Block 0238, lot 002
300 California St
- City’s use
- Commercial Office
- Built
- 1946
- Stories
- 8
- Units
- 2
- Rooms
- 10 bathrooms
- Building
- 144,382 sq ft
- Lot
- 15,097 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
189 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Sep 2026 | 300 California St | Gci, Inc | g/f revision to 202605121124: millwork placement adjustment to provide more space for cafe que line, update cafe equipment schedule & specification, finish & transitions, reflect ceiling update w/ removal of 1 arch & adjusted lighting layout, addition of power &data for a/v req, change in trash pathDetails
g/f revision to 202605121124: millwork placement adjustment to provide more space for cafe que line, update cafe equipment schedule & specification, finish & transitions, reflect ceiling update w/ removal of 1 arch & adjusted lighting layout, addition of power &data for a/v req, change in trash path | |
| May 12, 2026 | In progress issued Jul 2026 | 300 California St | Gci, Inc | renovation of building g/f lobby finishes and the adjacent tenant fit out. this includes demo of exterior store front, non-structural interior partitions, and new construction of interior partitions, ceilings, millwork and finishes. no increase in area. no change in occupancy or useDetails
renovation of building g/f lobby finishes and the adjacent tenant fit out. this includes demo of exterior store front, non-structural interior partitions, and new construction of interior partitions, ceilings, millwork and finishes. no increase in area. no change in occupancy or use | $1,270,000 |
| Feb 2, 2026 | Completed final sign-off Feb 2026 | 300 California St | Everon Llc | fire alarm t.i. to add 2 strobes only. ref pa#202508203469Details
fire alarm t.i. to add 2 strobes only. ref pa#202508203469 | $1,200 |
| Jan 5, 2026 | Completed final sign-off Jan 2026 | 300 California St | Pioneer Fire Inc. | 2/fl ref 202508203469- add (1) pendentDetails
2/fl ref 202508203469- add (1) pendent | $300 |
| Nov 4, 2025 | Completed final sign-off Feb 2026 | 300 California St | Everon Llc | 1st and 2nd floors: fire alarm t.i.- 1st floor: add 4 horn strobes, and 2 strobes. 2nd floor: add4 horn strobes and 1 strobe only. ref pa 202507291857 & 202507291861Details
1st and 2nd floors: fire alarm t.i.- 1st floor: add 4 horn strobes, and 2 strobes. 2nd floor: add4 horn strobes and 1 strobe only. ref pa 202507291857 & 202507291861 | $8,000 |
| Sep 16, 2025 | Completed final sign-off Jan 2026 | 300 California St | Pioneer Fire Inc. | 1st & 2nd fl: convert 3 pendents, 13 concealed pendents, relocate 18 pendents, 8 concealed pendents, 2 uprights. add 2 concealed pendents, remove 5 pendents.Details
1st & 2nd fl: convert 3 pendents, 13 concealed pendents, relocate 18 pendents, 8 concealed pendents, 2 uprights. add 2 concealed pendents, remove 5 pendents. | $10,250 |
| Sep 11, 2025 | In progress issued Sep 2025 | 300 California St | Discount Signs & Neon Inc | install 1 illuminated single faced wall sign "flagstar private bank"Details
install 1 illuminated single faced wall sign "flagstar private bank" | $6,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 300 California St | Discount Signs & Neon Inc | install 1 illuminated single faced wall sign "flagstar private bank"Details
install 1 illuminated single faced wall sign "flagstar private bank" | $6,000 |
| Aug 20, 2025 | Completed final sign-off Nov 2026 | 300 California St | Gci, Inc | 2/f: addition of (3) phone booths and (1) lactation pod to existing open office space. addition of new sprinklers and fire strobes tied to existing system under separate permits.Details
2/f: addition of (3) phone booths and (1) lactation pod to existing open office space. addition of new sprinklers and fire strobes tied to existing system under separate permits. | $15,000 |
| Jul 29, 2025 | Completed final sign-off May 2026 | 300 California St | Gci, Inc | 1st floor: commercial ti, new drywall, partitions, ceilings and finishes, w/ mechanical and electrical.Details
1st floor: commercial ti, new drywall, partitions, ceilings and finishes, w/ mechanical and electrical. | $80,000 |
| Jul 29, 2025 | Completed final sign-off Apr 2026 | 300 California St | Gci, Inc | 2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical.Details
2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical. | $800,000 |
| Apr 18, 2025 | Completed final sign-off May 2025 | 300 California St | Everon Llc | 4th/floor (suite #450): fire alarm t.i add 9 strobes & 6 horn/strobes.Details
4th/floor (suite #450): fire alarm t.i add 9 strobes & 6 horn/strobes. | $8,000 |
| Apr 4, 2025 | In progress issued Apr 2025 | 300 California St | Gci, Inc | ste 450 new power & signal devices. new 2022 title 24 compliant. ref pa 202502180503Details
ste 450 new power & signal devices. new 2022 title 24 compliant. ref pa 202502180503 | $180,000 |
| Apr 2, 2025 | In progress issued Apr 2025 | 300 California St | Gci, Inc | 4th floor: reference pa #202410293978. install 3 new vav boxes. air distribution, ductwork piping for new floor layout.Details
4th floor: reference pa #202410293978. install 3 new vav boxes. air distribution, ductwork piping for new floor layout. | $10,000 |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 300 California St | Pioneer Fire Inc. | 5/fl-revision 202412166892 - relocated (9) pendents and add (1) pendentDetails
5/fl-revision 202412166892 - relocated (9) pendents and add (1) pendent | $13,250 |
| Mar 11, 2025 | Completed final sign-off May 2025 | 300 California St | Pioneer Fire Inc. | 4/f-ste 450: relocate 33 pendents, relocate 8 uprights. ref ti# 202502180503Details
4/f-ste 450: relocate 33 pendents, relocate 8 uprights. ref ti# 202502180503 | $10,250 |
| Mar 6, 2025 | In progress issued Apr 2025 | 300 California St | Gci, Inc | 4th fl, ste 450 mechanical air distribution, ductwork & piping for new floor layoutDetails
4th fl, ste 450 mechanical air distribution, ductwork & piping for new floor layout | $70,182 |
| Feb 26, 2025 | Completed final sign-off Mar 2025 | 300 California St | Everon Llc | fire alarm as built for pa 202501087947Details
fire alarm as built for pa 202501087947 | |
| Feb 18, 2025 | In progress issued Feb 2025 | 300 California St | Gci, Inc | 4th floor. suite#: 450; demo of non-structural partitions. new construction of interior partitions, act gyp celiing, millowrk in n new pantyr, finishes where needed.Details
4th floor. suite#: 450; demo of non-structural partitions. new construction of interior partitions, act gyp celiing, millowrk in n new pantyr, finishes where needed. | $793,945 |
| Jan 8, 2025 | Completed final sign-off Mar 2025 | 300 California St | Everon Llc | 4/f suite 400: fire alarm t.i - add 4 strobes and 4 horn strobes. ref permit 202410293978Details
4/f suite 400: fire alarm t.i - add 4 strobes and 4 horn strobes. ref permit 202410293978 | $6,800 |
| Dec 31, 2024 | Completed final sign-off Apr 2025 | 300 California St | Everon Llc | 5th floor. fire alarm t.i. 5th floor. add 8 strobes, 15 horn/strobes and 1 duct dectator for fsdDetails
5th floor. fire alarm t.i. 5th floor. add 8 strobes, 15 horn/strobes and 1 duct dectator for fsd | $8,000 |
