Seabay Building Group Llc
- Based in
- Tempe
- On San Francisco permits
- Sep 2017 to Aug 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2018 | Completed final sign-off Oct 2019 | 300 Post St | installation of new rooftop swingstage for (e) green wall maintenance. maher naDetails
installation of new rooftop swingstage for (e) green wall maintenance. maher na | $10,000 |
| Jun 12, 2018 | Completed final sign-off Sep 2018 | 360 Post St | demolition in relation to future ti under ab-017Details
demolition in relation to future ti under ab-017 | $45,000 |
| Apr 16, 2018 | Completed final sign-off Oct 2018 | 360 Post St | 7th - ti of (e) office spaceDetails
7th - ti of (e) office space | $460,000 |
| Apr 16, 2018 | Completed final sign-off Jan 2019 | 300 Post St | remodel of tenant back of house at first and third level, work includes non structural partitions, finished, ele work. maher na change break room into open office area on 3rd flr; n/a maherDetails
remodel of tenant back of house at first and third level, work includes non structural partitions, finished, ele work. maher na change break room into open office area on 3rd flr; n/a maher | $90,000 |
| Mar 8, 2018 | Completed final sign-off Jun 2018 | 300 Post St | assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no constructionDetails
assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no construction | |
| Sep 25, 2017 | Completed final sign-off Dec 2017 | 300 Post St | additon of occupancy class assembly (a-3) for public events on 2/f. revistion to t.i. pa#201312164258. no construction work under this permit.Details
additon of occupancy class assembly (a-3) for public events on 2/f. revistion to t.i. pa#201312164258. no construction work under this permit. | |
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 350 Broderick St | addition of door and wall to serve as partition wall between living, office. wood 2x4 wall with 5/8" drywall both sides. door, casing, baseboard to match existing. fire sprinklers and alarm under separate permit(s).Details
addition of door and wall to serve as partition wall between living, office. wood 2x4 wall with 5/8" drywall both sides. door, casing, baseboard to match existing. fire sprinklers and alarm under separate permit(s). | $7,500 |