Block 0334, lot 005
400 Eddy St
- City’s use
- Commercial Hotel
- Built
- 1910
- Stories
- 6
- Units
- 65
- Rooms
- 35 bathrooms
- Building
- 23,470 sq ft
- Lot
- 3,500 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2017 | Never finaled issued Nov 2017, no final | 400 Eddy St | street space permit & mtaDetails
street space permit & mta | ||
| Jan 4, 2017 | Never finaled issued Jan 2017, no final | 317 Leavenworth St | Discovery Carpet And Flooring | units 101, 102 : work in residential unit #101,102: replace damaged drwall of area 3'x4' at each unit due to water leaking at sink. all new sheetrock to be replaced and reinstalled shall be 5/8" type x gyp. board. drywall only.Details
units 101, 102 : work in residential unit #101,102: replace damaged drwall of area 3'x4' at each unit due to water leaking at sink. all new sheetrock to be replaced and reinstalled shall be 5/8" type x gyp. board. drywall only. | $450 |
| Nov 3, 2016 | Never finaled issued Mar 2017, no final | 317 Leavenworth St | San Francisco Fire Protection | like for like voluntary fire system replacement w/elev modernization. replace e. control panel, smoke det & pull stations w/new at the same location. install relay modules for new elev recall, install monitor modules for sprinkler devices, ansul system & duct detectors tie-in ex 6 bells to new panelDetails
like for like voluntary fire system replacement w/elev modernization. replace e. control panel, smoke det & pull stations w/new at the same location. install relay modules for new elev recall, install monitor modules for sprinkler devices, ansul system & duct detectors tie-in ex 6 bells to new panel | $7,500 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 317 Leavenworth St | Discovery Carpet And Flooring | next to sink, replace tiles, install harddle backer, install wall tile, put grout and sealer. maximum 50 ft. to repair tile due to water damage. repair/maintenance only no plans or da checklist required.Details
next to sink, replace tiles, install harddle backer, install wall tile, put grout and sealer. maximum 50 ft. to repair tile due to water damage. repair/maintenance only no plans or da checklist required. | $900 |
| Jun 30, 2016 | Completed final sign-off Jul 2016 | 400 Eddy St | B B J Electric, Inc | revision to 201605238066 add monitor modules for flow and tamper in basement for restaurantDetails
revision to 201605238066 add monitor modules for flow and tamper in basement for restaurant | $1,000 |
| May 23, 2016 | Never finaled issued May 2016, no final | 400 Eddy St | B B J Electric, Inc | add 3 monitor modules to 2 duct detectors and 1 ansul system. ref arch pa# 201510190065, ref ul300 fire pa# 201605056596Details
add 3 monitor modules to 2 duct detectors and 1 ansul system. ref arch pa# 201510190065, ref ul300 fire pa# 201605056596 | $3,800 |
| May 5, 2016 | Completed final sign-off Jul 2016 | 400 Eddy St | International Fire Equip | install ul300 fire system. ref pa 2015-1019-0065Details
install ul300 fire system. ref pa 2015-1019-0065 | $3,500 |
| May 3, 2016 | Completed final sign-off Jul 2016 | 400 Eddy St | K Bali Construction | title 24 only. ref arch #201602038716. n/a for maherDetails
title 24 only. ref arch #201602038716. n/a for maher | $5,000 |
| Apr 29, 2016 | Never finaled issued Apr 2016, no final | 400 Eddy St | street space permit and mta permit - rnewal of permit # 201510190065Details
street space permit and mta permit - rnewal of permit # 201510190065 | ||
| Apr 18, 2016 | Completed final sign-off Jun 2016 | 317 Leavenworth St | Occidental Express | to comply with nov#201611274 dated 4/11/16. restore access with existing stairs from basement to first floor.Details
to comply with nov#201611274 dated 4/11/16. restore access with existing stairs from basement to first floor. | $2,500 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 317 Leavenworth St | Freedom Fire Protection Inc. | installation of fire sprinklers, 64 heads ref pa 2015-1019-0065 to basement and ground floor only. restaurant space (a-2) in hotel (r-1)Details
installation of fire sprinklers, 64 heads ref pa 2015-1019-0065 to basement and ground floor only. restaurant space (a-2) in hotel (r-1) | $15,000 |
| Feb 3, 2016 | Completed final sign-off Jul 2016 | 400 Eddy St | K Bali Construction | mechanical revision to 201510190065Details
