Permit GraphShortlistSan Francisco building permits since 2000

Block 0234, lot 017

22 Drumm St

City’s use
Commercial Hotel
Built
1972
Stories
18
Units
821
Building
863,441 sq ft
Lot
80,000 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

199 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 5, 2026In progress
issued Jul 2026
5 The EmbarcaderoMastec Network Solutions Incbasement - remove 25kva transformer and add 50kva transformer install conduit and conductors from trasnformer to ppc existing ref 202010096268
Details
Permit
202606052647
Status
issued
Filed
Jun 5, 2026
Permit issued
Jul 14, 2026
Declared cost
$10,000
Address
5 The Embarcadero

basement - remove 25kva transformer and add 50kva transformer install conduit and conductors from trasnformer to ppc existing ref 202010096268

Open the permit page

$10,000
May 7, 2026Completed
final sign-off Sep 2026
5 The EmbarcaderoMetropolitan Electrical Constructionmodification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.
Details
Permit
202605070866
Status
complete
Filed
May 7, 2026
Permit issued
Jun 2, 2026
Final sign-off
Sep 1, 2026
Declared cost
$46,722
Address
5 The Embarcadero

modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.

Open the permit page

$46,722
Aug 29, 2025In progress
issued Dec 2025
5 Embarcadero CenterFx Signsprop h: installation of (1) exterior illuminated wall sign to read philz coffee.sign area: 56.65 sq. ft. southeast elevation.
Details
Permit
202508284172
Status
issued
Filed
Aug 29, 2025
Permit issued
Dec 5, 2025
Declared cost
$1,000
Address
5 Embarcadero Center

prop h: installation of (1) exterior illuminated wall sign to read philz coffee.sign area: 56.65 sq. ft. southeast elevation.

Open the permit page

$1,000
Aug 29, 2025In progress
issued Dec 2025
5 Embarcadero CenterFx Signsprop h: installation of (2) exterior illuminated projecting blade signs - sign area: 4.34 sq. ft. each, southeast elevation.
Details
Permit
202508294283
Status
issued
Filed
Aug 29, 2025
Permit issued
Dec 5, 2025
Declared cost
$1,000
Address
5 Embarcadero Center

prop h: installation of (2) exterior illuminated projecting blade signs - sign area: 4.34 sq. ft. each, southeast elevation.

Open the permit page

$1,000
Aug 28, 2025Completed
final sign-off Dec 2025
5 The EmbarcaderoR L H Fire Protection Incbasement: fire sprinkler permit. replace existing 8" backflow preventer and existing 8" swing check valve.
Details
Permit
202508284104
Status
complete
Filed
Aug 28, 2025
Permit issued
Aug 28, 2025
Final sign-off
Dec 18, 2025
Declared cost
$5,000
Address
5 The Embarcadero

basement: fire sprinkler permit. replace existing 8" backflow preventer and existing 8" swing check valve.

Open the permit page

$5,000
Jul 9, 2025Completed
final sign-off Jan 2026
5 Embarcadero CenterMetropolitan Electrical Constructioninstallation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.
Details
Permit
202507090424
Status
complete
Filed
Jul 9, 2025
Permit issued
Jul 31, 2025
Final sign-off
Jan 15, 2026
Declared cost
$25,000
Address
5 Embarcadero Center

installation of the sector 3 ndw antennas, e new radios, 1 new dc9, inside frp pain to match building. install 1 new power plant, 8 batterires and ancillary equipment.

Open the permit page

$25,000
Jul 15, 2024Completed
final sign-off Feb 2025
5 Embarcadero CenterMetropolitan Electrical Constructionremove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc
Details
Permit
202407156433
Status
complete
Filed
Jul 15, 2024
Permit issued
Nov 14, 2024
Final sign-off
Feb 27, 2025
Declared cost
$25,000
Address
5 Embarcadero Center

remove 6 antennas install 6 antennas, remove/replace existing frp, rruv, with minor upgrade to cabling etc

Open the permit page

$25,000
Jun 21, 2024Completed
final sign-off Jul 2025
5 Embarcadero CenterVasko Electric Inccurrent (6) fully screened antennas flush mounted to the side of the subject buildng. proposed work involves removing (4) antennas and installing (7) new fully screened antennas for total of (9) antennas
Details
Permit
202406214963
Status
complete
Filed
Jun 21, 2024
Permit issued
Feb 5, 2025
Final sign-off
Jul 30, 2025
Declared cost
$49,500
Address
5 Embarcadero Center

current (6) fully screened antennas flush mounted to the side of the subject buildng. proposed work involves removing (4) antennas and installing (7) new fully screened antennas for total of (9) antennas

Open the permit page

$49,500
Mar 7, 2023Completed
final sign-off Dec 2023
5 The EmbarcaderoAriel-10, Incdemolition removal of sprint equipment such as antennas, cabinets, cables, and transformer etc.
Details
Permit
202303073147
Status
complete
Filed
Mar 7, 2023
Permit issued
Mar 7, 2023
Final sign-off
Dec 21, 2023
Declared cost
$15,000
Address
5 The Embarcadero

demolition removal of sprint equipment such as antennas, cabinets, cables, and transformer etc.

Open the permit page

$15,000
Dec 8, 2022Completed
final sign-off Mar 2023
5 The Embarcaderoto obtain final inspection for work approved under pa# 201908017612. all work is complete.
Details
Permit
202212087957
Status
complete
Filed
Dec 8, 2022
Permit issued
Dec 8, 2022
Final sign-off
Mar 10, 2023
Address
5 The Embarcadero

to obtain final inspection for work approved under pa# 201908017612. all work is complete.

Open the permit page

May 27, 2022Never finaled
filed May 2022, never issued
5 Embarcadero Centeraddition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows
Details
Permit
202205275168
Status
filed
Filed
May 27, 2022
Declared cost
$1,100,000
Address
5 Embarcadero Center

addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows

Open the permit page

$1,100,000
Apr 25, 2022Expired or cancelled
cancelled Jan 2026
5 Embarcadero CenterHathaway Dinwiddie Co.revision to pa# 202012030185. revising rating on doors from approved permit.
Details
Permit
202204252894
Status
cancelled
Filed
Apr 25, 2022
Address
5 Embarcadero Center

revision to pa# 202012030185. revising rating on doors from approved permit.

Open the permit page

Apr 11, 2022Completed
final sign-off Oct 2022
5 The EmbarcaderoEmcor Services/Mesa Energy Systems Inc2nd - 15th floor - remove & replace fan coils - like for like; ref pa 2021-0723-4963 residential hotel rooms. 559 units total.
Details
Permit
202204111960
Status
complete
Filed
Apr 11, 2022
Permit issued
Apr 13, 2022
Final sign-off
Oct 13, 2022
Declared cost
$280,000
Address
5 The Embarcadero

2nd - 15th floor - remove & replace fan coils - like for like; ref pa 2021-0723-4963 residential hotel rooms. 559 units total.

Open the permit page

$280,000
Dec 15, 2021Completed
final sign-off Dec 2022
5 Embarcadero CenterEveron Llcfire alarm t.i.- add notification appliances to 40 hearing impaired guest rooms. add 84 strobes, 42 smoke/carbon monoxide detectors with sounder bases, 10 tone generator modules, 10 riser modiles, 9 power supplies & 40 signal modules. ref 202107234963 & 202109158502
Details
Permit
202112154509
Status
complete
Filed
Dec 15, 2021
Permit issued
Jan 7, 2022
Final sign-off
Dec 30, 2022
Declared cost
$78,000
Address
5 Embarcadero Center

fire alarm t.i.- add notification appliances to 40 hearing impaired guest rooms. add 84 strobes, 42 smoke/carbon monoxide detectors with sounder bases, 10 tone generator modules, 10 riser modiles, 9 power supplies & 40 signal modules. ref 202107234963 & 202109158502

Open the permit page

$78,000
Dec 10, 2021Completed
final sign-off Feb 2022
5 Embarcadero CenterR L H Fire Protection Inc12th - 15th floor fire sprinkler permit. relocate 212 and add 87 sprinklers for guest room remodel and floors 12th-15th. ref pa 2021-0723-4963. 299 total heads.
Details
Permit
202112104132
Status
complete
Filed
Dec 10, 2021
Permit issued
Jan 10, 2022
Final sign-off
Feb 16, 2022
Declared cost
$87,960
Address
5 Embarcadero Center

12th - 15th floor fire sprinkler permit. relocate 212 and add 87 sprinklers for guest room remodel and floors 12th-15th. ref pa 2021-0723-4963. 299 total heads.

Open the permit page

$87,960
Dec 10, 2021Completed
final sign-off Feb 2023
5 Embarcadero CenterHathaway Dinwiddie Co.new evacuation plan signage in extg hotel guestrooms and corridors(floors 2-17). 905 total signs. guestroom and corridor renovations approved under pa#202107234963 and pa#202109158502. 70 signs total.
Details
Permit
202112104201
Status
complete
Filed
Dec 10, 2021
Permit issued
Jan 19, 2022
Final sign-off
Feb 15, 2023
Declared cost
$40,000
Address
5 Embarcadero Center

new evacuation plan signage in extg hotel guestrooms and corridors(floors 2-17). 905 total signs. guestroom and corridor renovations approved under pa#202107234963 and pa#202109158502. 70 signs total.

Open the permit page

$40,000
Dec 10, 2021Completed
final sign-off Aug 2022
5 The EmbarcaderoR L H Fire Protection Inc2nd-11th floor: fire sprinkler permit. relocate 666 and add 312 sprinklers for guest room remodel and floors 2-11. 978 heads total. ref pa 2021-0915-8502
Details
Permit
202112104129
Status
complete
Filed
Dec 10, 2021
Permit issued
Jun 1, 2022
Final sign-off
Aug 29, 2022
Declared cost
$320,000
Address
5 The Embarcadero

2nd-11th floor: fire sprinkler permit. relocate 666 and add 312 sprinklers for guest room remodel and floors 2-11. 978 heads total. ref pa 2021-0915-8502

Open the permit page

$320,000
Nov 18, 2021Never finaled
issued Jan 2022, no final
5 Embarcadero CenterHathaway Dinwiddie Co.identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotel
Details
Permit
202111182732
Status
issued
Filed
Nov 18, 2021
Permit issued
Jan 4, 2022
Address
5 Embarcadero Center

identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotel

Open the permit page

Nov 4, 2021Never finaled
issued Nov 2021, no final
5 Embarcadero CenterEveron Llcfire alarm for elevator modernization: add 3 contol relays for hat function. 1 control relay for shunt trip. 1 heat detector in machine room and one monitoring module for power monitoring
Details
Permit
202111041835
Status
issued
Filed
Nov 4, 2021
Permit issued
Nov 17, 2021
Declared cost
$5,000
Address
5 Embarcadero Center

fire alarm for elevator modernization: add 3 contol relays for hat function. 1 control relay for shunt trip. 1 heat detector in machine room and one monitoring module for power monitoring

Open the permit page

$5,000
Sep 15, 2021Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.
Details
Permit
202109158502
Status
complete
Filed
Sep 15, 2021
Permit issued
Nov 17, 2021
Final sign-off
Oct 13, 2022
Declared cost
$5,000,000
Address
5 Embarcadero Center

floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.

Open the permit page

$5,000,000
Jul 23, 2021Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.
Details
Permit
202107234963
Status
complete
Filed
Jul 23, 2021
Permit issued
Oct 27, 2021
Final sign-off
Oct 13, 2022
Declared cost
$26,554
Address
5 Embarcadero Center

renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.

Open the permit page

$26,554
Jul 22, 2021Expired or cancelled
cancelled Jan 2026
5 Embarcadero CenterSign Awningplace painted non-structural single face sign to wall. (i k u)
Details
Permit
202107224938
Status
cancelled
Filed
Jul 22, 2021
Declared cost
$99
Address
5 Embarcadero Center

place painted non-structural single face sign to wall. (i k u)

Open the permit page

$99
Jul 6, 2021Expired or cancelled
cancelled Sep 2025
5 The EmbarcaderoMetropolitan Electrical Constructionat&t modification: install 4(n) antennas; install 1 (n) power plant w/batteries; install 1(n) purcell cabinet; install 1 (n) 10 x 12 platform; install other small equipment
Details
Permit
202107063805
Status
cancelled
Filed
Jul 6, 2021
Permit issued
Oct 3, 2022
Declared cost
$82,000
Address
5 The Embarcadero

at&t modification: install 4(n) antennas; install 1 (n) power plant w/batteries; install 1(n) purcell cabinet; install 1 (n) 10 x 12 platform; install other small equipment

Open the permit page

$82,000
Jul 1, 2021Completed
final sign-off Oct 2021
5 The EmbarcaderoR L H Fire Protection Incfire sprinkler permit: remove all fire sprinklers and sprinkler pipe from elevator shafts and machine room for elevators 6, 7, and 12.
Details
Permit
202107013584
Status
complete
Filed
Jul 1, 2021
Permit issued
Jul 1, 2021
Final sign-off
Oct 20, 2021
Declared cost
$5,000
Address
5 The Embarcadero

fire sprinkler permit: remove all fire sprinklers and sprinkler pipe from elevator shafts and machine room for elevators 6, 7, and 12.

Open the permit page

$5,000
Jan 8, 2021Expired or cancelled
withdrawn Jul 2022
5 The Embarcaderoatt modification: install 3 (n) antennas. install 7 (n) rrus. install 1 (n) power plant with 12 (n) batteries. install 1 (n) parcell cabinet. install 1 (n) 10'x12' platform. install other small equipment.
Details
Permit
202101082355
Status
withdrawn
Filed
Jan 8, 2021
Declared cost
$73,000
Address
5 The Embarcadero

att modification: install 3 (n) antennas. install 7 (n) rrus. install 1 (n) power plant with 12 (n) batteries. install 1 (n) parcell cabinet. install 1 (n) 10'x12' platform. install other small equipment.

