Block 0311, lot 007
66 Kearny St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 21
- Building
- 260,624 sq ft
- Lot
- 3,081 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
87 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jun 2026 | 66 Kearny St | Thomas Swan Sign Co Inc | install 1 non illuminated double faced, expansion bolt-anchored, projecting sign. (a)Details
install 1 non illuminated double faced, expansion bolt-anchored, projecting sign. (a) | $4,000 |
| May 6, 2026 | Completed final sign-off Jun 2026 | 66 Kearny St | Thomas Swan Sign Co Inc | install 1 non illuminated single faced wall sign with individual letters attached to the exterior of the building with a tape and epoxy system: andytown coffee roasters.Details
install 1 non illuminated single faced wall sign with individual letters attached to the exterior of the building with a tape and epoxy system: andytown coffee roasters. | $4,000 |
| Mar 27, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.Details
revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house. | |
| Mar 10, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | 1st fl - meps for 202511260493Details
1st fl - meps for 202511260493 | $194,832 |
| Mar 6, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."Details
revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours." | |
| Nov 26, 2025 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.Details
project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture. | $800,000 |
| Apr 26, 2018 | Completed final sign-off May 2019 | 66 Kearny St | T C B Builders Inc | change of occupancy from m,b to a-2. starbucks cafe administrative permit to correct occupant load from 201710312717 no exterior workDetails
change of occupancy from m,b to a-2. starbucks cafe administrative permit to correct occupant load from 201710312717 no exterior work | |
| Apr 17, 2018 | Completed final sign-off May 2019 | 66 Kearny St | T C B Builders Inc | revision to 201710312717. entry door swing from in to outward. occupant load/ occupacy calcs. sffd assembly permit required maher not reqDetails
revision to 201710312717. entry door swing from in to outward. occupant load/ occupacy calcs. sffd assembly permit required maher not req | |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 66 Kearny St | T C B Builders Inc | rev. to 2017 1031 2717 ; t.i. for a new starbucks cafe. work is comprised of new interior non-structural partition walls, new restroom fixtures, new furnatures and finishes. n/a for maherDetails
rev. to 2017 1031 2717 ; t.i. for a new starbucks cafe. work is comprised of new interior non-structural partition walls, new restroom fixtures, new furnatures and finishes. n/a for maher | $22,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 66 Kearny St | Honeywell International, Inc | f/a modifications: on the 1st fl of 66 kearny st; add (10) speaker/strobes; (1) strobe booster; (4) control relays; (1) control modules; (2) duct detectors; (3) rib relays; relocate (1) smoke detector; remove (3) strobe & (3) speakers. maher naDetails
f/a modifications: on the 1st fl of 66 kearny st; add (10) speaker/strobes; (1) strobe booster; (4) control relays; (1) control modules; (2) duct detectors; (3) rib relays; relocate (1) smoke detector; remove (3) strobe & (3) speakers. maher na | $8,852 |
| Feb 13, 2018 | Never finaled issued Mar 2018, no final | 66 Kearny St | Superior Electrical Advertising Inc | install 1 illuminated sign on e canopy maher not reqDetails
install 1 illuminated sign on e canopy maher not req | $3,000 |
| Feb 13, 2018 | Never finaled issued Mar 2018, no final | 66 Kearny St | Superior Electrical Advertising Inc | install 1 illuminated projecting signDetails
