Block 3725, lot 014
934 Howard St
- City’s use
- Commercial Office
- Built
- 1924
- Stories
- 3
- Building
- 10,998 sq ft
- Lot
- 3,666 sq ft
- Zoning
- MUR
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2024 | In progress issued May 2024 | 934 Howard St | R B Roofing Co Inc | reroof. (subject to the cool roof program)Details
reroof. (subject to the cool roof program) | $43,500 |
| May 21, 2019 | Completed final sign-off Dec 2021 | 934 Howard St | Swinerton Builders | tie back extending under 934 howard. documentation for tieback encroachment only. n/a for maher. ref. main permit #2019-0521-1281.Details
tie back extending under 934 howard. documentation for tieback encroachment only. n/a for maher. ref. main permit #2019-0521-1281. | |
| Dec 13, 2018 | Completed final sign-off Jan 2019 | 934 Howard St | Crime Watch Security Sys Llc | installation of a new fire alarm system with sprinkler monitoring, ref pa# 201708296223, ref sprinkler# 201803163848Details
installation of a new fire alarm system with sprinkler monitoring, ref pa# 201708296223, ref sprinkler# 201803163848 | $13,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2019 | 934 Howard St | K Bali Construction | to obtain final inspection for work approved under pa 2013-0416-4687. all work is complete.Details
to obtain final inspection for work approved under pa 2013-0416-4687. all work is complete. | |
| May 16, 2018 | Completed final sign-off Jan 2019 | 934 Howard St | Stevenson Mechanical Inc | 3 rooftop hvac units, 2 heat pump split systemsDetails
3 rooftop hvac units, 2 heat pump split systems | $145,000 |
| Mar 29, 2018 | Completed final sign-off Jan 2019 | 934 Howard St | Jalilie Electric Inc /Ridgeway Electric | install shell lighting and power for future t.i. space in existing building. n/a for maher.Details
install shell lighting and power for future t.i. space in existing building. n/a for maher. | $70,000 |
| Mar 16, 2018 | Completed final sign-off Sep 2018 | 934 Howard St | Freedom Fire Protection Inc. | fire sprinkler system, relocating 2 heads and installing 20 new headsDetails
fire sprinkler system, relocating 2 heads and installing 20 new heads | $7,121 |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 934 Howard St | street space permit - renewal of permit #201708296223Details
street space permit - renewal of permit #201708296223 | ||
| Aug 29, 2017 | Completed final sign-off Jan 2019 | 934 Howard St | K Bali Construction | base bldg improvement of e 3 story bldg. replace e freight elevator , new accessible passenger elevator, new partitoins for new tenant spaces and monor storefront modification on mary street facade. mep fire sprinkler shall be design build and under sep permitDetails
base bldg improvement of e 3 story bldg. replace e freight elevator , new accessible passenger elevator, new partitoins for new tenant spaces and monor storefront modification on mary street facade. mep fire sprinkler shall be design build and under sep permit | $160,000 |
| Feb 3, 2015 | Completed final sign-off Jun 2015 | 934 Howard St | Doorman Property Management | tenant improvements at 1st flr only: new accessible break room, new conference room, expansion of accessible bathrooms & shower; new exterior level landing, new signage at restrooms; mechanical, elec & sprlr under separate permits; maher n/aDetails
tenant improvements at 1st flr only: new accessible break room, new conference room, expansion of accessible bathrooms & shower; new exterior level landing, new signage at restrooms; mechanical, elec & sprlr under separate permits; maher n/a | $10,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2022 | 934 Howard St | International Fire Equip | fire sprinkler add air cap to drain(basement). 2nd fl partially ofset main and add 5 sprinler heads in showers, 3rd fl add 5 sprinler heads in shower s and 2 in officeDetails
fire sprinkler add air cap to drain(basement). 2nd fl partially ofset main and add 5 sprinler heads in showers, 3rd fl add 5 sprinler heads in shower s and 2 in office | $5,000 |
| May 20, 2013 | Completed final sign-off Sep 2013 | 934 Howard St | Remodel 4 Less | relocation of office functions to ground floor and necessary work to comply with ground floor b occupancy. they include enclosing the stairs, enclosing the freight elevator, provide ada handrails & signage.Details
relocation of office functions to ground floor and necessary work to comply with ground floor b occupancy. they include enclosing the stairs, enclosing the freight elevator, provide ada handrails & signage. | $8,000 |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 934 Howard St | demolition (interior). existing vacant building. reconfigure non-accessible bathrooms installation of showers. full access compliance will be provided at future tenant improvement permit per sfbc ab-017.Details
demolition (interior). existing vacant building. reconfigure non-accessible bathrooms installation of showers. full access compliance will be provided at future tenant improvement permit per sfbc ab-017. | $28,000 | |
| Mar 13, 2009 | Never finaled issued Mar 2009, no final | 934 Howard St | mta pkg (50' - 5 days)Details
mta pkg (50' - 5 days) | ||
| Mar 5, 2009 | Completed final sign-off Apr 2009 | 934 Howard St | Westech Roofing Co | reroofing.Details
reroofing. | $27,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K Bali Construction (2), Crime Watch Security Sys Llc, Doorman Property Management, Freedom Fire Protection Inc., International Fire Equip, Jalilie Electric Inc /Ridgeway Electric, R B Roofing Co Inc, Remodel 4 Less, Stevenson Mechanical Inc, Swinerton Builders, Westech Roofing Co
- Architects
- Steve Suzuki (2), Harvey J Hacker, Marc Dimalanta
- Engineers
- E.S. Lindquist
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.