| Dec 19, 2024 | Completed final sign-off Jan 2025 | 300 California St | Pioneer Fire Inc. | relocate 14 uprights, convert 18 uprights to pendents, add 2 pendents. ref pa 202410293978Details
relocate 14 uprights, convert 18 uprights to pendents, add 2 pendents. ref pa 202410293978 | $8,500 |
| Dec 18, 2024 | In progress issued Mar 2025 | 300 California St | Gci, Inc | 5th flr - mechanical & eletrical. ref# 2024-0923-1387.Details
5th flr - mechanical & eletrical. ref# 2024-0923-1387. | $318,000 |
| Dec 16, 2024 | Completed final sign-off Apr 2025 | 300 California St | Pioneer Fire Inc. | 5th fl- relocate (52) pendents, add (1) pendent. ref to t.i. 202409231387Details
5th fl- relocate (52) pendents, add (1) pendent. ref to t.i. 202409231387 | $13,250 |
| Oct 29, 2024 | In progress issued Nov 2024 | 300 California St | Gci, Inc | 4/f suite 400: demo of non structural interior partitions and new construction of interior partitions, act a gyp ceilings, millwork in new pantry, finishes and lighting. mep deferred.Details
4/f suite 400: demo of non structural interior partitions and new construction of interior partitions, act a gyp ceilings, millwork in new pantry, finishes and lighting. mep deferred. | $428,658 |
| Sep 23, 2024 | In progress issued Dec 2024 | 300 California St | Gci, Inc | 5th/f ste 600: demo of non structural interior partitions & new construction of interior partitions, act gyp ceiling, millwork in new amanity areas, finishes where noted. mep deferredDetails
5th/f ste 600: demo of non structural interior partitions & new construction of interior partitions, act gyp ceiling, millwork in new amanity areas, finishes where noted. mep deferred | $1,419,496 |
| Jul 23, 2024 | In progress issued Jul 2024 | 255 Battery St | Coast Sign Incorporated | install (1) non-illuminated single faced wall sign "first citizens bank"Details
install (1) non-illuminated single faced wall sign "first citizens bank" | $4,500 |
| Jun 24, 2024 | In progress issued Jul 2024 | 300 California St | Gci, Inc | 7th-8th fl: demo only. non-structural partitions.Details
7th-8th fl: demo only. non-structural partitions. | $160,000 |
| May 25, 2023 | Completed final sign-off Sep 2023 | 300 California St | Build Group Inc. | 1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flrDetails
1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flr | $10,000 |
| Apr 12, 2023 | Completed final sign-off May 2023 | 300 California St | Novo Construction Inc | 7/f & 8/f: demolition of non structural partitions, doors, glazing. suites to remain unoccupied until a tenant improvment is filed per ab-17.Details
7/f & 8/f: demolition of non structural partitions, doors, glazing. suites to remain unoccupied until a tenant improvment is filed per ab-17. | $90,000 |
| Apr 10, 2023 | Completed final sign-off Apr 2023 | 300 California St | Pioneer Fire Inc. | convert 4 pendent sprinkler heads to uprightDetails
convert 4 pendent sprinkler heads to upright | $600 |
| Jul 19, 2022 | Completed final sign-off Nov 2022 | 255 Battery St | Berkeley Signs | non illuminated sign "sbv private" dimentional lettersDetails
non illuminated sign "sbv private" dimentional letters | $10,000 |
| Jan 3, 2022 | Completed final sign-off Mar 2022 | 255 Battery St | Novo Construction Inc | 1/f: tenant improvements in 2 existing rooms of an existing 8 story office building. improvements include minor demolition of existing partition to enlarge (e) idf room, minor construction within idf room, walls and floor finishes. no structural, exterior work, mechnical, electrical or plumbing.Details
1/f: tenant improvements in 2 existing rooms of an existing 8 story office building. improvements include minor demolition of existing partition to enlarge (e) idf room, minor construction within idf room, walls and floor finishes. no structural, exterior work, mechnical, electrical or plumbing. | $15,000 |
| Sep 16, 2021 | Completed final sign-off Sep 2021 | 300 California St | fire sprinkler: relocate 7, add 1 and delete 2 sprinklers on the 6th fl. t.i 2021 0630 3501Details
fire sprinkler: relocate 7, add 1 and delete 2 sprinklers on the 6th fl. t.i 2021 0630 3501 | $2,500 | |
| Sep 1, 2021 | Completed final sign-off Nov 2021 | 300 California St | Everon Llc | 6/f, #600: fire alarm t.i. add 7 horn/strobes, add 2 strobes only, and relocate 2 existing horn/strobes. ref. pa 202106303501.Details
6/f, #600: fire alarm t.i. add 7 horn/strobes, add 2 strobes only, and relocate 2 existing horn/strobes. ref. pa 202106303501. | $4,500 |
| Jun 30, 2021 | Completed final sign-off May 2022 | 300 California St | Gci, Inc | #600: new conferance rooms, pantry and reception, millwork, nw plumbing, lighting, power data, mechanical and partitions.Details
#600: new conferance rooms, pantry and reception, millwork, nw plumbing, lighting, power data, mechanical and partitions. | $385,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 300 California St | Sabah International Incorporated | voluntary. modify existing fire alarm system. remove(1) heat detector, add (3) control relays.Details
voluntary. modify existing fire alarm system. remove(1) heat detector, add (3) control relays. | $20,428 |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 300 California St | Eco Fire Sprinklers Inc | as-built plans for 201908280003- fire sprinklers. added 2 heads.Details
as-built plans for 201908280003- fire sprinklers. added 2 heads. | |
| Feb 3, 2020 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag.Details
revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag. | $10,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 300 California St | Thomas Swan Sign Co Inc | installation of 2 illuminated single-faced wall sign for "amazon go", sign a,bDetails
installation of 2 illuminated single-faced wall sign for "amazon go", sign a,b | $10,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 300 California St | Thomas Swan Sign Co Inc | installation of 2 illuminated double-faced projecting sign for "amazon go", sign c,dDetails
installation of 2 illuminated double-faced projecting sign for "amazon go", sign c,d | $10,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 300 California St | Build Group Inc. | permit for dph review health only. original permit 201912028428 not routed to healthDetails
permit for dph review health only. original permit 201912028428 not routed to health | |
| Jan 17, 2020 | Completed final sign-off Apr 2020 | 300 California St | Sabah International Incorporated | as built for 2019-0913-1554 remove monitoring of heat pumps. remove 2 fsd's to match field condition. corrected fa devices addresses & provide correct location of ahu per field conditionDetails
as built for 2019-0913-1554 remove monitoring of heat pumps. remove 2 fsd's to match field condition. corrected fa devices addresses & provide correct location of ahu per field condition | |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 300 California St | Sabah International Incorporated | 1st fl - modify existing fire alarm system, relocate 1 ceiling horn/strobe. add 1 ceiling horn/strobe, 2 wall strobes, 2 ceiling strobes. ref pa 201912028428 (asbuilt) & 201908027773Details