install 1 illuminated projecting sign | $3,000 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 66 Kearny St | Ayoob & Peery Plumbing Co Inc | ground floor: relocate and remove fire sprinklers per t.i. 11 relocate and 2 remove. ref app#201710312717. n/a for maherDetails
ground floor: relocate and remove fire sprinklers per t.i. 11 relocate and 2 remove. ref app#201710312717. n/a for maher | $2,500 |
| Oct 31, 2017 | Completed final sign-off Apr 2018 | 66 Kearny St | T C B Builders Inc | g/f -ti in existing historical building - new interior non-structural partition walls, new restrooms ada - furniture and finishes. fully sprinklered.Details
g/f -ti in existing historical building - new interior non-structural partition walls, new restrooms ada - furniture and finishes. fully sprinklered. | $250,000 |
| Oct 19, 2015 | Completed final sign-off Jan 2016 | 66 Kearny St | Golden Gate Sign Company Inc. | install illuminated wall sign "yogasmoga" maher naDetails
install illuminated wall sign "yogasmoga" maher na | $5,000 |
| Sep 18, 2015 | Never finaled issued Sep 2015, no final | 66 Kearny St | street spaceDetails
street space | ||
| Aug 24, 2015 | Expired or cancelled cancelled Jan 2026 | 66 Kearny St | change of tenant in existing ground floor lease space, only interior paint & furnishing. no change in use, egress or occupancy. n/a ordinance #155-13Details
change of tenant in existing ground floor lease space, only interior paint & furnishing. no change in use, egress or occupancy. n/a ordinance #155-13 | $15,000 | |
| Nov 22, 2013 | Completed final sign-off Jan 2014 | 88 Kearny St | 8 and 18th floor: evacuation maps. total 8 mapsDetails
8 and 18th floor: evacuation maps. total 8 maps | $3,200 | |
| Sep 6, 2013 | Completed final sign-off Mar 2015 | 88 Kearny St | Novo Construction Inc, Swinerton Builders | working as citibank: remodel of (e) bank branch on ground level, new wall construction, millwork finishes, new plmg & electrical work, new structural steel to supplement (e) structural at interior atm & modification of (e) hvac system. no exterior work under this permitDetails
working as citibank: remodel of (e) bank branch on ground level, new wall construction, millwork finishes, new plmg & electrical work, new structural steel to supplement (e) structural at interior atm & modification of (e) hvac system. no exterior work under this permit | $800,000 |
| Dec 7, 2012 | Completed final sign-off Dec 2012 | 88 Kearny St | Honeywell International, Inc | 3rd floor-add 19 speaker/strobes & 1 speaker. ti pa# 2012-1107-3712.Details
3rd floor-add 19 speaker/strobes & 1 speaker. ti pa# 2012-1107-3712. | $5,000 |
| Dec 7, 2012 | Completed final sign-off Jan 2013 | 88 Kearny St | Honeywell International, Inc | 16th floor/suite #1600-add 6 speaker/strobes. ti pa# 2012-1019-2424Details
16th floor/suite #1600-add 6 speaker/strobes. ti pa# 2012-1019-2424 | $5,000 |
| Nov 16, 2012 | Never finaled issued Nov 2012, no final | 88 Kearny St | Golden Gate Fire Protection Inc | fire spinker system upgrade; relocate 16 pendent sprinkler heads on the 3rd floor. upgrade branch line restraints. t.i pa# 201211073712Details
fire spinker system upgrade; relocate 16 pendent sprinkler heads on the 3rd floor. upgrade branch line restraints. t.i pa# 201211073712 | $8,240 |
| Aug 23, 2012 | Completed final sign-off Sep 2012 | 88 Kearny St | R L H Fire Protection Inc | fire sprinkler only - relocate 10 heads; remove 6 heads for the data center on the 17th floor..Details
fire sprinkler only - relocate 10 heads; remove 6 heads for the data center on the 17th floor.. | $5,000 |
| Aug 20, 2012 | Completed final sign-off Jan 2014 | 88 Kearny St | Swinerton Builders | new entry canopy, new entry glazing to replace existing, new decorative metal cladding over existing store front cladding.Details
