Block 0295, lot 016
345 Stockton St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
181 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2026 | Completed final sign-off Aug 2026 | 345 Stockton St | Pyro-Comm Systems, Inc. | to obtain a final inspection for work approved under pa: 202203220511Details
to obtain a final inspection for work approved under pa: 202203220511 | |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 345 Stockton St | Pyro-Comm Systems, Inc. | fire alarm 1 lcd annunciator will be added to the security desk at the loading dock. voluntary project, ref# 202209273240Details
fire alarm 1 lcd annunciator will be added to the security desk at the loading dock. voluntary project, ref# 202209273240 | $1,500 |
| Dec 12, 2024 | Completed final sign-off Dec 2025 | 300 Post St | Bates Construction Company | replace exterior doors, finishes, walk off matt and hardwareDetails
replace exterior doors, finishes, walk off matt and hardware | $985,000 |
| Aug 10, 2023 | Completed final sign-off Aug 2023 | 300 Post St | Arch Plumbing Inc | relocation of 2 heads and addition of 1 headDetails
relocation of 2 heads and addition of 1 head | $2,500 |
| Jun 28, 2023 | Completed final sign-off Jul 2023 | 300 Post St | Pyro-Comm Systems, Inc. | fire alarm 3 wall strobes and 2 ceiling speaker strobes to be added for proper coverage. ref pa# 202209202807Details
fire alarm 3 wall strobes and 2 ceiling speaker strobes to be added for proper coverage. ref pa# 202209202807 | $5,000 |
| Jun 2, 2023 | Never finaled issued Jun 2023, no final | 300 Post St | Sajo, Inc. | anchorage of fixed and or mobile retail shelving units. drawings contain only the plans and details pertaining to the proper anchorage of the back of house fixed and or mobie shelving rack systems. these shelving units shall not be expo the general publicDetails
anchorage of fixed and or mobile retail shelving units. drawings contain only the plans and details pertaining to the proper anchorage of the back of house fixed and or mobie shelving rack systems. these shelving units shall not be expo the general public | $19,000 |
| Aug 29, 2022 | Completed final sign-off Jun 2024 | 300 Post St | Sajo, Inc. | removal of (e) exterior concrete and replace with granite strone pavers at north and south facades. planning entitlement per 2022004853ptaDetails
removal of (e) exterior concrete and replace with granite strone pavers at north and south facades. planning entitlement per 2022004853pta | $75,000 |
| May 23, 2022 | Completed final sign-off Mar 2023 | 300 Post St | Sajo, Inc. | sliding door maintenance. work includes removel and in-kind replacement of concrete paving for water-proofing and drainage. no work in public right-of-way.Details
sliding door maintenance. work includes removel and in-kind replacement of concrete paving for water-proofing and drainage. no work in public right-of-way. | $75,000 |
| Mar 22, 2022 | Completed final sign-off Aug 2026 | 345 Stockton St | Pyro-Comm Systems, Inc. | voluntary - addition to (e) fire alarm system. elevator modernization. 1 relay module. 1 smoke detector.Details
voluntary - addition to (e) fire alarm system. elevator modernization. 1 relay module. 1 smoke detector. | $1,000 |
| Apr 26, 2021 | Completed final sign-off May 2022 | 300 Post St | Shawmut Woodworking & Supply Inc | revision to pa# 202102124602. to include induction loop + signage at level 2.Details
revision to pa# 202102124602. to include induction loop + signage at level 2. | |
| Feb 12, 2021 | Completed final sign-off May 2022 | 300 Post St | Shawmut Woodworking & Supply Inc | work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement.Details
work on existing multi level retail store including floor finish replacement and in-ground electrical fixtures replacement. | $400,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 300 Post St | Shawmut Woodworking & Supply Inc | interior only non-structural demo of floors per ab-017. areas of demo to remain vacant until all accessibility features have been restored.Details
interior only non-structural demo of floors per ab-017. areas of demo to remain vacant until all accessibility features have been restored. | $50,000 |
| Oct 7, 2020 | Completed final sign-off May 2022 | 300 Post St | Shawmut Woodworking & Supply Inc | accessibility upgrade to retail store's southwest entry door on 1st flr - work incl exterior and interior addition of 2 (n) push plate totems w/ signage. add concrete stain to (e) steps.Details
accessibility upgrade to retail store's southwest entry door on 1st flr - work incl exterior and interior addition of 2 (n) push plate totems w/ signage. add concrete stain to (e) steps. | $10,000 |
| Jul 2, 2020 | Completed final sign-off Jun 2021 | 345 Stockton St | install new combo bda and gamma no roof antenna. will program into new sf frequencies. no other changesDetails
install new combo bda and gamma no roof antenna. will program into new sf frequencies. no other changes | $10,000 | |
| May 13, 2020 | Never finaled issued May 2020, no final | 345 Stockton St | street spaceDetails
street space | ||
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 300 Post St | street spaceDetails
street space | ||
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 300 Post St | Shawmut Woodworking & Supply Inc | in-kind replacement of one glazing panel. ordinary maintenance and repair so no minor permit to alter requiredDetails
in-kind replacement of one glazing panel. ordinary maintenance and repair so no minor permit to alter required | $400,000 |
| Nov 9, 2018 | Completed final sign-off Dec 2018 | 345 Stockton St | Pyro-Comm Systems, Inc. | revision to 201810254088; used wrong cad background. there are no ada rooms so specific devices removed.Details
revision to 201810254088; used wrong cad background. there are no ada rooms so specific devices removed. | |
| Nov 2, 2018 | Completed final sign-off Nov 2018 | 345 Stockton St | R L H Fire Protection Inc | fire sprinkler ti on 32nd, 33rd, 34th fls, rleocate 3 sidewalls and 3 pendent heads. ref pa #201805108845Details
fire sprinkler ti on 32nd, 33rd, 34th fls, rleocate 3 sidewalls and 3 pendent heads. ref pa #201805108845 | $3,570 |
| Oct 25, 2018 | Completed final sign-off Dec 2018 | 345 Stockton St | Pyro-Comm Systems, Inc. | fire alarm ti - 2 smoke detectors, 3 strobes, 3 speakers strobes, 11 speakers - to be hooked up to existing facu. ref #201805108845. fl 32, 33, 34.Details
fire alarm ti - 2 smoke detectors, 3 strobes, 3 speakers strobes, 11 speakers - to be hooked up to existing facu. ref #201805108845. fl 32, 33, 34. | $8,500 |