1st fl - modify existing fire alarm system, relocate 1 ceiling horn/strobe. add 1 ceiling horn/strobe, 2 wall strobes, 2 ceiling strobes. ref pa 201912028428 (asbuilt) & 201908027773 | $19,545 |
| Dec 2, 2019 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | revision to pa# 2019-0802-7773: revised layout and egress drawings. added new restrooms. ground floor amazon go.Details
revision to pa# 2019-0802-7773: revised layout and egress drawings. added new restrooms. ground floor amazon go. | $10,000 |
| Sep 13, 2019 | Completed final sign-off Apr 2020 | 300 California St | Sabah International Incorporated | ground fl - tenant improvement modify existing alarm add 9 duct smoke detector, 9 high power control relay, 7 single input module, 1 dual input module, 1 power supply, 9 horn/strobes, 4 strobes (ceiling), 1 strobe wall. ref pa 2019-0327-6386. n/a for maherDetails
ground fl - tenant improvement modify existing alarm add 9 duct smoke detector, 9 high power control relay, 7 single input module, 1 dual input module, 1 power supply, 9 horn/strobes, 4 strobes (ceiling), 1 strobe wall. ref pa 2019-0327-6386. n/a for maher | $25,142 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 300 California St | Eco Fire Sprinklers Inc | add 1 new pendent and redlocating 1 pendent for t.i. n/a maherDetails
add 1 new pendent and redlocating 1 pendent for t.i. n/a maher | $6,311 |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 300 California St | Thomas Swan Sign Co Inc | install non-electric single faced wall sign (boston private welth trust private bank)Details
install non-electric single faced wall sign (boston private welth trust private bank) | $5,000 |
| Aug 7, 2019 | Never finaled issued Aug 2019, no final | 300 California St | Thomas Swan Sign Co Inc | install non electrc painted wall sign (255)Details
install non electrc painted wall sign (255) | $1,000 |
| Aug 2, 2019 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | tenant interior renovation gr fl retail space with new interior partitions, finishes, fixtures, equipment amazon goDetails
tenant interior renovation gr fl retail space with new interior partitions, finishes, fixtures, equipment amazon go | $525,000 |
| Jul 29, 2019 | Never finaled issued Jul 2019, no final | 255 Battery St | per pa #201903276386, add address for bank at block 0238, lot 002 as; 255 battery street.Details
per pa #201903276386, add address for bank at block 0238, lot 002 as; 255 battery street. | ||
| Jul 16, 2019 | Completed final sign-off Oct 2022 | 300 California St | Ayoob & Peery Plumbing Co Inc | 1st flr fire sprinklers. add 27 sprinklers in order to conform to (n) wall and ceiling layout of tenant improvement.Details
1st flr fire sprinklers. add 27 sprinklers in order to conform to (n) wall and ceiling layout of tenant improvement. | $14,175 |
| Jun 25, 2019 | Expired or cancelled cancelled Jan 2026 | 300 California St | portions of (e) tenant in this location are to be removed, replaced and altered as part of a separate t.i. project, thiis pakcage provides drawings secifically for the demo of the portions of the (e) space to be altered. ab-017.Details
portions of (e) tenant in this location are to be removed, replaced and altered as part of a separate t.i. project, thiis pakcage provides drawings secifically for the demo of the portions of the (e) space to be altered. ab-017. | $12,000 | |
| May 14, 2019 | Completed final sign-off Oct 2019 | 300 California St | Red Hawk Fire & Security Ca Llc | ground fl - fire alarm ti. add 2 weatherproof horn/strobes in showers & 1 duct detector w/control relay for fsd. ref pa 2019-0327-6386Details
ground fl - fire alarm ti. add 2 weatherproof horn/strobes in showers & 1 duct detector w/control relay for fsd. ref pa 2019-0327-6386 | $1,600 |
| Apr 30, 2019 | Completed final sign-off May 2019 | 300 California St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinkler per ti. 11 add 5 relocateDetails
add and relocate fire sprinkler per ti. 11 add 5 relocate | $1,650 |
| Apr 23, 2019 | Completed final sign-off Oct 2022 | 300 California St | Ayoob & Peery Plumbing Co Inc | 1st fl. add (0), relocate (6) and plug (1) sprinklers to confirm with the new wall/ceiling of tenant improvementDetails
1st fl. add (0), relocate (6) and plug (1) sprinklers to confirm with the new wall/ceiling of tenant improvement | $1,350 |
| Apr 23, 2019 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | demo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac workDetails
demo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac work | $270,000 |
| Mar 27, 2019 | Never finaled issued Apr 2019, no final | 300 California St | Bcci Construction Company | 1st flr, tenant improvement to incl new private offices, meeting rooms & break area w/ associated mep workDetails
1st flr, tenant improvement to incl new private offices, meeting rooms & break area w/ associated mep work | $1,800,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 300 California St | D A Pope Inc | 1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.Details
1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a. | $50,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 300 California St | Fire Alarm System Services | 1/f: add 2 duct smoke & 2 relay ref pa 2018-0518-9531 and 2018-0703-3589Details
1/f: add 2 duct smoke & 2 relay ref pa 2018-0518-9531 and 2018-0703-3589 | $4,224 |
| Oct 1, 2018 | Completed final sign-off Jan 2019 | 300 California St | Bcci Construction Company | 8th fl furniture plan per inspector. ref 201805229737, 201806212536Details
8th fl furniture plan per inspector. ref 201805229737, 201806212536 | |
| Sep 28, 2018 | Never finaled issued Oct 2018, no final | 300 California St | Build Group Inc. | mechanical revison to pa#201804045494. n/a for maher.Details
mechanical revison to pa#201804045494. n/a for maher. | |
| Sep 11, 2018 | Completed final sign-off Oct 2018 | 300 California St | Fire Alarm System Services | 1st flr - revision to 201807033591 add 1 fsd, add music shut down, correct matrix for pull statons ref bld 201804045494Details
1st flr - revision to 201807033591 add 1 fsd, add music shut down, correct matrix for pull statons ref bld 201804045494 | |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 300 California St | Fire Alarm System Services | 7th flr - revision to fa ref pa 201807305823 as builts - update existing field conditions per site survey and show relocation locations. one less (e) device affecting voltage drop calcs. bld ref pa 201803163854Details
7th flr - revision to fa ref pa 201807305823 as builts - update existing field conditions per site survey and show relocation locations. one less (e) device affecting voltage drop calcs. bld ref pa 201803163854 | |
| Aug 20, 2018 | Never finaled issued Aug 2018, no final | 300 California St | A- Ace Sign Company | "amazon go" - single faced channel letter electric wall signDetails
"amazon go" - single faced channel letter electric wall sign | $4,000 |
| Aug 20, 2018 | Never finaled issued Aug 2018, no final | 300 California St | A- Ace Sign Company | vinyl window door signs | $1,000 |
| Aug 20, 2018 | Never finaled issued Aug 2018, no final | 300 California St | A- Ace Sign Company | "amazon go" channel letters at east elevation, electric wall signDetails
