Block 3707, lot 051
685 Market St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 10
- Rooms
- 18 bathrooms
- Building
- 219,831 sq ft
- Lot
- 22,800 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | Completed final sign-off Aug 2026 | 685 Market St | Martin Sign Co Inc. | the fabrication & installation of (4) acrylic evacuation maps for 4th floor.Details
the fabrication & installation of (4) acrylic evacuation maps for 4th floor. | $1,000 |
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 685 Market St | Sc Builders, Inc | 4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantryDetails
4/f: full office t.i, new non-structural partitions, ceilings and finishes, employee break room/pantry | $2,500,000 |
| Jan 20, 2026 | Completed final sign-off Apr 2026 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 8th fl -as-built for 202504033518 as built adding 5 additional speaker strobe per building ref# 202601063283Details
8th fl -as-built for 202504033518 as built adding 5 additional speaker strobe per building ref# 202601063283 | $3,500 |
| Jan 20, 2026 | Completed final sign-off Apr 2026 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 9th fl - bldg pa original 202504013519 as built to original adding additional 5 speaker strobe for 5 additional phone boothsDetails
9th fl - bldg pa original 202504013519 as built to original adding additional 5 speaker strobe for 5 additional phone booths | $3,500 |
| Jan 6, 2026 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213Details
8th floor: install (5) phone booths. 9th floor: install (5) phone booths. 10th floor: install (5) phone booths. ref#: 202501138213 | $120,000 |
| Dec 16, 2025 | Completed final sign-off Feb 2026 | 685 Market St | Martin Sign Co Inc. | 7th floor: installation of 4 evacuation maps.Details
7th floor: installation of 4 evacuation maps. | $900 |
| Dec 12, 2025 | Completed final sign-off Dec 2025 | 685 Market St | Ayoob & Peery Plumbing Co Inc | 7th fl: record as built for pa #2025-0917-5459- fire sprinklers. add seismic bracing and clarity phone booth locations. job #25-655. ref pa #2025-0728-1741Details
7th fl: record as built for pa #2025-0917-5459- fire sprinklers. add seismic bracing and clarity phone booth locations. job #25-655. ref pa #2025-0728-1741 | |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope.Details
7th flr. revision to 202507281741 for dph approval of pantry. no exterior scope. | $2,000 |
| Oct 3, 2025 | Completed final sign-off Nov 2025 | 685 Market St | Sc Builders, Inc | installation of non structural partition and security door at lower levelDetails
installation of non structural partition and security door at lower level | $19,500 |
| Sep 24, 2025 | In progress issued Sep 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 7/fl- fire alarm ti - adding 1 power supply, 2 relay modules, 5 smoke detectors, 6 duct detectors and 63 speakers strobes to (e) notifier nfss2-3030 fire alarm system. ref: 202509084804Details
7/fl- fire alarm ti - adding 1 power supply, 2 relay modules, 5 smoke detectors, 6 duct detectors and 63 speakers strobes to (e) notifier nfss2-3030 fire alarm system. ref: 202509084804 | $46,950 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 685 Market St | Ayoob & Peery Plumbing Co Inc | 7th fl ref pa# 2025-0728-1741: add 31 relocate 53 change 97 fire sprinkler per ti job #25-655Details
7th fl ref pa# 2025-0728-1741: add 31 relocate 53 change 97 fire sprinkler per ti job #25-655 | $75,088 |
| Sep 16, 2025 | In progress issued Sep 2025 | 20 Annie St | addressing permit only. add the address 20 annie street. refer to pa #202503283304. link to parcel 3707/051.Details
addressing permit only. add the address 20 annie street. refer to pa #202503283304. link to parcel 3707/051. | ||
| Sep 12, 2025 | In progress issued Sep 2025 | 685 Market St | Martin Sign Co Inc. | floor 1, the fabrication of (6) acrylic evacuation maps for 1st floor.Details
floor 1, the fabrication of (6) acrylic evacuation maps for 1st floor. | $1,200 |
| Sep 12, 2025 | Completed final sign-off Oct 2025 | 685 Market St | Golden Gate Fire Protection Inc | 1st & 2nd fl - demo; relocate 139 uprights on the 2nd floor and relocate 31 uprights on the 1st floorDetails
1st & 2nd fl - demo; relocate 139 uprights on the 2nd floor and relocate 31 uprights on the 1st floor | $42,500 |
| Sep 12, 2025 | In progress issued Sep 2025 | 685 Market St | Martin Sign Co Inc. | floor 2, the fabrication of (3) acrylic evacuation maps for 2nd floor.Details
floor 2, the fabrication of (3) acrylic evacuation maps for 2nd floor. | $600 |
| Sep 12, 2025 | Completed final sign-off Oct 2025 | 685 Market St | Golden Gate Fire Protection Inc | demo; relocate 135 uprights on the 7th flr.Details
demo; relocate 135 uprights on the 7th flr. | $33,750 |
| Sep 8, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | revise 202507281741 & 202508072566 (7th fl. tenant improvement p/a) to document various field/construction related conditions including replacement of previously shown phone rooms with pre-fabricated phone booths.Details
revise 202507281741 & 202508072566 (7th fl. tenant improvement p/a) to document various field/construction related conditions including replacement of previously shown phone rooms with pre-fabricated phone booths. | |
| Sep 3, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | 1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788.Details
1/f- administrative revision to pa#'s 202506188937, 202503283304 abd 202506168762: to memorialize legalization of office use per cua motion m-21788. | |
| Aug 18, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm. t.i. as builts to original fa permit 202504013517 adding 5 speaker strobesDetails
fire alarm. t.i. as builts to original fa permit 202504013517 adding 5 speaker strobes | |
| Aug 11, 2025 | Completed final sign-off Oct 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | fire alarm ti:adding 2 relay modules,2 smoke deterctors,3 duct detectors,1sprinker and 10 speaker strobes to exisiting notfifies nfs-23030 fire alarm system ref arch 202506168762 ref mech 202507181134Details
fire alarm ti:adding 2 relay modules,2 smoke deterctors,3 duct detectors,1sprinker and 10 speaker strobes to exisiting notfifies nfs-23030 fire alarm system ref arch 202506168762 ref mech 202507181134 | $13,750 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 7/f: deffered mep to pa 202507281741.Details
7/f: deffered mep to pa 202507281741. | $1,200,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 685 Market St | Walschon Fire Protection Inc | 2/f: ref pa# 202503283304. as built drawings. modify sprinkler coverrage in elevator lobby. on the 2/fDetails
2/f: ref pa# 202503283304. as built drawings. modify sprinkler coverrage in elevator lobby. on the 2/f | $10,000 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 2ns floor - fire alarm ti to (e) notifier nfs2-3030. adding 1 power supply, 10 smoke detector, 2 in-duct smoke detectors, 12 duct smoke detector, 9 control module, 8 strobes, 55 speaker strobe and 3 speakers. ref# 202506178842Details
2ns floor - fire alarm ti to (e) notifier nfs2-3030. adding 1 power supply, 10 smoke detector, 2 in-duct smoke detectors, 12 duct smoke detector, 9 control module, 8 strobes, 55 speaker strobe and 3 speakers. ref# 202506178842 | $48,000 |
| Jul 28, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred.Details
7th floor: full t.i. in a 10 story hi-rise building. new non structural partitions, ceilings, and finishes. includues a breakroom/pantry. mep deferred. | $2,500,000 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 685 Market St | Walschon Fire Protection Inc | 1st floor. remove(e) sprinkler piping,sprinkler heads(38) & bracing due to structure upgrade.re-install piping,sprinkler heads and sway bracings.demo 38 sprinklers,re-installation 42 sprinkler heads.Details
1st floor. remove(e) sprinkler piping,sprinkler heads(38) & bracing due to structure upgrade.re-install piping,sprinkler heads and sway bracings.demo 38 sprinklers,re-installation 42 sprinkler heads. | $15,000 |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | level 1: deferred mep for permit 202506168762Details