| Aug 24, 2018 | Completed final sign-off Oct 2019 | 300 Post St | Seabay Building Group Llc | installation of new rooftop swingstage for (e) green wall maintenance. maher naDetails
installation of new rooftop swingstage for (e) green wall maintenance. maher na | $10,000 |
| May 10, 2018 | Completed final sign-off Feb 2019 | 345 Stockton St | Marchetti Group | interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #.Details
interior ti of (3) hospitality suites & (1) presidential suite on floors 32-34, creating (6) new hotel rooms. work includes (n) partitions, (n) bathrooms, (n) lighting, (n) finishes & furnishing. mech & plumbing under sep. pa #. | $500,000 |
| Apr 16, 2018 | Completed final sign-off Jan 2019 | 300 Post St | Seabay Building Group Llc | remodel of tenant back of house at first and third level, work includes non structural partitions, finished, ele work. maher na change break room into open office area on 3rd flr; n/a maherDetails
remodel of tenant back of house at first and third level, work includes non structural partitions, finished, ele work. maher na change break room into open office area on 3rd flr; n/a maher | $90,000 |
| Mar 8, 2018 | Completed final sign-off Jun 2018 | 300 Post St | Seabay Building Group Llc | assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no constructionDetails
assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no construction | |
| Mar 1, 2018 | Completed final sign-off Jun 2018 | 345 Stockton St | Peacock Construction | mezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher naDetails
mezzanine: tenant improvement: interior conversion of public dining room to pantry. finishes, equipment & lighting. maher na | $65,000 |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 300 Post St | Seabay Building Group Llc | additon of occupancy class assembly (a-3) for public events on 2/f. revistion to t.i. pa#201312164258. no construction work under this permit.Details
additon of occupancy class assembly (a-3) for public events on 2/f. revistion to t.i. pa#201312164258. no construction work under this permit. | |
| Aug 18, 2017 | Completed final sign-off Dec 2018 | 345 Stockton St | Peacock Construction | ground floor ti: millwork upgrades at reception, lighting & electrical improvements.Details
ground floor ti: millwork upgrades at reception, lighting & electrical improvements. | $275,000 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Oct 6, 2016 | Never finaled issued Oct 2016, no final | 345 Stockton St | Acco Engineered Systems Inc. Dba Acco En | renovation of an extg 139 sq. ft. service pantry including new cabinets, countertops, sinks and appliances, and associated plumbing and electrical. (plmg and electrical under seperate permits)Details
renovation of an extg 139 sq. ft. service pantry including new cabinets, countertops, sinks and appliances, and associated plumbing and electrical. (plmg and electrical under seperate permits) | $90,000 |
| Aug 29, 2016 | Completed final sign-off Feb 2017 | 300 Post St | Acco Engineered Systems Inc. Dba Acco En, Ledcor Construction Inc | revision to 201501206143 as builts. scope includes addition of 1 fd's @ b2 & b3. 2 - grillers @ bc coffee room. 3 - ef & hood for paint shop. 4 - bdd @ exhaust to paint shop and to b4Details
revision to 201501206143 as builts. scope includes addition of 1 fd's @ b2 & b3. 2 - grillers @ bc coffee room. 3 - ef & hood for paint shop. 4 - bdd @ exhaust to paint shop and to b4 | $20,000 |
| Aug 23, 2016 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | fire sprinkler as built to appl.#2015/06/16/9084 & #2015/07/07/0754 - relolcate bfp and connect sprinkler systen to existing branch line in elevator #10 lobby.Details
fire sprinkler as built to appl.#2015/06/16/9084 & #2015/07/07/0754 - relolcate bfp and connect sprinkler systen to existing branch line in elevator #10 lobby. | |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 300 Post St | street space permitDetails
street space permit | ||
| May 31, 2016 | Never finaled issued May 2016, no final | 345 Stockton St | street spaceDetails
street space | ||
| May 13, 2016 | Completed final sign-off Jul 2016 | 300 Post St | revision to pa#201312164258-s7, lighting & plumbing changes @ waterfall feature, (previous administrative correction of address under pa#201604285919)Details
revision to pa#201312164258-s7, lighting & plumbing changes @ waterfall feature, (previous administrative correction of address under pa#201604285919) | ||
| May 2, 2016 | Completed final sign-off Aug 2016 | 300 Post St | Ledcor Construction Inc | to obtain a final inspection for work approved under pa#201412173943 & pa#201502198808. al work is complete.Details
to obtain a final inspection for work approved under pa#201412173943 & pa#201502198808. al work is complete. | |
| May 2, 2016 | Completed final sign-off Aug 2016 | 300 Post St | Ledcor Construction Inc | to obtain a final inspection for work approved under pa#201411040678 & pa#201411040680 & pa#201411191906. all work is complete.Details
to obtain a final inspection for work approved under pa#201411040678 & pa#201411040680 & pa#201411191906. all work is complete. | |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 345 Stockton St | street spaceDetails
street space | ||
| Apr 28, 2016 | Completed final sign-off Apr 2016 | 300 Post St | Ledcor Construction Inc | administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, added per pa#m683347; applicable bpa #'s include: 201312164258, 201406027261, 201411040678, 201411040680, 201411191906, 201501206143, 201502198808, 201507272538, 201509177303,Details
administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, added per pa#m683347; applicable bpa #'s include: 201312164258, 201406027261, 201411040678, 201411040680, 201411191906, 201501206143, 201502198808, 201507272538, 201509177303, | |
| Apr 28, 2016 | Completed final sign-off Aug 2016 | 300 Post St | Ledcor Construction Inc | administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, per pa#m683347; applicable bpa #'s include: 201601086713, 201601086714, 201602048892, 201602058940, 201602058981, 201602119381, 201602169708, 201602169710, 201602220212Details
administrative permit to correct all apple store permits previously issued under 345 stockton to (n) address 300 post, per pa#m683347; applicable bpa #'s include: 201601086713, 201601086714, 201602048892, 201602058940, 201602058981, 201602119381, 201602169708, 201602169710, 201602220212 | |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 300 Post St | add address at block 0295, lot 016 for apple store as; 300 post streetDetails
