e) roof. the skylight will be similar in size as the (e) & will have a similar height & profile. roof work under separate pa# 2017/06/13/9128. ** maher: n/a **Details
replacement of the (e) skylights on the non-original hip rof portion of the (e) roof. the skylight will be similar in size as the (e) & will have a similar height & profile. roof work under separate pa# 2017/06/13/9128. ** maher: n/a ** | $15,000 | |
| Apr 19, 2018 | Never finaled issued Feb 2019, no final | 353 Kearny St | L 7 Principal Development | repair of (e) windows on kearny & pine street, floors 2-5. replacement of windows previously removed with new wood windows on st. george alley frontageDetails
repair of (e) windows on kearny & pine street, floors 2-5. replacement of windows previously removed with new wood windows on st. george alley frontage | $100,000 |
| Apr 3, 2018 | Completed final sign-off Jun 2021 | 101 Vallejo St | alterations to entries along vallejo street. **maher n/a**Details
alterations to entries along vallejo street. **maher n/a** | $150,000 | |
| Jan 8, 2018 | Never finaled issued Aug 2018, no final | 235 Geary St | Swinerton Builders | replacement of (e) storefront windows with (n) entry doors and (n) window display boxes.the (n) window display boxes will add approximately 200 squre feet of fl area. the window boxes will protrude from the face of the (e) facade but will not cross the property line into the public right of wayDetails
replacement of (e) storefront windows with (n) entry doors and (n) window display boxes.the (n) window display boxes will add approximately 200 squre feet of fl area. the window boxes will protrude from the face of the (e) facade but will not cross the property line into the public right of way | $403,411 |
| Oct 11, 2013 | Completed final sign-off Aug 2015 | 2390 Bush St | Cahill Contractors Inc | voluntary structural upgrade - seismic strengthening of interior side of front wall, accessibility improvements, barrier removal, accessible route of travel to main entry, main entry improvement, restroom & signage. n/a for maher ordinance.Details
voluntary structural upgrade - seismic strengthening of interior side of front wall, accessibility improvements, barrier removal, accessible route of travel to main entry, main entry improvement, restroom & signage. n/a for maher ordinance. | $1,200,000 |
| Jul 27, 2011 | Expired or cancelled expired Jun 2014 | 1000 Francisco St | Clay Young, Gen'l Contractor | revision to pa# 2011/04/07/3642. this consists of additional voluntary structural upgrades. the original cost of construction in the original permit includes this work.Details
revision to pa# 2011/04/07/3642. this consists of additional voluntary structural upgrades. the original cost of construction in the original permit includes this work. | |
| Apr 7, 2011 | Expired or cancelled expired Jun 2014 | 1000 Francisco St | Clay Young, Gen'l Contractor | basement: floor in be lowered 6" norm of column line 3. new stair from 1st floor to basement. rehabilitation will include new office, bath, laundry. new concrete floor throughout. 1st floor: kitchen & powder room remodeled. 2nd floor: bedrooms & baths reconfigured & remodeled. structural improvementDetails
basement: floor in be lowered 6" norm of column line 3. new stair from 1st floor to basement. rehabilitation will include new office, bath, laundry. new concrete floor throughout. 1st floor: kitchen & powder room remodeled. 2nd floor: bedrooms & baths reconfigured & remodeled. structural improvement | $550,000 |
| Dec 12, 2008 | Completed final sign-off Feb 2009 | 533 Bowdoin St | Sun Sun Construction Co | to comply w/ nov 200877093/bid, 200727612/his. legalize two bedrooms, one laundry & full bathroom on the ground per plan.(legalize alteration work to an existing family room and play room per plan.)Details
to comply w/ nov 200877093/bid, 200727612/his. legalize two bedrooms, one laundry & full bathroom on the ground per plan.(legalize alteration work to an existing family room and play room per plan.) | $10,000 |
| Jun 15, 2007 | Never finaled issued Feb 2008, no final | 2395 Diamond St | vertical addition add one story per plan.Details
vertical addition add one story per plan. | $150,000 | |
| Aug 1, 2006 | Completed final sign-off Dec 2006 | 2136 Noriega St | add one family room, one bedroom, one full bath & two storage on ground floor per plan. replace two fottings for (e) posts.Details
add one family room, one bedroom, one full bath & two storage on ground floor per plan. replace two fottings for (e) posts. | $30,000 | |
| Jul 19, 2006 | Expired or cancelled cancelled Oct 2011 | 261 Holyoke St | horizontal addition - add 2 bedrooms,1 study, 1 guest room,2 baths on 2nd flr. add 3 new bedrooms,1 playroom, 1 family room, 2 baths on gr floor per planDetails
horizontal addition - add 2 bedrooms,1 study, 1 guest room,2 baths on 2nd flr. add 3 new bedrooms,1 playroom, 1 family room, 2 baths on gr floor per plan | $160,000 | |
| Jul 6, 2006 | Completed final sign-off Jan 2007 | 2514 43rd Av | add two bedrooms, one full bath an laundry on ground flr per planDetails
add two bedrooms, one full bath an laundry on ground flr per plan | $30,000 | |
| May 10, 2006 | Expired or cancelled expired May 2025 | 1922 Palou Av | remove (e) deck & (e) stair. add (n) deck & (n) stair at backyard per plan.Details
remove (e) deck & (e) stair. add (n) deck & (n) stair at backyard per plan. | $5,000 | |
| May 10, 2006 | Completed final sign-off Feb 2007 | 256 Willard North St | revise 200604189252. relocate internal stair and bathroom on ground floor per plan.Details
revise 200604189252. relocate internal stair and bathroom on ground floor per plan. | ||
| Apr 28, 2006 | Completed final sign-off Apr 2008 | 1567 17th Av | add 2 bedrooms, 1 storage, 1 full bath on gr flr and 1 w full bath, remodel e full bath and kitchen, replace e stairs, remove 2nd and 3rd e interior stairs on 2nd 2nd floor per plan. enclose lightwellDetails
add 2 bedrooms, 1 storage, 1 full bath on gr flr and 1 w full bath, remodel e full bath and kitchen, replace e stairs, remove 2nd and 3rd e interior stairs on 2nd 2nd floor per plan. enclose lightwell | $50,000 | |
| Apr 18, 2006 | Completed final sign-off Dec 2006 | 256 Willard North St | add half bath, remodel bath, kitchen, relocate stairs on 2nd floor, add full bath, 2 bedrooms on gr flr. per plansDetails
add half bath, remodel bath, kitchen, relocate stairs on 2nd floor, add full bath, 2 bedrooms on gr flr. per plans | $25,000 | |
| Oct 18, 2004 | Completed final sign-off Oct 2005 | 836 Garfield St | legalize 2 bedrooms, 1 full bath and remove (e) stove, sink & counter on grd floor per plan.Details
legalize 2 bedrooms, 1 full bath and remove (e) stove, sink & counter on grd floor per plan. | $25,000 |