level 1: deferred mep for permit 202506168762 | $257,040 |
| Jun 24, 2025 | In progress issued Sep 2025 | 685 Market St | Drake Construction | #130: new exterior signage over suite entrance. non-electrical (junbi matcha & tea)Details
#130: new exterior signage over suite entrance. non-electrical (junbi matcha & tea) | $1,000 |
| Jun 20, 2025 | In progress issued Jun 2025 | 685 Market St | Walschon Fire Protection Inc | 2nd/f: modify e) sprinkler. relocate & add sprinkler heads due to new walls & ceilings. relocated 64 heads, add 18 heads. ref t.i. 202503283304Details
2nd/f: modify e) sprinkler. relocate & add sprinkler heads due to new walls & ceilings. relocated 64 heads, add 18 heads. ref t.i. 202503283304 | $35,657 |
| Jun 18, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit.Details
first/fl: coffee bar rev to 202503283304 & 202506168762. no legalization of sf planning office use on 1/f under this permit. | $40,000 |
| Jun 17, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2nd fl deferred mep for pa # 2025-0410-4123Details
2nd fl deferred mep for pa # 2025-0410-4123 | $1,635,840 |
| Jun 16, 2025 | Completed final sign-off Jul 2026 | 685 Market St | Sc Builders, Inc | 1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttranceDetails
1st/f: t.i. non structural partitions, finishes, & raised platform. work includes (n) 21" platform to courtyard & modifications to (e) railing for new finishes at annie st. enttrance | $999,000 |
| Jun 13, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferredDetails
2nd/f: dhp approval of food service scope at breakroom, fixture & finishes & equipment. ref to t.i. pa# 202504104123. mep deferred | |
| May 22, 2025 | Completed final sign-off Oct 2025 | 685 Market St | Sc Builders, Inc | demo plan for floor 1, 2, and 7 including demo of (e) mep, ceiling, floors, and walls. ti will be on sep permitDetails
demo plan for floor 1, 2, and 7 including demo of (e) mep, ceiling, floors, and walls. ti will be on sep permit | $274,000 |
| May 8, 2025 | In progress issued May 2025 | 685 Market St | Walschon Fire Protection Inc | 9th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138214Details
9th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138214 | $119,492 |
| May 8, 2025 | In progress issued May 2025 | 685 Market St | Walschon Fire Protection Inc | 10th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138215Details
10th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138215 | $35,657 |
| May 8, 2025 | In progress issued May 2025 | 685 Market St | Walschon Fire Protection Inc | 8th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138213Details
8th floor: as built drawings. add sprinkler coverage in new phone booth. 17 heads. ref pa#202501138213 | $115,655 |
| Apr 21, 2025 | In progress issued May 2025 | 685 Market St | Martin Sign Co Inc. | 8th fl - evacuation mapsDetails
8th fl - evacuation maps | $1,000 |
| Apr 21, 2025 | Completed final sign-off Aug 2026 | 685 Market St | Martin Sign Co Inc. | 9th fl - evacuation mapsDetails
9th fl - evacuation maps | $1,000 |
| Apr 21, 2025 | In progress issued May 2025 | 685 Market St | Martin Sign Co Inc. | 10th fl - evacuation mapsDetails
10th fl - evacuation maps | $1,000 |
| Apr 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area.Details
2/fl- ti to floor including addition of restroom, shower rooms, conference , library , alternate work areas and raised platform in all hands area. | $2,500,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 10th fl- structural attachments for phone boothsDetails
10th fl- structural attachments for phone booths | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213Details
8th fl- structural attachments for phone booths. ref p.a. 2025-0113-8213 | $5,000 |
| Apr 7, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 9th fl- structural attachments for phone booths. ref pa 2025-0113-8214Details
9th fl- structural attachments for phone booths. ref pa 2025-0113-8214 | $5,000 |
| Apr 4, 2025 | Completed final sign-off May 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 10/f: f/a t.i. add 1 power supply, 4 relay mods, 4 smoke detectors, 23 duct detectors and 55 speaker-strobes to (e) notifier nfs2-30330 fire alarm system.Details
10/f: f/a t.i. add 1 power supply, 4 relay mods, 4 smoke detectors, 23 duct detectors and 55 speaker-strobes to (e) notifier nfs2-30330 fire alarm system. | $44,485 |
| Apr 1, 2025 | Completed final sign-off May 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 9/f: f/a t.i. add 1 power supply, 4 relay mods, 4 smoke detectors, 22 duct detectors and 55 speaker-strobes to (e) notifier nfs2-3030 fire alarm system. ref arch 202501138214, ref mech 202502190616Details
9/f: f/a t.i. add 1 power supply, 4 relay mods, 4 smoke detectors, 22 duct detectors and 55 speaker-strobes to (e) notifier nfs2-3030 fire alarm system. ref arch 202501138214, ref mech 202502190616 | $44,485 |
| Apr 1, 2025 | Completed final sign-off May 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 8/f: f/a t.i. add 1 power supply, 4 relay mods, 1 yellow pull station, 4 smoke detectors, 25 duct detectors and 55 speaker-strobes to (e) notifier nfs2-3030 fire alarm system.Details
8/f: f/a t.i. add 1 power supply, 4 relay mods, 1 yellow pull station, 4 smoke detectors, 25 duct detectors and 55 speaker-strobes to (e) notifier nfs2-3030 fire alarm system. | $44,485 |
| Mar 28, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard.Details
1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard. | $315,000 |
| Mar 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th /f: mechanical & electrical ref to t.i. 202501138213Details
8th /f: mechanical & electrical ref to t.i. 202501138213 | |
| Mar 10, 2025 | Completed final sign-off Jun 2026 | 685 Market St | Sc Builders, Inc | 2nd/f, ste 200: floor structural renforcement & slab opening for future t.i.Details
2nd/f, ste 200: floor structural renforcement & slab opening for future t.i. | $340,000 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 685 Market St | Walschon Fire Protection Inc | 8th fl- ref pa 2025-0113-8213 modify (e) sprinkler system due to demo ceiling & sprinkler heads. add & relocate sprinkler heads due to new walls and ceiling. demo+118 relocate=14 add=149Details
8th fl- ref pa 2025-0113-8213 modify (e) sprinkler system due to demo ceiling & sprinkler heads. add & relocate sprinkler heads due to new walls and ceiling. demo+118 relocate=14 add=149 | $115,655 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 685 Market St | Walschon Fire Protection Inc | 10/f: modify (e) sprinkler system due to demo ceiling and sprinkler heads. add and relocate sprinkler heads due to new walls and ceiling. no demo. relocate (16). add (47). ref pa# 202501138215.Details
10/f: modify (e) sprinkler system due to demo ceiling and sprinkler heads. add and relocate sprinkler heads due to new walls and ceiling. no demo. relocate (16). add (47). ref pa# 202501138215. | $35,657 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 685 Market St | Walschon Fire Protection Inc | 9th fl- ref pa 2025-0113-8214 modify (e) sprinkler system due to demo ceiling & sprinkler heads. add & relocate sprinkler heads due to new walls and ceiling. demo=118 relocate=14 add=149Details
9th fl- ref pa 2025-0113-8214 modify (e) sprinkler system due to demo ceiling & sprinkler heads. add & relocate sprinkler heads due to new walls and ceiling. demo=118 relocate=14 add=149 | $119,492 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 10/f: mech & electrical for pa-202501138215Details
10/f: mech & electrical for pa-202501138215 | $90,000 |
| Feb 19, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 9/f: mech & electrical for pa-202501138214.Details
9/f: mech & electrical for pa-202501138214. | $90,000 |
