Andrew Merovich
- Listed as
- engineer
- Firm
- At Merovich & Assoc. Inc.
- On San Francisco permits
- May 2005 to Nov 2015
7 permits since 2000 (engineer on 7 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2015 | Completed final sign-off May 2017 | 1563 Mission St | Hathaway Dinwiddie Co. | rev. to pa#201501286888, thicken roof slab by 2-1/2"Details
rev. to pa#201501286888, thicken roof slab by 2-1/2" | $25,000 |
| Jul 29, 2015 | Never finaled issued Aug 2015, no final | 335 Powell St | Cw Horton General Contractor | mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13Details
mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13 | $350,000 |
| Feb 25, 2011 | Completed final sign-off Sep 2011 | 801 Fillmore St | Metro Construction Inc. | soft story retrofit; voluntary seismic upgrade per ab-094. new shear walls, collectors, diaphragm ties, improved foundatin: drilled piers, holdowns (drill piers for lateral support only).Details
soft story retrofit; voluntary seismic upgrade per ab-094. new shear walls, collectors, diaphragm ties, improved foundatin: drilled piers, holdowns (drill piers for lateral support only). | $75,000 |
| Jul 24, 2008 | Completed final sign-off Apr 2009 | 1 Embarcadero Center | Field Construction Inc. | 28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit.Details
28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit. | $631,730 |
| Dec 21, 2007 | Expired or cancelled expired Aug 2009 | 5 The Embarcadero | replace existing cooling tower with new 2-cells of refrigeration (condenser water) units per plan.Details
replace existing cooling tower with new 2-cells of refrigeration (condenser water) units per plan. | $45,000 | |
| Dec 21, 2007 | Completed final sign-off Jan 2013 | 345 Stockton St | Howard S. Wright Constructors Lp | guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work.Details
guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work. | $1,200,000 |
| May 17, 2005 | Completed final sign-off Dec 2005 | 275 Battery St | Gci, Inc | new support beams to accomidate operable partition wall, calcs. includedDetails
new support beams to accomidate operable partition wall, calcs. included | $9,000 |