Robert Dale Smith
- License
- 21902
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Feb 2021 to Feb 2022
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kdc Construction, Shawmut Woodworking & Supply Inc
- Architects
- Cristopher Calverley Gunter, Mariah Meyer
- Engineers
- Brian Alan Haugk, Justin Elliott, Mark Berkheimer
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2022 | Completed final sign-off Jan 2023 | 3801 03rd St | Kdc Construction | change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingDetails
change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving | $850,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 300 Post St | Shawmut Woodworking & Supply Inc | work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement.Details
work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement. | $400,000 |