Block 0646, lot 016
1500 Van Ness Av
66 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2020 | Never finaled issued Aug 2020, no final | 1500 Van Ness Av | Msr Mechanical Llc | replace a cooling tower | $60,000 |
| May 9, 2019 | Completed final sign-off Jul 2020 | 1500 Van Ness Av | Marchetti Group | remodel (e) guest rooms 708,2600,2601,2624 and 2625, with new partitions, doors and cabinetry, remodel (e) lower level pilots lounge room with new partitions and cabinetry | $65,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2020 | 1500 Van Ness Av | Marchetti Group | disabled access barrier removal only. addition of disabled access compliant truncated dome warning path to main entry at ground level and reconfigure disabled access parking at lower level for access compliance | $25,000 |
| Oct 12, 2017 | Expired or cancelled cancelled Nov 2018 | 1500 Van Ness Av | Marchetti Group | hotel bar, buffet, and market place t.i. minor demolition, new back bar finishes, new bar equipment, new marketplace concept, new sliding doors. no electrical, mechanical, or plumbing scope. n/a for maher | $40,000 |
| May 4, 2017 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Marchetti Group | the work illustrated in the following drawing provides details for repair of the (e) 5th flr park structure deck where theses elements have significant corrosion. n/a maher | $50,000 |
| Oct 22, 2015 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Ad Art Inc. | to erect electric projecting sign | $5,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 1500 Van Ness Av | street space | ||
| Mar 11, 2015 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Access Systems & Solutions Inc | install new davit bases to existing steel structure at existing high-rise building roof; n/a for maher. | $1,000 |
| Dec 19, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Marchetti Construction Inc. | revision to pa# 201210111829: elimate the replacement of all the interior finishes for the ballrooms and basement. | |
| Aug 28, 2014 | Never finaled issued Aug 2014, no final | 1500 Van Ness Av | street space | ||
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 1500 Van Ness Av | street space permit | ||
| Jun 6, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Marchetti Construction Inc. | revision to app#201205180772 and 201210111829. structural supports at ground level. n/a for the maher ordinance #155-13 | |
| May 30, 2014 | Never finaled issued May 2014, no final | 1500 Van Ness Av | street space | ||
| May 16, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Johnson Controls Fire | on bsmt, 1st and 6th floors- fire alarm modification to gr fl 1 new annunciator, 1 new remote mic, 3 new manual pulls, 30 smokes, 6 new duct smokes, 2 door holds, power supplies, 32 door holds, 1 sync module, 4 strobes, 10 speaker/strobes. ti pa# 2012101111829 | $42,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 1500 Van Ness Av | street space and mta parking | ||
| Mar 19, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | R L H Fire Protection Inc | fire sprinkler permit, relocate 79 and add 20 pendents, delete 4 pendents and relocate 1 sidewall on floors 1 and 6. na ordinance #155-13 | $51,400 |
| Feb 21, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Marchetti Construction Inc. | revision to pa# 201205180772/r-1 revise structural bracket. | |
| Feb 21, 2014 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Marchetti Construction Inc. | revision to appl #2012.10.11.1829 - updated interior walls, ceiling heights, electrical & fireproofing details. mechanical plans under separate permit. | |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 1500 Van Ness Av | streetspace and mta | ||
| Oct 23, 2013 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | Marchetti Construction Inc. | revision to pa# 2012/10/11/1829. change interior finishes & mep changes. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Aug 28, 2013 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Marchetti Construction Inc. | revision of sheet a-1.33 location of pool lift to be moved to north side of pool. revision to pa# 201210111829. permanent update. | |
| Mar 13, 2013 | Completed final sign-off May 2014 | 1500 Van Ness Av | Metropolitan Electrical Construction | revision to bldg p/a#201207275951. project includes the original scope of work (installation of one antenna, one gps unit & one equip cabinet) and one additional antenna, gps unit & equip. cabinet (2 total of each) on roof. nextnav whip antennas | $10,000 |
| Feb 27, 2013 | Completed final sign-off Jul 2013 | 1500 Van Ness Av | Simplexgrinnell Lp. | ada renovation to units: 708,711,712,714,715,716,708,809,815,1010,1012,1018,1105,1107,1109,1115, 2112,2118,2309,2315,2409, & 2415 - 44 strobes and 22 smokes. ref app#2012.0705.4128 | $20,000 |
| Oct 11, 2012 | Completed final sign-off Feb 2015 | 1500 Van Ness Av | t.i. basement level: new finishes. 1st fl; alteration t.i. of area open to receive public. new public restrooms, new restaurant, new receptions, bar area. 2-5 fl: restriping of parking. 6 fl: new fitness center. new pool fence.throughout area in scope ada improvement. store front under #201205180772 | $1,200,000 | |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 1500 Van Ness Av | street space | ||
| Jul 27, 2012 | Completed final sign-off May 2014 | 1500 Van Ness Av | Metropolitan Electrical Construction | install one (n) nextnav omni antenna, one (n) gps unit, and one (n) equipment box on roof. | $12,000 |
| Jul 5, 2012 | Completed final sign-off Mar 2014 | 1500 Van Ness Av | Marchetti Construction Inc. | retile all guest bathrooms.change toilets and simks.cosmetic upgrade to rooms & corridors. ada upgrade to suites, ada upgrade to ada rooms. | $1,300,000 |