"amazon go" channel letters at east elevation, electric wall sign | $4,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2018 | 300 California St | Ayoob & Peery Plumbing Co Inc | 1st flr - relocate fire sprinkler per ti 7 relocate and 4 plug ref pa#201805189535 & 201805189531Details
1st flr - relocate fire sprinkler per ti 7 relocate and 4 plug ref pa#201805189535 & 201805189531 | $1,575 |
| Aug 3, 2018 | Completed final sign-off Nov 2018 | 300 California St | Golden Gate Fire Protection Inc | 8/f: rev pa# 201807245345 & 201803163854; fire sprinkler only, as built to fire permit plumbing inspector wants to show additional pendents on planDetails
8/f: rev pa# 201807245345 & 201803163854; fire sprinkler only, as built to fire permit plumbing inspector wants to show additional pendents on plan | |
| Jul 30, 2018 | Completed final sign-off Nov 2018 | 300 California St | Fire Alarm System Services | 8th flr -add new horn strobes and relocate (e) horn strobes & station maher na. ref pa 2018-0522-9737Details
8th flr -add new horn strobes and relocate (e) horn strobes & station maher na. ref pa 2018-0522-9737 | $5,000 |
| Jul 30, 2018 | Completed final sign-off Nov 2018 | 300 California St | Fire Alarm System Services | 7th flr -add new strobes and relocate (e) horn strobes. ref pa 2018-0316-3854 maher naDetails
7th flr -add new strobes and relocate (e) horn strobes. ref pa 2018-0316-3854 maher na | $5,000 |
| Jul 27, 2018 | Completed final sign-off Jan 2019 | 300 California St | Bcci Construction Company | floor 8 mep, deferred permit for prev app 201805229737, install new vav bvox, exhaust fan, split system for idf foom, modify e duct work for new fl planDetails
floor 8 mep, deferred permit for prev app 201805229737, install new vav bvox, exhaust fan, split system for idf foom, modify e duct work for new fl plan | $35,000 |
| Jul 24, 2018 | Completed final sign-off Jul 2018 | 300 California St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 15 pendents and 14 uprights, add 2 pendents for igt. t.i. on the 8th floor. app#2018-03-16-3854Details
fire sprinkler only. relocate 15 pendents and 14 uprights, add 2 pendents for igt. t.i. on the 8th floor. app#2018-03-16-3854 | $16,500 |
| Jul 3, 2018 | Completed final sign-off Oct 2018 | 300 California St | Fire Alarm System Services | fire alarm ti first floor- add 2 smoke dectectors, 6 duct detectors, 1 pull stations , 4 strobes and 8 horn strobes.Details
fire alarm ti first floor- add 2 smoke dectectors, 6 duct detectors, 1 pull stations , 4 strobes and 8 horn strobes. | $5,000 |
| Jul 3, 2018 | Never finaled issued Jul 2018, no final | 300 California St | Fire Alarm System Services | fire alarm ti first floor- add 1 pull and 3 horn strobes, relocate existing horn strobesDetails
fire alarm ti first floor- add 1 pull and 3 horn strobes, relocate existing horn strobes | $5,000 |
| Jun 21, 2018 | Completed final sign-off Jan 2019 | 300 California St | Mc Millan Electric | electrical pemrit work only. ref 201805229737 maher not reqDetails
electrical pemrit work only. ref 201805229737 maher not req | $350,000 |
| Jun 8, 2018 | Completed final sign-off Aug 2018 | 300 California St | Eco Fire Sprinklers Inc | ref pa# 201804045494: install 48 new upright sprinklers 6 pendent sprinklers and 2 day sprinklers in area of work for t.tDetails
ref pa# 201804045494: install 48 new upright sprinklers 6 pendent sprinklers and 2 day sprinklers in area of work for t.t | $25,000 |
| May 22, 2018 | Completed final sign-off Jan 2019 | 300 California St | Bcci Construction Company | 8th flr - demo and ti build back for office space, full floor. mep/fire under separate permits. no access controlled lobby doors under this permit.Details
8th flr - demo and ti build back for office space, full floor. mep/fire under separate permits. no access controlled lobby doors under this permit. | $550,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no maheDetails
demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe | $250,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permitsDetails
amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits | $300,000 |
| May 14, 2018 | Never finaled issued Jun 2018, no final | 300 California St | Build Group Inc. | deferred submittal for health plan check review of retail ti space. ref 201804045494 for approved ti drawingsDetails
deferred submittal for health plan check review of retail ti space. ref 201804045494 for approved ti drawings | |
| Apr 4, 2018 | Completed final sign-off Nov 2018 | 300 California St | Build Group Inc. | new build-out of existing tenant space including non-structural framing, plumbing,electrical, mechanical and interior decorative materials & surfacesDetails
new build-out of existing tenant space including non-structural framing, plumbing,electrical, mechanical and interior decorative materials & surfaces | $1,264,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 300 California St | Bcci Construction Company | 7th flr - limited demo, enclosure of (e) communicating stair. maher n/aDetails
7th flr - limited demo, enclosure of (e) communicating stair. maher n/a | $106,337 |
| Jan 4, 2018 | Never finaled issued May 2018, no final | 300 California St | Build Group Inc. | g/f -ti- prepare (e) retail space a for futre retail tenant under separate ti permit. . construct new demising wall at north side of entrance space south of gridline. new exit corridor wall to define future tenant space. replace entry doors - modify (e) concrete slab maher naDetails
g/f -ti- prepare (e) retail space a for futre retail tenant under separate ti permit. . construct new demising wall at north side of entrance space south of gridline. new exit corridor wall to define future tenant space. replace entry doors - modify (e) concrete slab maher na | $90,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2017 | 300 California St | Red Hawk Fire & Security Ca Llc | 3rd floor: fire alarm as built for app#201710161300. n/a for maherDetails
3rd floor: fire alarm as built for app#201710161300. n/a for maher | |
| Oct 16, 2017 | Completed final sign-off Nov 2017 | 300 California St | Red Hawk Fire & Security Ca Llc | 3/f- fire alarm t.i., add (16) wall mount horn/strobes, (3) ceiling horn/strobes, (5) wall mount strobes, (4) ceiling strobes & (1) control relay for security interface. t.i. pa#201705247498. n/a ordinance #155-13Details
3/f- fire alarm t.i., add (16) wall mount horn/strobes, (3) ceiling horn/strobes, (5) wall mount strobes, (4) ceiling strobes & (1) control relay for security interface. t.i. pa#201705247498. n/a ordinance #155-13 | $14,000 |
| Sep 7, 2017 | Completed final sign-off Oct 2017 | 300 California St | Ayoob & Peery Plumbing Co Inc | 3rd floor: relocate fire sprinklers per t.i. plug outlets. 24 relocate and 9 plug. ref app#201705247498. n/a for maherDetails
3rd floor: relocate fire sprinklers per t.i. plug outlets. 24 relocate and 9 plug. ref app#201705247498. n/a for maher | $5,475 |
| Aug 31, 2017 | Completed final sign-off Nov 2017 | 300 California St | D A Pope Inc | revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.Details
revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher. | |
