Gwenyth R. Searer
- Listed as
- designer, engineer
- Firm
- Wje Associates, Inc.
- Based in
- Emeryville
- On San Francisco permits
- Nov 2004 to Oct 2023
14 permits since 2000 (engineer on 13 permits, designer on 1 permit): 9 completed, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 394 Pacific Av | Gci, Inc | 2-3/f: install 7-phone booths, accessibility is provided w/phone rooms directly adjacent to hpone booths. sprinkler/life safety deferredDetails
2-3/f: install 7-phone booths, accessibility is provided w/phone rooms directly adjacent to hpone booths. sprinkler/life safety deferred | $47,000 |
| Dec 30, 2020 | Completed final sign-off Nov 2021 | 942 Market St | Rainbow Waterproofing & Restor | rooftop: add 6 new fall arrest anchorage and improve fall protection by adding railings where the (e) parapet is less than 42in high. note that the railing is set back fromthe edge of the building and will not impact the facades.Details
rooftop: add 6 new fall arrest anchorage and improve fall protection by adding railings where the (e) parapet is less than 42in high. note that the railing is set back fromthe edge of the building and will not impact the facades. | $100,000 |
| Dec 15, 2020 | Never finaled issued Apr 2021, no final | 240 Stockton St | Access Systems & Solutions Inc | on main roof, install 4 new wall mounted anchors. install 1 5/16" extension to top of existing guardrails to increase total height to the 42" requirement, and install one 5'6" section of 42" guardrail per plan.Details
on main roof, install 4 new wall mounted anchors. install 1 5/16" extension to top of existing guardrails to increase total height to the 42" requirement, and install one 5'6" section of 42" guardrail per plan. | $29,290 |
| Mar 11, 2020 | Completed final sign-off Apr 2021 | 600 California St | Novo Construction Inc | structural work to add independent fale arrest anchorage to the 11th fl roof.Details
structural work to add independent fale arrest anchorage to the 11th fl roof. | $25,000 |
| Nov 19, 2018 | Completed final sign-off Mar 2019 | 150 Post St | J M L Engineering & Construction | remove existing fire escape steel stair & landing, repair & re-install.Details
remove existing fire escape steel stair & landing, repair & re-install. | $95,600 |
| Feb 7, 2018 | Completed final sign-off Jun 2019 | 100 California St | Principal Builders Inc. | addition of perimeter railing extension for roof. maher naDetails
addition of perimeter railing extension for roof. maher na | $50,000 |
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 555 Pine St | American Incorporated | add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher naDetails
add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher na | $50,000 |
| May 13, 2016 | Completed final sign-off Jul 2017 | 2266 California St | Plant Construction Co, Lp | revision to north reaction wall, piers foundations to pa# 200701302909Details
revision to north reaction wall, piers foundations to pa# 200701302909 | |
| Nov 17, 2014 | Completed final sign-off May 2017 | 1045 Taraval St | Ward-Tek Inc. | repair of fire damage (roof and floor); replacement of front entry door (disabled access) determine occupant load for a2/require place of assembly permitDetails
repair of fire damage (roof and floor); replacement of front entry door (disabled access) determine occupant load for a2/require place of assembly permit | $130,000 |
| Jun 2, 2014 | Completed final sign-off May 2016 | 1 Bush St | Access Systems & Solutions Inc | install window washing equipment and guardrails at the mian roof level.Details
install window washing equipment and guardrails at the mian roof level. | $350,000 |
| Mar 25, 2014 | Expired or cancelled cancelled Jan 2026 | 1 Bush St | install guardrails & window washing equipment on the roof.Details
install guardrails & window washing equipment on the roof. | $350,000 | |
| Aug 22, 2013 | Completed final sign-off Apr 2015 | 1450 Post St | reroofing and removal of "mangard" roof structure. strenghening of parapet and addition of safety railing. also see attachment.Details
reroofing and removal of "mangard" roof structure. strenghening of parapet and addition of safety railing. also see attachment. | $1,100,000 | |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 2720 Taylor St | Turner Construction Co | renew pa# 2004/11/16/9350 for final inspection only. (basement, 1st, 2nd, 3rd & 4th floor) sp insp req.Details
renew pa# 2004/11/16/9350 for final inspection only. (basement, 1st, 2nd, 3rd & 4th floor) sp insp req. | |
| Nov 16, 2004 | Expired or cancelled expired Jun 2008 | 2720 Taylor St | fiberwrap columns, construction of concrete shearwalls, column capitals, epoxy injectionDetails
fiberwrap columns, construction of concrete shearwalls, column capitals, epoxy injection | $1,600,000 |