| Feb 6, 2025 | Completed final sign-off Feb 2025 | 685 Market St | Rapid Fire Safety&Security Llc Dba Pafa | 1st fl - fire alarm ti deleting 1 pull station and adjusting candela of existing speaker-strobe of existing notifier nfs2-3030 fire alarm systems. ref pa 202411124788Details
1st fl - fire alarm ti deleting 1 pull station and adjusting candela of existing speaker-strobe of existing notifier nfs2-3030 fire alarm systems. ref pa 202411124788 | $2,454 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
9th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
10th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Jan 13, 2025 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom.Details
8th floor: ref demo pa# 202412237315. t.i. const. of non-load bearing partitions. new doors glazing. & hardwhere, new ceilings and lights fixtures. new power data receptacles, new millwork & finishes. modification of existing restrooms. additional of an accessible gender neutral restroom. | $2,288,400 |
| Dec 23, 2024 | Completed final sign-off Apr 2026 | 685 Market St | Sc Builders, Inc | 8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit.Details
8-10/fl- soft demo plan for (e) mep infrastructure, ceilings, floor and walls only. ti will be on separte permit. | $274,608 |
| Nov 12, 2024 | Completed final sign-off Mar 2025 | 685 Market St | suite #130: minor tenant improvement to existing cafe to new tenant cafe, to go only 592 sq ft. no change to path of travel or exterior. new finishes and equipment.Details
suite #130: minor tenant improvement to existing cafe to new tenant cafe, to go only 592 sq ft. no change to path of travel or exterior. new finishes and equipment. | $40,000 | |
| Jul 9, 2024 | Completed final sign-off Jul 2025 | 685 Market St | Eco Fire Sprinklers Inc | install (4) sprinklers on the 4th floor in area at work for tenant improvement ref pa# 2022-0405-1561Details
install (4) sprinklers on the 4th floor in area at work for tenant improvement ref pa# 2022-0405-1561 | $3,000 |
| May 15, 2024 | Completed final sign-off Sep 2024 | 685 Market St | C C I Commercial Construction & Improv | to document furniture clearance for previously completed teant improvement permit 2022-0405-1561Details
to document furniture clearance for previously completed teant improvement permit 2022-0405-1561 | |
| Aug 18, 2023 | Completed final sign-off Dec 2023 | 685 Market St | Peacock Construction | revision 202304044989 new powr and signal devices throughout the space. new 2019 title 24 compliant lighting and controlsDetails
revision 202304044989 new powr and signal devices throughout the space. new 2019 title 24 compliant lighting and controls | |
| Jun 29, 2023 | Completed final sign-off Jul 2023 | 685 Market St | Golden Gate Fire Protection Inc | 1/f: as-built to permit 2023-0505-7160, relocate 5 pendent sprinklers in the restrooms. t.i. ref# 2022-0811-0366Details
1/f: as-built to permit 2023-0505-7160, relocate 5 pendent sprinklers in the restrooms. t.i. ref# 2022-0811-0366 | $1,000 |
| Jun 15, 2023 | Completed final sign-off Dec 2023 | 685 Market St | Peacock Construction | electrical lighting reivsion in restroom. ref bpa#202304044989 & 202208110366Details
electrical lighting reivsion in restroom. ref bpa#202304044989 & 202208110366 | $10,000 |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 685 Market St | Pacific Auxiliary Fire Alarm | fire alarm ti: fiel revision "as-built" record drg submittal. 2 (e) notification devices being replaced w/ new qty (1) strobe and (1) speaker. strobe on (e) notifier nfs2-3030 fa sys. bpa#202208110366, fire pa#202303083268Details
fire alarm ti: fiel revision "as-built" record drg submittal. 2 (e) notification devices being replaced w/ new qty (1) strobe and (1) speaker. strobe on (e) notifier nfs2-3030 fa sys. bpa#202208110366, fire pa#202303083268 | |
| May 5, 2023 | Completed final sign-off Jul 2023 | 685 Market St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 7 pendent sprinklers on the gr fl lobby. ti ref #202208110366Details
fire sprinklers, relocate 7 pendent sprinklers on the gr fl lobby. ti ref #202208110366 | $3,850 |
| Apr 4, 2023 | Completed final sign-off Dec 2023 | 685 Market St | Peacock Construction | lobby: electrical work for t.i. to include new power & signal devices throughout the space, new title 24 compliant lighting and controls, ref pa# 202208110366.Details
lobby: electrical work for t.i. to include new power & signal devices throughout the space, new title 24 compliant lighting and controls, ref pa# 202208110366. | $15,000 |
| Mar 24, 2023 | Never finaled issued Mar 2023, no final | 685 Market St | Bilcor Inc | 4/f: revision to 202212168506. install (2) additional ceiling mount speaker strobes.Details
4/f: revision to 202212168506. install (2) additional ceiling mount speaker strobes. | $1,320 |
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 685 Market St | Pacific Auxiliary Fire Alarm | fire alarm t.i.- adding 1 speaker strobe to existing notifier nfs2-3030 fire alarm systemDetails
fire alarm t.i.- adding 1 speaker strobe to existing notifier nfs2-3030 fire alarm system | $6,512 |
| Jan 31, 2023 | Completed final sign-off Feb 2023 | 685 Market St | Eco Fire Sprinklers Inc | 4th flr - demo (10) fire sprinkler and flex drops, relocate (18) new fire sprinkers and flex drops. ref 202204051561. sep permit to repl old ceiling for "phone 421" to show compliance with astm c635/c636, if applicable.Details
4th flr - demo (10) fire sprinkler and flex drops, relocate (18) new fire sprinkers and flex drops. ref 202204051561. sep permit to repl old ceiling for "phone 421" to show compliance with astm c635/c636, if applicable. | $1,000 |
| Jan 17, 2023 | Completed final sign-off Aug 2023 | 685 Market St | Thomas Swan Sign Co Inc | install (1) new awning with painted sign, sign under separate permit 202301170218Details
install (1) new awning with painted sign, sign under separate permit 202301170218 | $2,000 |
| Jan 17, 2023 | Completed final sign-off Aug 2023 | 685 Market St | Thomas Swan Sign Co Inc | install (1) illuminated double faced projecting sign: "dawn club"Details
install (1) illuminated double faced projecting sign: "dawn club" | $12,000 |
| Jan 17, 2023 | Never finaled issued Feb 2023, no final | 685 Market St | Thomas Swan Sign Co Inc | install (1) painted sign "dawn club" onto awning, awning structure is under permit 202301170215.Details
install (1) painted sign "dawn club" onto awning, awning structure is under permit 202301170215. | $1,000 |
| Jan 12, 2023 | Completed final sign-off May 2023 | 685 Market St | Thomas Swan Sign Co Inc | install 1 illuminated wall sign "the cask"Details
install 1 illuminated wall sign "the cask" | $4,000 |
| Jan 12, 2023 | Completed final sign-off May 2023 | 685 Market St | Thomas Swan Sign Co Inc | install 1 illuminated wall sign "the lark bar"Details
install 1 illuminated wall sign "the lark bar" | $4,000 |
| Dec 16, 2022 | Never finaled issued Dec 2022, no final | 685 Market St | Bilcor Inc | 4/f: install 27 ceiling mount speaker strobes, install 1 smoke detector. install 4 duct detector housing with smoke. install 4 control relays. arch ref pa# 502204051561. mech ref pa# 202206287289Details
4/f: install 27 ceiling mount speaker strobes, install 1 smoke detector. install 4 duct detector housing with smoke. install 4 control relays. arch ref pa# 502204051561. mech ref pa# 202206287289 | $26,400 |
| Nov 9, 2022 | Completed final sign-off Dec 2022 | 685 Market St | Bilcor Inc | provide conduit rework to maintain extg life safety devices on floor. ref #202204041509Details
provide conduit rework to maintain extg life safety devices on floor. ref #202204041509 | $5,280 |
| Nov 1, 2022 | Never finaled issued Nov 2022, no final | 685 Market St | C C I Commercial Construction & Improv | ref bpa#202204051561. electrical work only, provide new lighting & branch circuiting panel, provide new power/signal/branch circuiting to (e) panel, provide ca title 24 compliance forms.Details
ref bpa#202204051561. electrical work only, provide new lighting & branch circuiting panel, provide new power/signal/branch circuiting to (e) panel, provide ca title 24 compliance forms. | $100 |