| May 24, 2017 | Expired or cancelled withdrawn Feb 2025 | 300 California St | 4th flr: demo (e) offices, recpt area, supply/stroage room. replace non accessible lavs w/2 new accessible lavs. new coffee area, new open office and 1 new storage rm. convert 2 offices into 1 large conference toom. relocate (e) accessible drinking fountains. maher naDetails
4th flr: demo (e) offices, recpt area, supply/stroage room. replace non accessible lavs w/2 new accessible lavs. new coffee area, new open office and 1 new storage rm. convert 2 offices into 1 large conference toom. relocate (e) accessible drinking fountains. maher na | $185,385 | |
| May 24, 2017 | Completed final sign-off Nov 2017 | 300 California St | D A Pope Inc | 3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher naDetails
3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher na | $385,000 |
| May 9, 2017 | Completed final sign-off Dec 2017 | 300 California St | D A Pope Inc | revise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/aDetails
revise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/a | $130,000 |
| Sep 30, 2016 | Completed final sign-off Nov 2016 | 300 California St | Red Hawk Fire & Security Ca Llc | 5th & 6th floor fire alarm t.i. - add 3 horn/strobes & 3 strobe only on 5th floor. 6th floor devices remain unchanged. ref #201607253204. n/a for maher.Details
5th & 6th floor fire alarm t.i. - add 3 horn/strobes & 3 strobe only on 5th floor. 6th floor devices remain unchanged. ref #201607253204. n/a for maher. | $3,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 300 California St | Clune Construction Company L P | #500 & #600 - t.i. including furniture, flooring, doors, frame & decorative lighting. n/a ordinance #155-13Details
#500 & #600 - t.i. including furniture, flooring, doors, frame & decorative lighting. n/a ordinance #155-13 | $320,000 |
| Apr 16, 2014 | Never finaled issued Apr 2014, no final | 300 California St | street space | ||
| Oct 11, 2013 | Never finaled issued Oct 2013, no final | 300 California St | D A Pope Inc | addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearanceDetails
addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearance | $32,000 |
| Jun 26, 2013 | Completed final sign-off Jan 2014 | 300 California St | Red Hawk Fire & Security Ca Llc | 1st floor t.i. of existing fire alarm system - scope of work is to provide a control relay for the access system on the ground floor. access control work to be done under separate permitDetails
1st floor t.i. of existing fire alarm system - scope of work is to provide a control relay for the access system on the ground floor. access control work to be done under separate permit | $5,000 |
| Dec 19, 2012 | Never finaled issued Dec 2012, no final | 300 California St | Tri-Signal Integration Inc. | 3rd floor-add 12 horn/strobes & 6 strobes to (e) fire alarm system. ti pa# 2012-1129-5089Details
3rd floor-add 12 horn/strobes & 6 strobes to (e) fire alarm system. ti pa# 2012-1129-5089 | $7,200 |
| Nov 29, 2012 | Expired or cancelled cancelled Jan 2014 | 300 California St | D A Pope Inc | 3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit.Details
3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit. | $125,000 |
| Apr 18, 2012 | Completed final sign-off Jul 2012 | 300 California St | Young Electric Sign Co. | revision to pa# 2011-1031-7944-erect a non electric wall single faced non illuminated panelDetails
revision to pa# 2011-1031-7944-erect a non electric wall single faced non illuminated panel | $500 |
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 300 California St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. @300 california 2nd flr, spec ste b, 1 wall horn/strobe, 2 wall strobesDetails
fire alarm t.i. @300 california 2nd flr, spec ste b, 1 wall horn/strobe, 2 wall strobes | $3,287 |
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 300 California St | Red Hawk Fire & Security Ca Llc | fire alarm t.f @ 300 montgomery st, 2nd fl, suite c, 1 wall horn/strobe & 2 wall strobes.Details
fire alarm t.f @ 300 montgomery st, 2nd fl, suite c, 1 wall horn/strobe & 2 wall strobes. | $3,483 |
| Feb 9, 2012 | Completed final sign-off Mar 2012 | 300 California St | Pribuss Engineering Inc | 2nd floor fire sprinkler t.i. relocate 26 sprinklers, 4 plugs(outlets). add 14 sprinklers. total 40.Details
2nd floor fire sprinkler t.i. relocate 26 sprinklers, 4 plugs(outlets). add 14 sprinklers. total 40. | $20,585 |
| Jan 6, 2012 | Completed final sign-off Mar 2012 | 300 California St | 2nd floor & 4th floor evacuation map.Details
2nd floor & 4th floor evacuation map. | $2,000 | |
| Dec 14, 2011 | Completed final sign-off Mar 2012 | 300 California St | 5 evacuation signs for 5th floor. 5 evacuation signs for 6th floor.Details
5 evacuation signs for 5th floor. 5 evacuation signs for 6th floor. | $1,000 | |
| Dec 1, 2011 | Completed final sign-off Mar 2012 | 300 California St | Swinerton Builders | 5th floor:revision to stairwell door hardware sets. revision to app#201108112243Details
5th floor:revision to stairwell door hardware sets. revision to app#201108112243 | |
| Dec 1, 2011 | Completed final sign-off Mar 2012 | 300 California St | Swinerton Builders | 6th floor:changes to interior stairwell door hardware sets. revision to app#20110725091`9Details
6th floor:changes to interior stairwell door hardware sets. revision to app#20110725091`9 | |
| Dec 1, 2011 | Completed final sign-off Apr 2012 | 300 California St | Swinerton Builders | 4th floor:revision to stairwell door hardware sets. revision to app#201108112276Details
4th floor:revision to stairwell door hardware sets. revision to app#201108112276 | |
| Nov 21, 2011 | Completed final sign-off Jun 2012 | 300 California St | D A Pope Inc | 2nd floor suite b:selective demo of extg improvements(non-load bearing)new partitions, doors/frames/hardware and interior finishes. mechanical and electrical under seperate permit. sprinkler and life safety under seperate permit.Details
2nd floor suite b:selective demo of extg improvements(non-load bearing)new partitions, doors/frames/hardware and interior finishes. mechanical and electrical under seperate permit. sprinkler and life safety under seperate permit. | $120,000 |
| Nov 21, 2011 | Completed final sign-off Jun 2012 | 300 California St | D A Pope Inc | 2nd floor suite c:selective demo of extg improvements(non-load bearing)new partitions, doors/frames/hardware and interior finishes. mechanical and electrical under seperate permit. sprinkler and life safety under seperate permit.Details
2nd floor suite c:selective demo of extg improvements(non-load bearing)new partitions, doors/frames/hardware and interior finishes. mechanical and electrical under seperate permit. sprinkler and life safety under seperate permit. | $120,000 |
| Nov 16, 2011 | Never finaled issued Nov 2011, no final | 300 California St | Red Hawk Fire & Security Ca Llc | on floors 2, 4, 5, & 6 - 89 added horn/strobes,10 added strobes, 2 added door holders,24 added duct detectors, 5 added pull stations,1 added power supply, 23 added smoke detDetails
on floors 2, 4, 5, & 6 - 89 added horn/strobes,10 added strobes, 2 added door holders,24 added duct detectors, 5 added pull stations,1 added power supply, 23 added smoke det | $20,000 |