| May 18, 2012 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Marchetti Construction Inc. | replace (e) exterior cladding in same locations | $90,000 |
| Nov 17, 2011 | Completed final sign-off Feb 2012 | 1500 Van Ness Av | Simplex Grinnell | to comply with number 201033549 complaint. umbrella permit for installation of an automatic fire sprinkler system in compliance with (e) high-rise sprinkler ordinance # 377-93 signed off by the appropriate building and fire inspectors | $2,500 |
| Mar 11, 2011 | Completed final sign-off Jan 2012 | 1500 Van Ness Av | International Fire Equip | add 5 sprinkler heads in hallway in ground floor. | $1,800 |
| Mar 12, 2010 | Completed final sign-off Mar 2011 | 1500 Van Ness Av | Structural & Refrigeration Mechanicalref | 6th floor-remove & replace (e) water chiller, re-connect (e) piping & electrical | $122,000 |
| Oct 1, 2009 | Expired or cancelled cancelled Jan 2026 | 1500 Van Ness Av | erect an electric, projecting, double faced sign. | $5,000 | |
| Oct 1, 2009 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | California Sign Installation | erect a electric, single faced, wall sign. | $5,000 |
| Oct 1, 2009 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | California Sign Installation | erect a non-electric, wall, single faced sign. | $1,800 |
| Jun 17, 2008 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Simplex Grinnell | 1st floor - add 1 pendant sprinkler into (e) computer room. | $991 |
| Jan 16, 2007 | Never finaled issued Jan 2007, no final | 1550 Van Ness Av | street space and sidewalk permit | ||
| Feb 8, 2006 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Simplex Grinnell | addition of 8 monitor modules for new water flow and tamper switches (fbo) | $3,000 |
| Jan 27, 2006 | Never finaled issued Jan 2006, no final | 1500 Van Ness Av | sidewalk permit only. | ||
| Nov 3, 2005 | Completed final sign-off Nov 2005 | 1500 Van Ness Av | to renew pa#2003/04/03/1388 & 2004/01/26/4853 for final inspection | ||
| Sep 10, 2004 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | Bay Area Signs | refacing signs | |
| Jan 26, 2004 | Expired or cancelled expired Sep 2005 | 1500 Van Ness Av | revision to 200304031388 as built drawings. | ||
| May 30, 2003 | Completed final sign-off Oct 2003 | 1500 Van Ness Av | minor alteration to structural details approved under appl#200208214593 | $99,800 | |
| Apr 3, 2003 | Expired or cancelled expired Apr 2021 | 1500 Van Ness Av | shorning & underpinning required due to adjacent new const bpn #200212042782 | $15,000 | |
| Mar 17, 2003 | Completed final sign-off Feb 2004 | 1500 Van Ness Av | ada building upgrade per nov ground level and basement 200117914 app 200012067335 | $30,000 | |
| Aug 21, 2002 | Completed final sign-off Oct 2003 | 1500 Van Ness Av | replace partial facade on all facades- no sign permit under this application | $1,100,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Dow Builders | renew 200005049083 for final inspection only. | |
| Dec 14, 2001 | Expired or cancelled cancelled Aug 2002 | 1500 Van Ness Av | single-faced non-electric wall sign | $1,500 | |
| Nov 20, 2001 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocate extg cpvc pipe | $41,400 |
| Nov 13, 2001 | Never finaled issued Nov 2001, no final | 1550 Van Ness Av | street space | ||
| Nov 8, 2001 | Expired or cancelled cancelled Nov 2024 | 1500 Van Ness Av | relocate existing sprinkler heads total of nine floors | $414,000 | |
| Jun 1, 2001 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocate 4 hds (sprinklers) at ground floor, change of 8 sprinklers as (0mega) | $1,800 |
| Apr 11, 2001 | Expired or cancelled expired Jan 2003 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocte nine sprinklers in restrooms | $2,000 |
| Jan 18, 2001 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocate 1-1/2 & 2" (e)cpuc pipe in corridors,to be relessed 3-4" into wall,no sprin head add | $27,600 |
| Jan 4, 2001 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | electrical lighting at basement location | $30,000 | |
| Dec 6, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | one-stop:m.t. upgrade bathrooms to make accessible main fl & basement level, ramp ,etc | $20,000 | |
| Nov 29, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | revisions to existing sprinkler pipe. existing pipe to be relocated approx. 3-4" in a new released p | $13,800 |
| Nov 20, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | recess existing sprinkler system into gypsum 1 hr wall assembly on 19 flrs 7th throught 25th flr. sp | $426,796 | |
| Sep 29, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Decker Electric Co Inc Electrical Contra | upgrade old life safety system with new system | $585,000 |
| Aug 1, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocate 3 spkrs due to new clg in offices | $1,500 |
| May 19, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Cosco Fire Protection Inc. | relocate exist loop on 15th flr from soffit about 3' to 4' to inside wall for arch | $4,600 |
| May 4, 2000 | Completed final sign-off May 2000 | 1500 Van Ness Av | Dow Builders | renewal of pa 9926127 | |
| May 4, 2000 | Expired or cancelled expired Dec 2000 | 1500 Van Ness Av | Dow Builders | demo parts of n/b walls and ceiling install new parti ceiling & finishes | $15,000 |
| Mar 21, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | recess sprinkler and conduit in wall of existing corridor on the 26th floor | $75,000 | |
| Mar 10, 2000 | Expired or cancelled expired Mar 2001 | 1500 Van Ness Av | street space use | ||
| Feb 18, 2000 | Completed final sign-off Jul 2002 | 1500 Van Ness Av | Don Builders | waterproofing | |
| Jan 28, 2000 | Completed final sign-off May 2000 | 1500 Van Ness Av | delete fire plan devises as per appl#9921168 |