| Oct 26, 2022 | Completed final sign-off Nov 2023 | 685 Market St | K C Glass Inc | demolition and replacement of approx 15 lin feet of storefront locted in the northern most bay facing market st. storefront opening will be replaced with new storefront of like kind and watch the onfiguration of the adjacent storefront openingDetails
demolition and replacement of approx 15 lin feet of storefront locted in the northern most bay facing market st. storefront opening will be replaced with new storefront of like kind and watch the onfiguration of the adjacent storefront opening | $38,000 |
| Oct 13, 2022 | Completed final sign-off May 2023 | 685 Market St | True North Signs & Graphic Services | install (1) non-illuminated set of vertical letters on base bar at restaurant space: "joyride pizza"Details
install (1) non-illuminated set of vertical letters on base bar at restaurant space: "joyride pizza" | $16,500 |
| Oct 5, 2022 | Never finaled issued Oct 2022, no final | 685 Market St | Pacific Auxiliary Fire Alarm | fire alarm t.i. add 1 relay module for penthouse door. fail safeDetails
fire alarm t.i. add 1 relay module for penthouse door. fail safe | $4,620 |
| Aug 18, 2022 | Completed final sign-off Sep 2022 | 685 Market St | 1/f: space 120 - minor t.i. of (e) restaurant: tenant interior renovation to add new equipment to service area (ventless oven), administrative change of tenant/name. not a change of use. limited restaurant. dph permit. no work under this permit. no layout changes.Details
1/f: space 120 - minor t.i. of (e) restaurant: tenant interior renovation to add new equipment to service area (ventless oven), administrative change of tenant/name. not a change of use. limited restaurant. dph permit. no work under this permit. no layout changes. | $25,000 | |
| Aug 11, 2022 | Completed final sign-off Nov 2024 | 685 Market St | Peacock Construction | lobby - modification of (e) ground fl lobby, elevator lobby, corridor, and includes new millwork, new light fixtures, new guard desk, stone floor, and remedial accessibility work in restrooms.Details
lobby - modification of (e) ground fl lobby, elevator lobby, corridor, and includes new millwork, new light fixtures, new guard desk, stone floor, and remedial accessibility work in restrooms. | $890,000 |
| Jun 28, 2022 | Completed final sign-off Sep 2023 | 685 Market St | C C I Commercial Construction & Improv | 4th fl - demo low side ductwork and replace with new to accommodate new zones. install new wshp to accommodate new zones as required. relocate wshp for ceiling changesDetails
4th fl - demo low side ductwork and replace with new to accommodate new zones. install new wshp to accommodate new zones as required. relocate wshp for ceiling changes | $30,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 685 Market St | Eco Fire Sprinklers Inc | demo 1 existing pendent sprinkler and drops in areas of work. install 137 ssu sprig, existing pendent to be left appropriate for white boxed vacant space. install nfpa wire branch line restaurant on end of branch lines throughout. existing seismic bracing to be updated per nfpa. bpa 202204051561Details
demo 1 existing pendent sprinkler and drops in areas of work. install 137 ssu sprig, existing pendent to be left appropriate for white boxed vacant space. install nfpa wire branch line restaurant on end of branch lines throughout. existing seismic bracing to be updated per nfpa. bpa 202204051561 | $10,000 |
| Jun 1, 2022 | Completed final sign-off Aug 2022 | 685 Market St | Eco Fire Sprinklers Inc | demo (e) pendent sprinklers & drops in area of work. install 137 ssu on sprig, (e) system to be left appropriate for white boxed vacant space. install nfpa wire branch line restaurant on end of branch lines throughout. (e) seismic bracing to be updated per nfpa. ref pa# 202204041509.Details
demo (e) pendent sprinklers & drops in area of work. install 137 ssu on sprig, (e) system to be left appropriate for white boxed vacant space. install nfpa wire branch line restaurant on end of branch lines throughout. (e) seismic bracing to be updated per nfpa. ref pa# 202204041509. | $10,000 |
| May 24, 2022 | Never finaled issued May 2022, no final | 685 Market St | Bilcor Inc | fire life safety: (1) install booster power, 19 ceiling speaker strobes, (5) duct detectors, (5) smoke detector heads, (6) control relay modules, ref pa# 2021-0916-8579.Details
fire life safety: (1) install booster power, 19 ceiling speaker strobes, (5) duct detectors, (5) smoke detector heads, (6) control relay modules, ref pa# 2021-0916-8579. | $23,100 |
| Apr 5, 2022 | Completed final sign-off Sep 2024 | 685 Market St | C C I Commercial Construction & Improv | ste 400. t.i - non load bearing partition, new ceiling grids, lighting, mill work - finishes - modification of existing restrooms - minor accessible requirements.Details
ste 400. t.i - non load bearing partition, new ceiling grids, lighting, mill work - finishes - modification of existing restrooms - minor accessible requirements. | $655,000 |
| Apr 4, 2022 | Completed final sign-off Sep 2023 | 685 Market St | C C I Commercial Construction & Improv | 10th fl: demolition of interior partition walls only. install emergency lighting. (ab-017)Details
10th fl: demolition of interior partition walls only. install emergency lighting. (ab-017) | $150,000 |
| Mar 8, 2022 | Completed final sign-off Aug 2022 | 685 Market St | Ayoob & Peery Plumbing Co Inc | ground floor: add 27 & relocate 41 fire sprinklers per t.i.. mechanical platform: add 6 & relocate 2 & changeout 7 fire sprinklers per t.i.. ref pa# 202109168579.Details
ground floor: add 27 & relocate 41 fire sprinklers per t.i.. mechanical platform: add 6 & relocate 2 & changeout 7 fire sprinklers per t.i.. ref pa# 202109168579. | $28,575 |
| Nov 18, 2021 | Never finaled issued Nov 2021, no final | 685 Market St | Bilcor Inc | g/f lenscrafter: fire life safety as built to pa 2021-0712-4176. reflect heat pump location.Details
g/f lenscrafter: fire life safety as built to pa 2021-0712-4176. reflect heat pump location. | |
| Nov 16, 2021 | Completed final sign-off Nov 2022 | 685 Market St | Pacific Auxiliary Fire Alarm | fire alarm project only. no associated construction or elevator work. voluntary project. functional notifier am2020 fire alarm and evac system is obselete. replacing the fire alarm and evac equipment with notifier nfs2-3030.like for like. all devices are listed for both system and will remainDetails
fire alarm project only. no associated construction or elevator work. voluntary project. functional notifier am2020 fire alarm and evac system is obselete. replacing the fire alarm and evac equipment with notifier nfs2-3030.like for like. all devices are listed for both system and will remain | $140,000 |
| Sep 16, 2021 | Completed final sign-off Nov 2023 | 685 Market St | Dome Construction Corp | t.i. of the extg space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, millwork concrete infill & new restauarant.Details
t.i. of the extg space on the ground floor of 685 market. this consists of nw mep systems and finishes for 2 nw bars & a liquor store. nw wood flooring, wall paneling, ceilings, metal hand rails, millwork concrete infill & new restauarant. | $2,300,000 |
| Jul 22, 2021 | Never finaled issued Aug 2021, no final | 685 Market St | Seamless Fire Protection Llc | suite 110 1st flr: 61 q.r concealed pendents for new suspended ceilings. ref pa 2021-0302-5692Details
suite 110 1st flr: 61 q.r concealed pendents for new suspended ceilings. ref pa 2021-0302-5692 | $7,500 |
| Jul 12, 2021 | Completed final sign-off Nov 2021 | 685 Market St | Bilcor Inc | g/f: install 22 ceiling speaker strobes, r/r 4 ne duct dectors, r/r 4 new cental relays. ref pa 202009144156.Details
g/f: install 22 ceiling speaker strobes, r/r 4 ne duct dectors, r/r 4 new cental relays. ref pa 202009144156. | $14,500 |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 685 Market St | Retail Contracting Group Inc | ste 110: revision to pa# 202009144156. changes to new flooring in scales; rcp; interior elevations; phasing plans/schedules. 4 construction phases total.Details