Open the permit page

$73,000
Dec 3, 2020Completed
final sign-off Oct 2022
5 Embarcadero CenterHathaway Dinwiddie Co.enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.
Details
Permit
202012030185
Status
complete
Filed
Dec 3, 2020
Permit issued
Feb 18, 2022
Final sign-off
Oct 7, 2022
Declared cost
$50,000
Address
5 Embarcadero Center

enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.

Open the permit page

$50,000
Oct 9, 2020Completed
final sign-off Aug 2021
5 Embarcadero CenterMastec Network Solutions Inct mobile - remove & replace two (2) cabinets w/(n) cabinets; remove (e) radio units and install in new cabinets; remove & replace frp; remove & replace two (2) antenna w/2 new antenna; install new frp screen - 2 new mounts - 3 hybrid cables; installin
Details
Permit
202010096268
Status
complete
Filed
Oct 9, 2020
Permit issued
Mar 31, 2021
Final sign-off
Aug 9, 2021
Declared cost
$25,000
Address
5 Embarcadero Center

t mobile - remove & replace two (2) cabinets w/(n) cabinets; remove (e) radio units and install in new cabinets; remove & replace frp; remove & replace two (2) antenna w/2 new antenna; install new frp screen - 2 new mounts - 3 hybrid cables; installin

Open the permit page

$25,000
Aug 5, 2020Never finaled
issued Oct 2020, no final
5 The EmbarcaderoHathaway Dinwiddie Co.5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na
Details
Permit
202008051189
Status
issued
Filed
Aug 5, 2020
Permit issued
Oct 7, 2020
Declared cost
$153,482
Address
5 The Embarcadero

5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na

Open the permit page

$153,482
May 6, 2020Never finaled
issued Jan 2021, no final
5 Embarcadero CenterElectric Tech Construction Incat&t modification: install 4 new 5g antennas on new pipe mounts; swap 3 extg antennas with 3 new antennas; remove 6 extg rrus & install 3 new rrus; install other small equipment; install new fiber. no change to extg batteries.
Details
Permit
202005067339
Status
issued
Filed
May 6, 2020
Permit issued
Jan 4, 2021
Declared cost
$24,000
Address
5 Embarcadero Center

at&t modification: install 4 new 5g antennas on new pipe mounts; swap 3 extg antennas with 3 new antennas; remove 6 extg rrus & install 3 new rrus; install other small equipment; install new fiber. no change to extg batteries.

Open the permit page

$24,000
Feb 10, 2020Never finaled
issued Feb 2020, no final
5 Embarcadero Centerstreet space
Details
Permit
M1192428
Status
issued
Filed
Feb 10, 2020
Permit issued
Feb 10, 2020
Address
5 Embarcadero Center

street space

Open the permit page

Jan 23, 2020Completed
final sign-off Apr 2020
5 Embarcadero CenterCosco Fire Protection Inc.extend 6 pendent sprinklers to new ceiling elevation of 10'0. remove e dry pend and install ndw dry pend in replacement cold box
Details
Permit
202001232574
Status
complete
Filed
Jan 23, 2020
Permit issued
Jan 23, 2020
Final sign-off
Apr 30, 2020
Declared cost
$12,550
Address
5 Embarcadero Center

extend 6 pendent sprinklers to new ceiling elevation of 10'0. remove e dry pend and install ndw dry pend in replacement cold box

Open the permit page

$12,550
Dec 23, 2019Expired or cancelled
cancelled Jan 2026
5 The EmbarcaderoDiscount Signs & Neon Incinstall 1 non-illuniated single faced wall sign "sushi takeaway"
Details
Permit
201912230308
Status
cancelled
Filed
Dec 23, 2019
Declared cost
$2,000
Address
5 The Embarcadero

install 1 non-illuniated single faced wall sign "sushi takeaway"

Open the permit page

$2,000
Dec 19, 2019Completed
final sign-off Dec 2020
5 The Embarcaderoadministrative permit only to document correct hotel/guest room count of 821 rooms. this is based on previously recorded and issued building perimts 381850 & cfc 201812208921. no work under this permit application.
Details
Permit
201912190069
Status
complete
Filed
Dec 19, 2019
Permit issued
Nov 30, 2020
Final sign-off
Dec 9, 2020
Address
5 The Embarcadero

administrative permit only to document correct hotel/guest room count of 821 rooms. this is based on previously recorded and issued building perimts 381850 & cfc 201812208921. no work under this permit application.

Open the permit page

Nov 1, 2019Never finaled
issued Nov 2019, no final
5 The Embarcaderostreet space
Details
Permit
M1160807
Status
issued
Filed
Nov 1, 2019
Permit issued
Nov 1, 2019
Address
5 The Embarcadero

street space

Open the permit page

Oct 29, 2019Completed
final sign-off Nov 2019
5 The EmbarcaderoAd Art Inc.install 2 non-electric projecting double faced sign "philz"
Details
Permit
201910295804
Status
complete
Filed
Oct 29, 2019
Permit issued
Nov 4, 2019
Final sign-off
Nov 8, 2019
Declared cost
$5,000
Address
5 The Embarcadero

install 2 non-electric projecting double faced sign "philz"

Open the permit page

$5,000
Oct 8, 2019Completed
final sign-off Dec 2019
5 The EmbarcaderoSsw Construction Corpphilz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher na
Details
Permit
201910083867
Status
complete
Filed
Oct 8, 2019
Permit issued
Nov 8, 2019
Final sign-off
Dec 10, 2019
Declared cost
$150,000
Address
5 The Embarcadero

philz coffee: equipment replacement for barista, new door to scullery, handsink added for health/convenience at barista. additional existing door activated/made operational for existing. new point of sale location. new cabinetry at customer area. maher na

Open the permit page

$150,000
Oct 8, 2019Never finaled
issued Oct 2019, no final
5 The EmbarcaderoPolytec Construction Company Increvision to approved permit # 2019-0801-7612; relocate casher and dining location per plans.
Details
Permit
201910083821
Status
issued
Filed
Oct 8, 2019
Permit issued
Oct 25, 2019
Declared cost
$100
Address
5 The Embarcadero

revision to approved permit # 2019-0801-7612; relocate casher and dining location per plans.

Open the permit page

$100
Sep 6, 2019Completed
final sign-off Oct 2019
5 Embarcadero CenterRed Hawk Fire & Security Ca Llcfire alarm t.i. provide 15 new ceiling speaker only in new guest room on each floor. provide 15 new strobe only in corridor outside of new guest room on each fl. add 2 nw power supplies. add 30 duct detectors with control relays and 1 duct detector for nw supply fan. ref 201812208921 n/a maher. add
Details
Permit
201909060927
Status
complete
Filed
Sep 6, 2019
Permit issued
Oct 4, 2019
Final sign-off
Oct 25, 2019
Declared cost
$36,000
Address
5 Embarcadero Center

fire alarm t.i. provide 15 new ceiling speaker only in new guest room on each floor. provide 15 new strobe only in corridor outside of new guest room on each fl. add 2 nw power supplies. add 30 duct detectors with control relays and 1 duct detector for nw supply fan. ref 201812208921 n/a maher. add

Open the permit page

$36,000
Aug 26, 2019Completed
final sign-off Dec 2019
5 The EmbarcaderoHathaway Dinwiddie Co.floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicated
Details
Permit
201908269838
Status
complete
Filed
Aug 26, 2019
Permit issued
Aug 28, 2019
Final sign-off
Dec 17, 2019
Address
5 The Embarcadero

floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicated

Open the permit page

Aug 9, 2019Completed
final sign-off Nov 2019
5 The EmbarcaderoRed Hawk Fire & Security Ca Llcbay level - fire alarm ti add 2 speaker strobes & 3 smoke detectors at elevator lobby ref pa 2018-1218-8652
Details
Permit
201908098395
Status
complete
Filed
Aug 9, 2019
Permit issued
Aug 13, 2019
Final sign-off
Nov 7, 2019
Declared cost
$2,500
Address
5 The Embarcadero

bay level - fire alarm ti add 2 speaker strobes & 3 smoke detectors at elevator lobby ref pa 2018-1218-8652

Open the permit page

$2,500
Aug 1, 2019Never finaled
issued Sep 2019, no final
5 The EmbarcaderoPolytec Construction Company Incti remodel (e) lunch cafe. work included remodeling kitchen, dining, cashier area, new equipments and new plumbing fixtures.
Details
Permit
201908017612
Status
issued
Filed
Aug 1, 2019
Permit issued
Sep 20, 2019
Declared cost
$25,000
Address
5 The Embarcadero

ti remodel (e) lunch cafe. work included remodeling kitchen, dining, cashier area, new equipments and new plumbing fixtures.

Open the permit page

$25,000
Jul 25, 2019Completed
final sign-off Aug 2019
5 The EmbarcaderoRed Hawk Fire & Security Ca Llc15th fl, ste 1540 - fire alarm ti add 4 speakers only ref pa 2018-1218-8651
Details
Permit
201907256969
Status
complete
Filed
Jul 25, 2019
Permit issued
Jul 26, 2019
Final sign-off
Aug 16, 2019
Declared cost
$2,000
Address
5 The Embarcadero

15th fl, ste 1540 - fire alarm ti add 4 speakers only ref pa 2018-1218-8651

Open the permit page

$2,000
Jul 16, 2019Never finaled
issued Jul 2019, no final
5 Embarcadero CenterR L H Fire Protection Inc2-12 flrs, fire sprinkler permit. relocate 28 sprinklers for new rooms. t.i pa 201812208921.
Details
Permit
201907165960
Status
issued
Filed
Jul 16, 2019
Permit issued
Jul 18, 2019
Declared cost
$6,000
Address
5 Embarcadero Center

2-12 flrs, fire sprinkler permit. relocate 28 sprinklers for new rooms. t.i pa 201812208921.

Open the permit page

$6,000
Jul 5, 2019Completed
final sign-off Nov 2019
5 The EmbarcaderoR L H Fire Protection Inc15th flr, fire sprinklers. relocate 5 pendent and 2 sidewalls, add 4 pendents. ref pa 201812188651
Details
Permit
201907055152
Status
complete
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Final sign-off
Nov 15, 2019
Declared cost
$3,500
Address
5 The Embarcadero

15th flr, fire sprinklers. relocate 5 pendent and 2 sidewalls, add 4 pendents. ref pa 201812188651

Open the permit page

$3,500
Jul 5, 2019Completed
final sign-off Nov 2019
5 The EmbarcaderoR L H Fire Protection Inc2nd flr, fire sprinklers. relocate 4, add 4 and delete 2 sprinlers. ref pa 201812188652
Details
Permit
201907055151
Status
complete
Filed
Jul 5, 2019
Permit issued
Jul 5, 2019
Final sign-off
Nov 15, 2019
Declared cost
$5,000
Address
5 The Embarcadero

2nd flr, fire sprinklers. relocate 4, add 4 and delete 2 sprinlers. ref pa 201812188652

Open the permit page

$5,000
Jun 21, 2019Completed
final sign-off Dec 2019
5 The EmbarcaderoHathaway Dinwiddie Co.revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maher
Details
Permit
201906214146
Status
complete
Filed
Jun 21, 2019
Permit issued
Jun 26, 2019
Final sign-off
Dec 17, 2019
Address
5 The Embarcadero

revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maher

Open the permit page

May 24, 2019Completed
final sign-off Oct 2020
5 The EmbarcaderoEmcor Services/Mesa Energy Systems Increvision to pa 2019-0411-7690 (electrical drawings)
Details
Permit
201905241606
Status
complete
Filed
May 24, 2019
Permit issued
May 28, 2019
Final sign-off
Oct 9, 2020
Address
5 The Embarcadero

revision to pa 2019-0411-7690 (electrical drawings)

Open the permit page

Apr 19, 2019Completed
final sign-off Jun 2019
5 The EmbarcaderoR L H Fire Protection Inc3rd flr. fire sprinklers. relocate 20, add 4 and delete 1 pendent sprinkler, install 23 new upright sprinklers at atrium level. ref t.i pa 201810102851.
Details
Permit
201904198443
Status
complete
Filed
Apr 19, 2019
Permit issued
Apr 19, 2019
Final sign-off
Jun 24, 2019
Declared cost
$16,500
Address
5 The Embarcadero

3rd flr. fire sprinklers. relocate 20, add 4 and delete 1 pendent sprinkler, install 23 new upright sprinklers at atrium level. ref t.i pa 201810102851.

Open the permit page

$16,500
Apr 16, 2019Completed
final sign-off Oct 2019
5 The Embarcaderodemo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit.
Details
Permit
201904168154
Status
complete
Filed
Apr 16, 2019
Permit issued
Aug 13, 2019
Final sign-off
Oct 25, 2019
Declared cost
$100,000
Address
5 The Embarcadero

demo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit.

Open the permit page

$100,000
Apr 11, 2019Never finaled
issued May 2019, no final
5 The EmbarcaderoEmcor Services/Mesa Energy Systems Incr&r 2 chillers and 4 pumps (2cwp, chwp) and add bypass pump. n/a for maher.
Details
Permit
201904117690
Status
issued
Filed
Apr 11, 2019
Permit issued
May 3, 2019
Declared cost
$250,000
Address
5 The Embarcadero

r&r 2 chillers and 4 pumps (2cwp, chwp) and add bypass pump. n/a for maher.

Open the permit page

$250,000
Mar 25, 2019Completed
final sign-off Jul 2019
5 The EmbarcaderoRed Hawk Fire & Security Ca Llcfire alarm ti add 2 ceiling speaker strobes. ref pa 2018-1010-2851
Details
Permit
201903256133
Status
complete
Filed
Mar 25, 2019
Permit issued
Mar 25, 2019
Final sign-off
Jul 19, 2019
Declared cost
$1,500
Address
5 The Embarcadero

fire alarm ti add 2 ceiling speaker strobes. ref pa 2018-1010-2851

Open the permit page

$1,500
Feb 7, 2019Completed
final sign-off Jul 2020
5 Embarcadero CenterElectric Tech Construction Incat&t modification - remove & replace 6(e) antennas w/ 6(n) antennas; remove & replace 6 (e) rrus w/ 9(n) rrus. remove 6(e) batteries and replace w/24 (n) batteries. n/a for maher.
Details
Permit
201902072375
Status
complete
Filed
Feb 7, 2019
Permit issued
May 20, 2019
Final sign-off
Jul 31, 2020
Declared cost
$45,000
Address
5 Embarcadero Center

at&t modification - remove & replace 6(e) antennas w/ 6(n) antennas; remove & replace 6 (e) rrus w/ 9(n) rrus. remove 6(e) batteries and replace w/24 (n) batteries. n/a for maher.