add address at block 0295, lot 016 for apple store as; 300 post street | ||
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 345 Stockton St | Pyro-Comm Systems, Inc. | new fire alarm devices added for hvac improvement in redwood ballroom. basement level 3 to include 4 duct detectors , 4 relay modulesDetails
new fire alarm devices added for hvac improvement in redwood ballroom. basement level 3 to include 4 duct detectors , 4 relay modules | $4,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall.Details
revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall. | |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7)Details
revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7) | |
| Feb 22, 2016 | Never finaled issued Apr 2016, no final | 345 Stockton St | Ledcor Construction Inc | to erect one polished stainless steel logo sign attached onto steel cladding.Details
to erect one polished stainless steel logo sign attached onto steel cladding. | $2,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 345 Stockton St | Ledcor Construction Inc | install ground, non-electric single faced signDetails
install ground, non-electric single faced sign | $15,000 |
| Feb 16, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | installation of steel wall & canopy panels on exterior & interior. revision to permit app # 201312164258 s4 architecturalsDetails
installation of steel wall & canopy panels on exterior & interior. revision to permit app # 201312164258 s4 architecturals | $70,000 |
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | mobile storage shelving system for (n) apple store.Details
mobile storage shelving system for (n) apple store. | $30,000 |
| Feb 5, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | installation of new 50 kw photo voltic array in association with new apple retail store under app#201312164258Details
installation of new 50 kw photo voltic array in association with new apple retail store under app#201312164258 | $600,000 |
| Feb 5, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2016 0108 6713. scope is revision to framing to avenue wall & fic for cut studs.Details
revision to pa 2016 0108 6713. scope is revision to framing to avenue wall & fic for cut studs. | |
| Feb 4, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | supply stair #6 only with guardrail for apple storeDetails
supply stair #6 only with guardrail for apple store | $5,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | vertical support and seismic bracing for ceilings at 2nd and roof levels at retail store.Details
vertical support and seismic bracing for ceilings at 2nd and roof levels at retail store. | $20,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | design build metal pan stairs for extg and new retail spaces stair #'s 3,4,5,6, & 7 on plans.Details
design build metal pan stairs for extg and new retail spaces stair #'s 3,4,5,6, & 7 on plans. | $20,000 |
| Jan 8, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | interior and exterior light guage framing for apple store.Details
interior and exterior light guage framing for apple store. | $20,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans.Details
revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans. | |
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | reroute existing fuel-oil tank vents.Details
reroute existing fuel-oil tank vents. | $25,000 |
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 345 Stockton St | street spaceDetails
street space | ||
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Sep 24, 2015 | Completed final sign-off Oct 2015 | 345 Stockton St | Pacific Inland & Associates Inc Dba Moti | modify (e) unmanned telecom facility, remove/replace (1) site support equipment rack with (1) new od-62dd equipment rack mounted in same location on concrete floor at 34/f mechanical room. no change to (e) antennas, no batteries in this installation.Details
modify (e) unmanned telecom facility, remove/replace (1) site support equipment rack with (1) new od-62dd equipment rack mounted in same location on concrete floor at 34/f mechanical room. no change to (e) antennas, no batteries in this installation. | $6,000 |
| Sep 17, 2015 | Expired or cancelled cancelled Jul 2023 | 345 Stockton St | Wolverine Fire Protection Co | (n) fire sprinkler systems in retail & bar building. no work in hotel space. job address is 300 post (not registered yet on 345 stockton property).Details
(n) fire sprinkler systems in retail & bar building. no work in hotel space. job address is 300 post (not registered yet on 345 stockton property). | $280,000 |
| Sep 17, 2015 | Never finaled issued Sep 2015, no final | 345 Stockton St | Acco Engineered Systems Inc. Dba Acco En | basement: replacement emergency generator in existing generator room (electrical under separate submission permit)Details
basement: replacement emergency generator in existing generator room (electrical under separate submission permit) | $375,000 |
| Aug 18, 2015 | Completed final sign-off Apr 2016 | 345 Stockton St | Pyro-Comm Systems, Inc. | level 3b: new fire alarm appliances added to ti on (e) bld. include 5 ceiling speaker/strobe ref pa 2015 0528 7436Details
level 3b: new fire alarm appliances added to ti on (e) bld. include 5 ceiling speaker/strobe ref pa 2015 0528 7436 | $2,500 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 345 Stockton St | revision to app# 201505287436. interior finishes and mepDetails
revision to app# 201505287436. interior finishes and mep | ||
| Jul 27, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | reroute exhaust flues serving generator & diesel fire pump. provide (n) fire dampers for outside air & exhaust air for generator room. provide fire wrapping for outside air & exhaust air on level b3.Details
reroute exhaust flues serving generator & diesel fire pump. provide (n) fire dampers for outside air & exhaust air for generator room. provide fire wrapping for outside air & exhaust air on level b3. | $125,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 345 Stockton St | Superior Automatic Sprinkler | 3b redwood room in 3rd basement of hotel - install 40 sprinkler props in new ceiling. ref pa #2015.0528.7436.Details
3b redwood room in 3rd basement of hotel - install 40 sprinkler props in new ceiling. ref pa #2015.0528.7436. | $16,100 |
| Jul 7, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | voluntary upgrade install new 8" double check detector assemblies in existing 8-inch fire service.Details