new entry canopy, new entry glazing to replace existing, new decorative metal cladding over existing store front cladding. | $482,000 |
| Mar 19, 2012 | Completed final sign-off Apr 2012 | 88 Kearny St | Honeywell International, Inc | 12th floor. fire alarm: scope: 6 strobes & 5 speakers.Details
12th floor. fire alarm: scope: 6 strobes & 5 speakers. | $5,000 |
| Mar 15, 2012 | Completed final sign-off May 2012 | 88 Kearny St | 4 evacuation signs for 12th floor, per sffd bulletin 2.11Details
4 evacuation signs for 12th floor, per sffd bulletin 2.11 | $1,000 | |
| Mar 7, 2012 | Completed final sign-off Mar 2012 | 88 Kearny St | Comfort Dynamics Inc. | 13th floor - demolish existing water source heat pumps on the elevator machine room. install 2 new water source heater pumps.Details
13th floor - demolish existing water source heat pumps on the elevator machine room. install 2 new water source heater pumps. | $15,000 |
| Mar 6, 2012 | Completed final sign-off Dec 2012 | 88 Kearny St | Skyline Construction | floor 17, 22, roof & mezz - demolition of tenant mechanical items/equipmnent as part of restoration work. new parital air distribution to serve existing space. remove tenant installed electrical systems (ab-017) interior demolition of paritions.Details
floor 17, 22, roof & mezz - demolition of tenant mechanical items/equipmnent as part of restoration work. new parital air distribution to serve existing space. remove tenant installed electrical systems (ab-017) interior demolition of paritions. | $225,000 |
| Feb 15, 2012 | Completed final sign-off Apr 2012 | 88 Kearny St | Golden Gate Fire Protection Inc | 12th floor-fire sprinkler system upgrades-relocate 18 pendent sprinkler heads & 4 uprightsDetails
12th floor-fire sprinkler system upgrades-relocate 18 pendent sprinkler heads & 4 uprights | $11,330 |
| Feb 3, 2012 | Completed final sign-off May 2012 | 88 Kearny St | Gci, Inc | 12th floor-mechanical & electrical work for t.i., refer to pa# 2012-0123-2688Details
12th floor-mechanical & electrical work for t.i., refer to pa# 2012-0123-2688 | $175,000 |
| Jan 30, 2012 | Completed final sign-off Mar 2012 | 88 Kearny St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade: relocate 31 pendent sprinkler heads on the 9th floor. upgrade branch line restraints.Details
fire sprinkler system upgrade: relocate 31 pendent sprinkler heads on the 9th floor. upgrade branch line restraints. | $15,965 |
| Jan 23, 2012 | Completed final sign-off May 2012 | 88 Kearny St | Gci, Inc | demolition of non-load bearing partitions. remodel of (e) office space. (n) partitions. mep, fire sprinkler under separate permit.Details
demolition of non-load bearing partitions. remodel of (e) office space. (n) partitions. mep, fire sprinkler under separate permit. | $265,000 |
| Jan 13, 2012 | Completed final sign-off Mar 2012 | 88 Kearny St | Novo Construction Inc | 17th floor-lighting & title 24 for tenant improvement. refer to arch pa# 2011-1024-7419Details
17th floor-lighting & title 24 for tenant improvement. refer to arch pa# 2011-1024-7419 | $750 |
| Dec 6, 2011 | Never finaled issued Dec 2011, no final | 88 Kearny St | Bcci Construction Company | pre construction demo on the 9th fl. no fire rated construction to be removed. fire ls/sprinklers to remain operationalDetails
pre construction demo on the 9th fl. no fire rated construction to be removed. fire ls/sprinklers to remain operational | $15,000 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 88 Kearny St | f o u r (4) -- 6th floor evacuation signs. note: issued under sellers permit 100- 433228Details