Open the permit page

$45,000
Dec 20, 2018Completed
final sign-off Dec 2019
5 The EmbarcaderoHathaway Dinwiddie Co.renovation of guestroom levels, scope of work includes new entry door, new ceiling, new toilet,shower, tub and vanity, new finish and new furnishings
Details
Permit
201812208921
Status
complete
Filed
Dec 20, 2018
Permit issued
Apr 15, 2019
Final sign-off
Dec 17, 2019
Declared cost
$400,000
Address
5 The Embarcadero

renovation of guestroom levels, scope of work includes new entry door, new ceiling, new toilet,shower, tub and vanity, new finish and new furnishings

Open the permit page

$400,000
Dec 18, 2018Completed
final sign-off Oct 2019
5 The Embarcadero15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a.
Details
Permit
201812188651
Status
complete
Filed
Dec 18, 2018
Permit issued
Apr 15, 2019
Final sign-off
Oct 25, 2019
Declared cost
$65,000
Address
5 The Embarcadero

15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a.

Open the permit page

$65,000
Dec 18, 2018Completed
final sign-off Feb 2020
5 The EmbarcaderoHathaway Dinwiddie Co.demo of (e) boh offices and business center to create an elevator lobby. cutting openings of elevator walls to create a stop at this level. new wall and floor finishes and new lighting
Details
Permit
201812188652
Status
complete
Filed
Dec 18, 2018
Permit issued
Apr 15, 2019
Final sign-off
Feb 12, 2020
Declared cost
$35,000
Address
5 The Embarcadero

demo of (e) boh offices and business center to create an elevator lobby. cutting openings of elevator walls to create a stop at this level. new wall and floor finishes and new lighting

Open the permit page

$35,000
Oct 10, 2018Completed
final sign-off Aug 2019
5 The EmbarcaderoHathaway Dinwiddie Co.fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/a
Details
Permit
201810102851
Status
complete
Filed
Oct 10, 2018
Permit issued
Feb 28, 2019
Final sign-off
Aug 5, 2019
Declared cost
$210,000
Address
5 The Embarcadero

fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/a

Open the permit page

$210,000
Sep 28, 2018Expired or cancelled
cancelled Jan 2026
5 Embarcadero Centerr/r 3 (e) 2500mhz antennas with 3 new massive mmo antennas. remove 3 (e) mhz rrhs. install 3 new hybrid cables. install du in (e) mmbs cabinet.maher n/a.
Details
Permit
201809281755
Status
cancelled
Filed
Sep 28, 2018
Declared cost
$25,000
Address
5 Embarcadero Center

r/r 3 (e) 2500mhz antennas with 3 new massive mmo antennas. remove 3 (e) mhz rrhs. install 3 new hybrid cables. install du in (e) mmbs cabinet.maher n/a.

Open the permit page

$25,000
May 25, 2018Completed
final sign-off Jun 2018
5 The EmbarcaderoRed Hawk Fire & Security Ca Llcfire alarm t.i. 2nd fl. suite 256 add (1) power booster supply, (2) synchronization moduels (4) wall mount strobes, (1) wall mount speaker, & (2) smoke detectors
Details
Permit
201805250283
Status
complete
Filed
May 25, 2018
Permit issued
May 30, 2018
Final sign-off
Jun 14, 2018
Declared cost
$4,000
Address
5 The Embarcadero

fire alarm t.i. 2nd fl. suite 256 add (1) power booster supply, (2) synchronization moduels (4) wall mount strobes, (1) wall mount speaker, & (2) smoke detectors

Open the permit page

$4,000
Mar 5, 2018Never finaled
issued Mar 2018, no final
5 Embarcadero CenterR L H Fire Protection Incfire sprinkler relocate 11 and add 14 pendent sprinklers on ,ultiple floorsa ref 201611021703 maher na
Details
Permit
201803052787
Status
issued
Filed
Mar 5, 2018
Permit issued
Mar 5, 2018
Declared cost
$23,000
Address
5 Embarcadero Center

fire sprinkler relocate 11 and add 14 pendent sprinklers on ,ultiple floorsa ref 201611021703 maher na

Open the permit page

$23,000
Dec 12, 2017Expired or cancelled
cancelled Jan 2026
5 The Embarcaderomodification to 225 guestroom guardrails majer na
Details
Permit
201712126249
Status
cancelled
Filed
Dec 12, 2017
Declared cost
$440,000
Address
5 The Embarcadero

modification to 225 guestroom guardrails majer na

Open the permit page

$440,000
Dec 6, 2017Expired or cancelled
withdrawn Jul 2018
5 The Embarcaderoswap (3) existing antennas for new, remove 3 existing radios & install (6) new radio models, install(3) xmu in existing cabinet, install (1) dc trunk line & dc/fiber jumpers. ** maher: n/a **
Details
Permit
201712065668
Status
withdrawn
Filed
Dec 6, 2017
Declared cost
$15,000
Address
5 The Embarcadero

swap (3) existing antennas for new, remove 3 existing radios & install (6) new radio models, install(3) xmu in existing cabinet, install (1) dc trunk line & dc/fiber jumpers. ** maher: n/a **

Open the permit page

$15,000
Oct 6, 2017Never finaled
issued Oct 2017, no final
5 The EmbarcaderoEmcor Services/Mesa Energy Systems Increplace and remove (2) air handler units. one at street level & one at intermediate level. maher ma
Details
Permit
201710060577
Status
issued
Filed
Oct 6, 2017
Permit issued
Oct 6, 2017
Declared cost
$42,302
Address
5 The Embarcadero

replace and remove (2) air handler units. one at street level & one at intermediate level. maher ma

Open the permit page

$42,302
Jun 20, 2017Never finaled
issued Jun 2017, no final
5 Embarcadero Centerstreet space
Details
Permit
M799767
Status
issued
Filed
Jun 20, 2017
Permit issued
Jun 20, 2017
Address
5 Embarcadero Center

street space

Open the permit page

Apr 26, 2017Never finaled
issued Apr 2017, no final
5 Embarcadero Centerstreet space
Details
Permit
M781127
Status
issued
Filed
Apr 26, 2017
Permit issued
Apr 26, 2017
Address
5 Embarcadero Center

street space

Open the permit page

Jan 4, 2017Never finaled
issued Jan 2017, no final
5 Embarcadero Centerstreet space
Details
Permit
M751947
Status
issued
Filed
Jan 4, 2017
Permit issued
Jan 4, 2017
Address
5 Embarcadero Center

street space

Open the permit page

Nov 29, 2016Completed
final sign-off Dec 2016
5 Embarcadero CenterR L H Fire Protection Incfire sprinkler t/i upgrade of the existing system. 4 added pendent sprinklers. ref 201612185515
Details
Permit
201611293697
Status
complete
Filed
Nov 29, 2016
Permit issued
Nov 29, 2016
Final sign-off
Dec 8, 2016
Declared cost
$4,441
Address
5 Embarcadero Center

fire sprinkler t/i upgrade of the existing system. 4 added pendent sprinklers. ref 201612185515

Open the permit page

$4,441
Nov 2, 2016Completed
final sign-off Jul 2018
5 Embarcadero CenterHathaway Dinwiddie Co.bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13
Details
Permit
201611021703
Status
complete
Filed
Nov 2, 2016
Permit issued
Aug 24, 2017
Final sign-off
Jul 24, 2018
Declared cost
$542,000
Address
5 Embarcadero Center

bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13

Open the permit page

$542,000
Oct 31, 2016Never finaled
issued Oct 2016, no final
5 Embarcadero Centerstreet space
Details
Permit
M734667
Status
issued
Filed
Oct 31, 2016
Permit issued
Oct 31, 2016
Address
5 Embarcadero Center

street space

Open the permit page

Sep 20, 2016Completed
final sign-off Feb 2017
5 The EmbarcaderoElectric Tech Construction Incat&t mobility to an (e) at&t facility including: installing 6 (n) rrus within building & behind (e) screening other minor upgrades including (n) qtmas, cabiling & dvs41 unit; n/a maher ord. 155-13
Details
Permit
201609208198
Status
complete
Filed
Sep 20, 2016
Permit issued
Jan 6, 2017
Final sign-off
Feb 27, 2017
Declared cost
$31,000
Address
5 The Embarcadero

at&t mobility to an (e) at&t facility including: installing 6 (n) rrus within building & behind (e) screening other minor upgrades including (n) qtmas, cabiling & dvs41 unit; n/a maher ord. 155-13

Open the permit page

$31,000
Sep 9, 2016Completed
final sign-off Nov 2016
5 The EmbarcaderoRed Hawk Fire & Security Ca Llcbasement partial fire alarm t.i. (ref. 201605056705) add 4 new speaker strobes; maher n/a on pacific level
Details
Permit
201609097319
Status
complete
Filed
Sep 9, 2016
Permit issued
Sep 12, 2016
Final sign-off
Nov 23, 2016
Declared cost
$2,000
Address
5 The Embarcadero

basement partial fire alarm t.i. (ref. 201605056705) add 4 new speaker strobes; maher n/a on pacific level

Open the permit page

$2,000
Aug 25, 2016Completed
final sign-off Oct 2016
5 Embarcadero CenterR L H Fire Protection Incbasement level fire sprinkler permit - relocate 37 & add 8 pendent sprinklers. ref ti #201605056705. n/a maher ordinance
Details
Permit
201608256004
Status
complete
Filed
Aug 25, 2016
Permit issued
Aug 25, 2016
Final sign-off
Oct 31, 2016
Declared cost
$12,000
Address
5 Embarcadero Center

basement level fire sprinkler permit - relocate 37 & add 8 pendent sprinklers. ref ti #201605056705. n/a maher ordinance

Open the permit page

$12,000
Aug 17, 2016Never finaled
issued Sep 2016, no final
5 Embarcadero CenterHathaway Dinwiddie Co.remodel 2 model rooms on the 9th and 16th fl. 1 tub to shower conversion, add 2 barndoors, enlarge e opening to 32"
Details
Permit
201608175276
Status
issued
Filed
Aug 17, 2016
Permit issued
Sep 8, 2016
Declared cost
$20,000
Address
5 Embarcadero Center

remodel 2 model rooms on the 9th and 16th fl. 1 tub to shower conversion, add 2 barndoors, enlarge e opening to 32"

Open the permit page

$20,000
Jul 21, 2016Completed
final sign-off Aug 2016
5 The EmbarcaderoTriton Tower Incto obtain final inspection for work approved under pa#201104214549. all work is complete.
Details
Permit
201607212970
Status
complete
Filed
Jul 21, 2016
Permit issued
Jul 21, 2016
Final sign-off
Aug 12, 2016
Address
5 The Embarcadero

to obtain final inspection for work approved under pa#201104214549. all work is complete.

Open the permit page

Jul 21, 2016Completed
final sign-off Jan 2017
5 Embarcadero CenterHathaway Dinwiddie Co.adding double door w/panic device at atrium level (3rd floor), adding two operable walls at atrium level.
Details
Permit
201607213033
Status
complete
Filed
Jul 21, 2016
Permit issued
Jan 17, 2017
Final sign-off
Jan 20, 2017
Declared cost
$20,000
Address
5 Embarcadero Center

adding double door w/panic device at atrium level (3rd floor), adding two operable walls at atrium level.

Open the permit page

$20,000
May 5, 2016Completed
final sign-off Dec 2016
5 The EmbarcaderoMarchetti Groupbasement: remodel and upgrade of 2 locker rooms. new toilet, showers, urinals. bathroom finishes, sinks, nmew lighting and electrical outlets. new metal lockers. maher na fire/life safety under sep permit
Details
Permit
201605056705
Status
complete
Filed
May 5, 2016
Permit issued
Jul 14, 2016
Final sign-off
Dec 16, 2016
Declared cost
$100,000
Address
5 The Embarcadero

basement: remodel and upgrade of 2 locker rooms. new toilet, showers, urinals. bathroom finishes, sinks, nmew lighting and electrical outlets. new metal lockers. maher na fire/life safety under sep permit

Open the permit page

$100,000
Mar 9, 2016Completed
final sign-off Mar 2017
5 Embarcadero CenterElectric Tech Construction Incmodification to an (e) at&t facility consisting of: installing (n)xmu unit inside(e)rack,3(n)rrus and r/r 3(e) antennas w/3(n)antennas, adding (n) frp extension,(n)bottom panel to (e)frp screen & painting screens to match building;maher n/a
Details
Permit
201603091621
Status
complete
Filed
Mar 9, 2016
Permit issued
Sep 7, 2016
Final sign-off
Mar 13, 2017
Declared cost
$26,000
Address
5 Embarcadero Center

modification to an (e) at&t facility consisting of: installing (n)xmu unit inside(e)rack,3(n)rrus and r/r 3(e) antennas w/3(n)antennas, adding (n) frp extension,(n)bottom panel to (e)frp screen & painting screens to match building;maher n/a

Open the permit page

$26,000
Feb 25, 2016Completed
final sign-off Mar 2017
5 Embarcadero CenterW M Wireless Incbsmnt: t-mobile, modification to existing unmanned telecommunication facility consisting of reanchoring (e) pbc6500 on (n) wf sleepers; adding batteries to (e) pbc6500 for a total of 20 batteries. maher na
Details
Permit
201602250531
Status
complete
Filed
Feb 25, 2016
Permit issued
Mar 1, 2017
Final sign-off
Mar 21, 2017
Declared cost
$8,000
Address
5 Embarcadero Center

bsmnt: t-mobile, modification to existing unmanned telecommunication facility consisting of reanchoring (e) pbc6500 on (n) wf sleepers; adding batteries to (e) pbc6500 for a total of 20 batteries. maher na