voluntary upgrade install new 8" double check detector assemblies in existing 8-inch fire service. | $19,100 |
| Jun 30, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | relocate standpipe with hose valves and replace bar bldg level 4 sprinkler system covering mechanical rooms with 40 sprinklers. ref app#201312164258.Details
relocate standpipe with hose valves and replace bar bldg level 4 sprinkler system covering mechanical rooms with 40 sprinklers. ref app#201312164258. | $19,650 |
| Jun 25, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | install 34 drop ceiling sprinklers of existing shell sprinkler system for basement level b3. 201506118775Details
install 34 drop ceiling sprinklers of existing shell sprinkler system for basement level b3. 201506118775 | $20,400 |
| Jun 18, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | install 91 sprinklers removed by others for basement level b1. ref 2013-12-16-4258.Details
install 91 sprinklers removed by others for basement level b1. ref 2013-12-16-4258. | $52,250 |
| Jun 16, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | basement level b2-install 86 sprinklers removed by others. ref #2013.1216.4258. also install new backflow preventer in building on existing 8-inch fire service and sfpuc to remove existing 8-inch single single detector check valve and meter in existing 8-inch underground and replace with spool pieceDetails
basement level b2-install 86 sprinklers removed by others. ref #2013.1216.4258. also install new backflow preventer in building on existing 8-inch fire service and sfpuc to remove existing 8-inch single single detector check valve and meter in existing 8-inch underground and replace with spool piece | $43,800 |
| Jun 11, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | patch and repair interior finishes from construction, iunstallation of new and e doors, replace and install wall coverings, finishes, non structural partitions damaged of removed for construction under 201312164258Details
patch and repair interior finishes from construction, iunstallation of new and e doors, replace and install wall coverings, finishes, non structural partitions damaged of removed for construction under 201312164258 | $100,000 |
| May 28, 2015 | Completed final sign-off Jun 2016 | 345 Stockton St | Skyline Construction, Ledcor Construction Inc | ti for redwood room in 3rd basement of hotel. work includes new doors, wall coverings operable partitions, finishes, acoustical tile and grid, reinstallation of e light fixturesDetails
ti for redwood room in 3rd basement of hotel. work includes new doors, wall coverings operable partitions, finishes, acoustical tile and grid, reinstallation of e light fixtures | $100,000 |
| May 18, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | on level b3 - install 53 sprinklers removed by others. ref app#201312164258Details
on level b3 - install 53 sprinklers removed by others. ref app#201312164258 | $36,500 |
| Mar 26, 2015 | Never finaled issued Mar 2015, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Feb 27, 2015 | Expired or cancelled cancelled Jan 2026 | 345 Stockton St | to obtain final inspection for work approved under pa# 2001 0802 5156 - all work is completeDetails
to obtain final inspection for work approved under pa# 2001 0802 5156 - all work is complete | ||
| Feb 19, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | structural revisions to addendum 5 structral 201312164258 (aka 300 post)Details
structural revisions to addendum 5 structral 201312164258 (aka 300 post) | |
| Jan 20, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | decommission 4/f handler; relocate fan coil units and generator aspiration fan, reroute assoc. duct work, reroute basement 2 & 3 exhaust flue;. provide temp. o. s,a duct on 1/f for riser shaft. reroute piping through 3/f ceiling into 4/f. decommision roof con. unit ; relocate dry air coolerDetails
decommission 4/f handler; relocate fan coil units and generator aspiration fan, reroute assoc. duct work, reroute basement 2 & 3 exhaust flue;. provide temp. o. s,a duct on 1/f for riser shaft. reroute piping through 3/f ceiling into 4/f. decommision roof con. unit ; relocate dry air cooler | $120,000 |
| Dec 17, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | temporary phased egress plan during construction for the hyatt assembly areas at basement level 3 of the hyatt hotel @ 345 stockton aka 300 post. no other work under this permit.Details
temporary phased egress plan during construction for the hyatt assembly areas at basement level 3 of the hyatt hotel @ 345 stockton aka 300 post. no other work under this permit. | |
| Nov 19, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | revision to pa#201312164258-s2 to clarify demolition phasing and sequencing.Details
revision to pa#201312164258-s2 to clarify demolition phasing and sequencing. | |
| Nov 7, 2014 | Completed final sign-off Oct 2015 | 345 Stockton St | Westower Communications | modification to (e) wireless facility by replacing (1) panel antenna, add (1) satellite dish & replace (1) equipment cabinet.Details
modification to (e) wireless facility by replacing (1) panel antenna, add (1) satellite dish & replace (1) equipment cabinet. | $15,001 |
| Nov 4, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | revision to foundation permit addendum pa 201312164258; changing rebar sizing for the stiffening of structural columns.Details
revision to foundation permit addendum pa 201312164258; changing rebar sizing for the stiffening of structural columns. | |
| Nov 4, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | revision to bar bldg seismic strengthening pa #201406027261; for the addiitions of penetrations in the shear walls for (n) man doors.Details
revision to bar bldg seismic strengthening pa #201406027261; for the addiitions of penetrations in the shear walls for (n) man doors. | |
| Oct 2, 2014 | Expired or cancelled cancelled Aug 2022 | 345 Stockton St | demolish existing storeront at entry vestibule reconstruct automatic revolving door and side glass doorDetails
demolish existing storeront at entry vestibule reconstruct automatic revolving door and side glass door | $100,000 | |
| Sep 26, 2014 | Never finaled issued Sep 2014, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Sep 26, 2014 | Completed final sign-off Apr 2016 | 345 Stockton St | Communication Technology Services Llc | installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 ad-pa-1921-18-20 hfb antenna. install 1 gps antenna.Details
installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 ad-pa-1921-18-20 hfb antenna. install 1 gps antenna. | $35,000 |
| Jun 2, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | seismic strengthening of bar building structure. work includes (n) shear walls & moment frames, gravity elements at selected locations for (n) staircase & elevator.Details
seismic strengthening of bar building structure. work includes (n) shear walls & moment frames, gravity elements at selected locations for (n) staircase & elevator. | $179,000 |
| May 30, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved)Details
b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved) | $20,000 |
| Dec 16, 2013 | Completed final sign-off Aug 2016 | 345 Stockton St | Ledcor Construction Inc | alteration to an (e) shell building work includes: seismic upgrade of impacted elements (n) structural frame, interior structural elements. (n) facade work including (n) structural glazing.Details
alteration to an (e) shell building work includes: seismic upgrade of impacted elements (n) structural frame, interior structural elements. (n) facade work including (n) structural glazing. | $18,500,000 |
| Oct 17, 2013 | Completed final sign-off Nov 2013 | 345 Stockton St | Peacock Construction Inc | construct box panel for mounting of art work in 2 locationsDetails
construct box panel for mounting of art work in 2 locations | $6,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 345 Stockton St | Bothwell Construction Corp | installation of new wireless telecommunication facility, 3 panel antennas mounted to penthouse and 1 equipment cabinet in existing beer room with associated connecting cables. no batteries.Details
installation of new wireless telecommunication facility, 3 panel antennas mounted to penthouse and 1 equipment cabinet in existing beer room with associated connecting cables. no batteries. | $30,000 |
| Mar 12, 2013 | Completed final sign-off Mar 2013 | 345 Stockton St | Red Hawk Fire & Security Ca Llc | revision to pa# 201303011255. fire alarm adding 2 duct detector and 2 control modules for fsd control on 36th floor mezz.Details
revision to pa# 201303011255. fire alarm adding 2 duct detector and 2 control modules for fsd control on 36th floor mezz. | $2,000 |
| Mar 1, 2013 | Never finaled issued Mar 2013, no final | 345 Stockton St | Red Hawk Fire & Security Ca Llc | fire alarm ti, 36th floor. existing speaker/strobes, strobes and smoke detectors to be relocated for proper coverage. ref. arch. pa# 2013-0117-8256Details
fire alarm ti, 36th floor. existing speaker/strobes, strobes and smoke detectors to be relocated for proper coverage. ref. arch. pa# 2013-0117-8256 | $5,000 |
| Feb 15, 2013 | Completed final sign-off Jun 2013 | 345 Stockton St | Structural & Refrigeration Mechanicalref | remove old air handlers and install new, 36th floor.Details
remove old air handlers and install new, 36th floor. | $143,000 |
| Jan 25, 2013 | Completed final sign-off May 2013 | 345 Stockton St | Red Hawk Fire & Security Ca Llc | revised from pa#201211305185. fire alarm, added mezz level - addition of 4 notification devices and 2 monitor modules. ti pa# 201109084161. added mezz. level 2- add 5 duct detector and 2 relay modules.Details
revised from pa#201211305185. fire alarm, added mezz level - addition of 4 notification devices and 2 monitor modules. ti pa# 201109084161. added mezz. level 2- add 5 duct detector and 2 relay modules. | $3,000 |
| Jan 25, 2013 | Never finaled issued Jan 2013, no final | 345 Stockton St | Westates Mechanical Corporation Inc | add 2 pendents, relocate 52 pendent, plug 3 & replace (e) 1 pendent to upright.Details
add 2 pendents, relocate 52 pendent, plug 3 & replace (e) 1 pendent to upright. | $28,050 |
| Jan 17, 2013 | Never finaled issued Mar 2013, no final | 345 Stockton St | Howard S. Wright Constructors Lp | for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321.Details
for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321. | |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 345 Stockton St | Progress Glass Co Inc | work at 36th floor: remove existing windows and replace with new upgraded windows, same colour, size and appearancwe as existing, no visable changes (total 72 windows), in kind replacement, same size. max u-factor =0.77.Details
work at 36th floor: remove existing windows and replace with new upgraded windows, same colour, size and appearancwe as existing, no visable changes (total 72 windows), in kind replacement, same size. max u-factor =0.77. | $134,434 |
| Nov 30, 2012 | Completed final sign-off May 2013 | 345 Stockton St | Red Hawk Fire & Security Ca Llc | ti pa# 2011-09-08-4161 lobby, 1st. & 2nd levels, fire alarm addition of 2 new speaker/strobes & relocate facp and pull station per approved pre-application, the rest of devices are (e).Details
ti pa# 2011-09-08-4161 lobby, 1st. & 2nd levels, fire alarm addition of 2 new speaker/strobes & relocate facp and pull station per approved pre-application, the rest of devices are (e). | $1,000 |
| Nov 27, 2012 | Expired or cancelled cancelled Jan 2026 | 345 Stockton St | revision to app#201204027359 to provide accessible update to registration desks.Details
revision to app#201204027359 to provide accessible update to registration desks. | ||
| Nov 26, 2012 | Never finaled issued Nov 2014, no final | 345 Stockton St | J S J Electrical Display Corp | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $5,000 |
| Nov 26, 2012 | Never finaled issued Nov 2014, no final | 345 Stockton St | J S J Electrical Display Corp | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $2,500 |
| Nov 26, 2012 | Never finaled issued Nov 2014, no final | 345 Stockton St | J S J Electrical Display Corp | erect electrict, wall, single-faced, direct, new sign.Details
erect electrict, wall, single-faced, direct, new sign. | $2,500 |
| Nov 26, 2012 | Never finaled issued Nov 2014, no final | 345 Stockton St | J S J Electrical Display Corp | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $2,500 |
| Nov 26, 2012 | Expired or cancelled cancelled Jul 2016 | 345 Stockton St | J S J Electrical Display Corp | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $5,000 |
| Nov 21, 2012 | Never finaled issued Nov 2014, no final | 345 Stockton St | J S J Electrical Display Corp | install electric, wall, single faced sign.Details
install electric, wall, single faced sign. | $2,500 |
| Oct 12, 2012 | Completed final sign-off Oct 2012 | 345 Stockton St | Firemaster | install fire suppression system to meet ul300 standard.Details
install fire suppression system to meet ul300 standard. | $4,000 |
