Brian Kehoe
- License
- S3398
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3398 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Wje
- Based in
- Emeryville
- On San Francisco permits
- Nov 2004 to Oct 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (2), Oliver & Company Inc., Rainbow Waterproofing & Restor, Western Waterproofing/Brisk Wp
- Architects
- Matt Stromberg, Timothy Haley
- Engineers
- Emily Guglielmo, Eunice Yoon, Gwenyth R. Searer, Jason Lau
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 4
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2026 | In progress filed Oct 2026, not yet issued | 1065 Sutter St | Rainbow Waterproofing & Restor | ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installedDetails
ref 202505206819: installatin of carbon fiber reinforcing on select roof level beam support. new 2x carbon fiber reinforcing will be installed on top of existing beams to add flexure strengh at the roof level on top of roof slab between columns. new 2xcarbon fiber reinforcing will be installed | $163,740 |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 755 Ashbury St | Plant Construction Co, Lp | priority process. voluntary seismic upgrade. vertical supplemental seismic resistance. diaphgram strengthening and connection. roofing.Details
priority process. voluntary seismic upgrade. vertical supplemental seismic resistance. diaphgram strengthening and connection. roofing. | $3,700,000 |
| Sep 8, 2021 | Completed final sign-off Nov 2023 | 755 Ashbury St | Plant Construction Co, Lp | priority processing. this project is limited to the addition of out of plane floor to wall anchorage and out of plane bracing in selected areas where the previously designed bracing was omitted during construction of the 1996 seismic retrofit.no floor layout changes.Details
priority processing. this project is limited to the addition of out of plane floor to wall anchorage and out of plane bracing in selected areas where the previously designed bracing was omitted during construction of the 1996 seismic retrofit.no floor layout changes. | $160,000 |
| Jan 14, 2020 | Completed final sign-off Jan 2022 | 1250 Jones St | Western Waterproofing/Brisk Wp | exterior concrete patching & coating of an (e) concrete clad high rise. to comply with nov 201906651.Details
exterior concrete patching & coating of an (e) concrete clad high rise. to comply with nov 201906651. | $4,958,750 |
| Sep 20, 2018 | Completed final sign-off Feb 2021 | 1830 17th St | Oliver & Company Inc. | remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include.Details
remodel of (e) 2 story building. no change of use. no historic re source. partial roof collapse & notice of violation #201845721 & correction notice require full roof replacement. update interior spaces & accessibility upgrade and include. | $1,000,000 |
| Nov 16, 2004 | Expired or cancelled expired Jun 2008 | 2720 Taylor St | fiberwrap columns, construction of concrete shearwalls, column capitals, epoxy injectionDetails
fiberwrap columns, construction of concrete shearwalls, column capitals, epoxy injection | $1,600,000 |