Open the permit page

$8,000
Jan 22, 2016Completed
final sign-off May 2016
5 The EmbarcaderoRed Hawk Fire & Security Ca Llcadd 9 new speaker/strobes for ti. ref 2014-1217-3967
Details
Permit
201601227711
Status
complete
Filed
Jan 22, 2016
Permit issued
Jan 22, 2016
Final sign-off
May 18, 2016
Declared cost
$5,000
Address
5 The Embarcadero

add 9 new speaker/strobes for ti. ref 2014-1217-3967

Open the permit page

$5,000
Dec 18, 2015Completed
final sign-off Jan 2017
5 Embarcadero CenterMarchetti Groupremodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets
Details
Permit
201512185515
Status
complete
Filed
Dec 18, 2015
Permit issued
Oct 20, 2016
Final sign-off
Jan 12, 2017
Declared cost
$88,000
Address
5 Embarcadero Center

remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets

Open the permit page

$88,000
Dec 7, 2015Completed
final sign-off Jan 2016
5 Embarcadero CenterAyoob & Peery Plumbing Co Increlocate 5 sprinklers per ti gr fl
Details
Permit
201512074283
Status
complete
Filed
Dec 7, 2015
Permit issued
Dec 7, 2015
Final sign-off
Jan 27, 2016
Declared cost
$1,000
Address
5 Embarcadero Center

relocate 5 sprinklers per ti gr fl

Open the permit page

$1,000
Nov 9, 2015Never finaled
issued Dec 2015, no final
5 Embarcadero CenterGci, Inct.i. for construction of a coffee shop in a ground floor level commercial space inside hyatt hotel. revision to 201505115957 add ceiling in scullery per sfdph. n/a for maher.
Details
Permit
201511092154
Status
issued
Filed
Nov 9, 2015
Permit issued
Dec 22, 2015
Declared cost
$250,000
Address
5 Embarcadero Center

t.i. for construction of a coffee shop in a ground floor level commercial space inside hyatt hotel. revision to 201505115957 add ceiling in scullery per sfdph. n/a for maher.

Open the permit page

$250,000
Oct 23, 2015Never finaled
issued Oct 2015, no final
5 The Embarcaderostreet space permit
Details
Permit
M632347
Status
issued
Filed
Oct 23, 2015
Permit issued
Oct 23, 2015
Address
5 The Embarcadero

street space permit

Open the permit page

Oct 16, 2015Completed
final sign-off Oct 2015
5 Embarcadero CenterR L H Fire Protection Incfire sprinker permit. relocate 9, add 7 pendents, delete 8 sidewall sprinklers. atrium level (3rd fl). ref ti 2014-1217-3967.
Details
Permit
201510169918
Status
complete
Filed
Oct 16, 2015
Permit issued
Oct 16, 2015
Final sign-off
Oct 30, 2015
Declared cost
$5,300
Address
5 Embarcadero Center

fire sprinker permit. relocate 9, add 7 pendents, delete 8 sidewall sprinklers. atrium level (3rd fl). ref ti 2014-1217-3967.

Open the permit page

$5,300
Sep 30, 2015Completed
final sign-off Jan 2016
5 Embarcadero CenterTriton Tower Incmodification to an (e) at&t facility including: removing and replacing 3 antennas, removing and replacing 3 rru's with 3-rru's - 11s and 4 surge suppressors with 4 new surge suppressors. maher na
Details
Permit
201509308408
Status
complete
Filed
Sep 30, 2015
Permit issued
Nov 24, 2015
Final sign-off
Jan 14, 2016
Declared cost
$24,000
Address
5 Embarcadero Center

modification to an (e) at&t facility including: removing and replacing 3 antennas, removing and replacing 3 rru's with 3-rru's - 11s and 4 surge suppressors with 4 new surge suppressors. maher na

Open the permit page

$24,000
Sep 10, 2015Completed
final sign-off Nov 2015
5 Embarcadero CenterRed Hawk Fire & Security Ca Llcadd 8 new speaker/strobes & 3 duct det with 3 relays. ref #201503302164. n/a maher ordinance
Details
Permit
201509106541
Status
complete
Filed
Sep 10, 2015
Permit issued
Sep 10, 2015
Final sign-off
Nov 20, 2015
Declared cost
$7,500
Address
5 Embarcadero Center

add 8 new speaker/strobes & 3 duct det with 3 relays. ref #201503302164. n/a maher ordinance

Open the permit page

$7,500
Aug 31, 2015Completed
final sign-off Oct 2015
5 Embarcadero CenterR L H Fire Protection Incfloors 1-3: fire sprinkler permit. add 25 pendent sprinkler in restrooms. n/a for maher. ref app#201505115957
Details
Permit
201508315705
Status
complete
Filed
Aug 31, 2015
Permit issued
Aug 31, 2015
Final sign-off
Oct 22, 2015
Declared cost
$12,850
Address
5 Embarcadero Center

floors 1-3: fire sprinkler permit. add 25 pendent sprinkler in restrooms. n/a for maher. ref app#201505115957

Open the permit page

$12,850
Aug 20, 2015Never finaled
issued Aug 2015, no final
5 The EmbarcaderoPioneer Fire Inc.ground floor - relocate or add fire sprinklers to accommodate new build out. ref pa 2015-0511-5957
Details
Permit
201508204843
Status
issued
Filed
Aug 20, 2015
Permit issued
Aug 20, 2015
Declared cost
$15,477
Address
5 The Embarcadero

ground floor - relocate or add fire sprinklers to accommodate new build out. ref pa 2015-0511-5957

Open the permit page

$15,477
Jul 16, 2015Expired or cancelled
withdrawn Jul 2022
5 Embarcadero Centerinstall new distributed antenna system(das) inside the hyatt hotel. n/a for maher.
Details
Permit
201507161646
Status
withdrawn
Filed
Jul 16, 2015
Declared cost
$75,000
Address
5 Embarcadero Center

install new distributed antenna system(das) inside the hyatt hotel. n/a for maher.

Open the permit page

$75,000
Jul 13, 2015Completed
final sign-off Dec 2015
5 The EmbarcaderoAd Art Inc.erect an electric single faced wall sign. n/a maher ordinance
Details
Permit
201507131257
Status
complete
Filed
Jul 13, 2015
Permit issued
Aug 6, 2015
Final sign-off
Dec 3, 2015
Declared cost
$5,000
Address
5 The Embarcadero

erect an electric single faced wall sign. n/a maher ordinance

Open the permit page

$5,000
Jul 13, 2015Completed
final sign-off Dec 2015
5 The EmbarcaderoAd Art Inc.erect (2) non-electric double faced projecting signs. n/a maher ordinance
Details
Permit
201507131255
Status
complete
Filed
Jul 13, 2015
Permit issued
Aug 6, 2015
Final sign-off
Dec 3, 2015
Declared cost
$1,500
Address
5 The Embarcadero

erect (2) non-electric double faced projecting signs. n/a maher ordinance

Open the permit page

$1,500
Jul 8, 2015Completed
final sign-off Sep 2015
5 Embarcadero CenterR L H Fire Protection Inc3rd flr, fire sprinkler permit relocate 40,add 8 and elete 4 sprinklers on the atrium level t.i. #201505115957; maher n/a
Details
Permit
201507080950
Status
complete
Filed
Jul 8, 2015
Permit issued
Jul 8, 2015
Final sign-off
Sep 11, 2015
Declared cost
$24,672
Address
5 Embarcadero Center

3rd flr, fire sprinkler permit relocate 40,add 8 and elete 4 sprinklers on the atrium level t.i. #201505115957; maher n/a

Open the permit page

$24,672
Jul 6, 2015Completed
final sign-off Jul 2015
5 Embarcadero CenterR L H Fire Protection Incfire sprinkler permit: basement to relocate 2 and add 12 pendent and bay level restrooms. t.i. 201505115957. n/a for the maher.
Details
Permit
201507060715
Status
complete
Filed
Jul 6, 2015
Permit issued
Jul 6, 2015
Final sign-off
Jul 30, 2015
Declared cost
$7,196
Address
5 Embarcadero Center

fire sprinkler permit: basement to relocate 2 and add 12 pendent and bay level restrooms. t.i. 201505115957. n/a for the maher.

Open the permit page

$7,196
Jun 19, 2015Completed
final sign-off Jul 2016
5 Embarcadero Centerverizon wireless unmanned telecommunications facility consisting of 5 total antennas behind frp and related radio equiment. n/a for maher
Details
Permit
201506199458
Status
complete
Filed
Jun 19, 2015
Permit issued
Aug 12, 2015
Final sign-off
Jul 6, 2016
Declared cost
$410,000
Address
5 Embarcadero Center

verizon wireless unmanned telecommunications facility consisting of 5 total antennas behind frp and related radio equiment. n/a for maher

Open the permit page

$410,000
Jun 2, 2015Completed
final sign-off Jun 2016
5 The EmbarcaderoHathaway Dinwiddie Co.revision to pa #2014 1217 3967: handrail locations at raised seating area in lobby per bld inspector. maher na
Details
Permit
201506027806
Status
complete
Filed
Jun 2, 2015
Permit issued
Jun 5, 2015
Final sign-off
Jun 20, 2016
Address
5 The Embarcadero

revision to pa #2014 1217 3967: handrail locations at raised seating area in lobby per bld inspector. maher na

Open the permit page

May 11, 2015Completed
final sign-off Jan 2016
5 The EmbarcaderoGci, Incgrounf level: ti - coffee shop, wall partitions, installation of (n) carpets, food service equip, mech, elect, plumb/ fire sprinkler systems (e) to be modified - under sep permit. ref pa 2015 0330 2164
Details
Permit
201505115957
Status
complete
Filed
May 11, 2015
Permit issued
Jul 14, 2015
Final sign-off
Jan 19, 2016
Declared cost
$250,000
Address
5 The Embarcadero

grounf level: ti - coffee shop, wall partitions, installation of (n) carpets, food service equip, mech, elect, plumb/ fire sprinkler systems (e) to be modified - under sep permit. ref pa 2015 0330 2164

Open the permit page

$250,000
Apr 29, 2015Never finaled
issued May 2015, no final
5 The EmbarcaderoViking Sign Installationsinstall 1 illuminated wall sign. n/a maher ord. 155-13
Details
Permit
201504294927
Status
issued
Filed
Apr 29, 2015
Permit issued
May 14, 2015
Declared cost
$10,000
Address
5 The Embarcadero

install 1 illuminated wall sign. n/a maher ord. 155-13

Open the permit page

$10,000
Apr 29, 2015Completed
final sign-off Aug 2016
5 Embarcadero CenterHathaway Dinwiddie Co.new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit.
Details
Permit
201504294930
Status
complete
Filed
Apr 29, 2015
Permit issued
Oct 13, 2015
Final sign-off
Aug 24, 2016
Declared cost
$1,025,000
Address
5 Embarcadero Center

new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit.

Open the permit page

$1,025,000
Apr 23, 2015Expired or cancelled
cancelled Jan 2026
5 Embarcadero CenterViking Sign Installationsto erect electric wall sign
Details
Permit
201504234376
Status
cancelled
Filed
Apr 23, 2015
Declared cost
$10,000
Address
5 Embarcadero Center

to erect electric wall sign

Open the permit page

$10,000
Apr 22, 2015Never finaled
issued Apr 2015, no final
5 Embarcadero Centerstreet space permit
Details
Permit
M579807
Status
issued
Filed
Apr 22, 2015
Permit issued
Apr 22, 2015
Address
5 Embarcadero Center

street space permit

Open the permit page

Apr 20, 2015Never finaled
issued May 2015, no final
5 The EmbarcaderoViking Sign Installationserect (3) non illum signs. maher - not req'd
Details
Permit
201504204073
Status
issued
Filed
Apr 20, 2015
Permit issued
May 14, 2015
Declared cost
$3,000
Address
5 The Embarcadero

erect (3) non illum signs. maher - not req'd

Open the permit page

$3,000
Apr 20, 2015Never finaled
issued May 2015, no final
5 The EmbarcaderoViking Sign Installationserect illum sign; maher n/a
Details
Permit
201504204079
Status
issued
Filed
Apr 20, 2015
Permit issued
May 14, 2015
Declared cost
$5,000
Address
5 The Embarcadero

erect illum sign; maher n/a

Open the permit page

$5,000
Apr 20, 2015Never finaled
issued Jun 2015, no final
5 The EmbarcaderoViking Sign Installationsinstall 2 electric wall signs
Details
Permit
201504204048
Status
issued
Filed
Apr 20, 2015
Permit issued
Jun 3, 2015
Declared cost
$15,000
Address
5 The Embarcadero

install 2 electric wall signs

Open the permit page

$15,000
Apr 20, 2015Never finaled
issued May 2015, no final
5 The EmbarcaderoViking Sign Installationserect non illum sign. maher - not req'd
Details
Permit
201504204077
Status
issued
Filed
Apr 20, 2015
Permit issued
May 14, 2015
Declared cost
$2,000
Address
5 The Embarcadero

erect non illum sign. maher - not req'd

Open the permit page

$2,000
Mar 30, 2015Never finaled
issued Apr 2015, no final
5 Embarcadero CenterE & F Demolitionnon structural demolition to retail space. storefront to remain. combine 2 retail spaces into 1 space. n/a maher ord. #155-13
Details
Permit
201503302164
Status
issued
Filed
Mar 30, 2015
Permit issued
Apr 1, 2015
Declared cost
$40,000
Address
5 Embarcadero Center

non structural demolition to retail space. storefront to remain. combine 2 retail spaces into 1 space. n/a maher ord. #155-13

Open the permit page

$40,000
Mar 11, 2015Completed
final sign-off Apr 2015
5 Embarcadero CenterR L H Fire Protection Inc17th floor suite #1740 fire sprinkler permit - relocate 1 pendent & 1 sidewall sprinkler. ref #2014.0829.5081. n/a maher ordinance
Details
Permit
201503110486
Status
complete
Filed
Mar 11, 2015
Permit issued
Mar 11, 2015
Final sign-off
Apr 30, 2015
Declared cost
$1,028
Address
5 Embarcadero Center

17th floor suite #1740 fire sprinkler permit - relocate 1 pendent & 1 sidewall sprinkler. ref #2014.0829.5081. n/a maher ordinance

Open the permit page

$1,028
Mar 9, 2015Completed
final sign-off Mar 2015
5 The EmbarcaderoOverland Contracting Incto obtain a final inspection for work already approved under pa# 201210111825, all work is complete
Details
Permit
201503090306
Status
complete
Filed
Mar 9, 2015
Permit issued
Mar 9, 2015
Final sign-off
Mar 27, 2015
Address
5 The Embarcadero

to obtain a final inspection for work already approved under pa# 201210111825, all work is complete

Open the permit page

Jan 13, 2015Completed
final sign-off Feb 2015
5 The EmbarcaderoHathaway Dinwiddie Co.revision appl. #2014.0829.5081. replace guestroom entry door was to be enlarged from 2'-8" to 3'-0". but guest room #1656 entry door is to remain the existing size 2'-8" due to the (e) structural column. maher n/a.
Details
Permit
201501135622
Status
complete
Filed
Jan 13, 2015
Permit issued
Jan 15, 2015
Final sign-off
Feb 3, 2015
Address
5 The Embarcadero

revision appl. #2014.0829.5081. replace guestroom entry door was to be enlarged from 2'-8" to 3'-0". but guest room #1656 entry door is to remain the existing size 2'-8" due to the (e) structural column. maher n/a.