f o u r (4) -- 6th floor evacuation signs. note: issued under sellers permit 100- 433228 | $600 | |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 88 Kearny St | R L H Fire Protection Inc | fire sprinkler only. office and common area on the 13th and 17th floor. 13th relocate 9 heads. 17th relocate 8 heads.Details
fire sprinkler only. office and common area on the 13th and 17th floor. 13th relocate 9 heads. 17th relocate 8 heads. | $8,500 |
| Oct 21, 2011 | Completed final sign-off Dec 2011 | 88 Kearny St | Honeywell International, Inc | fire alarm- 26 strobes, 23 speakers, 2 speaker/strobesDetails
fire alarm- 26 strobes, 23 speakers, 2 speaker/strobes | $6,000 |
| Oct 17, 2011 | Completed final sign-off Oct 2011 | 88 Kearny St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate 84 pendent sprinkler heads on the 6 th fl. upgrade branch line restraints.Details
fire sprinkler system upgrade. relocate 84 pendent sprinkler heads on the 6 th fl. upgrade branch line restraints. | $43,260 |
| Feb 23, 2011 | Expired or cancelled cancelled Jan 2026 | 88 Kearny St | relocate (1) 110 candella strobe in suite 1704 to small conf. room 1701. relocate (1) 110 candela strobe in hallway opposite wall ( eastwall) to break copy room wall. ref# pa 2011.02.10.9970 for finalDetails
relocate (1) 110 candella strobe in suite 1704 to small conf. room 1701. relocate (1) 110 candela strobe in hallway opposite wall ( eastwall) to break copy room wall. ref# pa 2011.02.10.9970 for final | ||
| Jul 13, 2010 | Completed final sign-off Sep 2010 | 88 Kearny St | Hathaway Dinwiddie Co., R L H Fire Protection Inc | 19th fl: new/revised electrical, misc fire sprinkler head relocations. building is fully sprinkleredDetails
19th fl: new/revised electrical, misc fire sprinkler head relocations. building is fully sprinklered | $201,919 |
| Jul 6, 2010 | Completed final sign-off Sep 2010 | 88 Kearny St | Honeywell International, Inc | fire alarm system on the 19th floor. add 13 strobes and 4 speakers to existing fa systemDetails
fire alarm system on the 19th floor. add 13 strobes and 4 speakers to existing fa system | $8,000 |
| Jun 11, 2010 | Never finaled issued Jun 2010, no final | 88 Kearny St | Honeywell International, Inc | 8th floor fire alarm scope: add (4) new strobes & (4) new speakers to accommodate tenant space remodel ( epsilon).Details
8th floor fire alarm scope: add (4) new strobes & (4) new speakers to accommodate tenant space remodel ( epsilon). | $4,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 88 Kearny St | Novo Construction Inc | office ti on the 8th fl. demo and construction of non load cearing partitons, new ceiling grid and tile, mep, life saftey and sprinkler under separate permitDetails
office ti on the 8th fl. demo and construction of non load cearing partitons, new ceiling grid and tile, mep, life saftey and sprinkler under separate permit | $12,000 |
| Aug 21, 2009 | Completed final sign-off Dec 2009 | 88 Kearny St | Intelligent Technologies & Services Inc | 20th fl - install preaction detectors and bell in 20th floor server room. pre-action system under separate permit. no office increase.Details
20th fl - install preaction detectors and bell in 20th floor server room. pre-action system under separate permit. no office increase. | $4,500 |
| Aug 13, 2009 | Completed final sign-off Dec 2009 | 88 Kearny St | Novo Construction Inc | 20th floor .install new heat pumps. demo existing condenser water pump. install new condenser. ref. arch. #2009/0728/3592.adding two fire smoke dampersDetails
20th floor .install new heat pumps. demo existing condenser water pump. install new condenser. ref. arch. #2009/0728/3592.adding two fire smoke dampers | $26,000 |
