Firemaster
- Based in
- Fort Meyers
- On San Francisco permits
- Apr 2011 to Nov 2012
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2012 | Completed final sign-off Jan 2013 | 3250 Van Ness Av | hook up pyro chem system to meet ul 300 standardDetails
hook up pyro chem system to meet ul 300 standard | $2,000 |
| Oct 23, 2012 | Never finaled issued Oct 2012, no final | 1100 Tennessee St | upgrade fire suppression system to meet ul 300 standardDetails
upgrade fire suppression system to meet ul 300 standard | $1,800 |
| Oct 12, 2012 | Completed final sign-off Oct 2012 | 345 Stockton St | install fire suppression system to meet ul300 standard.Details
install fire suppression system to meet ul300 standard. | $4,000 |
| Aug 22, 2012 | Never finaled issued Sep 2012, no final | 1 Kearny St | install/connect for 3 kitchen hoods new fire suppression system to meet ul 300 standard- fire alarm connection separate permitDetails
install/connect for 3 kitchen hoods new fire suppression system to meet ul 300 standard- fire alarm connection separate permit | $2,000 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 740 Valencia St | hookup ul300 standard fire suppression system for kitchen- fire alarm connection separate permitDetails
hookup ul300 standard fire suppression system for kitchen- fire alarm connection separate permit | $1,900 |
| May 23, 2012 | Completed final sign-off Jun 2012 | 865 Market St | suite #496-install fire suppression system to meet ul-300Details
suite #496-install fire suppression system to meet ul-300 | $1,900 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 301 Battery St | install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate applicationDetails
install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate application | $1,780 |
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 555 California St | install one new ul 300 pyro chem kitchen nkight 11 hood and duct fire suppression system. (hood is pre piped by streivor, hood manufacture)Details
install one new ul 300 pyro chem kitchen nkight 11 hood and duct fire suppression system. (hood is pre piped by streivor, hood manufacture) | $1,370 |
| Sep 22, 2011 | Completed final sign-off Oct 2011 | 822 Irving St | install pyrochem ul 300 fire suppression system. if a fire alarm system is on site then fire suppression system must be tied into that fire control panel on separate permit. field verfify.Details
install pyrochem ul 300 fire suppression system. if a fire alarm system is on site then fire suppression system must be tied into that fire control panel on separate permit. field verfify. | $575 |
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 3250 Van Ness Av | hook-up & activate pre paid pyro-chem fire suppression system.Details
hook-up & activate pre paid pyro-chem fire suppression system. | $4,500 |
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 5155 03rd St | upgrade (e) ansul system to ul-300, ansul r-102Details
upgrade (e) ansul system to ul-300, ansul r-102 | $4,500 |
| Apr 6, 2011 | Completed final sign-off May 2011 | 557 Valencia St | expand existing fire suppression system to meet ul300 standard: (e) tanks, pull station; replace piping and relocate (e) nozzles; add tank, nozzles and piping for (n) wood charbroiler.Details
expand existing fire suppression system to meet ul300 standard: (e) tanks, pull station; replace piping and relocate (e) nozzles; add tank, nozzles and piping for (n) wood charbroiler. | $5,500 |