Structural & Refrigeration Mechanicalref
- Based in
- Concord
- On San Francisco permits
- Mar 2006 to Sep 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 8 completed, 7 never finaled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2017 | Never finaled issued Sep 2017, no final | 601 Montgomery St | roof: change out old cooling towers - install new heat exchange & 2 pumps. maher naDetails
roof: change out old cooling towers - install new heat exchange & 2 pumps. maher na | $899,000 |
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 100 California St | basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher naDetails
basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher na | $1,500,000 |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 501 Geary St | remove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher naDetails
remove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher na | $139,000 |
| Oct 20, 2014 | Never finaled issued Jan 2015, no final | 650 Townsend St | install customer supplied chiller. pumps, reconnect existing pipes to same. repipe existing heat exchanger. install 2 control values. life safety under separate permit.Details
install customer supplied chiller. pumps, reconnect existing pipes to same. repipe existing heat exchanger. install 2 control values. life safety under separate permit. | $190,000 |
| Mar 3, 2014 | Completed final sign-off Apr 2014 | 475 Sansome St | install condenser water piping from 22nd floor down to 12th floor interconnect 4 new pumps into system. n/a for the maher ordinance #155-13. removal of old piping on roof.Details
install condenser water piping from 22nd floor down to 12th floor interconnect 4 new pumps into system. n/a for the maher ordinance #155-13. removal of old piping on roof. | $226,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 650 Townsend St | remove 3 cooling towers and replace with 2 new cooling towers.Details
remove 3 cooling towers and replace with 2 new cooling towers. | $250,000 |
| Feb 15, 2013 | Completed final sign-off Jun 2013 | 345 Stockton St | remove old air handlers and install new, 36th floor.Details
remove old air handlers and install new, 36th floor. | $143,000 |
| Dec 27, 2012 | Never finaled issued Feb 2013, no final | 650 Townsend St | change out chiller and 2 pumpsDetails
change out chiller and 2 pumps | $450,000 |
| Jul 25, 2012 | Never finaled issued Jul 2012, no final | 244 Jackson St | remove and replace 60 ton air cooler water chiller w/ new chiller (less weight).Details
remove and replace 60 ton air cooler water chiller w/ new chiller (less weight). | $50,000 |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 50 Beale St | add addition 2m btu hot water boiler to existing boiler plant at 24th floor.Details
add addition 2m btu hot water boiler to existing boiler plant at 24th floor. | $99,490 |
| Mar 25, 2011 | Completed final sign-off Feb 2012 | 2 Folsom St | add 1 140 ton water chiller to (e) central cooling plantDetails
add 1 140 ton water chiller to (e) central cooling plant | $98,500 |
| Jan 28, 2011 | Completed final sign-off Jun 2011 | 850 Mason St | remove two existing rooftop package a/c units, replace with new units at the existing locations above the ballroom.Details
remove two existing rooftop package a/c units, replace with new units at the existing locations above the ballroom. | $31,500 |
| Mar 12, 2010 | Completed final sign-off Mar 2011 | 1500 Van Ness Av | 6th floor-remove & replace (e) water chiller, re-connect (e) piping & electricalDetails
6th floor-remove & replace (e) water chiller, re-connect (e) piping & electrical | $122,000 |
| Oct 15, 2009 | Completed final sign-off Jun 2010 | 71 Stevenson St | remove and replace 1 chiller and upgrade mechanical chiller system. no structural work. replace equipments in kind.Details
remove and replace 1 chiller and upgrade mechanical chiller system. no structural work. replace equipments in kind. | $250,000 |
| Mar 29, 2006 | Completed final sign-off Jun 2007 | 50 Beale St | 24th floor - install 3 new natural gas boiler used for heating/hydronic systems. various piping changes to accomodate new design. old boiler is already removed.Details
24th floor - install 3 new natural gas boiler used for heating/hydronic systems. various piping changes to accomodate new design. old boiler is already removed. | $200,000 |