Open the permit page

Jan 12, 2015Completed
final sign-off Apr 2015
5 Embarcadero CenterRed Hawk Fire & Security Ca Llc16th floor suite #1637- adding to existing 1 module, 1 sync module, 1 smoke/co det, 1 sounder base, 1 signal generator, 1 speaker, 2 strobe's. ref #2014.1106.0926. n/a maher ordinance
Details
Permit
201501125442
Status
complete
Filed
Jan 12, 2015
Permit issued
Jan 12, 2015
Final sign-off
Apr 10, 2015
Declared cost
$5,500
Address
5 Embarcadero Center

16th floor suite #1637- adding to existing 1 module, 1 sync module, 1 smoke/co det, 1 sounder base, 1 signal generator, 1 speaker, 2 strobe's. ref #2014.1106.0926. n/a maher ordinance

Open the permit page

$5,500
Dec 17, 2014Completed
final sign-off Jun 2016
5 The EmbarcaderoHathaway Dinwiddie Co.remodel of hotel, bar, flex space, platform w/ (n) reception & concierge desk & @ the 3rd floor level/ new occupant loads-mep, removal & replace selected floor finishes, new wall finishes gyp board ceiling,new doors, operable walls & lighting. sprinklers & fire alarm sep. permit
Details
Permit
201412173967
Status
complete
Filed
Dec 17, 2014
Permit issued
Apr 24, 2015
Final sign-off
Jun 20, 2016
Declared cost
$1,800,000
Address
5 The Embarcadero

remodel of hotel, bar, flex space, platform w/ (n) reception & concierge desk & @ the 3rd floor level/ new occupant loads-mep, removal & replace selected floor finishes, new wall finishes gyp board ceiling,new doors, operable walls & lighting. sprinklers & fire alarm sep. permit

Open the permit page

$1,800,000
Dec 9, 2014Expired or cancelled
cancelled Jan 2026
5 Embarcadero Centeratrium level garden meeting rooms - mechanical scope omitted from pa# 201411071064, no new hvac systems, existing reused, replace air economizer system, add co2 sensors, no changes in airflows. n/a ordinance #155-13
Details
Permit
201412093347
Status
cancelled
Filed
Dec 9, 2014
Declared cost
$30,000
Address
5 Embarcadero Center

atrium level garden meeting rooms - mechanical scope omitted from pa# 201411071064, no new hvac systems, existing reused, replace air economizer system, add co2 sensors, no changes in airflows. n/a ordinance #155-13

Open the permit page

$30,000
Dec 8, 2014Completed
final sign-off Jan 2017
5 Embarcadero CenterHathaway Dinwiddie Co.3rd fl atrium: demolition of extg hyatt regency embarcadero interior non structural walls, ceilings and finishes at flex-space and platform areas as shown in attached plans. n/a ordinance #155-13
Details
Permit
201412083287
Status
complete
Filed
Dec 8, 2014
Permit issued
Dec 12, 2014
Final sign-off
Jan 20, 2017
Declared cost
$30,000
Address
5 Embarcadero Center

3rd fl atrium: demolition of extg hyatt regency embarcadero interior non structural walls, ceilings and finishes at flex-space and platform areas as shown in attached plans. n/a ordinance #155-13

Open the permit page

$30,000
Nov 7, 2014Completed
final sign-off Jan 2017
5 Embarcadero CenterHathaway Dinwiddie Co.interior improvements to meeting space and related restrooms on the basement level, ground floor level, 2nd level and 3rd level.
Details
Permit
201411071064
Status
complete
Filed
Nov 7, 2014
Permit issued
Nov 14, 2014
Final sign-off
Jan 20, 2017
Declared cost
$80,000
Address
5 Embarcadero Center

interior improvements to meeting space and related restrooms on the basement level, ground floor level, 2nd level and 3rd level.

Open the permit page

$80,000
Nov 6, 2014Never finaled
issued Nov 2014, no final
5 Embarcadero CenterHathaway Dinwiddie Co.remodel guest room 1637 consisting of alteration to guest bath to provide for accessibility
Details
Permit
201411060926
Status
issued
Filed
Nov 6, 2014
Permit issued
Nov 14, 2014
Declared cost
$30,000
Address
5 Embarcadero Center

remodel guest room 1637 consisting of alteration to guest bath to provide for accessibility

Open the permit page

$30,000
Sep 26, 2014Expired or cancelled
cancelled Mar 2020
5 Embarcadero Centersprint:add(3)2.5 panel antennas(1)each at sectors, a,b & c; add(3) 2.5 rrh,(1)each at sectors a,b & c,add new 2.5 equipment inside(e)mmbs cabinet add new 2.5 batteries inside(e)bbo cabinet,add(n)coax jumper lines from rrhs to (n) antennas,add new stealth screening at each of sectors a,b & c, add
Details
Permit
201409267443
Status
cancelled
Filed
Sep 26, 2014
Declared cost
$20,000
Address
5 Embarcadero Center

sprint:add(3)2.5 panel antennas(1)each at sectors, a,b & c; add(3) 2.5 rrh,(1)each at sectors a,b & c,add new 2.5 equipment inside(e)mmbs cabinet add new 2.5 batteries inside(e)bbo cabinet,add(n)coax jumper lines from rrhs to (n) antennas,add new stealth screening at each of sectors a,b & c, add

Open the permit page

$20,000
Aug 29, 2014Completed
final sign-off Jun 2015
5 Embarcadero CenterHathaway Dinwiddie Co.renovation of four luxury suites. selected demo of partitions, ceiling, millwork. new partitions, finishes, plumbing fixtures, selected lighting. upgrade of 1 of those suites to be ada compliant suite 1740, 1640, 1656, 1756
Details
Permit
201408295081
Status
complete
Filed
Aug 29, 2014
Permit issued
Oct 15, 2014
Final sign-off
Jun 30, 2015
Declared cost
$63,750
Address
5 Embarcadero Center

renovation of four luxury suites. selected demo of partitions, ceiling, millwork. new partitions, finishes, plumbing fixtures, selected lighting. upgrade of 1 of those suites to be ada compliant suite 1740, 1640, 1656, 1756

Open the permit page

$63,750
Jun 24, 2014Completed
final sign-off Aug 2015
5 Embarcadero CenterHathaway Dinwiddie Co.15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies.
Details
Permit
201406249326
Status
complete
Filed
Jun 24, 2014
Permit issued
Jul 14, 2014
Final sign-off
Aug 10, 2015
Declared cost
$20,000
Address
5 Embarcadero Center

15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies.

Open the permit page

$20,000
Jun 25, 2013Completed
final sign-off Jan 2014
5 Embarcadero CenterTriton Tower Incadd 3 new rru's at extg at&t antenna locations.
Details
Permit
201306250422
Status
complete
Filed
Jun 25, 2013
Permit issued
Dec 23, 2013
Final sign-off
Jan 15, 2014
Declared cost
$15,000
Address
5 Embarcadero Center

add 3 new rru's at extg at&t antenna locations.

Open the permit page

$15,000
Apr 11, 2013Never finaled
issued Apr 2013, no final
5 Embarcadero CenterR L H Fire Protection Incsprinkler umbrella permit ordinance #377-93
Details
Permit
201304114301
Status
issued
Filed
Apr 11, 2013
Permit issued
Apr 15, 2013
Address
5 Embarcadero Center

sprinkler umbrella permit ordinance #377-93

Open the permit page

Oct 11, 2012Never finaled
issued Nov 2012, no final
5 Embarcadero CenterOverland Contracting Incsprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof.
Details
Permit
201210111825
Status
issued
Filed
Oct 11, 2012
Permit issued
Nov 14, 2012
Declared cost
$45,000
Address
5 Embarcadero Center

sprint wireless modification: replace (6) existing panel antennas with (3) new antennas on roof; replace (2) existing equipment cabinets with (2) equipment cabinets within (e) lease area on roof.

Open the permit page

$45,000
Oct 2, 2012Completed
final sign-off Jan 2013
5 Embarcadero CenterRed Hawk Fire & Security Ca Llcbasement level-pre action fire system & fire alarm t.i in electrical room-7 conventional detectors, 2 monitor modules & 1 addressable smoke detector
Details
Permit
201210021051
Status
complete
Filed
Oct 2, 2012
Permit issued
Oct 2, 2012
Final sign-off
Jan 15, 2013
Declared cost
$8,000
Address
5 Embarcadero Center

basement level-pre action fire system & fire alarm t.i in electrical room-7 conventional detectors, 2 monitor modules & 1 addressable smoke detector

Open the permit page

$8,000
Aug 28, 2012Completed
final sign-off Sep 2013
5 The EmbarcaderoTriton Tower Incinstall 3 (n) rrvs near (e) antennas and intstall 1 (n) 6601 rbs unit within 1 (n) equipment. back in at&t (e) indoor equipment room.
Details
Permit
201208288433
Status
complete
Filed
Aug 28, 2012
Permit issued
Feb 22, 2013
Final sign-off
Sep 26, 2013
Declared cost
$25,000
Address
5 The Embarcadero

install 3 (n) rrvs near (e) antennas and intstall 1 (n) 6601 rbs unit within 1 (n) equipment. back in at&t (e) indoor equipment room.

Open the permit page

$25,000
Jul 18, 2012Completed
final sign-off Jan 2013
5 Embarcadero CenterR L H Fire Protection Incupgrade the exisiting fire sprinkler system to meet the requirement of the high rise sprinkler ordinance #377-93. install a new preaction system in the main electrical room on level a. add 81 new uprights, 10 new pendents and 2 new sidewalls
Details
Permit
201207185139
Status
complete
Filed
Jul 18, 2012
Permit issued
Sep 4, 2012
Final sign-off
Jan 15, 2013
Declared cost
$50,000
Address
5 Embarcadero Center

upgrade the exisiting fire sprinkler system to meet the requirement of the high rise sprinkler ordinance #377-93. install a new preaction system in the main electrical room on level a. add 81 new uprights, 10 new pendents and 2 new sidewalls

Open the permit page

$50,000
May 18, 2011Completed
final sign-off Aug 2011
5 Embarcadero CenterAnderson, Rowe & Buckley, Inc.tenant improvements,extg fire sprinkler system, 2 lowered sprinklers,1 removed sprinkler/sacramento alley bay street level.
Details
Permit
201105186267
Status
complete
Filed
May 18, 2011
Permit issued
May 18, 2011
Final sign-off
Aug 31, 2011
Declared cost
$1,000
Address
5 Embarcadero Center

tenant improvements,extg fire sprinkler system, 2 lowered sprinklers,1 removed sprinkler/sacramento alley bay street level.

Open the permit page

$1,000
Apr 21, 2011Never finaled
issued Oct 2011, no final
5 Embarcadero CenterRidge Communications Inca modification to an (e) unmanned telecommunications facility consisting of removing & replacing (3) new at &t antennas with (3) (e) at &t lte antennas, adding (3) new surge suppressors, (6) new rru's, a new bps antenna & adding (3) new 6601 rbs lte units in (e) equipment areas.
Details
Permit
201104214549
Status
issued
Filed
Apr 21, 2011
Permit issued
Oct 20, 2011
Declared cost
$72,000
Address
5 Embarcadero Center

a modification to an (e) unmanned telecommunications facility consisting of removing & replacing (3) new at &t antennas with (3) (e) at &t lte antennas, adding (3) new surge suppressors, (6) new rru's, a new bps antenna & adding (3) new 6601 rbs lte units in (e) equipment areas.

Open the permit page

$72,000
Dec 9, 2010Completed
final sign-off Feb 2011
5 Embarcadero CenterMetropolitan Electrical Constructioninstall at&t wi-fi equipment in extg at&t mobility equipment locations. the installation includes adding equipment racks and 4 antennas to extg at & t mobility equipment areas. these equipment areas are in the mezzanine level of the hotel. the antennas will be located on the exterior of the bldg.
Details
Permit
201012096392
Status
complete
Filed
Dec 9, 2010
Permit issued
Dec 21, 2010
Final sign-off
Feb 7, 2011
Declared cost
$40,000
Address
5 Embarcadero Center

install at&t wi-fi equipment in extg at&t mobility equipment locations. the installation includes adding equipment racks and 4 antennas to extg at & t mobility equipment areas. these equipment areas are in the mezzanine level of the hotel. the antennas will be located on the exterior of the bldg.