| Nov 16, 2011 | Completed final sign-off Mar 2012 | 300 California St | Pribuss Engineering Inc | floors 2,4,5,6-fire sprinkler t.i. -2nd flr: remove/add 22, change out 24, relocate 21 (total 67 sprinkelrs). 4th flr:add 109, remove 6, relocate 28 (total 137 sprinkers). 5th flr:add 116, relocate 20, remove 5 (total 136 sprinkler). 6th flr: add 95, remove 1, c.o.-3, relocate 34 (total 132 sprinkl)Details
floors 2,4,5,6-fire sprinkler t.i. -2nd flr: remove/add 22, change out 24, relocate 21 (total 67 sprinkelrs). 4th flr:add 109, remove 6, relocate 28 (total 137 sprinkers). 5th flr:add 116, relocate 20, remove 5 (total 136 sprinkler). 6th flr: add 95, remove 1, c.o.-3, relocate 34 (total 132 sprinkl) | $242,901 |
| Oct 31, 2011 | Completed final sign-off Jul 2012 | 300 California St | Young Electric Sign Co. | to erect an electric lighted single faced wall signDetails
to erect an electric lighted single faced wall sign | $5,000 |
| Aug 12, 2011 | Completed final sign-off Mar 2012 | 300 California St | Swinerton Builders | 2nd floor-minor demo, installation of non-structural partitions, finishes, mech, elec., & plumbing. fire sprinklers & fire alarm work to be issued under separate permit.Details
2nd floor-minor demo, installation of non-structural partitions, finishes, mech, elec., & plumbing. fire sprinklers & fire alarm work to be issued under separate permit. | $700,000 |
| Aug 11, 2011 | Completed final sign-off Mar 2012 | 300 California St | Swinerton Builders | interior non structural partitions, finishes, mech, electrical, plumbing system are to be upgraded at 5th floor. fire sprinklers and fire alarm work is to be issued under seperate permit.Details
interior non structural partitions, finishes, mech, electrical, plumbing system are to be upgraded at 5th floor. fire sprinklers and fire alarm work is to be issued under seperate permit. | $1,240,000 |
| Aug 11, 2011 | Completed final sign-off Apr 2012 | 300 California St | Swinerton Builders | minor demo. installation of non-structural partitions, finishes, mech, elec, and plumbing. fire sprinklers and fire alarm work to be issued under separate permit.Details
minor demo. installation of non-structural partitions, finishes, mech, elec, and plumbing. fire sprinklers and fire alarm work to be issued under separate permit. | $1,240,000 |
| Jul 25, 2011 | Completed final sign-off Mar 2012 | 300 California St | Swinerton Builders | 6th floor-remodeled for new tenant-aecom-interior partitions, finishes, mechanical, electrical, plumbing, information tech & systems are to be updated & added onto. 2 new handicap accessible toilet & shower rooms are also being added tooDetails
6th floor-remodeled for new tenant-aecom-interior partitions, finishes, mechanical, electrical, plumbing, information tech & systems are to be updated & added onto. 2 new handicap accessible toilet & shower rooms are also being added too | $1,500,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 300 California St | Anderson, Rowe & Buckley, Inc. | t.i. improvements. extg fire sprinkler system. 19 added sprinklers,3 removed sprinklers,3 removed sprinklers, 29 relocated sprinklers at 7th floorDetails
t.i. improvements. extg fire sprinkler system. 19 added sprinklers,3 removed sprinklers,3 removed sprinklers, 29 relocated sprinklers at 7th floor | $24,000 |
| Jun 17, 2011 | Completed final sign-off Nov 2011 | 300 California St | Red Hawk Fire & Security Ca Llc | 7th floor ste 700 fire alarm t.i. - (3) wall mounted horn/strobes, (14) relcoate existing horn/strobes & strobes.Details
7th floor ste 700 fire alarm t.i. - (3) wall mounted horn/strobes, (14) relcoate existing horn/strobes & strobes. | $5,238 |
| Apr 7, 2011 | Completed final sign-off Nov 2011 | 300 California St | D A Pope Inc | 7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor.Details
7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor. | $50,000 |
| Mar 31, 2011 | Completed final sign-off Nov 2011 | 300 California St | D A Pope Inc | modification of existing tenant improvement space includes demo and contruction of non load bearing partitions, new doors, sidelight. partial ceilings and cabinetryDetails
modification of existing tenant improvement space includes demo and contruction of non load bearing partitions, new doors, sidelight. partial ceilings and cabinetry | $150,000 |
| Aug 10, 2010 | Never finaled issued Aug 2010, no final | 300 California St | D A Pope Inc | suite 600: scope of work to be second generation tenant improvement on the 6th. flr. to consist of 2,898 s.f. remodel area. space to include non-bearing partitions for offices, small break room & conf. rm.Details
suite 600: scope of work to be second generation tenant improvement on the 6th. flr. to consist of 2,898 s.f. remodel area. space to include non-bearing partitions for offices, small break room & conf. rm. | $230,000 |
| Jun 30, 2009 | Completed final sign-off Aug 2009 | 300 California St | D A Pope Inc | electrical title 24 deferred sumbittal for existing arch app 200906089929Details
electrical title 24 deferred sumbittal for existing arch app 200906089929 | $19,851 |
| Jun 25, 2009 | Completed final sign-off Aug 2009 | 300 California St | Pribuss Engineering Inc | add 4 sprinkler heads, relocate 5 heads on the 8th floor,Details
add 4 sprinkler heads, relocate 5 heads on the 8th floor, | $2,700 |
| Jun 8, 2009 | Completed final sign-off Aug 2009 | 300 California St | D A Pope Inc | modifications to existing 8th fl tenant space suite 800. demo/construct non load bearing partitions, relocation of light fixtures,demo of existing gyp bd ceiling, new acoutistical ceiling , new doors, finishes, exit light changes. mep sep permitDetails
modifications to existing 8th fl tenant space suite 800. demo/construct non load bearing partitions, relocation of light fixtures,demo of existing gyp bd ceiling, new acoutistical ceiling , new doors, finishes, exit light changes. mep sep permit | $45,000 |
| Apr 27, 2009 | Never finaled issued May 2009, no final | 300 California St | street space permit only. | ||
| Mar 5, 2009 | Completed final sign-off Mar 2009 | 300 California St | Pribuss Engineering Inc | renew pa# 2006/02/09/4205 to obtain final inspection. all work has been completed.Details
renew pa# 2006/02/09/4205 to obtain final inspection. all work has been completed. | |
| Nov 24, 2008 | Completed final sign-off Jun 2010 | 300 California St | voluntary seismic upgrade br basement to 8th fl, all finish damaged will be repaired, no exterior facade wall involved, existing path of travel upgrade.Details
voluntary seismic upgrade br basement to 8th fl, all finish damaged will be repaired, no exterior facade wall involved, existing path of travel upgrade. | $1,000,000 | |
| Nov 1, 2007 | Never finaled issued Nov 2007, no final | 300 California St | street space | ||
| Aug 27, 2007 | Never finaled issued Mar 2008, no final | 300 California St | voluntary structural upgrade from basement through 4th floor. no exterior work.Details
voluntary structural upgrade from basement through 4th floor. no exterior work. | $2,400,000 | |