| Aug 30, 2012 | Never finaled issued Oct 2012, no final | 345 Stockton St | revision to 201108222979. revise landscape along stockton street frontageDetails
revision to 201108222979. revise landscape along stockton street frontage | ||
| Aug 27, 2012 | Completed final sign-off Apr 2014 | 345 Stockton St | 36th floor tenant improvemnets to meeting spaces, corridors and restroom. relocation of men's restroom. removal of restaurant and bar.to be converted to meeting and pre-function space. upgrades include funitures, mill work, new plumbing fixtures, lighting upgrades,mechanical&electric improvementsDetails
36th floor tenant improvemnets to meeting spaces, corridors and restroom. relocation of men's restroom. removal of restaurant and bar.to be converted to meeting and pre-function space. upgrades include funitures, mill work, new plumbing fixtures, lighting upgrades,mechanical&electric improvements | $1,500,000 | |
| Aug 14, 2012 | Never finaled issued Aug 2012, no final | 345 Stockton St | street space & mta permitDetails
street space & mta permit | ||
| Aug 8, 2012 | Never finaled filed Aug 2012, never issued | 345 Stockton St | street space with metersDetails
street space with meters | ||
| Jul 20, 2012 | Never finaled issued Jul 2012, no final | 345 Stockton St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Jul 18, 2012 | Never finaled issued Aug 2012, no final | 345 Stockton St | Howard S. Wright Constructors Lp | refer ot to pa# 2011-0908-4161-temporary install wood ada ramp with overhead canopy & lighting to provide ada access during construction of main entry area. for main entry constructionDetails
refer ot to pa# 2011-0908-4161-temporary install wood ada ramp with overhead canopy & lighting to provide ada access during construction of main entry area. for main entry construction | $8,000 |
| May 3, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | revision to 201109084161. structural framing revision per plansDetails
revision to 201109084161. structural framing revision per plans | |
| Apr 4, 2012 | Completed final sign-off Jul 2012 | 345 Stockton St | Westates Mechanical Corporation Inc | 1st & 2nd floors, sprinkler tenant improvement on 1st, mezz., and 2nd floors: add and relocate 142 pendent, 8 upright & 4 speaker fire sprinkler heads.Details
1st & 2nd floors, sprinkler tenant improvement on 1st, mezz., and 2nd floors: add and relocate 142 pendent, 8 upright & 4 speaker fire sprinkler heads. | $77,000 |
| Apr 2, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | 34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil unitsDetails
34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil units | $850,000 |
| Jan 25, 2012 | Never finaled issued Mar 2012, no final | 345 Stockton St | to comply with nov 200871623. umbrella permit for compliance with high rise sprinkler ordinance #377-93Details
to comply with nov 200871623. umbrella permit for compliance with high rise sprinkler ordinance #377-93 | $7,000 | |
| Jan 12, 2012 | Never finaled issued Jan 2012, no final | 345 Stockton St | street space with meters.Details
street space with meters. | ||
| Jan 12, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | ground floor-interior exploration demo at lobby & mezzanine, no cfc. ada compliance under permit #2011-0908-4161Details
ground floor-interior exploration demo at lobby & mezzanine, no cfc. ada compliance under permit #2011-0908-4161 | $20,000 |
| Sep 8, 2011 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | 1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby...Details
1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby... | $850,000 |
| Aug 22, 2011 | Completed final sign-off Jun 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | ground floor tenant improvement: removal and replacement of selective store fronts.exterior improvements including landscaping and canopy replacement.Details
ground floor tenant improvement: removal and replacement of selective store fronts.exterior improvements including landscaping and canopy replacement. | $25,000 |
| Aug 15, 2011 | Never finaled issued Sep 2011, no final | 345 Stockton St | Howard S. Wright Constructors Lp | revision to pa# 2010.12.28.7483. revise and correct dwelling room count from 685 to 661 roomsDetails
revision to pa# 2010.12.28.7483. revise and correct dwelling room count from 685 to 661 rooms | |
| Jul 21, 2011 | Never finaled issued Jul 2011, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Jul 11, 2011 | Expired or cancelled cancelled Jan 2026 | 345 Stockton St | ground floor tenant improvements: revision to pa# 2010-1228-7486, to include wasteline upgrades for future lobby improvements, gas line installation for future lobby improvements.Details
ground floor tenant improvements: revision to pa# 2010-1228-7486, to include wasteline upgrades for future lobby improvements, gas line installation for future lobby improvements. | $8,000 | |
| Jun 14, 2011 | Never finaled issued Jun 2011, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Jun 14, 2011 | Never finaled issued Jun 2011, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| May 12, 2011 | Never finaled issued May 2011, no final | 345 Stockton St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 21, 2011 | Completed final sign-off Jan 2013 | 345 Stockton St | revision to pa# 2010.12.28.7485. structural details for (n) escalator replacement for 1st fl to basementsDetails
revision to pa# 2010.12.28.7485. structural details for (n) escalator replacement for 1st fl to basements | ||
| Apr 15, 2011 | Completed final sign-off Aug 2011 | 345 Stockton St | Westates Mechanical Corporation Inc | relocate 273 fire sprinkler pendent heads at the basement levels 1 & 3.Details
relocate 273 fire sprinkler pendent heads at the basement levels 1 & 3. | $81,900 |
| Feb 22, 2011 | Never finaled issued Feb 2011, no final | 345 Stockton St | street spaceDetails
street space | ||
| Jan 10, 2011 | Never finaled issued Jan 2011, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Dec 28, 2010 | Completed final sign-off Jan 2013 | 345 Stockton St | ground floor tenant improvement:temporaty removal & re-installation of (e) storefront & guardrail for (n) escalator installation. basement tenant improvement; reconfiguration of meeting rooms & upgrade and renovation including millwork, restroom finishes, plumbing fixtures & lighting, etc.Details
ground floor tenant improvement:temporaty removal & re-installation of (e) storefront & guardrail for (n) escalator installation. basement tenant improvement; reconfiguration of meeting rooms & upgrade and renovation including millwork, restroom finishes, plumbing fixtures & lighting, etc. | $3,610,000 | |
