Marian Meyer
- Listed as
- architect, engineer
- Firm
- Brr
- Based in
- Merrian
- On San Francisco permits
- Aug 2019 to May 2023
28 permits since 2000 (architect on 26 permits, engineer on 2 permits): 19 completed, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 25, 2023 | Completed final sign-off Sep 2023 | 300 California St | Build Group Inc. | 1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flrDetails
1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flr | $10,000 |
| Mar 2, 2023 | Never finaled filed Mar 2023, never issued | 690 Stanyan St | installation of amazon package return kioskDetails
installation of amazon package return kiosk | $765 | |
| Apr 29, 2022 | Completed final sign-off Dec 2022 | 450 Rhode Island St | P S R West Coast Builders Inc | interior remodel; equipment update and minor demolition create order pick up area(not visible from the street)Details
interior remodel; equipment update and minor demolition create order pick up area(not visible from the street) | $32,872 |
| Feb 24, 2022 | Completed final sign-off Jan 2023 | 3801 03rd St | Kdc Construction | change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingDetails
change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving | $850,000 |
| Jun 21, 2021 | Completed final sign-off Mar 2023 | 1765 California St | P S R West Coast Builders Inc | t.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge.Details
t.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge. | $989,966 |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 355 Bay Shore Bl | Tilton Pacific Const Inc. | revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changesDetails
revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changes | $25,000 |
| Dec 16, 2020 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Dome Construction Corp | suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area.Details
suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area. | $150,000 |
| Oct 24, 2020 | Completed final sign-off Apr 2021 | 353 Bay Shore Bl | Tilton Pacific Const Inc. | construct 4 ada stall within (e) parking lot nw of (e) bldg. demo (e) columns, concrete wall & sidewalk, concrete wheel stop, eradicating striping, concrete curb, asphalt pavement, truncated domes, raise utility structure, raise strom drain inlet. construct concrete sidewalks, truncated domes,Details
construct 4 ada stall within (e) parking lot nw of (e) bldg. demo (e) columns, concrete wall & sidewalk, concrete wheel stop, eradicating striping, concrete curb, asphalt pavement, truncated domes, raise utility structure, raise strom drain inlet. construct concrete sidewalks, truncated domes, | $30,000 |
| Sep 15, 2020 | Completed final sign-off Oct 2022 | 1765 California St | On Top Construction, Inc. | mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment.Details
mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment. | $275,000 |
| Sep 15, 2020 | Completed final sign-off Mar 2022 | 1150 Ocean Av | Stealth Enterprises Inc. | t.i installation of freezers, coolers, work table, wire racking and storage cabinet. minor electrical & plumbing. work area: 1600 sq ft.Details
t.i installation of freezers, coolers, work table, wire racking and storage cabinet. minor electrical & plumbing. work area: 1600 sq ft. | $50,000 |
| Sep 15, 2020 | Completed final sign-off Jan 2023 | 399 04th St | On Top Construction, Inc. | replacing refigeration fixtures and related refigeration equipment including regigeration racks, etc. no walls proposed.Details
replacing refigeration fixtures and related refigeration equipment including regigeration racks, etc. no walls proposed. | $80,000 |
| Jul 14, 2020 | Completed final sign-off Mar 2021 | 3950 24th St | Stealth Enterprises Inc. | extg whole food: interior work only. at the back of the house(employee area only), we are installing 1 reach in prefabricated self contained cooler, a packaging table and some utility shelvs/racks. the shelves are not for storage. they are operational. also infilling walkin cooler door.Details
extg whole food: interior work only. at the back of the house(employee area only), we are installing 1 reach in prefabricated self contained cooler, a packaging table and some utility shelvs/racks. the shelves are not for storage. they are operational. also infilling walkin cooler door. | $15,000 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 98 Post St | Build Group Inc. | rev to pa# 201912058714 & 202003066369 revised electrical distribution and circuting to eliminate new 480v service, loads on (e) circuits are revised, new circuits are revised to be served from (e) 208v service to demissed premisesDetails
rev to pa# 201912058714 & 202003066369 revised electrical distribution and circuting to eliminate new 480v service, loads on (e) circuits are revised, new circuits are revised to be served from (e) 208v service to demissed premises | |
| Apr 23, 2020 | Completed final sign-off Mar 2021 | 399 04th St | Stealth Enterprises Inc. | essential construction project: install 4 prefabricated reachin coolers and 2 freezer and 4 dry storage metro shelves. this work is for mobile order pick ups of groceries. no new wallsDetails