| Sep 21, 2006 | Expired or cancelled expired Apr 2009 | 300 California St | Mc Millan Electric | install fire alarm devices: 9 heat detectors, 1 control & monitor modules for elevator shunt trips. 1 monitor module for water flue & temper switch.Details
install fire alarm devices: 9 heat detectors, 1 control & monitor modules for elevator shunt trips. 1 monitor module for water flue & temper switch. | $5,000 |
| Sep 19, 2006 | Expired or cancelled withdrawn Jun 2007 | 300 California St | voluntary seismic upgrade from basement to 4th floor | $250,000 | |
| Feb 9, 2006 | Completed final sign-off Apr 2006 | 300 California St | Pribuss Engineering Inc | fire sprinkler umbrella permit, as built, compliance with highrise spkr ordinance #377-93.Details
fire sprinkler umbrella permit, as built, compliance with highrise spkr ordinance #377-93. | |
| Feb 9, 2006 | Expired or cancelled expired Feb 2009 | 300 California St | Pribuss Engineering Inc | fire sprinkler t.i.- 4th fl-6 heads, 6th fl-4 heads, 8th fl-2 heads. demo abandened pump-basement & garage.Details
fire sprinkler t.i.- 4th fl-6 heads, 6th fl-4 heads, 8th fl-2 heads. demo abandened pump-basement & garage. | $2,800 |
| Jan 26, 2006 | Expired or cancelled expired Sep 2006 | 300 California St | Pribuss Engineering Inc | penthouse (elev. equip.) 16 sprinklers.Details
penthouse (elev. equip.) 16 sprinklers. | $2,200 |
| Oct 22, 2004 | Expired or cancelled expired Sep 2006 | 300 California St | Pribuss Engineering Inc | 5th/fl base fire spkr sys. | $30,000 |
| Jul 14, 2004 | Never finaled issued Sep 2004, no final | 300 California St | Pribuss Engineering Inc | 4/f- base fire sprinkler systemsDetails
4/f- base fire sprinkler systems | $30,000 |
| Apr 10, 2003 | Expired or cancelled expired Mar 2004 | 300 California St | Pribuss Engineering Inc | base fire spkr sys- 6th floor, total 114 heads, 6th flrDetails
base fire spkr sys- 6th floor, total 114 heads, 6th flr | $20,000 |
| Feb 12, 2003 | Expired or cancelled expired Mar 2004 | 300 California St | Censource Inc | erect sign of electric, wall projecting, double facedDetails
erect sign of electric, wall projecting, double faced | $19,000 |
| Oct 10, 2002 | Expired or cancelled expired Mar 2004 | 300 California St | Pribuss Engineering Inc | as built as requested for appl#200206219603Details
as built as requested for appl#200206219603 | |
| Aug 1, 2002 | Completed final sign-off Sep 2002 | 300 California St | Bcci Construction Company | minor life safety work on the grnd flrDetails
minor life safety work on the grnd flr | $1,800 |
| Aug 1, 2002 | Completed final sign-off Sep 2002 | 300 California St | Bcci Construction Company | engr lighting & title 24 & power plan for electrical work associated with 2002/04/29/5218 on grd fl.Details
engr lighting & title 24 & power plan for electrical work associated with 2002/04/29/5218 on grd fl. | $14,000 |
| Jul 1, 2002 | Completed final sign-off Sep 2002 | 300 California St | fire sprinkler tenant improvements-relocate 6 heads on ground floorDetails
fire sprinkler tenant improvements-relocate 6 heads on ground floor | $950 | |
| Jun 21, 2002 | Expired or cancelled expired Mar 2004 | 300 California St | Pribuss Engineering Inc | add sprinklers to bathrooms,mech rms,stairs 2nd,1st,mezz,thru 8th flDetails
add sprinklers to bathrooms,mech rms,stairs 2nd,1st,mezz,thru 8th fl | $80,500 |
| Jun 21, 2002 | Expired or cancelled cancelled Nov 2024 | 300 California St | Pribuss Engineering Inc | add spkrs to bathrooms-mech rms stairs 2nd-1st floor mezzanine thru 8th floofDetails
add spkrs to bathrooms-mech rms stairs 2nd-1st floor mezzanine thru 8th floof | $80,500 |
| May 22, 2002 | Completed final sign-off Jun 2002 | 300 California St | Calmac Installations | plan clasification requested by fiel ispector/revision to app#200112286034/200204255025Details
plan clasification requested by fiel ispector/revision to app#200112286034/200204255025 | $100 |
| Apr 29, 2002 | Completed final sign-off Sep 2002 | 300 California St | install cafe includes millwork, finishes, kitchen equipment, elec/ltg. refurbish storefrontDetails
install cafe includes millwork, finishes, kitchen equipment, elec/ltg. refurbish storefront | $60,000 | |
| Apr 25, 2002 | Expired or cancelled cancelled Feb 2003 | 300 California St | rev. appl#200202048345 revise racking incorporating the pipp mobile systemDetails
rev. appl#200202048345 revise racking incorporating the pipp mobile system | $10,000 | |
| Apr 12, 2002 | Completed final sign-off Jun 2002 | 300 California St | Rice Fire Protection | 1/fl- cut 78 heads to fit new ceiling, cut in 1 new head in back rm, add 6 new 200' uprights in backDetails
1/fl- cut 78 heads to fit new ceiling, cut in 1 new head in back rm, add 6 new 200' uprights in back | $9,000 |
| Apr 12, 2002 | Completed final sign-off Jun 2002 | 300 California St | Orange County Air Condition, Inc. | relocate (e) ducts, diffusioins & zone controls as per plans for new tennord on 1st fl.Details
relocate (e) ducts, diffusioins & zone controls as per plans for new tennord on 1st fl. | $20,000 |
| Apr 2, 2002 | Completed final sign-off May 2002 | 300 California St | Sign Industries Inc | erect single faced electric wall signDetails
erect single faced electric wall sign | |
| Mar 25, 2002 | Expired or cancelled expired Nov 2002 | 300 California St | Comm Air Mechanical | install heat pump to serve 5th flr,computer room incl associated piping,ductwork & controlsDetails
install heat pump to serve 5th flr,computer room incl associated piping,ductwork & controls | $25,000 |
| Mar 25, 2002 | Completed final sign-off Jul 2002 | 300 California St | Calmac Installations | fire alarm rev. #2 to appl#200112286034Details
fire alarm rev. #2 to appl#200112286034 | |
| Feb 4, 2002 | Completed final sign-off Jul 2002 | 300 California St | installation of storage racks & gondolosDetails
installation of storage racks & gondolos | $45,000 | |
| Dec 28, 2001 | Completed final sign-off Jul 2002 | 300 California St | Calmac Installations | 1st fl.- new interior partitions/floor covering/t bar clg/elec./ltgs/power, plumb new fix.inter demoDetails
1st fl.- new interior partitions/floor covering/t bar clg/elec./ltgs/power, plumb new fix.inter demo | $450,000 |
| Oct 3, 2001 | Expired or cancelled expired Jul 2002 | 300 California St | Bryan J. Valverde Co | remove under grib partitions 25 gauge studs w 5/8 gypsum both sides.patch carpetDetails
remove under grib partitions 25 gauge studs w 5/8 gypsum both sides.patch carpet | $18,000 |
| Apr 6, 2001 | Expired or cancelled expired Aug 2001 | 300 California St | Fisher Development Inc | renew appl#200012127712 & 9925873 for final inspectionDetails
renew appl#200012127712 & 9925873 for final inspection | |
| Dec 12, 2000 | Completed final sign-off Jan 2001 | 300 California St | Fisher Development Inc | to complete the horn strobes on 3 &4/fl appl#09925873 final insepctionDetails
to complete the horn strobes on 3 &4/fl appl#09925873 final insepction | |
| Dec 1, 2000 | Expired or cancelled expired Apr 2001 | 300 California St | Fisher Development Inc | revision to roof cooler base connection detail no new concrete installed app 2000/07/12/4899Details
