Douglas Robertson
- Listed as
- architect
- On San Francisco permits
- Jun 2018 to Jul 2020
5 permits since 2000 (architect on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2020 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | mep scope for interior improvement to (e) 5th flr office space, kitchen areas and collaboration and conferences spaces (building permit #2020-0128-2872). no change of use, replace restroom finishes and accessories.Details
mep scope for interior improvement to (e) 5th flr office space, kitchen areas and collaboration and conferences spaces (building permit #2020-0128-2872). no change of use, replace restroom finishes and accessories. | $990,000 |
| Jan 28, 2020 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | interior ti to existing 5th fl office space, kitchen area, & collaboration and conference spaces. no change of use; replace restroom finishes and accessories. mep deferred.Details
interior ti to existing 5th fl office space, kitchen area, & collaboration and conference spaces. no change of use; replace restroom finishes and accessories. mep deferred. | $1,906,715 |
| Dec 20, 2019 | Completed final sign-off Apr 2021 | 685 Market St | Swinerton Builders | 5th flr - interior non-structural demo of existing office floor on 5th floor per ab-17. remove existing non load bearing partition, doors, millwork and finishes; remove and replace existing restroom finishes and fixtures in same locations. no ceiling or sprinkler work (under sep permit).Details
5th flr - interior non-structural demo of existing office floor on 5th floor per ab-17. remove existing non load bearing partition, doors, millwork and finishes; remove and replace existing restroom finishes and fixtures in same locations. no ceiling or sprinkler work (under sep permit). | $100,000 |
| Sep 26, 2019 | Expired or cancelled cancelled Jan 2026 | 295 Bay St | interior non-structural demo per ab-017Details
interior non-structural demo per ab-017 | $25,000 | |
| Jun 29, 2018 | Completed final sign-off Apr 2022 | 415 Natoma St | Swinerton Builders | erect 25-story, 2 basements, type 1-a, assembly, office, retail, parking, commercial building. merge lots #005, 006, 008, 009, 012, 098.Details
erect 25-story, 2 basements, type 1-a, assembly, office, retail, parking, commercial building. merge lots #005, 006, 008, 009, 012, 098. | $145,000,000 |