Brian Alan Haugk
- Listed as
- engineer
- On San Francisco permits
- Oct 2017 to Feb 2022
10 permits since 2000 (engineer on 10 permits): 10 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Jan 2023 | 3801 03rd St | Kdc Construction | change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingDetails
change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving | $850,000 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 19/f: mechanical & electrical for t.i. ref pa201912270747. maher n/aDetails
19/f: mechanical & electrical for t.i. ref pa201912270747. maher n/a | $35,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes.Details
23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes. | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes.Details
22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes. | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher naDetails
19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher na | $250,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 525 Market St | Skyline Construction | 2nd fl - interior ti to existing corridor event space. alt work space, new ceilings, finishes, lighting. no exterior or structuralDetails
2nd fl - interior ti to existing corridor event space. alt work space, new ceilings, finishes, lighting. no exterior or structural | $288,000 |
| Nov 21, 2018 | Completed final sign-off Jan 2020 | 845 Market St | Rylko Builders Inc. | new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfacesDetails
new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfaces | $800,000 |
| Oct 26, 2017 | Completed final sign-off Jan 2019 | 525 Market St | Skyline Construction | 19th floor - interior tenant improvement incl demo, drywall, finishes, arch & electrical only. mechanical under sep permitDetails
19th floor - interior tenant improvement incl demo, drywall, finishes, arch & electrical only. mechanical under sep permit | $3,433,800 |