revision to roof cooler base connection detail no new concrete installed app 2000/07/12/4899 | $600 |
| Nov 30, 2000 | Expired or cancelled expired Dec 2001 | 300 California St | Pribuss Engineering Inc | fire sprinkler | $28,500 |
| Nov 21, 2000 | Completed final sign-off Jan 2001 | 300 California St | Fisher Development Inc | fire alarm-horn & strobes-3rd floorDetails
fire alarm-horn & strobes-3rd floor | $15,000 |
| Oct 31, 2000 | Expired or cancelled expired Feb 2001 | 300 California St | Bcci Construction Company | final inspection of 9911902,9920569 and 9921817Details
final inspection of 9911902,9920569 and 9921817 | |
| Sep 15, 2000 | Completed final sign-off Jan 2001 | 300 California St | Fisher Development Inc | oti-2 3rd fl el, meDetails
oti-2 3rd fl el, me | $150,000 |
| Sep 15, 2000 | Completed final sign-off Jan 2001 | 300 California St | Fisher Development Inc | oti-1 3rd flr el,me,ls, spDetails
oti-1 3rd flr el,me,ls, sp | $350,000 |
| Sep 6, 2000 | Expired or cancelled expired Mar 2001 | 300 California St | Fisher Development Inc | demolition of third floor t.i. space-complete (interior demolition-non structural only)Details
demolition of third floor t.i. space-complete (interior demolition-non structural only) | $20,000 |
| Aug 16, 2000 | Completed final sign-off Feb 2001 | 300 California St | Paganini Electric Corp(See Signatories) | oti-3 2nd floor lsDetails
oti-3 2nd floor ls | $19,000 |
| Aug 16, 2000 | Completed final sign-off Feb 2001 | 300 California St | Sabah International Incorporated | provide & install an fmz00 fire supperession system @ 2nd fl.Details
provide & install an fmz00 fire supperession system @ 2nd fl. | $44,645 |
| Jul 14, 2000 | Completed final sign-off Feb 2001 | 300 California St | Pribuss Engineering Inc | fire sprinklersDetails
fire sprinklers | $45,000 |
| Jul 12, 2000 | Completed final sign-off Feb 2001 | 300 California St | Fisher Development Inc | revision to architectural,, m.e.p. & new structuralDetails
revision to architectural,, m.e.p. & new structural | $2,000 |
| May 31, 2000 | Completed final sign-off Aug 2000 | 300 California St | J S J Electrical Display Corp | erect signDetails
erect sign | |
| May 5, 2000 | Completed final sign-off Feb 2001 | 300 California St | Fisher Development Inc | oti 2 2nd fl el meDetails
oti 2 2nd fl el me | $150,000 |
| May 5, 2000 | Completed final sign-off Feb 2001 | 300 California St | Fisher Development Inc | oti-1 2nd floor el me ls spDetails
oti-1 2nd floor el me ls sp | $200,000 |
| Apr 25, 2000 | Completed final sign-off Feb 2001 | 300 California St | Fisher Development Inc | demo of second floor t.i. space - complete.Details
demo of second floor t.i. space - complete. | $20,000 |
| Apr 13, 2000 | Expired or cancelled expired May 2002 | 300 California St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work ground floor-2000/03/24/5338Details
provide tenant fire protection work ground floor-2000/03/24/5338 | $21,000 |
| Apr 6, 2000 | Expired or cancelled expired May 2002 | 300 California St | Paganini Electric Corp(See Signatories) | install new life safety to tenant space-groundfloorDetails
install new life safety to tenant space-groundfloor | $28,000 |
| Mar 30, 2000 | Expired or cancelled expired May 2001 | 300 California St | Pribuss Engineering Inc | fire sprinklers-as built-basement & ground per inspechoe-relcate main fees paid under pa-9917178Details
fire sprinklers-as built-basement & ground per inspechoe-relcate main fees paid under pa-9917178 | |
| Mar 24, 2000 | Expired or cancelled expired May 2002 | 300 California St | one-stop,int t.i. of outpatient medical clinic,incl m.e.p. (n) finishes,(n) partitionsDetails
one-stop,int t.i. of outpatient medical clinic,incl m.e.p. (n) finishes,(n) partitions | $350,000 | |
| Mar 8, 2000 | Expired or cancelled expired Sep 2000 | 300 California St | int non-structural demo in advance of tenant improvement-non-structural onlyDetails
int non-structural demo in advance of tenant improvement-non-structural only | $6,750 | |
| Mar 6, 2000 | Expired or cancelled expired Mar 2001 | 300 California St | demolition & partitions, electrical, mech & strl support-mecDetails
demolition & partitions, electrical, mech & strl support-mec | $75,000 | |
| Mar 1, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | fire alarm system | $4,350 | |
| Feb 17, 2000 | Completed final sign-off Nov 2000 | 300 California St | Paganini Electric Corp(See Signatories) | life safety upgrade for building core, install new control panel.Details
life safety upgrade for building core, install new control panel. | $51,000 |
| Feb 15, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | Swinerton Builders | oti-3 8th floor l.s. only | $10,000 |
| Feb 15, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | Swinerton Builders | oti-3 ls 7th floor | $10,000 |
| Feb 15, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | oti-3 5th floor ls only | $10,000 | |
| Feb 15, 2000 | Expired or cancelled expired Jul 2000 | 300 California St | oti-3 5th floor l/s only | $5,000 | |
| Feb 11, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | Swinerton Builders | oti 2, 7th floor, sp | $22,000 |
| Feb 4, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | oti-2, sp 5th fl | $6,000 | |
| Feb 4, 2000 | Expired or cancelled expired Aug 2000 | 300 California St | Swinerton Builders | oti-2 sp, 8th floor | $22,000 |
| Jan 27, 2000 | Expired or cancelled expired Feb 2001 | 300 California St | oti-2, el, me, ls, 8th floor | $150,000 | |
| Jan 23, 2000 | Expired or cancelled expired Jan 2001 | 300 California St | oti-2, el, me, ls, 7th floor | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D A Pope Inc (16), Pribuss Engineering Inc (16), Gci, Inc (14), Fisher Development Inc (11), Swinerton Builders (11), Build Group Inc. (9), Red Hawk Fire & Security Ca Llc (9), Bcci Construction Company (8), Everon Llc (7), Fire Alarm System Services (7), Pioneer Fire Inc. (7), Ayoob & Peery Plumbing Co Inc (5), Sabah International Incorporated (5), Thomas Swan Sign Co Inc (4), A- Ace Sign Company (3), Calmac Installations (3), Eco Fire Sprinklers Inc (3), Paganini Electric Corp(See Signatories) (3), Anderson, Rowe & Buckley, Inc. (2), Discount Signs & Neon Inc (2), Golden Gate Fire Protection Inc (2), Mc Millan Electric (2), Novo Construction Inc (2), Young Electric Sign Co. (2), Berkeley Signs, Bryan J. Valverde Co, Censource Inc, Clune Construction Company L P, Coast Sign Incorporated, Comm Air Mechanical, J S J Electrical Display Corp, Orange County Air Condition, Inc., Rice Fire Protection, Sign Industries Inc, Tri-Signal Integration Inc.
- Architects
- Guion Chilldress (6), Mariah B. Meyer (4), Nicholas Detorres (4), Luda Hoe (2), Tamara Shroll (2), Ana Quezada, Anthony Cataldo, Benjamin Kracke, David Little, George Josephs, Habin Youssef, Michael Castro, Naveen Mathur, Steven Lichtenberger, Young Lee
- Engineers
- Habtom Tewelde (2), Stephen Shaffer (2), Blaine Conner, Diversified Fire Products, Ivano Russo, Jesus Cabellon Jr., Marc Andrew Steyer, Marian Meyer, Nabih F G Youssef, Peter Kogan, Susanna M. See, Zhen Chao Xiong
- Authorized agents
- Robin Potampa-Ziv
- Designers
- Everon Llc (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.