| Jul 28, 2009 | Completed final sign-off Dec 2009 | 88 Kearny St | Novo Construction Inc | demolition and construction of non-load bearing partitions new ceiling grid & tiles. mep, fire sprinkler & life safety system under separate permit.Details
demolition and construction of non-load bearing partitions new ceiling grid & tiles. mep, fire sprinkler & life safety system under separate permit. | $20,000 |
| Jul 28, 2009 | Completed final sign-off Dec 2009 | 88 Kearny St | Novo Construction Inc | minor demolition, construction of non-load bearing partitions, new ceiling tiles, new millwork & finishes. mep, life safety & fire sprinkler under separate permit.Details
minor demolition, construction of non-load bearing partitions, new ceiling tiles, new millwork & finishes. mep, life safety & fire sprinkler under separate permit. | $75,000 |
| Apr 30, 2009 | Expired or cancelled cancelled Jan 2026 | 66 Kearny St | 1st floor revision to appl #200809050865 - change exit door landing in lobby. increase landing to 44" depth.Details
1st floor revision to appl #200809050865 - change exit door landing in lobby. increase landing to 44" depth. | ||
| Nov 21, 2008 | Never finaled issued Dec 2008, no final | 66 Kearny St | Thomas Swan Sign Co Inc | to erect 1 non electric wall signDetails
to erect 1 non electric wall sign | $2,000 |
| Oct 27, 2008 | Never finaled issued Oct 2008, no final | 66 Kearny St | Bellanti Plumbing Inc | provide fire sprinkler adjustments to existing system for new changes to existing spaceDetails
provide fire sprinkler adjustments to existing system for new changes to existing space | $20,000 |
| Oct 21, 2008 | Never finaled issued Oct 2008, no final | 66 Kearny St | Honeywell International, Inc | fire alarm: 4 new strobes 1 new pull stationDetails
fire alarm: 4 new strobes 1 new pull station | $25,000 |
| Sep 16, 2008 | Completed final sign-off Mar 2009 | 88 Kearny St | Siemens Industry, Inc. | replacement of the existing firefighter's override panel. the smoke control sequence of operation ofr the existing life safety system is not being changed.Details
replacement of the existing firefighter's override panel. the smoke control sequence of operation ofr the existing life safety system is not being changed. | $35,000 |
| Sep 11, 2008 | Completed final sign-off Feb 2009 | 88 Kearny St | Honeywell International, Inc | 16th floor: fire alarm additions for tenant impromvement. add 6 speakers, 17 strobe lights, 3 smoke detectorsDetails
16th floor: fire alarm additions for tenant impromvement. add 6 speakers, 17 strobe lights, 3 smoke detectors | $16,400 |
| Sep 5, 2008 | Never finaled issued Sep 2008, no final | 66 Kearny St | tenant improvement 1st floor retail space: modify gyp ceiling, new light fixt, furring for 2 partitions, replace entry doors in kind, new floor finish, modify elec & fire alarm, (e) hvac reused w/new ductwork, new 2nd exit 1 hr door, fire alarm/sprinkler modifications under sep permitDetails
tenant improvement 1st floor retail space: modify gyp ceiling, new light fixt, furring for 2 partitions, replace entry doors in kind, new floor finish, modify elec & fire alarm, (e) hvac reused w/new ductwork, new 2nd exit 1 hr door, fire alarm/sprinkler modifications under sep permit | $320,000 | |
| Aug 22, 2008 | Completed final sign-off Feb 2009 | 88 Kearny St | Novo Construction Inc | new lighting/title 24 for 16th floor. reference application 200807257636.Details
new lighting/title 24 for 16th floor. reference application 200807257636. | $65,000 |
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 66 Kearny St | non structural interior demolition. remove gyprb, ceiling lights, remove vct + wood flooring, remove decorative trims on walls and ceiling, remove electrical switches & outlets as needed. life safety system to remain operational.Details
