Back to kitchen remodel contractors
Firemaster
- Based in
- Fort Meyers
- On San Francisco permits
- Apr 2011 to Nov 2012
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 47 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2012 | Never finaled issued Sep 2012, no final | 1 Kearny St | install/connect for 3 kitchen hoods new fire suppression system to meet ul 300 standard- fire alarm connection separate permitDetails
install/connect for 3 kitchen hoods new fire suppression system to meet ul 300 standard- fire alarm connection separate permit | $2,000 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 740 Valencia St | hookup ul300 standard fire suppression system for kitchen- fire alarm connection separate permitDetails
hookup ul300 standard fire suppression system for kitchen- fire alarm connection separate permit | $1,900 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 301 Battery St | install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate applicationDetails
install field connect new kitchen knight ii pcl 460 pyro chem in one prepiped kitchen hood. system connection to building fire alarm system under separate application | $1,780 |
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 555 California St | install one new ul 300 pyro chem kitchen nkight 11 hood and duct fire suppression system. (hood is pre piped by streivor, hood manufacture)Details
install one new ul 300 pyro chem kitchen nkight 11 hood and duct fire suppression system. (hood is pre piped by streivor, hood manufacture) | $1,370 |