| Dec 28, 2010 | Completed final sign-off Feb 2013 | 345 Stockton St | guestrms&bathrms: work to include but not limited to: installation of (n)finishes;widen interconnecting doors btw guestrooms,remove tub and replace bathroom finishes with (n)tubs/shower stalls and (n)finishes.(n)sliding doors &valences to be installed.replace (e)wall coverings with (n)in area ofDetails
guestrms&bathrms: work to include but not limited to: installation of (n)finishes;widen interconnecting doors btw guestrooms,remove tub and replace bathroom finishes with (n)tubs/shower stalls and (n)finishes.(n)sliding doors &valences to be installed.replace (e)wall coverings with (n)in area of | $2,980,000 | |
| Oct 28, 2010 | Never finaled issued Oct 2010, no final | 345 Stockton St | Westates Mechanical Corporation Inc | relocate 22 pendent sprinklers due to new wall. 1 per floor level 5 to 12, 14-23,28,31,32,34Details
relocate 22 pendent sprinklers due to new wall. 1 per floor level 5 to 12, 14-23,28,31,32,34 | $4,000 |
| Oct 20, 2010 | Never finaled issued Nov 2010, no final | 345 Stockton St | Red Hawk Fire & Security Ca Llc | fire alarm retrofit. upgrade cover to include bldg emergency plan and plan check comments. reference permit #201002166610Details
fire alarm retrofit. upgrade cover to include bldg emergency plan and plan check comments. reference permit #201002166610 | $100 |
| Oct 13, 2010 | Never finaled issued Oct 2010, no final | 345 Stockton St | street spaceDetails
street space | ||
| Sep 14, 2010 | Expired or cancelled cancelled Sep 2023 | 345 Stockton St | evacuation signs for elevator lobby and stairwell floors 3-34Details
evacuation signs for elevator lobby and stairwell floors 3-34 | $40,000 | |
| Sep 13, 2010 | Never finaled issued Sep 2010, no final | 345 Stockton St | Columbia Mechanical Contractors | installing sprinklers in staircases on 35th , 36th & 37th floors. total of 6 sprinkler heads.Details
installing sprinklers in staircases on 35th , 36th & 37th floors. total of 6 sprinkler heads. | $10,000 |
| Sep 2, 2010 | Expired or cancelled cancelled Jul 2024 | 345 Stockton St | Red Hawk Fire & Security Ca Llc | sffd audio system per sffd requirements.Details
sffd audio system per sffd requirements. | $75,000 |
| Jul 7, 2010 | Never finaled issued Jul 2010, no final | 345 Stockton St | street space and mtaDetails
street space and mta | ||
| Jul 2, 2010 | Never finaled issued Jul 2010, no final | 345 Stockton St | street spaceDetails
street space | ||
| Mar 4, 2010 | Never finaled issued Mar 2010, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Feb 16, 2010 | Never finaled issued Sep 2010, no final | 345 Stockton St | Red Hawk Fire & Security Ca Llc | fire alarm system upgrade.Details
fire alarm system upgrade. | $425,000 |
| Jan 7, 2010 | Never finaled issued Jan 2010, no final | 345 Stockton St | street space permitDetails
street space permit | ||
| Dec 16, 2009 | Completed final sign-off Jan 2012 | 345 Stockton St | Columbia Mechanical Contractors | 2nd floor basement - installing sprinklers in electrical closet & on top of staircase.Details
2nd floor basement - installing sprinklers in electrical closet & on top of staircase. | $15,000 |
| Nov 2, 2009 | Completed final sign-off Mar 2011 | 345 Stockton St | Interserv Lp | remodel 2 existing hotel rooms including carpet, paint, wood flooring, tile, light fixtures, tub, shower & lavatories in "model rooms" for future complete renovation to be done under separate permit.Details
remodel 2 existing hotel rooms including carpet, paint, wood flooring, tile, light fixtures, tub, shower & lavatories in "model rooms" for future complete renovation to be done under separate permit. | $67,000 |
| Dec 21, 2007 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work.Details
guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work. | $1,200,000 |
| Jun 22, 2007 | Expired or cancelled cancelled Dec 2008 | 345 Stockton St | apply 3m scotchcal electro cut graphic film to windows. ground floor retail space on post street & stockton street.Details
apply 3m scotchcal electro cut graphic film to windows. ground floor retail space on post street & stockton street. | $35,000 | |
| Mar 1, 2007 | Never finaled issued Mar 2007, no final | 345 Stockton St | street spaceDetails
street space | ||
| Feb 6, 2007 | Completed final sign-off Feb 2007 | 345 Stockton St | Johnson Controls Inc. | as per m.w.sausse print #37577.2c, install steel attachment plate as verified by others. revision to appl#200503167612 structural work under this permit only.Details
as per m.w.sausse print #37577.2c, install steel attachment plate as verified by others. revision to appl#200503167612 structural work under this permit only. | $10,000 |
| Dec 22, 2006 | Never finaled filed Dec 2006, never issued | 345 Stockton St | Red Hawk Fire & Security Ca Llc | replace the existing fire alarm systemDetails
replace the existing fire alarm system | $1,000,000 |
| Sep 29, 2006 | Completed final sign-off Mar 2007 | 345 Stockton St | Western Roofing Service | reroofingDetails
reroofing | $300,000 |
| Sep 12, 2006 | Never finaled issued Sep 2006, no final | 345 Stockton St | remodel 2 existing hotel lrooms, including light fixture, tub and lavatories in bathrm as model room for future renovations. revisions to previously approved permit 200005181940 changes indicated as per detail 1 on plansDetails
remodel 2 existing hotel lrooms, including light fixture, tub and lavatories in bathrm as model room for future renovations. revisions to previously approved permit 200005181940 changes indicated as per detail 1 on plans | $5,001 | |
| Sep 8, 2006 | Never finaled issued Sep 2006, no final | 345 Stockton St | Critchfield Mechanical Inc | replace two domestic hot water toilets with 6 (six) high efficiency low no boilers, remove/replace 2 heating hot water pumps. remove/replace 2 (two) domestic water pumps. capacity and size of equipment being replaced is equal to (e). using (e) piping.Details
replace two domestic hot water toilets with 6 (six) high efficiency low no boilers, remove/replace 2 heating hot water pumps. remove/replace 2 (two) domestic water pumps. capacity and size of equipment being replaced is equal to (e). using (e) piping. | $696,830 |
| May 18, 2006 | Completed final sign-off Jul 2006 | 345 Stockton St | renovate 2 hotel rooms on 25th floor for "model room" prototypes. work includes (n) bathroom fixtures, painting, carpet, finishes (n) lighting & plumbing connections. soft demo previously approved on pa#2006/05/03/0584. no other workDetails