mechanical revision to 201510190065 | $1,000 |
| Dec 18, 2015 | Never finaled issued Dec 2015, no final | 317 Leavenworth St | street spaceDetails
street space | ||
| Oct 29, 2015 | Never finaled issued Oct 2015, no final | 317 Leavenworth St | streetspaceDetails
streetspace | ||
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 400 Eddy St | K Bali Construction | build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units.Details
build out kitchen, restroom , and bar on ground floor. buildout 3 restrooms and bar in basement & storage rooms. new finishes, equipment and lighting. replace extg windows and doors on facade. replace extg tile w/brick on facade. no work on residential units. | $800,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 317 Leavenworth St | Occidental Express | comply w/nov #201571331 (repair walls & ceiling w/drywall where exposed for plumbing repairs). nov# 201544261 (remove rust on stell bean in basement & paint) sidewalk repair to fix basement leak.Details
comply w/nov #201571331 (repair walls & ceiling w/drywall where exposed for plumbing repairs). nov# 201544261 (remove rust on stell bean in basement & paint) sidewalk repair to fix basement leak. | $2,000 |
| Dec 18, 2014 | Never finaled issued Dec 2014, no final | 400 Eddy St | aka 317 leavenworth street. g/f and basement - all interior work -demo plaster & lathe walls throughout approx 7000 sf; demo 1 mezzanine, demo tile flooring throughout, comply with nov 201405402 dated 10/31/2014. future ti & life safety under separate permit. ab-017 applies.Details
aka 317 leavenworth street. g/f and basement - all interior work -demo plaster & lathe walls throughout approx 7000 sf; demo 1 mezzanine, demo tile flooring throughout, comply with nov 201405402 dated 10/31/2014. future ti & life safety under separate permit. ab-017 applies. | $34,000 | |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 317 Leavenworth St | street space for 400 eddy street: 0334/005.Details
street space for 400 eddy street: 0334/005. | ||
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 317 Leavenworth St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 17, 2010 | Completed final sign-off Apr 2011 | 317 Leavenworth St | installation of emergency/fire evacuationmap on 6 residential floors. draft plan attached.Details
installation of emergency/fire evacuationmap on 6 residential floors. draft plan attached. | $484 | |
| May 28, 2009 | Completed final sign-off Sep 2009 | 317 Leavenworth St | change of use from tourist hotel to sro rooms af all 65 rooms per dbi approval of permit to convert (3-11-09) & planning dept. variance decision (case # 2007.1164v, 7/10/08. subject conversion in conjunction with conversion at 140 ellis st. per planning commision motion 17610 (6/5/08).Details
change of use from tourist hotel to sro rooms af all 65 rooms per dbi approval of permit to convert (3-11-09) & planning dept. variance decision (case # 2007.1164v, 7/10/08. subject conversion in conjunction with conversion at 140 ellis st. per planning commision motion 17610 (6/5/08). | ||
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 317 Leavenworth St | San Francisco Fire Protection | add 1 fire panel to monitor new sprinkler system. add 18 point modules to monitor water flows and tamper switches and existing panel. water flow will back trip existing audibles.Details
add 1 fire panel to monitor new sprinkler system. add 18 point modules to monitor water flows and tamper switches and existing panel. water flow will back trip existing audibles. | $2,500 |
| Dec 8, 2008 | Completed final sign-off Jul 2009 | 317 Leavenworth St | Polytec Construction Co.*** See Notes* | fire sprinkler work. install fire sprinkler system for entire building. 145 pendents, 105 sizewall. total of 250 heads.Details
fire sprinkler work. install fire sprinkler system for entire building. 145 pendents, 105 sizewall. total of 250 heads. | $55,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K Bali Construction (3), B B J Electric, Inc (2), Discovery Carpet And Flooring (2), Occidental Express (2), San Francisco Fire Protection (2), Freedom Fire Protection Inc., International Fire Equip, Polytec Construction Co.*** See Notes*
- Architects
- Nate Williams
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.