George Josephs
- Listed as
- architect, engineer
- Based in
- Tempe
- On San Francisco permits
- Mar 2005 to Nov 2022
17 permits since 2000 (architect on 13 permits, engineer on 4 permits): 14 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2022 | Completed final sign-off Mar 2024 | 565 Buckingham Wy | Reeve-Knight Construction Inc. | t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05.Details
t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05. | $950,000 |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 2300 16th St | Custom Cooling Of California Llc | hvac - 4 unit like for like replacement.Details
hvac - 4 unit like for like replacement. | $78,447 |
| Oct 17, 2018 | Completed final sign-off Jun 2019 | 200 West Portal Av | Custom Cooling Of California Llc | 4 hvac unit replacement. like for likeDetails
4 hvac unit replacement. like for like | $56,064 |
| Nov 17, 2016 | Expired or cancelled withdrawn Apr 2017 | 1180 Post St | Mattson Construction-West Inc | tenant improvement of an (e) imaging suite. improvements consist of an additional nuclear modality & (n) read room. minor demo, mechanical & electrical modifications will occur to accomodate (n) equipment. ** maher: n/a **Details
tenant improvement of an (e) imaging suite. improvements consist of an additional nuclear modality & (n) read room. minor demo, mechanical & electrical modifications will occur to accomodate (n) equipment. ** maher: n/a ** | $40,000 |
| Sep 17, 2015 | Completed final sign-off Apr 2016 | 180 Montgomery St | Bevilacqua & Sons | revision to permit 2015-0807-3634 (20th floor) to show product information on fire proofing being installed to repair areas that have fallen off.Details
revision to permit 2015-0807-3634 (20th floor) to show product information on fire proofing being installed to repair areas that have fallen off. | |
| Jul 10, 2015 | Completed final sign-off Sep 2016 | 685 Market St | Swinerton Builders | demolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinanceDetails
demolition of a roof shed in it's entirety. that to be demolished shed is wood & metal sheathing construction. n/a maher ordinance | $8,000 |
| Oct 3, 2014 | Completed final sign-off Aug 2015 | 850 Montgomery St | Dome Construction Corp | ste #200: modification & expansion of (e) t.i. incl selective const of non load bearing partitions, modifications to ceiling grid & tile, new light fixtures incl re-switching, new conferen rm door & frame. millwork & new sink(s) & new finishes. maher n/aDetails
ste #200: modification & expansion of (e) t.i. incl selective const of non load bearing partitions, modifications to ceiling grid & tile, new light fixtures incl re-switching, new conferen rm door & frame. millwork & new sink(s) & new finishes. maher n/a | $122,500 |
| Sep 26, 2014 | Completed final sign-off Jan 2015 | 731 Market St | Peacock Construction | modification ot existing building lobby to include construction of non structural partition, modification to ceiling, moulding, light fixture.(sprinklers under separate permit)Details
modification ot existing building lobby to include construction of non structural partition, modification to ceiling, moulding, light fixture.(sprinklers under separate permit) | $27,000 |
| Jun 19, 2012 | Completed final sign-off Dec 2013 | 180 Montgomery St | Hathaway Dinwiddie Co. | relocate/provide new plumbing fixtures & toilet partitions to remove accessibility barriers at restrooms on 2nd, 3rd and 4th floor.Details
relocate/provide new plumbing fixtures & toilet partitions to remove accessibility barriers at restrooms on 2nd, 3rd and 4th floor. | $60,000 |
| Dec 19, 2011 | Completed final sign-off Feb 2012 | 165 Post St | Swinerton Builders | ste 300 minor renovation ot existing tenant improvement, elec, mech & life safety under separate permit. demolition of existing offices & conversion of 1 office to a conf. room.Details
ste 300 minor renovation ot existing tenant improvement, elec, mech & life safety under separate permit. demolition of existing offices & conversion of 1 office to a conf. room. | $115,000 |
| Dec 7, 2011 | Completed final sign-off Mar 2012 | 1 Front St | Principal Builders Inc. | 14th floor minor renovation to an existing tenant suite, scope includes demo & construction of non-load bearing partitions, ceiling patch, minor millwork, lighting & finishes.Details
14th floor minor renovation to an existing tenant suite, scope includes demo & construction of non-load bearing partitions, ceiling patch, minor millwork, lighting & finishes. | $250,000 |
| Jul 29, 2011 | Completed final sign-off Aug 2011 | 150 Spear St | Rossi Builders Inc. | 16th floor modifications to existing suite to include demo & construction of non-load bearing walls & new interior finishes.Details
16th floor modifications to existing suite to include demo & construction of non-load bearing walls & new interior finishes. | $30,000 |
| Jul 29, 2011 | Completed final sign-off Feb 2012 | 150 Spear St | Peacock Construction Inc | 7th floor modifications to existing elevator lobby space to include demo & construction of new suspended ceiling grid & tile & new finishes.Details
7th floor modifications to existing elevator lobby space to include demo & construction of new suspended ceiling grid & tile & new finishes. | $50,400 |
| Jul 26, 2011 | Expired or cancelled cancelled Jan 2026 | 88 Kearny St | Details
| $500,000 | |
| Apr 7, 2011 | Completed final sign-off Nov 2011 | 300 California St | D A Pope Inc | 7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor.Details
7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor. | $50,000 |
| Apr 5, 2011 | Completed final sign-off Jun 2011 | 600 Harrison St | Skyline Construction | #600 - demo and construction of non load bearing partitions, millwork and finishes. mech, elec, plumbing sep permitDetails
#600 - demo and construction of non load bearing partitions, millwork and finishes. mech, elec, plumbing sep permit | $650,000 |
| Mar 17, 2005 | Completed final sign-off Jun 2005 | 88 Kearny St | Novo Construction Inc | oti-1, 14th floor, el, me, ls, sp.Details
oti-1, 14th floor, el, me, ls, sp. | $45,000 |