Baycor Builders Inc
- Based in
- San Rafael
- On San Francisco permits
- Jun 2002 to Oct 2007
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2007 | Completed final sign-off May 2008 | 1690 Broadway | remove existing wood siding & alim single payne windows/ replace w/hardi-plank and dual glazed . dry rot repair where occursvinyl windowsDetails
remove existing wood siding & alim single payne windows/ replace w/hardi-plank and dual glazed . dry rot repair where occursvinyl windows | $1,000,000 |
| May 4, 2007 | Never finaled issued May 2007, no final | 1690 Broadway | renew pa#200512069582,#200603156706,#200611077061 for final inspection.Details
renew pa#200512069582,#200603156706,#200611077061 for final inspection. | |
| Apr 12, 2007 | Completed final sign-off Sep 2007 | 162 Ralston St | demo, new drywall, cabinets, doors & hardware, base boards, flooring, roof patche, 4 new windows, electrical, duct work, insulation, reset 1 toilet & sinks (2). 2 windows visible from street. demo drywall & replace all on second floor & one storage room on ground floor.Details
demo, new drywall, cabinets, doors & hardware, base boards, flooring, roof patche, 4 new windows, electrical, duct work, insulation, reset 1 toilet & sinks (2). 2 windows visible from street. demo drywall & replace all on second floor & one storage room on ground floor. | $30,000 |
| Nov 7, 2006 | Completed final sign-off May 2007 | 1690 Broadway | rev. to pa#2005/12/06/9582: demolish approx. 9 l.f. non bearing partition, relocate approx. 14 l.f. non-bearing partition, to enlarge mgr's office, relocate fire boxDetails
rev. to pa#2005/12/06/9582: demolish approx. 9 l.f. non bearing partition, relocate approx. 14 l.f. non-bearing partition, to enlarge mgr's office, relocate fire box | |
| Aug 8, 2006 | Completed final sign-off Feb 2007 | 173 Addison St | repair laundry room entry decking and door (less than 50%) replace folding table revision to app #2006/04/10/8635Details
repair laundry room entry decking and door (less than 50%) replace folding table revision to app #2006/04/10/8635 | $7,000 |
| Jun 6, 2006 | Completed final sign-off Jan 2007 | 2126 35th Av | fire repair. interior demolition. drywall-elect outlet lights-plumbing-carpet paint d f h. per pre application receipt #201178.Details
fire repair. interior demolition. drywall-elect outlet lights-plumbing-carpet paint d f h. per pre application receipt #201178. | $110,000 |
| Apr 10, 2006 | Completed final sign-off Feb 2007 | 204 Addison St | replacing (e) shingle siding, wd, w/ new cement fiber horz. siding replacing (e) alum wndws w/ new double glazed vinyl windows. paint all exterior walls, doors & site fences, guard rail, handrails, etc. replace (e) metal open drain w/ conc. "v" ditch. replace (e) alum siding glass dr. w/ vinyl.Details
replacing (e) shingle siding, wd, w/ new cement fiber horz. siding replacing (e) alum wndws w/ new double glazed vinyl windows. paint all exterior walls, doors & site fences, guard rail, handrails, etc. replace (e) metal open drain w/ conc. "v" ditch. replace (e) alum siding glass dr. w/ vinyl. | $850,000 |
| Apr 10, 2006 | Completed final sign-off Feb 2007 | 173 Addison St | replacing extg shingle siding, wd, with new cement fiber hoz. siding. replacing extg alum. wndws with new dble gazed vinyl wndws. paint all exterior walls, doors & site fences, gaurdrail handrails etc. replace extg metal open drain with conc. "v" ditch. replace extg alum. sliding glass dr w/vinyl.Details
replacing extg shingle siding, wd, with new cement fiber hoz. siding. replacing extg alum. wndws with new dble gazed vinyl wndws. paint all exterior walls, doors & site fences, gaurdrail handrails etc. replace extg metal open drain with conc. "v" ditch. replace extg alum. sliding glass dr w/vinyl. | $850,000 |
| Apr 22, 2005 | Expired or cancelled expired Apr 2007 | 175 21st Av | replace gyp gd at ceiling of bathroom/kitchen, fire damage, rpelace cabinets, appliances, kitchen/Details
replace gyp gd at ceiling of bathroom/kitchen, fire damage, rpelace cabinets, appliances, kitchen/ | $42,000 |
| Jan 14, 2005 | Completed final sign-off Jan 2006 | 1925 Gough St | new lighting with new wiring and switches/new casework, baseboards, shelving, door trim/nw caseworkDetails
new lighting with new wiring and switches/new casework, baseboards, shelving, door trim/nw casework | $224,000 |
| Dec 21, 2004 | Completed final sign-off Apr 2005 | 3739 20th St | kitchen remodel, moving the range, adding hood, cabinets, new sinkDetails
kitchen remodel, moving the range, adding hood, cabinets, new sink | $22,000 |
| Apr 28, 2004 | Completed final sign-off Jul 2004 | 5 Embarcadero Center | lunch cafe-new finishes,cabinets&counters,food display cases, minor electrical/lighting,minor plumbDetails
lunch cafe-new finishes,cabinets&counters,food display cases, minor electrical/lighting,minor plumb | $95,000 |
| Aug 11, 2003 | Completed final sign-off Nov 2003 | 150 Lombard St | bthrm remodel includes relocation of elecrical and plmgDetails
bthrm remodel includes relocation of elecrical and plmg | $21,000 |
| Jul 24, 2003 | Completed final sign-off Dec 2003 | 10 Hill St | remove & install new kitchen & powder room cabinets to include some electrical & plumbing.Details
remove & install new kitchen & powder room cabinets to include some electrical & plumbing. | $75,000 |
| Jun 12, 2003 | Completed final sign-off Jul 2003 | 2299 Post St | revision:200306036072=demo 2 non-bearing walls, construct 2 non-bearing partitions,electrical,mech,Details
revision:200306036072=demo 2 non-bearing walls, construct 2 non-bearing partitions,electrical,mech, | $2,000 |
| Jun 3, 2003 | Completed final sign-off Jul 2003 | 2299 Post St | office renovation-demolition of two (2) nonbearing partitions (25 linear ft) construction of two (2Details
office renovation-demolition of two (2) nonbearing partitions (25 linear ft) construction of two (2 | $45,000 |
| Dec 19, 2002 | Completed final sign-off Mar 2003 | 466 Townsend St | raised floor @ partial 2/fl, path of travel front entry,temp ramp to comply under seperate permitDetails
raised floor @ partial 2/fl, path of travel front entry,temp ramp to comply under seperate permit | $60,000 |
| Dec 19, 2002 | Completed final sign-off Mar 2003 | 466 Townsend St | construction temp. ada compliant entry ramp under review w/board of supervisorsDetails
construction temp. ada compliant entry ramp under review w/board of supervisors | $10,000 |
| Jun 6, 2002 | Completed final sign-off Mar 2003 | 121 Spear St | to renew app 200102202526-value of remaining work 68,000 perform work under prev permitDetails
to renew app 200102202526-value of remaining work 68,000 perform work under prev permit | $68,000 |