ste 110: revision to pa# 202009144156. changes to new flooring in scales; rcp; interior elevations; phasing plans/schedules. 4 construction phases total. | |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign j "o oakley" illuminated channel letters, 5.7 sfDetails
install sign j "o oakley" illuminated channel letters, 5.7 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign b "eye exams" illuminated cabinet, 2 sfDetails
install sign b "eye exams" illuminated cabinet, 2 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign i "lens crafters" illuminated channel letters, 4 sfDetails
install sign i "lens crafters" illuminated channel letters, 4 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign e, face-lit ellipse sign, 15 sfDetails
install sign e, face-lit ellipse sign, 15 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign g "eye exams" illuminated channel letter, 1.9 sfDetails
install sign g "eye exams" illuminated channel letter, 1.9 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign f "lens lab" illuminated channel letter, 1.5 sfDetails
install sign f "lens lab" illuminated channel letter, 1.5 sf | $5,000 |
| Jan 22, 2021 | Never finaled issued Jun 2021, no final | 685 Market St | Craddaar Corp Dba Solano Signs | install sign d "ray ban" illuminated matal letters, 5.25 sfDetails
install sign d "ray ban" illuminated matal letters, 5.25 sf | $5,000 |
| Nov 30, 2020 | Completed final sign-off Feb 2022 | 685 Market St | Swinerton Builders | new entry to replace (e) non-operable entry at annie st. work include (n) wood doors with transom window, (n) metal framed partition & ceiling for entry vestibule, (n) window with louvered gille to replace (e), & enclosure between floor & entry landing for required fire separation to basement.Details
new entry to replace (e) non-operable entry at annie st. work include (n) wood doors with transom window, (n) metal framed partition & ceiling for entry vestibule, (n) window with louvered gille to replace (e), & enclosure between floor & entry landing for required fire separation to basement. | $75,000 |
| Nov 9, 2020 | Completed final sign-off Nov 2020 | 685 Market St | Bilcor Inc | fire life safety: install (6) wall mount speaker strobes, (35) ceiling mount speaker strobes, (1) smoke detector with base, (22) duct detectors, (24) control relay modules. reference ti# 2020-0128-2872.Details
fire life safety: install (6) wall mount speaker strobes, (35) ceiling mount speaker strobes, (1) smoke detector with base, (22) duct detectors, (24) control relay modules. reference ti# 2020-0128-2872. | $58,000 |
| Oct 17, 2020 | Expired or cancelled cancelled Jan 2026 | 685 Market St | selective demolition of non-load bearing walls. ceiling tile,lighting & floor finishes (basement). **maher n/a**Details
selective demolition of non-load bearing walls. ceiling tile,lighting & floor finishes (basement). **maher n/a** | $67,000 | |
| Oct 17, 2020 | Completed final sign-off Mar 2021 | 685 Market St | Commercial Interior Builders Inc | 1st floor: selective demolition of non load bearing walls, ceiling tile, lighting and floor finishes.Details
1st floor: selective demolition of non load bearing walls, ceiling tile, lighting and floor finishes. | $47,000 |
| Sep 15, 2020 | Completed final sign-off Nov 2020 | 685 Market St | Ayoob & Peery Plumbing Co Inc | 5th floor tenant improvement: add (46) and relocate (27) sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 201912200135Details
5th floor tenant improvement: add (46) and relocate (27) sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref pa 201912200135 | $30,225 |
| Sep 14, 2020 | Never finaled issued Feb 2021, no final | 685 Market St | Retail Contracting Group Inc | tenant improvement of (e) mercantile space in (e) space. all new restrooms to have od finishes & tile on walls-floor to ceiling (wt-100); lab floor to be tf-110; new ceiling height to remain at 9'5.5" to match existing.Details
tenant improvement of (e) mercantile space in (e) space. all new restrooms to have od finishes & tile on walls-floor to ceiling (wt-100); lab floor to be tf-110; new ceiling height to remain at 9'5.5" to match existing. | $302,000 |
| Jul 21, 2020 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | deferred submittal for pa# 2020-0128-2872 for nanawall structural attachment.Details
deferred submittal for pa# 2020-0128-2872 for nanawall structural attachment. | |
| Jul 20, 2020 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | mep scope for interior improvement to (e) 5th flr office space, kitchen areas and collaboration and conferences spaces (building permit #2020-0128-2872). no change of use, replace restroom finishes and accessories.Details
mep scope for interior improvement to (e) 5th flr office space, kitchen areas and collaboration and conferences spaces (building permit #2020-0128-2872). no change of use, replace restroom finishes and accessories. | $990,000 |
| Mar 13, 2020 | Never finaled issued Mar 2020, no final | 180 Stevenson St | street spaceDetails
street space | ||
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 180 Stevenson St | street spaceDetails
street space | ||
| Jan 30, 2020 | Never finaled issued Jan 2020, no final | 180 Stevenson St | streetspaceDetails
streetspace | ||
| Jan 28, 2020 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | interior ti to existing 5th fl office space, kitchen area, & collaboration and conference spaces. no change of use; replace restroom finishes and accessories. mep deferred.Details
interior ti to existing 5th fl office space, kitchen area, & collaboration and conference spaces. no change of use; replace restroom finishes and accessories. mep deferred. | $1,906,715 |
| Jan 28, 2020 | Completed final sign-off Feb 2022 | 685 Market St | Swinerton Builders | ground floor - core & shell strengthen 3 floor beams fill in slab at existing doorDetails
ground floor - core & shell strengthen 3 floor beams fill in slab at existing door | $50,000 |
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 180 Stevenson St | street spaceDetails
street space | ||
| Dec 20, 2019 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | 5th flr - interior non-structural demo of existing office floor on 5th floor per ab-17. remove existing non load bearing partition, doors, millwork and finishes; remove and replace existing restroom finishes and fixtures in same locations. no ceiling or sprinkler work (under sep permit).Details
5th flr - interior non-structural demo of existing office floor on 5th floor per ab-17. remove existing non load bearing partition, doors, millwork and finishes; remove and replace existing restroom finishes and fixtures in same locations. no ceiling or sprinkler work (under sep permit). | $100,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 180 Stevenson St | street spaceDetails
street space | ||
| Oct 15, 2019 | Completed final sign-off Oct 2019 | 685 Market St | Edison Fire Extinguisher Company Inc | new ul 300 fire suppression system installationDetails
new ul 300 fire suppression system installation | $3,400 |
| Sep 6, 2019 | Completed final sign-off Oct 2019 | 685 Market St | Bilcor Inc | t.i: install 2 ceiling mount speaker- strobes. install 1 monitor module.Details
t.i: install 2 ceiling mount speaker- strobes. install 1 monitor module. | $1,980 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 685 Market St | Potter Fire Protection | relocate 4 fire sprinklers; add 1 sprinkler; ref 201906274551Details
relocate 4 fire sprinklers; add 1 sprinkler; ref 201906274551 | $2,200 |
| Jun 27, 2019 | Completed final sign-off Oct 2019 | 685 Market St | Northern Sun Associates | tenant improvement to remove and replace finishes, new lighting, new partition wall, and new food service equipmentDetails
tenant improvement to remove and replace finishes, new lighting, new partition wall, and new food service equipment | $90,000 |
