Retail Contracting Group Inc
- Based in
- Lake Elmo
- On San Francisco permits
- Jan 2018 to Mar 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 2 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2026 | Completed final sign-off Apr 2026 | 3251 20th Av | suite #152: this is a temp store for crocs shoes. we will be painting, cleaning and installing sales fixtures. we have no mep work and will be utilizing existing.Details
suite #152: this is a temp store for crocs shoes. we will be painting, cleaning and installing sales fixtures. we have no mep work and will be utilizing existing. | $12,000 |
| Apr 27, 2023 | Never finaled issued Jul 2023, no final | 3251 20th Av | int ti for lenscrafters at stonestown 2nd lv. demo, structural, & mep included. new restrooms & drinking foundtain.Details
int ti for lenscrafters at stonestown 2nd lv. demo, structural, & mep included. new restrooms & drinking foundtain. | $400,000 |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 685 Market St | ste 110: revision to pa# 202009144156. changes to new flooring in scales; rcp; interior elevations; phasing plans/schedules. 4 construction phases total.Details
ste 110: revision to pa# 202009144156. changes to new flooring in scales; rcp; interior elevations; phasing plans/schedules. 4 construction phases total. | |
| Sep 14, 2020 | Never finaled issued Feb 2021, no final | 685 Market St | tenant improvement of (e) mercantile space in (e) space. all new restrooms to have od finishes & tile on walls-floor to ceiling (wt-100); lab floor to be tf-110; new ceiling height to remain at 9'5.5" to match existing.Details
tenant improvement of (e) mercantile space in (e) space. all new restrooms to have od finishes & tile on walls-floor to ceiling (wt-100); lab floor to be tf-110; new ceiling height to remain at 9'5.5" to match existing. | $302,000 |
| Jan 23, 2018 | Completed final sign-off May 2018 | 3251 20th Av | space 167 - inter ti only - no change in use. demo work (e) hvac to remain, base bld structure & utils to remain, int storefront work, non structural partitions, unisex rrm other plm, duct work, ele work stockrm, fx, sales fxDetails
space 167 - inter ti only - no change in use. demo work (e) hvac to remain, base bld structure & utils to remain, int storefront work, non structural partitions, unisex rrm other plm, duct work, ele work stockrm, fx, sales fx | $300,000 |