Block 1217, lot 078
332 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 8 bedrooms, 2 bathrooms
- Building
- 3,590 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 332 Divisadero St | new joist & patched floor at residential unit level 2 at abandoned stairway.Details
new joist & patched floor at residential unit level 2 at abandoned stairway. | $12,000 | |
| Jun 1, 2026 | In progress issued Jun 2026 | 332 Divisadero St | D'angeles Construction | remove laundry at under stair storage. remove half bath at top floor.Details
remove laundry at under stair storage. remove half bath at top floor. | $2,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 332 Divisadero St | Freedom Fire Protection Inc. | 2nd & 3rd fl ref pa #2025-1125-0385: fire sprinkler as builtDetails
2nd & 3rd fl ref pa #2025-1125-0385: fire sprinkler as built | |
| Nov 25, 2025 | In progress issued Nov 2025 | 332 Divisadero St | Freedom Fire Protection Inc. | installing fire sprinkler system on the 2nd and 3rd floor. each floor will have its own dedicated service for a total of 52 heads. ref 202504224973Details
installing fire sprinkler system on the 2nd and 3rd floor. each floor will have its own dedicated service for a total of 52 heads. ref 202504224973 | $19,260 |
| Apr 22, 2025 | In progress issued Jul 2025 | 334 Divisadero St | D'angeles Construction | opening middle wall removal on 2nd and 3rd floor. (remodel)architectural alterations to 2nd and 3rd floor. for both units: convert laundry to full bath, relocate laundry, add one bath. relocate kitchenDetails
opening middle wall removal on 2nd and 3rd floor. (remodel)architectural alterations to 2nd and 3rd floor. for both units: convert laundry to full bath, relocate laundry, add one bath. relocate kitchen | $30,000 |
| Jan 29, 2025 | In progress issued Jan 2025 | 332 Divisadero St | D'angeles Construction | 1.remove approx 400 sq ft. of sheet rock from property line walls in 332 and 334 (2nd and 3rd floors). 2.replace dryrotted framing in kind. 3.re-cover walls with 5/8" type x sheet rock. not visible from the street. all interior work.Details
1.remove approx 400 sq ft. of sheet rock from property line walls in 332 and 334 (2nd and 3rd floors). 2.replace dryrotted framing in kind. 3.re-cover walls with 5/8" type x sheet rock. not visible from the street. all interior work. | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D'angeles Construction (3), Freedom Fire Protection Inc. (2)
- Engineers
- Fareed Alam Himmati
Find contractors for work like this