| May 22, 2018 | Completed final sign-off May 2018 | 685 Market St | Bilcor Inc | basement: as-built for #201710191684 & 201805169261. install (1) wall mount speaker-strobe. maher naDetails
basement: as-built for #201710191684 & 201805169261. install (1) wall mount speaker-strobe. maher na | |
| May 17, 2018 | Never finaled issued May 2018, no final | 685 Market St | Truebeck Construction | to obtain final inspection for work approved under pa# 201511102320. all work is complete.Details
to obtain final inspection for work approved under pa# 201511102320. all work is complete. | |
| May 16, 2018 | Completed final sign-off May 2018 | 685 Market St | Bilcor Inc | fire alarm-revision pa# 201710191684; as-built to reflect strobe's accurate locationDetails
fire alarm-revision pa# 201710191684; as-built to reflect strobe's accurate location | |
| Apr 13, 2018 | Completed final sign-off Apr 2018 | 685 Market St | Ayoob & Peery Plumbing Co Inc | to obtain final inspection for work approved under pa#201601268037. all work is complete.Details
to obtain final inspection for work approved under pa#201601268037. all work is complete. | |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 180 Stevenson St | streetspaceDetails
streetspace | ||
| Oct 19, 2017 | Completed final sign-off Mar 2018 | 685 Market St | Bilcor Inc | renew for final 201505226978. all work is completeDetails
renew for final 201505226978. all work is complete | |
| Oct 19, 2017 | Completed final sign-off May 2018 | 685 Market St | Bilcor Inc | fire alarm ti relocate (1) wall mount speaker strobe, relocate (1) smoke detector with base, remove (1) smoke detector with base, install (1) wall mount speaker strobe. ref pa 2017-0119-7477Details
fire alarm ti relocate (1) wall mount speaker strobe, relocate (1) smoke detector with base, remove (1) smoke detector with base, install (1) wall mount speaker strobe. ref pa 2017-0119-7477 | $1,500 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 685 Market St | Ayoob & Peery Plumbing Co Inc | 1st fl f/s t.i.: relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref #2017-0619-9717. maher naDetails
1st fl f/s t.i.: relocate 2 sprinklers to conform with the new wall/ceiling layout of the t.i. ref #2017-0619-9717. maher na | $450 |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 180 Stevenson St | street space permitDetails
street space permit | ||
| Sep 13, 2017 | Completed final sign-off Mar 2018 | 685 Market St | Ayoob & Peery Plumbing Co Inc | re-route existing fire sprinkler line due to seismic upgrade (add 1 sprinkler head) in basement. ref #201701197477. maher naDetails
re-route existing fire sprinkler line due to seismic upgrade (add 1 sprinkler head) in basement. ref #201701197477. maher na | $525 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 685 Market St | Bilcor Inc | suite 130: fire alarm t.i. install 2 wall mount speaker/strobes. install 1 pull station. ref t.i. pa#2016-1202-4008. maher n/a.Details
suite 130: fire alarm t.i. install 2 wall mount speaker/strobes. install 1 pull station. ref t.i. pa#2016-1202-4008. maher n/a. | $1,500 |
| Jul 31, 2017 | Never finaled issued Nov 2017, no final | 685 Market St | Viking Sign Installations | to erect electric, wall, single faced sign. ** maher: n/a **Details
to erect electric, wall, single faced sign. ** maher: n/a ** | $5,000 |
| Jul 18, 2017 | Completed final sign-off Aug 2017 | 685 Market St | Legacy Mechanical & Energy Services, Inc | renew permit app#201006225018 per fire inspector janice hayes. n/a for maherDetails
renew permit app#201006225018 per fire inspector janice hayes. n/a for maher | |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 180 Stevenson St | street space/mta metersDetails
street space/mta meters | ||
| Jun 21, 2017 | Completed final sign-off Jul 2017 | 685 Market St | Legacy Mechanical & Energy Services, Inc | to obtain final inspection for work approved under pa#201010122682, 201006225018, 201002267186. all work is complete.Details
to obtain final inspection for work approved under pa#201010122682, 201006225018, 201002267186. all work is complete. | |
| Jun 19, 2017 | Completed final sign-off Mar 2018 | 685 Market St | Swinerton Builders | #130 - revision to 201612024008 revised counter layout + 60 sf additional space. maher naDetails
#130 - revision to 201612024008 revised counter layout + 60 sf additional space. maher na | |
| May 19, 2017 | Completed final sign-off Dec 2017 | 685 Market St | Swinerton Builders | replace non-compliant, non structural step with a compliant ada ramp & power operated button. ** maher: n/a **Details
replace non-compliant, non structural step with a compliant ada ramp & power operated button. ** maher: n/a ** | $65,000 |
| Mar 28, 2017 | Never finaled issued Mar 2017, no final | 685 Market St | street spaceDetails
street space | ||
| Feb 8, 2017 | Expired or cancelled cancelled Jan 2026 | 685 Market St | Acco Engineered Systems Inc. Dba Acco En | 1/f- demo and replace existing lobby wshp with like unit. n/a ordinance #155-13Details
1/f- demo and replace existing lobby wshp with like unit. n/a ordinance #155-13 | $10,000 |
| Feb 3, 2017 | Never finaled issued Feb 2017, no final | 685 Market St | street space permit and mta permit - renewal of permit m739727Details
street space permit and mta permit - renewal of permit m739727 | ||
| Jan 19, 2017 | Completed final sign-off Jul 2018 | 685 Market St | Swinerton Builders | voluntary local structural strengthening to improve seismic response. ** maher: n/a **Details
voluntary local structural strengthening to improve seismic response. ** maher: n/a ** | $400,000 |
| Dec 2, 2016 | Completed final sign-off Mar 2018 | 685 Market St | Swinerton Builders | suite #130: t.i. of extg ground floor retail space to accomodate new take out coffee shop. no change to exterior of building. n/a for maher.Details
suite #130: t.i. of extg ground floor retail space to accomodate new take out coffee shop. no change to exterior of building. n/a for maher. | $250,000 |
| Nov 21, 2016 | Completed final sign-off Dec 2016 | 685 Market St | Bilcor Inc | 2nd floor: fire alarm t.i.: reinstall 11 ceiling mount speaker/strobe. remove 5 ceiling mounted speaker/strobes. reinstall 6 duct detectors with base. install 6 control relays. ref app#201609228498. n/a for maherDetails
2nd floor: fire alarm t.i.: reinstall 11 ceiling mount speaker/strobe. remove 5 ceiling mounted speaker/strobes. reinstall 6 duct detectors with base. install 6 control relays. ref app#201609228498. n/a for maher | $6,800 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 685 Market St | street spaceDetails
street space | ||
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 685 Market St | Swinerton Builders | 10/f & roof: repair rust damage at existing mechanical platform. n/a ordinance #155-13Details
10/f & roof: repair rust damage at existing mechanical platform. n/a ordinance #155-13 | $250,000 |
| Nov 2, 2016 | Completed final sign-off Dec 2016 | 685 Market St | R L H Fire Protection Inc | fire sprinkler permit - relocate 37, add 3 and delete 11 pendent sprinklers. remocate 7 and add 1 upright sprinkler on the 2nd floor. ref pa 2016-0922-8498. maher naDetails
fire sprinkler permit - relocate 37, add 3 and delete 11 pendent sprinklers. remocate 7 and add 1 upright sprinkler on the 2nd floor. ref pa 2016-0922-8498. maher na | $11,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 685 Market St | Western Roofing Service | reroofing.Details
reroofing. | $510,450 |
| Sep 22, 2016 | Never finaled issued Oct 2016, no final | 685 Market St | Truebeck Construction | ti suite 220 (e) finishes to remain. suite 290: demo finishes & partitions. new partitions, door/frames, sidelights, finishes, ceiling system/devices light fixtures and electricalDetails
ti suite 220 (e) finishes to remain. suite 290: demo finishes & partitions. new partitions, door/frames, sidelights, finishes, ceiling system/devices light fixtures and electrical | $1,075,000 |