Open the permit page

$40,000
Nov 30, 2010Never finaled
issued Jan 2011, no final
5 Embarcadero CenterMetropolitan Electrical Constructionwireless facility, roof top: install 1 base transreceiver cabinet on the roof top, 6 panel antennas, 1 internet services exchange switch antenna & 1 gps antenna. modification to pa# 2009/08/10/4513. relocate 1 internet services exchange switch antenna from penthouse to (e) sprint platform.
Details
Permit
201011305828
Status
issued
Filed
Nov 30, 2010
Permit issued
Jan 19, 2011
Declared cost
$15,000
Address
5 Embarcadero Center

wireless facility, roof top: install 1 base transreceiver cabinet on the roof top, 6 panel antennas, 1 internet services exchange switch antenna & 1 gps antenna. modification to pa# 2009/08/10/4513. relocate 1 internet services exchange switch antenna from penthouse to (e) sprint platform.

Open the permit page

$15,000
Nov 16, 2010Never finaled
issued Nov 2010, no final
5 Embarcadero CenterReal Signs And Lightingreface existing blade sign and add new wall sign
Details
Permit
201011165055
Status
issued
Filed
Nov 16, 2010
Permit issued
Nov 16, 2010
Declared cost
$2,500
Address
5 Embarcadero Center

reface existing blade sign and add new wall sign

Open the permit page

$2,500
Jul 12, 2010Expired or cancelled
withdrawn Oct 2016
5 The Embarcaderoat & t. a modification to an (e) unmanned telecomunication facility consisting of adding a new 3518 rbs cabinet, 3 new rrv's with new fiber cable, a new frp screen at sector a, and 3 new radomes at sections b and c
Details
Permit
201007126414
Status
withdrawn
Filed
Jul 12, 2010
Declared cost
$55,000
Address
5 The Embarcadero

at & t. a modification to an (e) unmanned telecomunication facility consisting of adding a new 3518 rbs cabinet, 3 new rrv's with new fiber cable, a new frp screen at sector a, and 3 new radomes at sections b and c

Open the permit page

$55,000
Jun 23, 2010Completed
final sign-off Sep 2010
5 Embarcadero CenterR L H Fire Protection Incatrium level ti upgrade on the e fire sprinkler system. relocate 8 pendant sprnkler heads in exising builing. relocate 8 pendents
Details
Permit
201006235118
Status
complete
Filed
Jun 23, 2010
Permit issued
Jun 23, 2010
Final sign-off
Sep 22, 2010
Declared cost
$2,500
Address
5 Embarcadero Center

atrium level ti upgrade on the e fire sprinkler system. relocate 8 pendant sprnkler heads in exising builing. relocate 8 pendents

Open the permit page

$2,500
Jun 2, 2010Completed
final sign-off Sep 2010
5 Embarcadero CenterBcci Construction Companyreplace entry doors to interior space, remove 1-14" (e) wall. minor lighting & electrical
Details
Permit
201006023642
Status
complete
Filed
Jun 2, 2010
Permit issued
Jun 3, 2010
Final sign-off
Sep 22, 2010
Declared cost
$83,000
Address
5 Embarcadero Center

replace entry doors to interior space, remove 1-14" (e) wall. minor lighting & electrical

Open the permit page

$83,000
May 25, 2010Completed
final sign-off Jun 2011
5 The EmbarcaderoBroken Arrow Communications Inca modification to an (e) unmanned telecomunication facility consisting of adding a (n) 3518 rbs cabinet & 3-(n) rru's (remote radio units) w/ (n) fiber cable.
Details
Permit
201005253189
Status
complete
Filed
May 25, 2010
Permit issued
Jun 25, 2010
Final sign-off
Jun 6, 2011
Declared cost
$20,000
Address
5 The Embarcadero

a modification to an (e) unmanned telecomunication facility consisting of adding a (n) 3518 rbs cabinet & 3-(n) rru's (remote radio units) w/ (n) fiber cable.

Open the permit page

$20,000
Nov 20, 2009Completed
final sign-off Feb 2011
5 The EmbarcaderoCapital Tower & Communicationshyatt regency. remove and replace the existing antenna. add 1 new antenna for a total of two. add 1 new ericsson 3206 bts for a total of 2 in the basement. remove and replace the existing battery back unit (bbu) cabinet with a newer model (6500)
Details
Permit
200911201811
Status
complete
Filed
Nov 20, 2009
Permit issued
Feb 3, 2011
Final sign-off
Feb 9, 2011
Declared cost
$15,000
Address
5 The Embarcadero

hyatt regency. remove and replace the existing antenna. add 1 new antenna for a total of two. add 1 new ericsson 3206 bts for a total of 2 in the basement. remove and replace the existing battery back unit (bbu) cabinet with a newer model (6500)

Open the permit page

$15,000
Oct 16, 2009Completed
final sign-off Feb 2010
5 Embarcadero CenterRed Hawk Fire & Security Ca Llclobby level-2 (e) speaker/strobes to be replace with new
Details
Permit
200910169085
Status
complete
Filed
Oct 16, 2009
Permit issued
Oct 16, 2009
Final sign-off
Feb 1, 2010
Declared cost
$5,000
Address
5 Embarcadero Center

lobby level-2 (e) speaker/strobes to be replace with new

Open the permit page

$5,000
Oct 14, 2009Completed
final sign-off Dec 2009
5 The EmbarcaderoBcci Construction Companyhyatt regency. install light strings ( lighting plans) in the hotel lobby
Details
Permit
200910148901
Status
complete
Filed
Oct 14, 2009
Permit issued
Oct 20, 2009
Final sign-off
Dec 18, 2009
Declared cost
$200,000
Address
5 The Embarcadero

hyatt regency. install light strings ( lighting plans) in the hotel lobby

Open the permit page

$200,000
Oct 14, 2009Completed
final sign-off Feb 2010
5 Embarcadero CenterBcci Construction Companyhyatt regency. structural work associated with approved pa# 2009.09.02.6034. showing structural support for mech space.
Details
Permit
200910148940
Status
complete
Filed
Oct 14, 2009
Permit issued
Oct 14, 2009
Final sign-off
Feb 1, 2010
Address
5 Embarcadero Center

hyatt regency. structural work associated with approved pa# 2009.09.02.6034. showing structural support for mech space.

Open the permit page

Oct 8, 2009Completed
final sign-off Dec 2009
5 Embarcadero CenterAyoob & Peery Plumbing Co Incatrium level - relocate & remove fire sprinkler heads per tenant improvements, 14 relcoate, 9 remove.
Details
Permit
200910088573
Status
complete
Filed
Oct 8, 2009
Permit issued
Oct 8, 2009
Final sign-off
Dec 4, 2009
Declared cost
$2,100
Address
5 Embarcadero Center

atrium level - relocate & remove fire sprinkler heads per tenant improvements, 14 relcoate, 9 remove.

Open the permit page

$2,100
Sep 28, 2009Completed
final sign-off Feb 2010
5 Embarcadero CenterBcci Construction Companyatirum -work at the new fitness center & car rental desk. electrical work is lighting & power & data, work associated with pa# 2009-0902-6034
Details
Permit
200909287779
Status
complete
Filed
Sep 28, 2009
Permit issued
Sep 29, 2009
Final sign-off
Feb 1, 2010
Declared cost
$181,000
Address
5 Embarcadero Center

atirum -work at the new fitness center & car rental desk. electrical work is lighting & power & data, work associated with pa# 2009-0902-6034

Open the permit page

$181,000
Sep 2, 2009Completed
final sign-off Jan 2010
5 Embarcadero CenterBcci Construction Companyrelocation of fitness center from bay level to atrium level, refinish space being vacated. work includes minor demo, new millwork, finishes & equipment. mep, life safety & sprinklers under separate permit.
Details
Permit
200909026034
Status
complete
Filed
Sep 2, 2009
Permit issued
Sep 2, 2009
Final sign-off
Jan 29, 2010
Declared cost
$550,422
Address
5 Embarcadero Center

relocation of fitness center from bay level to atrium level, refinish space being vacated. work includes minor demo, new millwork, finishes & equipment. mep, life safety & sprinklers under separate permit.

Open the permit page

$550,422
Aug 10, 2009Completed
final sign-off Jul 2010
5 Embarcadero CenterMetropolitan Electrical Constructioninstallation of 1 base transceiver cabinet on the rooftop on sprint/nextels existing platform, 6 rf panel antennas (1 per sector) on monopole mounts on building facade (1) and existing penthouse (2), 1 internet services exchange switch antenna on monopoles, 1 gps antenna.
Details
Permit
200908104513
Status
complete
Filed
Aug 10, 2009
Permit issued
Mar 29, 2010
Final sign-off
Jul 12, 2010
Declared cost
$45,000
Address
5 Embarcadero Center

installation of 1 base transceiver cabinet on the rooftop on sprint/nextels existing platform, 6 rf panel antennas (1 per sector) on monopole mounts on building facade (1) and existing penthouse (2), 1 internet services exchange switch antenna on monopoles, 1 gps antenna.

Open the permit page

$45,000
Aug 6, 2009Never finaled
issued Aug 2009, no final
5 Embarcadero Centerstreet space permit
Details
Permit
M175813
Status
issued
Filed
Aug 6, 2009
Permit issued
Aug 6, 2009
Address
5 Embarcadero Center

street space permit

Open the permit page

Aug 4, 2009Never finaled
issued Aug 2009, no final
5 The EmbarcaderoN S A Wireless Incproposed modification to (e) wireless site include: removal of 3 existing antenna. install 9 new antennas. install 5 new equip cabinets, six rru's, nine bbu's. and 2 existing cabinets removed
Details
Permit
200908044089
Status
issued
Filed
Aug 4, 2009
Permit issued
Aug 18, 2009
Declared cost
$75,000
Address
5 The Embarcadero

proposed modification to (e) wireless site include: removal of 3 existing antenna. install 9 new antennas. install 5 new equip cabinets, six rru's, nine bbu's. and 2 existing cabinets removed

Open the permit page

$75,000
Mar 13, 2009Completed
final sign-off Aug 2009
5 The EmbarcaderoHathaway Dinwiddie Co.to obtain final inspection for work approved under 200712211170. all work has been completed.
Details
Permit
200903134143
Status
complete
Filed
Mar 13, 2009
Permit issued
Mar 13, 2009
Final sign-off
Aug 24, 2009
Address
5 The Embarcadero

to obtain final inspection for work approved under 200712211170. all work has been completed.

Open the permit page

Feb 3, 2009Completed
final sign-off Jun 2009
5 Embarcadero CenterWard Alan Emery Construction Inc.ground floor minor renovation of (e) retail space to create sandwich shop w/no seating,no washing,no cooking of food on site. includesadding 1 3-basin sink, moving electrical outlets, installing floor & wall tile,casework & food related equip, not bldg new walls/ceilings,floors or modifying (e)same.
Details
Permit
200902031264
Status
complete
Filed
Feb 3, 2009
Permit issued
Apr 17, 2009
Final sign-off
Jun 8, 2009
Declared cost
$15,000
Address
5 Embarcadero Center

ground floor minor renovation of (e) retail space to create sandwich shop w/no seating,no washing,no cooking of food on site. includesadding 1 3-basin sink, moving electrical outlets, installing floor & wall tile,casework & food related equip, not bldg new walls/ceilings,floors or modifying (e)same.

Open the permit page

$15,000
Jan 22, 2009Completed
final sign-off May 2009
5 Embarcadero Centerto clarify ada details for ada ramp approved under pa #200708240840. on the equinox regency club @ 19th. floor.
Details
Permit
200901220669
Status
complete
Filed
Jan 22, 2009
Permit issued
Jan 27, 2009
Final sign-off
May 7, 2009
Address
5 Embarcadero Center

to clarify ada details for ada ramp approved under pa #200708240840. on the equinox regency club @ 19th. floor.

Open the permit page

Sep 10, 2008Never finaled
issued Sep 2008, no final
5 The EmbarcaderoRed Hawk Fire & Security Ca Llc22/f -replace (e) 3 smoke detectors in equinox restaurant/meeting room to 3 heat detectors over buffett-3 heat detectors
Details
Permit
200809101237
Status
issued
Filed
Sep 10, 2008
Permit issued
Sep 10, 2008
Declared cost
$1,000
Address
5 The Embarcadero

22/f -replace (e) 3 smoke detectors in equinox restaurant/meeting room to 3 heat detectors over buffett-3 heat detectors

Open the permit page

$1,000
Aug 25, 2008Completed
final sign-off May 2009
5 Embarcadero CenterMc Millan Electricadd receptcles & lighting in the atrium cafe. revision to application 200807166828.
Details
Permit
200808259918
Status
complete
Filed
Aug 25, 2008
Permit issued
Aug 25, 2008
Final sign-off
May 7, 2009
Declared cost
$13,500
Address
5 Embarcadero Center

add receptcles & lighting in the atrium cafe. revision to application 200807166828.

Open the permit page

$13,500
Aug 5, 2008Never finaled
issued Aug 2008, no final
5 The Embarcaderointerior demolition of existing service station including associated millwork, finishes. work to be perform at partial atrium level only - ab017 applies
Details
Permit
200808058468
Status
issued
Filed
Aug 5, 2008
Permit issued
Aug 6, 2008
Declared cost
$5,000
Address
5 The Embarcadero

interior demolition of existing service station including associated millwork, finishes. work to be perform at partial atrium level only - ab017 applies

Open the permit page

$5,000
Jul 16, 2008Completed
final sign-off May 2009
5 Embarcadero Centerrefurbish dinning area finishes, reuse & install new furniture, banquette seating, add (n) millwork as needed. install required electrical, data & voice outlets as needed for restaurant operation and install (n) bar.
Details
Permit
200807166828
Status
complete
Filed
Jul 16, 2008
Permit issued
Aug 11, 2008
Final sign-off
May 7, 2009
Declared cost
$300,000
Address
5 Embarcadero Center

refurbish dinning area finishes, reuse & install new furniture, banquette seating, add (n) millwork as needed. install required electrical, data & voice outlets as needed for restaurant operation and install (n) bar.