renovate 2 hotel rooms on 25th floor for "model room" prototypes. work includes (n) bathroom fixtures, painting, carpet, finishes (n) lighting & plumbing connections. soft demo previously approved on pa#2006/05/03/0584. no other work | $80,000 | |
| May 3, 2006 | Never finaled issued May 2006, no final | 345 Stockton St | non-structural soft demo in (2) rooms(#2523 & #2524) on 25th floor only.remove (e) tub, shower head, vanity, sink & faucet, toilet closet doors & partition wall in advance of tenant improvement for (n) "model" rooms. no construction under this permitDetails
non-structural soft demo in (2) rooms(#2523 & #2524) on 25th floor only.remove (e) tub, shower head, vanity, sink & faucet, toilet closet doors & partition wall in advance of tenant improvement for (n) "model" rooms. no construction under this permit | $10,000 | |
| Jan 19, 2006 | Never finaled issued Jan 2006, no final | 345 Stockton St | street spaceDetails
street space | ||
| Sep 8, 2005 | Never finaled issued Sep 2005, no final | 345 Stockton St | Aaa Restaurant Fire Control/Dba Aaa Fire | install ansul piranha fire systemsDetails
install ansul piranha fire systems | $10,000 |
| Jun 28, 2005 | Completed final sign-off Jul 2006 | 345 Stockton St | Cal-Air Inc | replace (4) fan coil units. on lobby. add return air outlets. add registers. reinstall existing smokDetails
replace (4) fan coil units. on lobby. add return air outlets. add registers. reinstall existing smok | $137,440 |
| Mar 16, 2005 | Completed final sign-off Feb 2007 | 345 Stockton St | Johnson Controls Inc. | exact replacement of cooling tower on roof top of grand hyatt san francisco,general & mechanical conDetails
exact replacement of cooling tower on roof top of grand hyatt san francisco,general & mechanical con | $497,000 |
| Jun 10, 2002 | Expired or cancelled expired Aug 2003 | 345 Stockton St | erect a electric, single faced trim assemblyDetails
erect a electric, single faced trim assembly | ||
| May 31, 2002 | Never finaled issued May 2002, no final | 345 Stockton St | erect a electric, single faced wall signDetails
erect a electric, single faced wall sign | ||
| Mar 20, 2002 | Completed final sign-off Aug 2002 | 345 Stockton St | interior soft demolition (non-structural demo)Details
interior soft demolition (non-structural demo) | $40,000 | |
| Mar 19, 2002 | Completed final sign-off May 2002 | 345 Stockton St | to final app #9823491Details
to final app #9823491 | ||
| Mar 19, 2002 | Completed final sign-off May 2002 | 345 Stockton St | to renew app #9926741Details
to renew app #9926741 | ||
| Mar 19, 2002 | Completed final sign-off Apr 2002 | 345 Stockton St | to renew pa#2000/06/15/2801 for final inspectionDetails
to renew pa#2000/06/15/2801 for final inspection | ||
| Mar 19, 2002 | Completed final sign-off Apr 2002 | 345 Stockton St | to renew pa#2001/04/10/6415 for final inspectionDetails
to renew pa#2001/04/10/6415 for final inspection | ||
| Mar 19, 2002 | Completed final sign-off May 2002 | 345 Stockton St | to renew pa#200005311351Details
to renew pa#200005311351 | ||
| Mar 14, 2002 | Completed final sign-off Aug 2002 | 345 Stockton St | remodel the extg retail store on floors 1,2, and 3Details
remodel the extg retail store on floors 1,2, and 3 | $750,000 | |
| Feb 7, 2002 | Completed final sign-off Jul 2002 | 345 Stockton St | Arrow Sign Company | rev to 2001-05-31-0414;recommencement of work on permit expired due to work not started under prmtDetails
rev to 2001-05-31-0414;recommencement of work on permit expired due to work not started under prmt | $10,000 |
| Dec 11, 2001 | Completed final sign-off May 2002 | 345 Stockton St | Atc Tower Services Inc | renew 200108025156 for final inspection onlyDetails
renew 200108025156 for final inspection only | |
| Aug 2, 2001 | Expired or cancelled expired Aug 2003 | 345 Stockton St | install 1 40" panel antenna, 1 26" parabolic dish antenna, 1 28"x24x55 controller cabnt on roofDetails
install 1 40" panel antenna, 1 26" parabolic dish antenna, 1 28"x24x55 controller cabnt on roof | $30,000 | |
| Jun 20, 2001 | Expired or cancelled expired Jan 2002 | 345 Stockton St | Arrow Sign Company | revision to 2000105310414 ensure fire integrity by using complying conduit and w/ cbc 709.6.1Details
revision to 2000105310414 ensure fire integrity by using complying conduit and w/ cbc 709.6.1 | |
| May 31, 2001 | Expired or cancelled expired Sep 2001 | 345 Stockton St | Arrow Sign Company | rev. to appl#200103204714 sign a lower by 3' fm balcony, sign b dropped by 4', sign c dropped by 1'Details
rev. to appl#200103204714 sign a lower by 3' fm balcony, sign b dropped by 4', sign c dropped by 1' | |
| Apr 10, 2001 | Expired or cancelled expired Aug 2001 | 345 Stockton St | add exhaust grill/ductwork to space 2nd bsmt, no change of use/occupncy rooms not affectedDetails
add exhaust grill/ductwork to space 2nd bsmt, no change of use/occupncy rooms not affected | $1,500 | |
| Mar 20, 2001 | Expired or cancelled expired Sep 2001 | 345 Stockton St | Arrow Sign Company | erect a single faced, electrical wall signDetails
erect a single faced, electrical wall sign | |
| Sep 18, 2000 | Completed final sign-off Dec 2000 | 345 Stockton St | for dbi records to correct loss of 2 hotel rooms correction to application 200006193072Details
for dbi records to correct loss of 2 hotel rooms correction to application 200006193072 | ||
| Jul 17, 2000 | Completed final sign-off Aug 2000 | 345 Stockton St | Blue's Roofing Co | re roofing and street spaceDetails
re roofing and street space | $21,000 |
| Jun 19, 2000 | Completed final sign-off Jun 2000 | 345 Stockton St | renewal of application 98099151,9720648,9821260,9804334,9921273Details
renewal of application 98099151,9720648,9821260,9804334,9921273 | ||
| Jun 15, 2000 | Expired or cancelled expired Oct 2000 | 345 Stockton St | Columbia Mechanical Contractors | add: sprinkler heads to soffitts in ada bathrm (7, 20, 22, 26, 28, 30, 31 & 32)Details
add: sprinkler heads to soffitts in ada bathrm (7, 20, 22, 26, 28, 30, 31 & 32) | $5,000 |
| Jun 12, 2000 | Completed final sign-off Mar 2002 | 345 Stockton St | Plant Construction | renew expired appl #9904266Details
renew expired appl #9904266 | |
| May 31, 2000 | Expired or cancelled expired Sep 2000 | 345 Stockton St | add one hour wall & 20 minute door at paint storage space sprinkler & lifesafety work, if required,Details
add one hour wall & 20 minute door at paint storage space sprinkler & lifesafety work, if required, | $700 |
Find contractors for work like this