| Aug 10, 2016 | Never finaled issued Aug 2016, no final | 685 Market St | Pribuss Engineering Inc | 5th flr, ste 520: fire sprinkler t.i. under permit 201606281043, relocate 1 + 1 plug. total 1 x 517.32; maher n/aDetails
5th flr, ste 520: fire sprinkler t.i. under permit 201606281043, relocate 1 + 1 plug. total 1 x 517.32; maher n/a | $517 |
| Jul 6, 2016 | Completed final sign-off Jul 2016 | 685 Market St | Bilcor Inc | suite 500 - fire alarm as builts. delete installation of duct smoke detectors and control replay module ref pa 201605046535 maher naDetails
suite 500 - fire alarm as builts. delete installation of duct smoke detectors and control replay module ref pa 201605046535 maher na | $800 |
| Jun 28, 2016 | Completed final sign-off May 2017 | 685 Market St | Swinerton Builders | suite 520: modification of existing tenant improvement to include selective demo and construction of non load bearing partitions, modification to existing millwork, existing grid and new ceiling tiles, new light fixtures, new outlets and finishes. l/s and mep under separate permit.Details
suite 520: modification of existing tenant improvement to include selective demo and construction of non load bearing partitions, modification to existing millwork, existing grid and new ceiling tiles, new light fixtures, new outlets and finishes. l/s and mep under separate permit. | $75,000 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 685 Market St | Bilcor Inc | 5th floor: fire alarm t.i. to install 11 ceiling mount speaker strobes, install 1 duct detector with housing, install 1 control relay module. ref app#201605046535. n/a for maher.Details
5th floor: fire alarm t.i. to install 11 ceiling mount speaker strobes, install 1 duct detector with housing, install 1 control relay module. ref app#201605046535. n/a for maher. | $5,000 |
| Jun 2, 2016 | Completed final sign-off Jun 2016 | 685 Market St | Pribuss Engineering Inc | fire sprinkler ti - relocate 34. maher naDetails
fire sprinkler ti - relocate 34. maher na | $14,497 |
| May 4, 2016 | Completed final sign-off Sep 2016 | 685 Market St | Swinerton Builders | 5th floor: modification of (e) tenant space to include selective demo & construction of non-load bearing partitions, new ceiling grid, tiles, new light fixtures, new doors & frames, new millwork and new sink and finishes. maher naDetails
5th floor: modification of (e) tenant space to include selective demo & construction of non-load bearing partitions, new ceiling grid, tiles, new light fixtures, new doors & frames, new millwork and new sink and finishes. maher na | $443,347 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 685 Market St | True North Signs & Graphic Services | install non-electric wall single faced sign maher naDetails
install non-electric wall single faced sign maher na | $3,000 |
| Mar 22, 2016 | Never finaled issued Apr 2016, no final | 685 Market St | True North Signs & Graphic Services | install non-electric wall single faced sign "monadnock" maher naDetails
install non-electric wall single faced sign "monadnock" maher na | $9,000 |
| Mar 14, 2016 | Completed final sign-off Oct 2017 | 685 Market St | Legacy Mechanical & Energy Services, Inc | replace existing cooling tower, pumps and associated control. maher naDetails
replace existing cooling tower, pumps and associated control. maher na | $88,000 |
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 685 Market St | Bilcor Inc | 2nd flr: fire alarm ti - ref 2015-1021-0414 install 4 ceiling mount speaker/strobes maher naDetails
2nd flr: fire alarm ti - ref 2015-1021-0414 install 4 ceiling mount speaker/strobes maher na | $2,000 |
| Jan 26, 2016 | Completed final sign-off Apr 2018 | 685 Market St | Ayoob & Peery Plumbing Co Inc | to obtain final inspection for work approved under pa#2012-1113-4054 and 2012-1126-4786. all work is complete.Details
to obtain final inspection for work approved under pa#2012-1113-4054 and 2012-1126-4786. all work is complete. | |
| Jan 26, 2016 | Completed final sign-off Jan 2016 | 685 Market St | R L H Fire Protection Inc | 4th floor: fire sprinkler permit. relocate 8 sprinklers ti app#201512155148. n/a for maherDetails
4th floor: fire sprinkler permit. relocate 8 sprinklers ti app#201512155148. n/a for maher | $1,600 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 685 Market St | Bilcor Inc | fire alarm t.i. to install 6 dual monitor modules and 1 wall mount speaker strobe. renewal for app#201308124084.Details
fire alarm t.i. to install 6 dual monitor modules and 1 wall mount speaker strobe. renewal for app#201308124084. | |
| Jan 8, 2016 | Never finaled issued Jan 2016, no final | 685 Market St | street space permit & mtaDetails
street space permit & mta | ||
| Jan 6, 2016 | Never finaled issued Jan 2016, no final | 685 Market St | street spaceDetails
street space | ||
| Dec 15, 2015 | Never finaled issued Dec 2015, no final | 685 Market St | Truebeck Construction | new finishes, ceiling, lighting, furniture, and audio visual. no new walls or doors. suite 437, l/s, mep under separae permit n/a for maher.Details
new finishes, ceiling, lighting, furniture, and audio visual. no new walls or doors. suite 437, l/s, mep under separae permit n/a for maher. | $110,000 |
| Dec 14, 2015 | Completed final sign-off Feb 2016 | 685 Market St | Bilcor Inc | 4th floor fire alarm tenant improvement: install 1 duct detector with housing, install 1 control relay. ref pa #201507222148. n/a maher ordinanceDetails
4th floor fire alarm tenant improvement: install 1 duct detector with housing, install 1 control relay. ref pa #201507222148. n/a maher ordinance | $500 |
| Dec 7, 2015 | Completed final sign-off Jul 2016 | 685 Market St | Ayoob & Peery Plumbing Co Inc | relocate 13 sprinklers, plugg 7 sprinklers, add 3 sprinklers suite 220Details
relocate 13 sprinklers, plugg 7 sprinklers, add 3 sprinklers suite 220 | $4,400 |
| Dec 3, 2015 | Completed final sign-off Jan 2016 | 685 Market St | Pribuss Engineering Inc | 1st flr: fire sprinkler t.i. under permit 201509288160, relocate 9 heads; maher n/aDetails
1st flr: fire sprinkler t.i. under permit 201509288160, relocate 9 heads; maher n/a | $4,630 |
| Nov 20, 2015 | Completed final sign-off Jan 2016 | 685 Market St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 22 pendent sprinklers on the 5/f, relocate 1 upright. t.i. pa#2015-0717-1808. n/a ordinance #155-13Details
fire sprinklers: relocate 22 pendent sprinklers on the 5/f, relocate 1 upright. t.i. pa#2015-0717-1808. n/a ordinance #155-13 | $11,845 |
| Nov 10, 2015 | Completed final sign-off Jul 2018 | 685 Market St | Truebeck Construction | 5th floor: revision to 201509167176. new door between extg space and new space. new card reader, may lock and motion sensor.Details
5th floor: revision to 201509167176. new door between extg space and new space. new card reader, may lock and motion sensor. | $1,000 |
| Nov 9, 2015 | Completed final sign-off Jan 2016 | 685 Market St | Bilcor Inc | 5th floor fire alarm t.i.: install 10 ceiling mount speaker strobes, 2 ceiling mount strobes, 1 duct detector, 1 control relay module. ti 201510260741Details
5th floor fire alarm t.i.: install 10 ceiling mount speaker strobes, 2 ceiling mount strobes, 1 duct detector, 1 control relay module. ti 201510260741 | $5,600 |
| Oct 26, 2015 | Never finaled issued Oct 2015, no final | 685 Market St | Commercial Interior Builders Inc | 5th floor: selective demo of no load bearing partitions, ceiling and light fixture. suite to remain unoccupied until a ti is filed per ab17. maher naDetails
5th floor: selective demo of no load bearing partitions, ceiling and light fixture. suite to remain unoccupied until a ti is filed per ab17. maher na | $20,000 |
| Oct 21, 2015 | Completed final sign-off Sep 2016 | 685 Market St | Swinerton Builders | 2nd floor, suite 220: work include selective demolition ad construction of non-load bearing partitions and demo existing ceiling grid and tile. new light fixtures, new millwork and new finishes. maher n/a.Details