essential construction project: install 4 prefabricated reachin coolers and 2 freezer and 4 dry storage metro shelves. this work is for mobile order pick ups of groceries. no new walls | $15,000 |
| Mar 6, 2020 | Never finaled issued Mar 2020, no final | 98 Post St | ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058714. maher naDetails
ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058714. maher na | ||
| Mar 6, 2020 | Completed final sign-off Aug 2020 | 575 Market St | ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher naDetails
ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher na | ||
| Feb 3, 2020 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag.Details
revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag. | $10,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 300 California St | Build Group Inc. | permit for dph review health only. original permit 201912028428 not routed to healthDetails
permit for dph review health only. original permit 201912028428 not routed to health | |
| Dec 26, 2019 | Expired or cancelled cancelled Nov 2024 | 370 Drumm St | add 2 canopies to provide weather protection over 4 existing tennis courts. replace entry doors with automatic glass sliding doors. cover and update finishes over a portion f entry trellis signage under sep permit; as did not exist in 1988.Details
add 2 canopies to provide weather protection over 4 existing tennis courts. replace entry doors with automatic glass sliding doors. cover and update finishes over a portion f entry trellis signage under sep permit; as did not exist in 1988. | $700,000 | |
| Dec 23, 2019 | Completed final sign-off Sep 2021 | 355 Bay Shore Bl | Tilton Pacific Const Inc. | convert (e) tenant space into (n) grocery outlet store. scope includes metal stud framing, interior finishes, (n) restrooms, offices & breakroom. (n) work in cooler & freezer boxes, refrigerated cases on sales floor, (n) shelving & roll up door in stock room. fire alarm and sprinklers sep permits.Details
convert (e) tenant space into (n) grocery outlet store. scope includes metal stud framing, interior finishes, (n) restrooms, offices & breakroom. (n) work in cooler & freezer boxes, refrigerated cases on sales floor, (n) shelving & roll up door in stock room. fire alarm and sprinklers sep permits. | $450,000 |
| Dec 5, 2019 | Never finaled issued Feb 2020, no final | 98 Post St | Build Group Inc. | remodel of retail space, new layout and egress drawings. relocate restroom & cooler. refer to original pa #201803204126. maher naDetails
remodel of retail space, new layout and egress drawings. relocate restroom & cooler. refer to original pa #201803204126. maher na | $100,000 |
| Dec 5, 2019 | Completed final sign-off Aug 2020 | 575 Market St | Build Group Inc. | remodel of retail space, new layout and egress drawings. new dining area, new restroom. refer to original pa #201805239949. maher naDetails
remodel of retail space, new layout and egress drawings. new dining area, new restroom. refer to original pa #201805239949. maher na | $100,000 |
| Dec 2, 2019 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | revision to pa# 2019-0802-7773: revised layout and egress drawings. added new restrooms. ground floor amazon go.Details
revision to pa# 2019-0802-7773: revised layout and egress drawings. added new restrooms. ground floor amazon go. | $10,000 |
| Nov 21, 2019 | Expired or cancelled withdrawn May 2025 | 1616 Jackson St | J K Baker Construction | tenant improvements to (e) retail space, electrical, plumbing, mechanical, refrigeration, fire protection, finishes, new interior stair, for operation of retail grocery store including food prep.Details
tenant improvements to (e) retail space, electrical, plumbing, mechanical, refrigeration, fire protection, finishes, new interior stair, for operation of retail grocery store including food prep. | $500,000 |
| Nov 21, 2019 | Expired or cancelled withdrawn May 2025 | 1600 Jackson St | J K Baker Construction | tenant improvements to (e) retail space, electrical, plumbing, mechanical, refrigeration, fire protection, finishes, new interior stair, for operation of retail grocery store including food prep.Details
tenant improvements to (e) retail space, electrical, plumbing, mechanical, refrigeration, fire protection, finishes, new interior stair, for operation of retail grocery store including food prep. | $2,500,000 |
| Oct 28, 2019 | Completed final sign-off Feb 2020 | 399 04th St | Stealth Enterprises Inc. | relocate self contained coolers to 1st floorDetails
relocate self contained coolers to 1st floor | $15,000 |
| Oct 25, 2019 | Never finaled issued Oct 2019, no final | 1765 California St | Stealth Enterprises Inc. | relocate existing freezing & coolers to the 1st fl prep tables & racking to be moved to 1st flDetails
relocate existing freezing & coolers to the 1st fl prep tables & racking to be moved to 1st fl | $60,000 |
| Aug 2, 2019 | Completed final sign-off May 2020 | 300 California St | Build Group Inc. | tenant interior renovation gr fl retail space with new interior partitions, finishes, fixtures, equipment amazon goDetails
tenant interior renovation gr fl retail space with new interior partitions, finishes, fixtures, equipment amazon go | $525,000 |