Open the permit page

$300,000
May 23, 2008Completed
final sign-off May 2009
5 The Embarcaderoto clarify details for existing ada room #1644 only as indicated by delta 4. reference to previously approved #2007/830/1440.
Details
Permit
200805232826
Status
complete
Filed
May 23, 2008
Permit issued
May 23, 2008
Final sign-off
May 7, 2009
Declared cost
$2,000
Address
5 The Embarcadero

to clarify details for existing ada room #1644 only as indicated by delta 4. reference to previously approved #2007/830/1440.

Open the permit page

$2,000
Mar 11, 2008Completed
final sign-off May 2009
5 Embarcadero CenterHathaway Dinwiddie Co.renew pa#200/03/01/6474 for final inspection.
Details
Permit
200803116802
Status
complete
Filed
Mar 11, 2008
Permit issued
Mar 11, 2008
Final sign-off
May 7, 2009
Address
5 Embarcadero Center

renew pa#200/03/01/6474 for final inspection.

Open the permit page

Mar 4, 2008Completed
final sign-off May 2009
5 Embarcadero CenterHathaway Dinwiddie Co.renewal of permit application # 200210310489
Details
Permit
200803046183
Status
complete
Filed
Mar 4, 2008
Permit issued
Mar 4, 2008
Final sign-off
May 7, 2009
Address
5 Embarcadero Center

renewal of permit application # 200210310489

Open the permit page

Dec 21, 2007Expired or cancelled
expired Aug 2009
5 The Embarcaderoreplace existing cooling tower with new 2-cells of refrigeration (condenser water) units per plan.
Details
Permit
200712211170
Status
expired
Filed
Dec 21, 2007
Permit issued
Jan 29, 2008
Declared cost
$45,000
Address
5 The Embarcadero

replace existing cooling tower with new 2-cells of refrigeration (condenser water) units per plan.

Open the permit page

$45,000
Dec 5, 2007Completed
final sign-off May 2009
5 The Embarcaderoev. to p/a #2007.08.24.0840. incr. scope of work: front entrance area of club lounge to include beverage counter & reach in referigerator, incr. buffet counter length and increase space betwem (e) backwall & allow low panels for banquett seating & install (n) furring walls. (changes as delta 8).
Details
Permit
200712059697
Status
complete
Filed
Dec 5, 2007
Permit issued
Dec 21, 2007
Final sign-off
May 7, 2009
Declared cost
$400,000
Address
5 The Embarcadero

ev. to p/a #2007.08.24.0840. incr. scope of work: front entrance area of club lounge to include beverage counter & reach in referigerator, incr. buffet counter length and increase space betwem (e) backwall & allow low panels for banquett seating & install (n) furring walls. (changes as delta 8).

Open the permit page

$400,000
Dec 3, 2007Completed
final sign-off May 2009
5 The Embarcaderorevision to pa# 2007-0830-1440 for reduced scope of work. changes include removing all alternative bathroom conditions & maintaining a portion of the existing lighting in all rooms, add new plumbing drawings to show (n) shower vs. (e) tub configurations.
Details
Permit
200712039487
Status
complete
Filed
Dec 3, 2007
Permit issued
Dec 21, 2007
Final sign-off
May 7, 2009
Declared cost
$1,400,000
Address
5 The Embarcadero

revision to pa# 2007-0830-1440 for reduced scope of work. changes include removing all alternative bathroom conditions & maintaining a portion of the existing lighting in all rooms, add new plumbing drawings to show (n) shower vs. (e) tub configurations.

Open the permit page

$1,400,000
Aug 30, 2007Completed
final sign-off May 2009
5 The Embarcaderotenant improv. to guest rms. on 16/f & 17/f & suite rms. on 2/f to 15/f (type s1, s2 & s3) fixture, furniture & finishes upgrades throughout.(n) floor @ entry vestibule. (n) toilet, (n) faucets @ lav. & tub (alternate condition: remove (e) tub & install (n) shower or (n) tub as per pln. total 135 rm
Details
Permit
200708301440
Status
complete
Filed
Aug 30, 2007
Permit issued
Sep 7, 2007
Final sign-off
May 7, 2009
Declared cost
$2,500,000
Address
5 The Embarcadero

tenant improv. to guest rms. on 16/f & 17/f & suite rms. on 2/f to 15/f (type s1, s2 & s3) fixture, furniture & finishes upgrades throughout.(n) floor @ entry vestibule. (n) toilet, (n) faucets @ lav. & tub (alternate condition: remove (e) tub & install (n) shower or (n) tub as per pln. total 135 rm

Open the permit page

$2,500,000
Aug 24, 2007Completed
final sign-off May 2009
5 The Embarcadero18/f- tenant improvement to elevator lobby & regency lounge club, electrical to be under seperate permit.
Details
Permit
200708240840
Status
complete
Filed
Aug 24, 2007
Permit issued
Sep 7, 2007
Final sign-off
May 7, 2009
Declared cost
$200,000
Address
5 The Embarcadero

18/f- tenant improvement to elevator lobby & regency lounge club, electrical to be under seperate permit.

Open the permit page

$200,000
Apr 19, 2007Completed
final sign-off May 2009
5 Embarcadero Centerto install a typica model guest room at ste#1616 only no other work.
Details
Permit
200704199246
Status
complete
Filed
Apr 19, 2007
Permit issued
Apr 19, 2007
Final sign-off
May 7, 2009
Declared cost
$8,000
Address
5 Embarcadero Center

to install a typica model guest room at ste#1616 only no other work.

Open the permit page

$8,000
Dec 19, 2006Expired or cancelled
expired Jun 2007
5 Embarcadero CenterHathaway Dinwiddie Co.renew pa# 200503016474 for final inspection.
Details
Permit
200612190099
Status
expired
Filed
Dec 19, 2006
Permit issued
Dec 19, 2006
Address
5 Embarcadero Center

renew pa# 200503016474 for final inspection.

Open the permit page

Nov 1, 2006Completed
final sign-off Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.renew pa# 2006/03/22/7616, pa# 2005/12/19/0615, pa# 2005/12/20/0757 & pa# 2005/10/17/5729 for final inspection.
Details
Permit
200611016552
Status
complete
Filed
Nov 1, 2006
Permit issued
Nov 1, 2006
Final sign-off
Nov 8, 2006
Address
5 Embarcadero Center

renew pa# 2006/03/22/7616, pa# 2005/12/19/0615, pa# 2005/12/20/0757 & pa# 2005/10/17/5729 for final inspection.

Open the permit page

Jun 21, 2006Completed
final sign-off Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.9th fl. beam penetrations and repairs on 9th & 17th floor for new sprinkler work 200508230954.
Details
Permit
200606214590
Status
complete
Filed
Jun 21, 2006
Permit issued
Sep 14, 2006
Final sign-off
Nov 8, 2006
Declared cost
$14,000
Address
5 Embarcadero Center

9th fl. beam penetrations and repairs on 9th & 17th floor for new sprinkler work 200508230954.

Open the permit page

$14,000
Mar 22, 2006Expired or cancelled
expired Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.revision to pa#200508291455 per request of site inspector to show changes to bath rooms and closets, see delta one changes. fire protection on separate application.
Details
Permit
200603227316
Status
expired
Filed
Mar 22, 2006
Permit issued
Mar 22, 2006
Address
5 Embarcadero Center

revision to pa#200508291455 per request of site inspector to show changes to bath rooms and closets, see delta one changes. fire protection on separate application.

Open the permit page

Dec 20, 2005Expired or cancelled
expired Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.revision to pa# 2005/08/22/0867 for fire alarm all floors.
Details
Permit
200512200757
Status
expired
Filed
Dec 20, 2005
Permit issued
Feb 21, 2006
Declared cost
$22,000
Address
5 Embarcadero Center

revision to pa# 2005/08/22/0867 for fire alarm all floors.

Open the permit page

$22,000
Dec 19, 2005Expired or cancelled
expired Nov 2006
5 Embarcadero Centerrevision to approved pa# 2005/08/23/0954 for approval of fire proofing detail at beam penetrations.
Details
Permit
200512190615
Status
expired
Filed
Dec 19, 2005
Permit issued
Dec 19, 2005
Address
5 Embarcadero Center

revision to approved pa# 2005/08/23/0954 for approval of fire proofing detail at beam penetrations.

Open the permit page

Oct 17, 2005Expired or cancelled
expired Nov 2006
5 Embarcadero Centerrevision to pa 200508291455, to beam penetrations on guest level 15.
Details
Permit
200510175729
Status
expired
Filed
Oct 17, 2005
Permit issued
Oct 17, 2005
Address
5 Embarcadero Center

revision to pa 200508291455, to beam penetrations on guest level 15.

Open the permit page

Aug 29, 2005Completed
final sign-off Nov 2006
5 Embarcadero Centeraccessible bathroom upgrades in 9 guestrooms,ceiling,repair for new sprinkler system.
Details
Permit
200508291455
Status
complete
Filed
Aug 29, 2005
Permit issued
Oct 14, 2005
Final sign-off
Nov 8, 2006
Declared cost
$250,000
Address
5 Embarcadero Center

accessible bathroom upgrades in 9 guestrooms,ceiling,repair for new sprinkler system.

Open the permit page

$250,000
Aug 23, 2005Completed
final sign-off Nov 2006
5 Embarcadero Centerupgrade sprinkler system on guest floors 2-15, roof mechanical space and mechanical mezzanine.
Details
Permit
200508230954
Status
complete
Filed
Aug 23, 2005
Permit issued
Oct 26, 2005
Final sign-off
Nov 8, 2006
Declared cost
$250,000
Address
5 Embarcadero Center

upgrade sprinkler system on guest floors 2-15, roof mechanical space and mechanical mezzanine.

Open the permit page

$250,000
Aug 22, 2005Completed
final sign-off Nov 2006
5 Embarcadero Centernew addressable fire alarm system on all floors
Details
Permit
200508220867
Status
complete
Filed
Aug 22, 2005
Permit issued
Nov 14, 2005
Final sign-off
Nov 8, 2006
Declared cost
$250,000
Address
5 Embarcadero Center

new addressable fire alarm system on all floors

Open the permit page

$250,000
Apr 7, 2005Expired or cancelled
expired Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.upgrade (e) seismic bracing to current code and replace 220 (e) sprinkler heads with new quick
Details
Permit
200504079397
Status
expired
Filed
Apr 7, 2005
Permit issued
May 5, 2005
Declared cost
$2,500
Address
5 Embarcadero Center

upgrade (e) seismic bracing to current code and replace 220 (e) sprinkler heads with new quick

Open the permit page

$2,500
Mar 1, 2005Expired or cancelled
expired Nov 2006
5 Embarcadero CenterHathaway Dinwiddie Co.replace(e) 2'x2'ceiling wnew 2'x2' ceiling . replace (e) downlights & 2x4 lighting w/new downlights
Details
Permit
200503016474
Status
expired
Filed
Mar 1, 2005
Permit issued
Mar 21, 2005
Declared cost
$150,000
Address
5 Embarcadero Center

replace(e) 2'x2'ceiling wnew 2'x2' ceiling . replace (e) downlights & 2x4 lighting w/new downlights

Open the permit page

$150,000
Jan 20, 2005Expired or cancelled
cancelled Nov 2005
5 Embarcadero Centerremodel 1,100sq.ft. of (e)retail space on atrium level for retail use,a starbucks coffee shop.
Details
Permit
200501203591
Status
cancelled
Filed
Jan 20, 2005
Declared cost
$245,000
Address
5 Embarcadero Center

remodel 1,100sq.ft. of (e)retail space on atrium level for retail use,a starbucks coffee shop.

Open the permit page

$245,000
Dec 22, 2004Expired or cancelled
expired Apr 2006
5 Embarcadero Centerto erect non electric projecting sign
Details
Permit
200412222007
Status
expired
Filed
Dec 22, 2004
Permit issued
Dec 22, 2004
Address
5 Embarcadero Center

to erect non electric projecting sign

Open the permit page

Sep 24, 2004Completed
final sign-off Feb 2005
5 Embarcadero CenterSimplex Grinnellinstall 2 simplex strobes + 1 simplex speaker in subway tenant space. 1st fl street level. relocate
Details
Permit
200409245095
Status
complete
Filed
Sep 24, 2004
Permit issued
Sep 24, 2004
Final sign-off
Feb 8, 2005
Declared cost
$3,200
Address
5 Embarcadero Center

install 2 simplex strobes + 1 simplex speaker in subway tenant space. 1st fl street level. relocate

Open the permit page

$3,200
Aug 3, 2004Completed
final sign-off Feb 2005
22 Drumm Stremodel 20 feet of new wall, new finishes, new tile & floor and new lighting
Details
Permit
200408030449
Status
complete
Filed
Aug 3, 2004
Permit issued
Oct 7, 2004
Final sign-off
Feb 8, 2005
Declared cost
$60,000
Address
22 Drumm St

remodel 20 feet of new wall, new finishes, new tile & floor and new lighting

Open the permit page

$60,000
Jul 26, 2004Completed
final sign-off Feb 2005
22 Drumm Stremodel-reconfigure (e) mechanical system to new use and configuration, new floor sink, new water
Details
Permit
200407269760
Status
complete
Filed
Jul 26, 2004
Permit issued
Nov 23, 2004
Final sign-off
Feb 8, 2005
Declared cost
$40,000
Address
22 Drumm St

remodel-reconfigure (e) mechanical system to new use and configuration, new floor sink, new water

Open the permit page

$40,000
Jul 21, 2004Expired or cancelled
expired Apr 2006
5 Embarcadero CenterThomas Swan Sign Co Incerect non-electric, single faced, non iluminated new sing
Details
Permit
200407219468
Status
expired
Filed
Jul 21, 2004
Permit issued
Jul 21, 2004
Address
5 Embarcadero Center

erect non-electric, single faced, non iluminated new sing

Open the permit page

Apr 28, 2004Completed
final sign-off Jul 2004
5 Embarcadero CenterBaycor Builders Inclunch cafe-new finishes,cabinets&counters,food display cases, minor electrical/lighting,minor plumb
Details
Permit
200404282485
Status
complete
Filed
Apr 28, 2004
Permit issued
Apr 28, 2004
Final sign-off
Jul 15, 2004
Declared cost
$95,000
Address
5 Embarcadero Center

lunch cafe-new finishes,cabinets&counters,food display cases, minor electrical/lighting,minor plumb