2nd floor, suite 220: work include selective demolition ad construction of non-load bearing partitions and demo existing ceiling grid and tile. new light fixtures, new millwork and new finishes. maher n/a. | $255,591 |
| Oct 15, 2015 | Completed final sign-off Oct 2015 | 685 Market St | Bilcor Inc | fire alarm t.i.: install 31 ceiling mount speaker/strobes, 21 control relay modules, 22 duct detectors with base & 3 smoke detector with base. t.i. pa#201507222148. n/a ordinance #155-13Details
fire alarm t.i.: install 31 ceiling mount speaker/strobes, 21 control relay modules, 22 duct detectors with base & 3 smoke detector with base. t.i. pa#201507222148. n/a ordinance #155-13 | $30,800 |
| Oct 14, 2015 | Completed final sign-off Nov 2016 | 685 Market St | Principal Builders Inc. | 4th floor: revision to ref pa 2015 0722 2148 to document filed corrections, lighting fixtures, and structural dimensionsl on (e) plans maher naDetails
4th floor: revision to ref pa 2015 0722 2148 to document filed corrections, lighting fixtures, and structural dimensionsl on (e) plans maher na | |
| Sep 30, 2015 | Never finaled issued Sep 2015, no final | 685 Market St | street spaceDetails
street space | ||
| Sep 29, 2015 | Completed final sign-off Dec 2015 | 685 Market St | Metropolitan Electrical Construction | floor outlets for new furniture. title 24. n/a for maherDetails
floor outlets for new furniture. title 24. n/a for maher | $15,000 |
| Sep 28, 2015 | Completed final sign-off Sep 2016 | 685 Market St | Swinerton Builders | interior renovation at building lobby to replace security desk, provide new building directory and provide landscape improvements to building courtyard. mep & fire deisgn -build. light improvement at elevator lobby.Details
interior renovation at building lobby to replace security desk, provide new building directory and provide landscape improvements to building courtyard. mep & fire deisgn -build. light improvement at elevator lobby. | $300,000 |
| Sep 22, 2015 | Completed final sign-off Oct 2015 | 685 Market St | R L H Fire Protection Inc | 4th flr: fire sprinkler tenant improvement 121 relocated & 12 added heads ,ref. permit 201507222148; maher n/aDetails
4th flr: fire sprinkler tenant improvement 121 relocated & 12 added heads ,ref. permit 201507222148; maher n/a | $31,820 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 685 Market St | street spaceDetails
street space | ||
| Sep 16, 2015 | Never finaled issued Nov 2015, no final | 685 Market St | Truebeck Construction | 5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/aDetails
5th flr: partial floor administrative office, t.i. selective demo,partitions,ceilings,finishes,meps,no structural work, sprinkler & life safety permits under separate submittal; maher n/a | $250,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2015 | 685 Market St | Eco Fire Sprinklers Inc | 1st floor - demo all (e) pendant sprinkler drops back to line piping, return to warm shell conditions. bldg pa ref #201507302900. maher naDetails
1st floor - demo all (e) pendant sprinkler drops back to line piping, return to warm shell conditions. bldg pa ref #201507302900. maher na | $10,000 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 685 Market St | C C I Commercial Construction & Improv | soft demo non structural millwork and finishes on 1st fl. per ab-017. suite 130 & 140Details
soft demo non structural millwork and finishes on 1st fl. per ab-017. suite 130 & 140 | $20,000 |
| Jul 27, 2015 | Completed final sign-off Aug 2015 | 685 Market St | Bilcor Inc | fire alarm tenant improvement. elimate 2 duct detectors, install 2 smoke detectors. as built. maher n/a. ref t.i pa# 201506179230Details
fire alarm tenant improvement. elimate 2 duct detectors, install 2 smoke detectors. as built. maher n/a. ref t.i pa# 201506179230 | $1,600 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 685 Market St | street spaceDetails
street space | ||
| Jul 22, 2015 | Completed final sign-off Nov 2016 | 685 Market St | Principal Builders Inc. | 4th floor - tenant improvement to build new partitions, doors, break room, ceiling, millwork & finishes & mep. life safety & sprinklers on separate permit. n/a maher ordinance. a.k.a. 861 market streetDetails
4th floor - tenant improvement to build new partitions, doors, break room, ceiling, millwork & finishes & mep. life safety & sprinklers on separate permit. n/a maher ordinance. a.k.a. 861 market street | $1,500,000 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 685 Market St | street spaceDetails
street space | ||
| Jul 10, 2015 | Completed final sign-off Sep 2016 | 685 Market St | Swinerton Builders | demolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinanceDetails
demolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinance | $8,000 |
| Jul 1, 2015 | Completed final sign-off Nov 2016 | 685 Market St | Principal Builders Inc. | demolition of partitions, doors, millwork, ceiling and finishes on 4/f, space will remain unoccupied during demo per ab017, ada will be addressed under upcoming t.i. permit. n/a ordinance #155-13Details
demolition of partitions, doors, millwork, ceiling and finishes on 4/f, space will remain unoccupied during demo per ab017, ada will be addressed under upcoming t.i. permit. n/a ordinance #155-13 | $100,000 |
| Jun 17, 2015 | Completed final sign-off Jul 2015 | 685 Market St | Bilcor Inc | fire alarm improvemment install 4 detectors w/ duct housing install 1 control relay module maher not requiredDetails
fire alarm improvemment install 4 detectors w/ duct housing install 1 control relay module maher not required | $2,000 |
| Jun 4, 2015 | Completed final sign-off Jun 2015 | 685 Market St | Principal Builders Inc. | revision to pa#201503251893 & 201504305065 to provide da checklist & path of travel info; for demo work previously done under ab017 to reflect work, no soft demo with no additional t.i. work to follow in tenant space. n/a ordinance #155-13Details
revision to pa#201503251893 & 201504305065 to provide da checklist & path of travel info; for demo work previously done under ab017 to reflect work, no soft demo with no additional t.i. work to follow in tenant space. n/a ordinance #155-13 | |
| Jun 1, 2015 | Completed final sign-off Mar 2017 | 685 Market St | C C I Commercial Construction & Improv | removal (e) infill aluminum storefronts, store front awnings, flooring & slab at the immediate vicinity of store front entrance. n/a ordinance #155-13Details
removal (e) infill aluminum storefronts, store front awnings, flooring & slab at the immediate vicinity of store front entrance. n/a ordinance #155-13 | $20,000 |
| May 29, 2015 | Completed final sign-off Jul 2015 | 685 Market St | Anderson, Rowe & Buckley, Inc. | 1st floor: fire sprinkler t.i. relocated 3 speakers. ref #201503090261. n/a for the maher.Details
1st floor: fire sprinkler t.i. relocated 3 speakers. ref #201503090261. n/a for the maher. | $1,550 |
| May 29, 2015 | Never finaled issued Jun 2015, no final | 685 Market St | Anderson, Rowe & Buckley, Inc. | 1)demo duct work and distribution per sheet im2.1 2)install new duct work and distribution per sheet 1m2.1 3)install 4 new fire smoke dampers per sheet 1m2.1 4)balance grilles to new valves sheet 2m2.1 n/a for the maher.Details
1)demo duct work and distribution per sheet im2.1 2)install new duct work and distribution per sheet 1m2.1 3)install 4 new fire smoke dampers per sheet 1m2.1 4)balance grilles to new valves sheet 2m2.1 n/a for the maher. | $15,000 |
| May 22, 2015 | Completed final sign-off Mar 2018 | 685 Market St | Bilcor Inc | basement: fire alarm - install 2 control relay modules. maher naDetails
basement: fire alarm - install 2 control relay modules. maher na | $800 |
| May 15, 2015 | Never finaled issued May 2015, no final | 685 Market St | street spaceDetails
street space | ||
| Apr 30, 2015 | Completed final sign-off Jun 2015 | 685 Market St | Principal Builders Inc. | revision to pa#201503251893 to reconfigure demo layout. n/a ordinance #155-13Details
revision to pa#201503251893 to reconfigure demo layout. n/a ordinance #155-13 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.