non structural interior demolition. remove gyprb, ceiling lights, remove vct + wood flooring, remove decorative trims on walls and ceiling, remove electrical switches & outlets as needed. life safety system to remain operational. | $10,000 | |
| Jul 25, 2008 | Never finaled issued Jul 2008, no final | 66 Kearny St | street spaceDetails
street space | ||
| Dec 3, 2007 | Never finaled issued Dec 2007, no final | 88 Kearny St | Swinerton Builders | renew pa# 2006/11/13/7477 for final inspection only.Details
renew pa# 2006/11/13/7477 for final inspection only. | |
| Nov 21, 2007 | Expired or cancelled expired Apr 2009 | 88 Kearny St | Swinerton Builders | renew pa# 2007/01/18/1897 for final inspection only.Details
renew pa# 2007/01/18/1897 for final inspection only. | |
| Nov 21, 2007 | Never finaled issued Nov 2007, no final | 88 Kearny St | Swinerton Builders | renew pa# 2006/10/23/5752 for final inspection only.Details
renew pa# 2006/10/23/5752 for final inspection only. | |
| Nov 21, 2007 | Never finaled issued Nov 2007, no final | 88 Kearny St | Swinerton Builders | renew pa# 2007/01/19/2055 for final inspection only.Details
renew pa# 2007/01/19/2055 for final inspection only. | |
| Jun 19, 2007 | Expired or cancelled expired Apr 2009 | 88 Kearny St | Allied Fire Protection | new sprinklers for car stackers on basement level.Details
new sprinklers for car stackers on basement level. | $32,000 |
| Feb 16, 2007 | Never finaled issued Feb 2007, no final | 88 Kearny St | street space permit only.Details
street space permit only. | ||
| Jan 18, 2007 | Expired or cancelled expired Sep 2007 | 88 Kearny St | Ayoob & Peery Plumbing Co Inc | relocate and add sprinklers per tenant improvements. 15th fl (new heads 27), (relocate 33).Details
relocate and add sprinklers per tenant improvements. 15th fl (new heads 27), (relocate 33). | $15,000 |
| Oct 23, 2006 | Never finaled issued Oct 2006, no final | 88 Kearny St | Swinerton Builders | soft demolition only. demolish interior finishes. no structural work.Details
soft demolition only. demolish interior finishes. no structural work. | $15,000 |
| May 18, 2006 | Never finaled issued May 2006, no final | 88 Kearny St | street spaceDetails
street space | ||
| May 17, 2006 | Completed final sign-off Jul 2006 | 88 Kearny St | R L H Fire Protection Inc | t. i. upgrade fire sprinklers system 7th floor french trade 4 hd relocatedDetails
t. i. upgrade fire sprinklers system 7th floor french trade 4 hd relocated | $2,000 |
| Apr 12, 2006 | Completed final sign-off Jun 2006 | 88 Kearny St | Acco Engineered Systems Inc. Dba Acco En | installation of heat pump and fire smoke damper.Details
installation of heat pump and fire smoke damper. | $15,000 |
| Apr 7, 2006 | Completed final sign-off Jun 2006 | 88 Kearny St | R L H Fire Protection Inc | ti upgrade fire sprinkler for reuters 6th flr. 7 relocated, 4 adds, 5 deletes. total 21 headsDetails
ti upgrade fire sprinkler for reuters 6th flr. 7 relocated, 4 adds, 5 deletes. total 21 heads | $3,000 |
| Dec 22, 2005 | Expired or cancelled expired Nov 2006 | 88 Kearny St | R L H Fire Protection Inc | fire sprinkler remodel of 10th flor conference rooms & reception total 19 heads. fire sprinkler remodel of 11th flr office total 2 heads.Details
fire sprinkler remodel of 10th flor conference rooms & reception total 19 heads. fire sprinkler remodel of 11th flr office total 2 heads. | $5,200 |
| Mar 17, 2005 | Completed final sign-off Jun 2005 | 88 Kearny St | Novo Construction Inc | oti-1, 14th floor, el, me, ls, sp.Details
oti-1, 14th floor, el, me, ls, sp. | $45,000 |
| Aug 21, 2003 | Never finaled issued Aug 2003, no final | 66 Kearny St | street space permitDetails
street space permit | ||
