Western Waterproofing/Brisk Wp
- Based in
- St. Louis
- On San Francisco permits
- Jul 2009 to May 2024
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | Completed final sign-off Aug 2024 | 989 Market St | installation of steel channel to reinforce corroded column. west facade only was 100 percent tuckpointed.Details
installation of steel channel to reinforce corroded column. west facade only was 100 percent tuckpointed. | $717,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 650 Townsend St | re-paint 13 windows ledges using gacoflex urethane coating.Details
re-paint 13 windows ledges using gacoflex urethane coating. | $2,000 |
| Mar 20, 2024 | In progress filed Mar 2024, not yet issued | 650 Townsend St | re-paint 13 window ledges using gacoflex urethane coating.Details
re-paint 13 window ledges using gacoflex urethane coating. | $2,000 |
| Jun 9, 2022 | Never finaled issued Jun 2022, no final | 200 Kearny St | repair cracked terra cotta blocks on the 3rd fl water table as per specifications and drawings. waterproof as per attached specification & drawings.Details
repair cracked terra cotta blocks on the 3rd fl water table as per specifications and drawings. waterproof as per attached specification & drawings. | $25,459 |
| Jan 14, 2020 | Completed final sign-off Jan 2022 | 1250 Jones St | exterior concrete patching & coating of an (e) concrete clad high rise. to comply with nov 201906651.Details
exterior concrete patching & coating of an (e) concrete clad high rise. to comply with nov 201906651. | $4,958,750 |
| Sep 10, 2019 | Completed final sign-off Nov 2019 | 973 Market St | proposed repair in-kind of deteriorated historic brick on stevenson street (rear elevation) approximately 45sf total area. nov#201954811 located at column between loading docks (area approx. 4' x 10').Details
proposed repair in-kind of deteriorated historic brick on stevenson street (rear elevation) approximately 45sf total area. nov#201954811 located at column between loading docks (area approx. 4' x 10'). | $10,000 |
| Aug 15, 2018 | Completed final sign-off Jun 2019 | 171 02nd St | comply with nov 201842221; repair damaged brick facade facing 2nd street.Details
comply with nov 201842221; repair damaged brick facade facing 2nd street. | $40,000 |
| May 10, 2010 | Completed final sign-off Jun 2017 | 685 Market St | install additional brick ties as part of masonry joint repairs per permit 200912314048 to interior courtyard per plan.Details
install additional brick ties as part of masonry joint repairs per permit 200912314048 to interior courtyard per plan. | $20,000 |
| Dec 31, 2009 | Expired or cancelled expired Nov 2013 | 685 Market St | install brick ties as part of masonry joint repairs per permit #2009-1118-1568, dated 11-18-09 to interior courtyard per plan.Details
install brick ties as part of masonry joint repairs per permit #2009-1118-1568, dated 11-18-09 to interior courtyard per plan. | $20,000 |
| Nov 18, 2009 | Expired or cancelled expired Nov 2013 | 685 Market St | inspect interior light courtyard non load bearing brick walls. repaint and repair mortar joint cracks where they are observed. no widow,door workDetails
inspect interior light courtyard non load bearing brick walls. repaint and repair mortar joint cracks where they are observed. no widow,door work | $15,000 |
| Sep 10, 2009 | Completed final sign-off Feb 2010 | 425 Bush St | deteriorated stucco is to be removed. brick behind the stucco is to be inspected and repaired as necessary. stuuco is to be replaced over the brick in the patch aresas. work include one cornice and upper parapet repairs. claude lane elevation of the bldg. is to be painted.Details
deteriorated stucco is to be removed. brick behind the stucco is to be inspected and repaired as necessary. stuuco is to be replaced over the brick in the patch aresas. work include one cornice and upper parapet repairs. claude lane elevation of the bldg. is to be painted. | $73,000 |
| Jul 28, 2009 | Never finaled issued Jul 2009, no final | 222 Sutter St | coat sidewalk, clean sidewalk, re-coat surfarp. the area is an alley off 222 sutter, where mark lane & harlan plaace meet. approx area 23'x8' no structural work.Details
coat sidewalk, clean sidewalk, re-coat surfarp. the area is an alley off 222 sutter, where mark lane & harlan plaace meet. approx area 23'x8' no structural work. | $2,500 |