Open the permit page

$95,000
Feb 13, 2004Expired or cancelled
expired Apr 2006
5 Embarcadero CenterSimplex Grinnellinstallation of new ansul fire systems in kitchen hood on the g/f lobby level and 22nd floor
Details
Permit
200402136351
Status
expired
Filed
Feb 13, 2004
Permit issued
Mar 24, 2004
Declared cost
$13,000
Address
5 Embarcadero Center

installation of new ansul fire systems in kitchen hood on the g/f lobby level and 22nd floor

Open the permit page

$13,000
Dec 31, 2003Completed
final sign-off Apr 2005
5 Embarcadero CenterBuchanan General Contracting Coconstruct a cellular wireless facility consisting of an equipment cabinets and 2 2' antennas to be
Details
Permit
200312313267
Status
complete
Filed
Dec 31, 2003
Permit issued
Nov 18, 2004
Final sign-off
Apr 7, 2005
Declared cost
$30,000
Address
5 Embarcadero Center

construct a cellular wireless facility consisting of an equipment cabinets and 2 2' antennas to be

Open the permit page

$30,000
Jan 7, 2003Expired or cancelled
expired Apr 2006
5 Embarcadero CenterHathaway Dinwiddie Co.life safety in association with pa#2002/10/31/0489
Details
Permit
200301074698
Status
expired
Filed
Jan 7, 2003
Permit issued
Jan 15, 2003
Declared cost
$4,000
Address
5 Embarcadero Center

life safety in association with pa#2002/10/31/0489

Open the permit page

$4,000
Dec 19, 2002Expired or cancelled
expired Apr 2006
5 Embarcadero CenterHathaway Dinwiddie Co.rev to app 200210310489-relocate elevator lobby door & new glass partitions behind circulation rm 02
Details
Permit
200212193905
Status
expired
Filed
Dec 19, 2002
Permit issued
Jul 30, 2003
Declared cost
$5,000
Address
5 Embarcadero Center

rev to app 200210310489-relocate elevator lobby door & new glass partitions behind circulation rm 02

Open the permit page

$5,000
Dec 12, 2002Expired or cancelled
expired Mar 2004
5 Embarcadero CenterR L H Fire Protection Incfire sprinkler tenant imrpovmnt
Details
Permit
200212123387
Status
expired
Filed
Dec 12, 2002
Permit issued
Dec 12, 2002
Declared cost
$750
Address
5 Embarcadero Center

fire sprinkler tenant imrpovmnt

Open the permit page

$750
Oct 31, 2002Expired or cancelled
expired Apr 2006
5 Embarcadero CenterHathaway Dinwiddie Co.demolition of (e) finishes, installation of (n) finishes w/minor elel, mech, plumging & fire alarm
Details
Permit
200210310489
Status
expired
Filed
Oct 31, 2002
Permit issued
Dec 6, 2002
Declared cost
$435,000
Address
5 Embarcadero Center

demolition of (e) finishes, installation of (n) finishes w/minor elel, mech, plumging & fire alarm

Open the permit page

$435,000
Sep 18, 2002Expired or cancelled
cancelled Jun 2003
5 Embarcadero Center2 panel antennas to be located on outside of bldg., associated equipment to be located in equipment
Details
Permit
200209186823
Status
cancelled
Filed
Sep 18, 2002
Declared cost
$41,500
Address
5 Embarcadero Center

2 panel antennas to be located on outside of bldg., associated equipment to be located in equipment

Open the permit page

$41,500
Jun 21, 2002Expired or cancelled
expired Oct 2002
5 Embarcadero CenterPotter Fire Protectionrelocate 5 sprinklers at street level crepe cafe
Details
Permit
200206219639
Status
expired
Filed
Jun 21, 2002
Permit issued
Jun 21, 2002
Declared cost
$800
Address
5 Embarcadero Center

relocate 5 sprinklers at street level crepe cafe

Open the permit page

$800
Jun 12, 2002Never finaled
issued Jun 2002, no final
5 Embarcadero CenterColumbia Mechanical Contractorsfurnish & install exhaust system for a type 2 kitchen hood,furnish & install a make up air fan & fil
Details
Permit
200206128891
Status
issued
Filed
Jun 12, 2002
Permit issued
Jun 12, 2002
Declared cost
$9,000
Address
5 Embarcadero Center

furnish & install exhaust system for a type 2 kitchen hood,furnish & install a make up air fan & fil

Open the permit page

$9,000
Aug 3, 2001Completed
final sign-off Oct 2001
5 Embarcadero CenterAllied Fire Protectionrelocate 10 fire sprinklers heads
Details
Permit
200108035238
Status
complete
Filed
Aug 3, 2001
Permit issued
Aug 6, 2001
Final sign-off
Oct 24, 2001
Declared cost
$1,200
Address
5 Embarcadero Center

relocate 10 fire sprinklers heads

Open the permit page

$1,200
Jul 13, 2001Completed
final sign-off Oct 2001
5 Embarcadero Centerrelocate fire sprinkler heads
Details
Permit
200107133635
Status
complete
Filed
Jul 13, 2001
Permit issued
Jul 13, 2001
Final sign-off
Oct 24, 2001
Declared cost
$1,200
Address
5 Embarcadero Center

relocate fire sprinkler heads

Open the permit page

$1,200
Jun 27, 2001Completed
final sign-off Nov 2001
5 Embarcadero Centerchange ap#200101069341 fr 4 embarcadero ctr to 5 embarcadero ctr remov/repla (e)steel/glass storefr
Details
Permit
200106272430
Status
complete
Filed
Jun 27, 2001
Permit issued
Jun 29, 2001
Final sign-off
Nov 15, 2001
Address
5 Embarcadero Center

change ap#200101069341 fr 4 embarcadero ctr to 5 embarcadero ctr remov/repla (e)steel/glass storefr

Open the permit page

Jun 27, 2001Completed
final sign-off Nov 2001
5 Embarcadero Centerchange ap#200106151659 fr 4 embarcadero ctr to 5 embarcadero ctr remov/repla n/fireproof
Details
Permit
200106272426
Status
complete
Filed
Jun 27, 2001
Permit issued
Jun 29, 2001
Final sign-off
Nov 15, 2001
Address
5 Embarcadero Center

change ap#200106151659 fr 4 embarcadero ctr to 5 embarcadero ctr remov/repla n/fireproof

Open the permit page

May 25, 2001Completed
final sign-off Oct 2001
5 Embarcadero CenterHathaway Dinwiddie Co.ref. drawings & accessibility 200103123997 mec. & elec. fit center & meeting room on intermediate le
Details
Permit
200105250021
Status
complete
Filed
May 25, 2001
Permit issued
Jul 16, 2001
Final sign-off
Oct 24, 2001
Declared cost
$25,000
Address
5 Embarcadero Center

ref. drawings & accessibility 200103123997 mec. & elec. fit center & meeting room on intermediate le

Open the permit page

$25,000
May 22, 2001Completed
final sign-off Nov 2001
5 Embarcadero CenterWebcor Construction Inc.fire life safty
Details
Permit
200105229713
Status
complete
Filed
May 22, 2001
Permit issued
May 22, 2001
Final sign-off
Nov 15, 2001
Declared cost
$40,000
Address
5 Embarcadero Center

fire life safty

Open the permit page

$40,000
May 11, 2001Completed
final sign-off Nov 2001
5 Embarcadero Centerminor restaurant renovation includes, new ceiling, finishes & misc. kitchen equipment on g/level
Details
Permit
200105118914
Status
complete
Filed
May 11, 2001
Permit issued
May 11, 2001
Final sign-off
Nov 9, 2001
Declared cost
$30,000
Address
5 Embarcadero Center

minor restaurant renovation includes, new ceiling, finishes & misc. kitchen equipment on g/level

Open the permit page

$30,000
Mar 12, 2001Completed
final sign-off Oct 2001
5 Embarcadero Centerfitness cntr demolish e glazing partition,lagin ceil, e gyp bd ceil new partn door ceil mech system,
Details
Permit
200103123997
Status
complete
Filed
Mar 12, 2001
Permit issued
Aug 13, 2001
Final sign-off
Oct 24, 2001
Declared cost
$109,330
Address
5 Embarcadero Center

fitness cntr demolish e glazing partition,lagin ceil, e gyp bd ceil new partn door ceil mech system,

Open the permit page

$109,330
Sep 1, 2000Completed
final sign-off Nov 2000
5 Embarcadero CenterSix Counties Fire Protectsprinkler t/1 in basement of #5 embarcadero center-18 relocates
Details
Permit
200009019517
Status
complete
Filed
Sep 1, 2000
Permit issued
Sep 1, 2000
Final sign-off
Nov 22, 2000
Declared cost
$2,000
Address
5 Embarcadero Center

sprinkler t/1 in basement of #5 embarcadero center-18 relocates

Open the permit page

$2,000
Aug 31, 2000Completed
final sign-off Nov 2000
5 Embarcadero Centerinstall life safety system in retail tenant space.
Details
Permit
200008319362
Status
complete
Filed
Aug 31, 2000
Permit issued
Aug 31, 2000
Final sign-off
Nov 22, 2000
Declared cost
$60,000
Address
5 Embarcadero Center

install life safety system in retail tenant space.

Open the permit page

$60,000
May 17, 2000Completed
final sign-off Aug 2000
5 Embarcadero CenterMc Millan Electricfurnish and install 3 devices per floor
Details
Permit
200005170252
Status
complete
Filed
May 17, 2000
Permit issued
May 17, 2000
Final sign-off
Aug 17, 2000
Declared cost
$20,000
Address
5 Embarcadero Center

furnish and install 3 devices per floor

Open the permit page

$20,000
Feb 1, 2000Expired or cancelled
expired Jun 2000
5 Embarcadero Centerstreet space use
Details
Permit
M11353
Status
expired
Filed
Feb 1, 2000
Permit issued
Feb 1, 2000
Address
5 Embarcadero Center

street space use

Open the permit page

Jan 31, 2000Completed
final sign-off Aug 2000
5 Embarcadero Centerremove and build interior partitions & plumbing fixtures. work is for provision of accessibility .
Details
Permit
20000131671
Status
complete
Filed
Jan 31, 2000
Permit issued
Apr 5, 2000
Final sign-off
Aug 17, 2000
Declared cost
$160,000
Address
5 Embarcadero Center

remove and build interior partitions & plumbing fixtures. work is for provision of accessibility .

Open the permit page

$160,000
Jan 10, 2000Completed
final sign-off Nov 2000
5 Embarcadero Centerinstall interior partitions,new finishes,kitchen equip.,exhaust system,tables/chairs
Details
Permit
20000110705
Status
complete
Filed
Jan 10, 2000
Permit issued
Jul 17, 2000
Final sign-off
Nov 22, 2000
Declared cost
$60,000
Address
5 Embarcadero Center

install interior partitions,new finishes,kitchen equip.,exhaust system,tables/chairs

Open the permit page

$60,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Hathaway Dinwiddie Co. (38), R L H Fire Protection Inc (20), Red Hawk Fire & Security Ca Llc (12), Metropolitan Electrical Construction (7), Viking Sign Installations (6), Bcci Construction Company (5), Electric Tech Construction Inc (4), Emcor Services/Mesa Energy Systems Inc (4), Triton Tower Inc (4), Ad Art Inc. (3), Ayoob & Peery Plumbing Co Inc (2), Everon Llc (2), Fx Signs (2), Gci, Inc (2), Marchetti Group (2), Mastec Network Solutions Inc (2), Mc Millan Electric (2), Overland Contracting Inc (2), Polytec Construction Company Inc (2), Simplex Grinnell (2), Allied Fire Protection, Anderson, Rowe & Buckley, Inc., Ariel-10, Inc, Baycor Builders Inc, Broken Arrow Communications Inc, Buchanan General Contracting Co, Capital Tower & Communications, Columbia Mechanical Contractors, Cosco Fire Protection Inc., Discount Signs & Neon Inc, E & F Demolition, N S A Wireless Inc, Pioneer Fire Inc., Potter Fire Protection, Real Signs And Lighting, Ridge Communications Inc, Sign Awning, Six Counties Fire Protect, Ssw Construction Corp, Thomas Swan Sign Co Inc, Vasko Electric Inc, W M Wireless Inc, Ward Alan Emery Construction Inc., Webcor Construction Inc.
Architects
Rory Carroll (13), Cory Steven Creath (10), Charles Kridier (3), Smwm (2), Xie Xing "Bill" Guan (2), Charles Blank, Christopher Shelton, Lawrence Wong, Michael Wilk, Michelle Eaton, Nestor Popowych, Richard Sambucetti, Sean Irwin, Shaen Evan Alexander, Tom Holland, William Oren
Engineers
Vincent Waters (4), Emily Guglielmo (2), John Kabak (2), Kevin Sorensen (2), Peter Kraut (2), Robert A. Kitsteiner (2), Amer Abdel K. Alkloub, Andrew Merovich, Antonio Jacksalem, Daniel Yau, Dorel Anghel, Gensler, Glen Hunt, Jacob Proctor, James R. Spore, James Spore, Jeffrey Jeong, Jose Albano, Joseph J Fitzsimons, Lewis James Burrows, Meng Hsiu Chen, Nestor Popowycu Valerio-Hernandez, Oscar Tune Louie, Paul Ferbrache, Robert Cardoso, Robert Keith Calloway, Santos & Urrutia, Steven Schaub, Steven Terry, Streamline Engineering, Tom Dusza, Wilson Lee, Xinguo Cai
Attorneys
Santos & Urrutia
Authorized agent-otherss
Jennifer Esquivel, Mcmillen Elec, Paul Gregory Cosko
Designers
James R Spore

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.