| Jul 11, 2003 | Completed final sign-off Aug 2004 | 88 Kearny St | T C B Builders Inc | oti-3 20th floor, me & lsDetails
oti-3 20th floor, me & ls | $20,000 |
| May 16, 2003 | Completed final sign-off Aug 2004 | 88 Kearny St | T C B Builders Inc | oti-1 20th fl,sp,el,me,lsDetails
oti-1 20th fl,sp,el,me,ls | $150,000 |
| Jun 26, 2002 | Completed final sign-off Sep 2002 | 88 Kearny St | oti-2, 5th floor, ltg, mechDetails
oti-2, 5th floor, ltg, mech | $35,000 | |
| Jun 19, 2002 | Completed final sign-off Sep 2002 | 88 Kearny St | Hathaway Dinwiddie Co. | oti-1 5th floor, ltg, mech, ls, sprDetails
oti-1 5th floor, ltg, mech, ls, spr | $150,000 |
| Jun 3, 2002 | Expired or cancelled expired Jun 2003 | 88 Kearny St | R L H Fire Protection Inc | omega head replacement in kind, viking horizon sin #vk402Details
omega head replacement in kind, viking horizon sin #vk402 | $20,000 |
| Dec 3, 2001 | Completed final sign-off Jan 2002 | 88 Kearny St | Field Construction Inc. | oti-3, 14th floor, ls onlyDetails
oti-3, 14th floor, ls only | $5,000 |
| Nov 27, 2001 | Completed final sign-off Jan 2002 | 88 Kearny St | Field Construction Inc. | oti-2 14th flr, ltg, mech, sprDetails
oti-2 14th flr, ltg, mech, spr | $24,000 |
| Nov 20, 2001 | Completed final sign-off Jan 2002 | 88 Kearny St | Field Construction Inc. | 14th floor oti-1, el, me, ls, spDetails
14th floor oti-1, el, me, ls, sp | $15,000 |
| Apr 6, 2001 | Completed final sign-off Apr 2001 | 88 Kearny St | Skyline Construction | plan and details: impact roof revision 20010131036 not roof deck 5' clearance not requiredDetails
plan and details: impact roof revision 20010131036 not roof deck 5' clearance not required | $500 |
| Feb 20, 2001 | Expired or cancelled cancelled Aug 2001 | 88 Kearny St | oti-2 8th floor el & meDetails
oti-2 8th floor el & me | $8,000 | |
| Feb 12, 2001 | Expired or cancelled cancelled Aug 2001 | 88 Kearny St | oti-1 8th floor ltg,mech ls,sprDetails
oti-1 8th floor ltg,mech ls,spr | $25,000 | |
| Jan 31, 2001 | Completed final sign-off Apr 2001 | 88 Kearny St | Skyline Construction | plan & details, impact roof, structuralDetails
plan & details, impact roof, structural | $55,000 |
| Sep 5, 2000 | Expired or cancelled expired Jan 2001 | 88 Kearny St | Skyline Construction | sprinkler work to be performed on 15th floor, 5 relocations.Details
sprinkler work to be performed on 15th floor, 5 relocations. | $2,000 |
| Aug 7, 2000 | Completed final sign-off Jul 2001 | 88 Kearny St | Hathaway Dinwiddie Co. | oti-4, 21st floor, lsDetails
oti-4, 21st floor, ls | $20,000 |
| Mar 31, 2000 | Completed final sign-off Aug 2000 | 88 Kearny St | Field Construction Inc. | install life safety system on 13th floorDetails
install life safety system on 13th floor | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Honeywell International, Inc (9), Novo Construction Inc (8), R L H Fire Protection Inc (7), Swinerton Builders (7), T C B Builders Inc (6), Field Construction Inc. (4), Golden Gate Fire Protection Inc (4), Skyline Construction (4), Source Planning And Construction Inc (4), Hathaway Dinwiddie Co. (3), Thomas Swan Sign Co Inc (3), Ayoob & Peery Plumbing Co Inc (2), Gci, Inc (2), Superior Electrical Advertising Inc (2), Acco Engineered Systems Inc. Dba Acco En, Allied Fire Protection, Bcci Construction Company, Bellanti Plumbing Inc, Comfort Dynamics Inc., Golden Gate Sign Company Inc., Intelligent Technologies & Services Inc, Siemens Industry, Inc.
- Architects
- Dane Bunton (3), Jant Crane (2), George Josephs, Janet Crane, John Thiele, Michael R. Downey, Niccolo Valerio
- Engineers
- Bradley Hollub, Craig Ristow, Dean Macy, Dennis Cheung, Keith Abey, Robert Trifunovic, Sherry Chaumpluke
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.